S02. Renovate ORs - Final Specifications Vol 3.pdf
PDF 18 MB Posted
- Attached to
- Y1DA--RENOVATE OPERATING ROOMS 541-19-101
- Solicitation number
- 36C25026R0054
About this file
This is a Final Construction Document containing technical specifications for the renovation of operating rooms at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio (Project No. 541-19-101). The document spans three volumes and covers comprehensive design, materials, installation, testing, and commissioning requirements across multiple building systems and trades.
The specifications establish detailed requirements for fire suppression systems including wet-pipe sprinkler design per NFPA 13 standards with hydraulic calculations, piping (black steel Schedule 40 for sizes 50mm and smaller with threaded connections; Schedule 10 with grooved connections for larger sizes), FM-approved quick-response sprinklers, control valves, check valves, and comprehensive signage and valve identification. Plumbing systems must comply with International Plumbing Code standards and include requirements for materials (NSF-certified plastic piping with minimum 25% recycled content, lead-free solder), equipment identification with bar-code nameplates, pipe supports and hangers per MSS standards, firestopping at all penetrations, and comprehensive as-built documentation. The specifications mandate that all materials be new and free from defects, with manufacturers holding NSF and UL/FM certifications. Contractors must be licensed with ten years of active commercial system installation experience, provide qualified technicians, submit detailed shop drawings signed by NICET Level III/IV technicians or registered professional engineers, and conduct pre-functional checklists, contractor tests, and systems functional performance testing witnessed by a Commissioning Agent. Training of VA operations and maintenance personnel by factory-authorized personnel is required, along with comprehensive operations and maintenance manuals, as-built drawings in multiple formats (printed, PDF, and AutoCAD), and Material and Testing Certificates per NFPA standards. All work must maintain continuity of existing facility operations, coordinate with other trades, and comply with local codes where more stringent than specified standards.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center
10701 East Boulevard Cleveland, OH 44106
Renovate Operating Rooms VA Project No. 541-19-101
PREPARED BY:
Perspectus Architecture 1300 East 9th Street, Suite 910 Cleveland, Ohio 44114 P (216) 752-1800 Project Director: John Walkosak
IMEG
672 East Royalton Road Broadview Heights, Ohio 44147 P (440) 546-9696 Project Principal: Jeff Duale
Barber & Hoffman, Inc.
2217 East Ninth Street, Suite 350 Cleveland, Ohio 44115 P (216) 875-0100 Project Principal: Jon Leuthaeuser
Final Construction Document
VOLUME 3 OF 3
ISSUE DATE: 08/20/2025
LOUIS STOKES CLEVELAND,VAMC
Final Construction Document Renovate Operating Rooms 08/20/2025 Project No. 541-19-101
Table of Contents
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION DESCRIPTION PAGES
VOLUME 1 OF 3
DIVISION 0 - SPECIAL SECTIONS
00 01 10 Table of Contents 1-5 00 01 15 Drawing Index 1-5
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 1-28
GENERAL REQUIREMENTS ATTACHMENTS
OSHA Requirements and Safety And Health Regulations – Attachment 1
1-8
Pre-Construction Risk Assessment (PCRA) – Att. 2 1-4 Construction Safety Poster - Cleveland VA – Att. 3 1-1 Interim Life Safety Risk Assessment Form – Att. 4 1-2 Contractor Safety and Security Orientation – Att.5 1-1 Job Safety Check Sheet - Attachment 6 1-3
01 32 16.15 Project Schedule 1-8 01 33 23 Shop Drawings, Product Data, and Samples 1-6 01 35 26 Safety Requirements 1-24
Site Specific Accident Prevention Plan - Sample Infection Control During Construction Infection Control Risk Assessment Infection Control Orientation for Construction Workers Infection Control Construction Permit Infection Control Construction Inspection Form
01 42 19 Reference Standards 1-5 01 45 00 Quality Control 1-12 01 45 29 Testing Laboratory Services 1-17 01 45 35 Special Inspections 1-17 01 57 19 Temporary Environmental Controls 1-7 01 58 16 Temporary Interior Signage 1-1 01 74 19 Construction Waste Management 1-5 01 81 13 Sustainable Construction Requirements 1-11 01 91 00 General Commissioning Requirements 1-60
00 01 10-2
VOLUME 2 OF 3
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 1-3
DIVISION 03 – CONCRETE
03 30 53 Cast-In-Place Concrete 1-8
DIVISION 04 – MASONRY
Not Used
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 1-5 05 36 00 Composite Metal Decking 1-8 05 40 00 Cold-Formed Metal Framing 1-6 05 50 00 Metal Fabrications 1-10
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 1-14 06 20 00 Finish Carpentry and Millwork 1-9
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Roofing 1-7 07 21 00 Thermal Insulation 1-2 07 22 00 Roof and Deck Insulation 1-5 07 41 00 Aluminum Composition Building Panels 1-9 07 81 00 Applied Fireproofing 1-7 07 84 00 Firestopping 1-5 07 92 00 Joint Sealants 1-10
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 1-10 08 14 00 Interior Wood Doors 1-7 08 31 13 Access Doors and Frames 1-5 08 71 00 Door Hardware 1-25 08 71 13 Automatic Door Operators 1-5 08 80 00 Glazing 1-24 08 88 16 Vision Control Glass 1-4
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 1-6 09 22 16 Non-Structural Metal Framing 1-8 09 29 00 Gypsum Board 1-7 09 51 00 Acoustical Ceilings 1-10 09 65 13 Resilient Base and Accessories 1-5 09 65 16 Resilient Sheet Flooring 1-6 09 65 19 Resilient Tile Flooring 1-6 09 65 36 Control Resilient Tile Flooring 1-7
00 01 10-3
09 67 23.20 Resinous Poured-In-Place Resilient Flooring 1-11 09 68 00 Carpeting 1-5 09 81 16 Acoustic Blanket Insulation 1-2 09 91 00 Painting 1-27 09 96 59 Resinous Specialty Glazed Coating Systems for Walls 1-8
DIVISION 10 – SPECIALTIES
10 11 13 Markerboards 1-4 10 26 00 Wall and Door Protection 1-6 10 28 00 Toilet, Bath, and Laundry Accessories 1-11 10 44 13 Fire Extinguisher Cabinets 1
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 1-4
DIVISION 12 – FURNISHINGS
12 31 00 Manufactured Metal Casework 1-15 12 36 00 Countertops 1-12
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
VOLUME 3 OF 3
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems 1-4 21 13 13 Wet-Pipe Sprinkler Systems 1-11
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 1-31 22 05 23 General-Duty Valves for Plumbing Piping 1-13 22 07 11 Plumbing Insulation 1-18 22 08 00 Commissioning of Plumbing Systems 1-4 22 11 00 Facility Water Distribution 1-13 22 13 00 Facility Sanitary and Vent Piping 1-15 22 40 00 Plumbing Fixtures 1-10 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 1-21 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 1-19
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 1-41 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 1-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
1-10
00 01 10-4
23 05 93 Testing, Adjusting, and Balancing for HVAC 1-14 23 07 11 HVAC and Boiler Plant Insulation 1-21 23 08 00 Commissioning of HVAC Systems 1-5 23 09 23 Direct-Digital Control System for HVAC 1-65
23 09 23.1 Cleveland_VAMC_Niagara_N4_Standards_Guide 1-62 23 21 13 Hydronic Piping 1-21 23 21 23 Hydronic pumps 1-6 23 22 13 Steam and Condensate Heating Piping 1-21 23 23 00 Refrigerant Piping 1-12 23 25 00 HVAC Water Treatment 1-6 23 31 00 HVAC Ducts and Casings 1-17 23 34 00 HVAC Fans 1-11 23 36 00 Air Terminal Units 1-9 23 37 00 Air Outlets and Inlets 1-9 23 40 00 HVAC Air Cleaning Devices 1-15 23 64 00 Packaged Water Chillers 1-11 23 81 00 Decentralized Unitary HVAC Equipment 1-8 23 82 16 Air Coils 1-5
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 1-11 26 05 19 Low-Voltage Electrical Power Conductors and Cables 1-7 26 05 26 Grounding and Bonding for Electrical Systems 1-8 26 05 33 Raceway and Boxes for Electrical Systems 1-12 26 05 73 Overcurrent Protective Device Coordination Study 1-5 26 08 00 Commissioning of Electrical Systems 1-4 26 09 23 Lighting Controls 1-5 26 20 11 Isolated Power Systems 1-6 26 24 16 Panelboards 1-6 26 27 26 Wiring Devices 1-5 26 29 11 Motor Controllers 1-10 26 29 21 Enclosed Switches and Circuit Breakers 1-4 26 41 00 Facility Lightning Protection 1-5 26 43 13 Surge Protective Devices 1-4 26 51 00 Interior Lighting 1-11 26 55 71 Medical and Surgical Lighting Fixtures 1-6
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 1-47 27 05 26 Grounding and Bonding for Communications Systems 1-8 27 05 33 Raceways and Boxes for Communications Systems 1-15 27 08 00 Commissioning of Communications Systems 1-3 27 10 00 Control, Communication, and Signal Wiring 1-11 27 15 00 Communications Structured Cabling 1-12 27 41 31 Master Antenna Television Equipment And Systems 1-28 27 52 23 Hill-Rom Nurse Call and Code Blue Systems 1-75
00 01 10-5
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 1-87 28 05 13 Conductors and Cables for Electronic Safety and
Security 1-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
1-8
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
1-16
28 08 00 Commissioning of Electronic Safety and Security Systems 1-4 28 13 00 Physical Access Control System 1-123 28 23 00 Video Surveillance 1-27 28 31 00 Fire Detection and Alarm 1-14
Final Construction Document VAMC WADE PARK 08/20/2025 Renovate Operating Rooms Project No. 541-19-101
Drawings Index 00 01 19-1
DEPARTMENT OF VETERANS AFFAIRS
SPECIFICATIONS
DRAWING INDEX
Section 00 01 19
SHEET
NUMBER SHEET NAME
0-G1-1 COVER SHEET
3-S1-1 GENERAL NOTES, TESTING AND SPECIAL INSPECTIONS
3-S1-2 SECOND FLOOR FRAMING PLANS AND DETAILS
0-A1-0 SITE PLAN
0-A1-1 EXISTING FLOOR PLAN
0-A1-2 COMPLETED FLOOR PLAN
0-A1-3 COMPLETED REFLECTED CEILING PLAN
0-A2-1 PROJECT PHASING - OVERALL
0-A2-2 PROJECT PHASING - PHASE 1
0-A2-3 PROJECT PHASING - PHASE 2
0-A2-4 PROJECT PHASING - PHASE 3
0-A3-1 SECOND FLOOR LIFE SAFETY PLAN - PHASE 1
0-A3-2 SECOND FLOOR LIFE SAFETY PLAN - PHASE 2
0-A3-3 SECOND FLOOR LIFE SAFETY PLAN - PHASE 3
0-A4-1 FIRST FLOOR INFECTION CONTROL PLAN - PHASE 2
0-A5-1 DOOR SCHEDULES AND NOTES
0-A6-1 MILLWORK DETAILS
1-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 1
1-A1-4 SECOND FLOOR NEW WORK PLAN - PHASE 1
1-A1-5 SECOND FLOOR STORED MATERIALS PLAN - PHASE 1
1-A1-6 STORED MATERIALS
1-A1-7 STORED MATERIALS
1-A1-8 STORED MATERIALS
1-A1-9 STORED MATERIALS
1-A3-3 SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 1
1-A4-1 INTERIOR ELEVATIONS
1-A5-0 FINISH SCHEDULE AND DETAILS - ALL PHASES
1-A5-3 SECOND FLOOR FINISH FLOOR PLAN PHASE 1
1-A5-4 SECOND FLOOR FINISH WALL PLAN PHASE 1
1-A6-1 EQUIPMENT PLAN - PHASE 1
00 01 19-2
1-A6-2 EQUIPMENT PLANS AND SCHEDULES - PHASE 1
2-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 2
2-A1-2 SECOND FLOOR NEW WORK PLAN - PHASE 2
2-A1-3 ENLARGED FLOOR PLANS
2-A1-5 ROOF PLAN - PHASE 2
2-A3-2 SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 2
2-A4-1 INTERIOR ELEVATIONS
2-A4-2 INTERIOR ELEVATIONS
2-A4-3 INTERIOR ELEVATIONS
2-A5-3 SECOND FLOOR FINISH FLOOR PLAN PHASE 2
2-A5-4 SECOND FLOOR FINISH WALL PLAN PHASE 2
2-A6-1 EQUIPMENT PLAN - PHASE 2
2-A6-2 EQUIPMENT PLANS - PHASE 2
2-A6-3 EQUIPMENT SCHEDULES - PHASE 2
3-A1-1 SECOND FLOOR DEMOLITION PLAN - PHASE 3
3-A1-2 SECOND FLOOR NEW WORK PLAN - PHASE 3
3-A3-1 SECOND FLOOR NEW WORK REFLECTED CLNG PLAN - PHASE 3
3-A5-3 SECOND FLOOR FINISH FLOOR PLAN - PHASE 3
3-A5-4 SECOND FLOOR FINISH WALL PLAN - PHASE 3
3-A6-1 EQUIPMENT PLAN - PHASE 3
3-A6-2 EQUIPMENT SCHEDULES - PHASE 3
3-A7-1 EXTERIOR DETAILS
0-FP1-1 FIRE PROTECTION LEGEND AND GENERAL NOTES
1-FP2-1
PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE
1-FP2-2 PENTHOUSE FIRE PROTECTION PLAN - PHASE 1
2-FP1-1
PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE
2-FP1-2
PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE
2-FP2-1 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 2
2-FP2-2 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 2
3-FP1-1
PARTIAL FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE
3-FP1-2
PARTIAL SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN - PHASE
3-FP2-1 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PHASE 3
3-FP2-2 PARTIAL SECOND FLOOR FIRE PROTECTION PLAN - PHASE 3
3-FP2-3 PENTHOUSE FIRE PROTECTION PLAN - PHASE 3
0-P1-1 PLUMBING LEGEND, SCHEDULE, DETAILS, AND NOTES
00 01 19-3
0-P1-2 PLUMBING ISOMETRICS
0-P1-3 PLUMBING ISOMETRICS
0-P1-4 PLUMBING ISOMETRICS
1-P2-1 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 1
1-P2-2 PARTIAL SECOND FLOOR PLUMBING PLAN - PHASE 1
2-P1-1 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 2
2-P1-2 PARTIAL SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 2
2-P2-1 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 2
2-P2-2 PARTIAL SECOND FLOOR PLUMBING PLAN - PHASE 2
3-P1-1 PARTIAL FIRST FLOOR PLUMBING DEMOLITION PLAN - PHASE 3
3-P1-2 PARTIAL SECOND FLOOR PLUMBING DEMOLITION PLAN - PHASE 3
3-P2-1 PARTIAL FIRST FLOOR PLUMBING PLAN - PHASE 3
3-P2-2 PARTIAL SECOND FLOOR PLUMBING PLAN - PHASE 3
0-MG1-1 MEDICAL GAS LEGEND, SCHEDULES, DETAILS, AND NOTES
2-MG1-1 PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 2
2-MG1-2 PARTIAL SECOND FLOOR MEDICAL GASS DEMOLITION PLAN PHASE 2
2-MG2-1 PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 2
3-MG1-1 PARTIAL FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3
3-MG1-2 PARTIAL SECOND FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3
3-MG2-1 PARTIAL SECOND FLOOR MEDICAL GAS PLAN - PHASE 3
0-H0-1 MECHANICAL LEGEND AND GENERAL NOTES
0-H0-2 MECHANICAL DETAILS
0-H0-3 MECHANICAL DETAILS
0-H0-4 MECHANICAL DETAILS
0-H0-5 MECHANICAL SCHEDULES
0-H0-6 MECHANICAL SCHEDULES
0-H1-1 TEMPERATURE CONTROLS
0-H1-2 TEMPERATURE CONTROLS
0-H1-3 TEMPERATURE CONTROLS
0-H1-4 TEMPERATURE CONTROLS
0-H1-5 AIRFLOW DIAGRAMS
0-H1-6 HEATING HOT WATER PIPING DIAGRAM
1-H1-1 PARTIAL SECOND FLOOR HVAC EXISTING CONDITIONS - PHASE 1
1-H1-2 PARTIAL SECOND FLOOR HVAC DUCTWORK PLAN - PHASE 1
1-H1-3 PARTIAL SECOND FLOOR HVAC PIPING PLAN - PHASE 1
1-H3-6 PARTIAL ROOF HVAC PLAN - PHASE 1
1-H5-1 PENTHOUSE INTERSTITIAL SPACE HVAC PLAN - PHASE 1
1-H5-2 PENTHOUSE HVAC DUCTWORK PLAN - PHASE 1
1-H6-1 PENTHOUSE HVAC PIPING PLAN - PHASE 1
1-H7-1 HVAC PHASING PLANS - PHASE 1
00 01 19-4
1-H7-2 OPERATING ROOM HVAC PLANS - PHASE 1
1-H8-1 MECHANICAL SECTIONS
1-H8-2 MECHANICAL SECTIONS
2-H1-1 PARTIAL FIRST FLOOR FLOOR HVAC DEMOLITION PLAN - PHASE 2
2-H1-2 PARTIAL SECOND FLOOR HVAC DEMOLITION PLAN - PHASE 2
2-H1-3 PARTIAL SECOND FLOOR HVAC PLAN - PHASE 2
2-H1-4 PARTIAL SECOND FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 2
2-H1-5 PARTIAL ROOF HVAC DEMOLITION PLAN - PHASE 2
2-H1-6 PARTIAL ROOF HVAC DEMOLITION PLAN – PHASE 2
2-H3-4 PARTIAL ROOF HVAC PLAN - PHASE 2
2-H5-1 PENTHOUSE INTERSTITIAL SPACE HVAC PLAN - PHASE 2
2-H5-2 PENTHOUSE HVAC DUCTWORK PLAN - PHASE 2
2-H5-3 PENTHOUSE HVAC PIPING PLAN – PHASE 2
2-H7-1 OPERATING ROOM HVAC PLANS - PHASE 2
3-H1-1 PARTIAL SECOND FLOOR HVAC DUCTOWRK DEMOLITION PLAN - PHASE 3
3-H1-2 PARTIAL SECOND FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 3
3-H1-3 PARTIAL ROOF HVAC DEMOLITION PLAN _ PHASE 3
3-H2-1 ENLARGED MECHANICAL ROOM 107 DEMOLITION PLANS - PHASE 3
3-H3-2 PARTIAL SECOND FLOOR HVAC DUCTWORK PLAN - PHASE 3
3-H3-4 PARTIAL ROOF HVAC PLAN - PHASE 3
3-H4-1 ENLARGED MECHANICAL ROOM 107 PLAN - PHASE 3
3-H4-2 ENLARGED SEVENTH FLOOR ROOF PLAN – PHASE 3
3-H7-1 OPERATING ROOM HVAC PLANS - PHASE 3
3-H8-1 MECHANICAL SECTIONS
0-E1-1 ELECTRICAL LEGEND AND GENERAL NOTES
0-E1-2 LIGHTING FIXTURE SCHEDULE AND DETAILS
0-E1-3 FIRST FLOOR ELECTRICAL KEY PLAN
0-E1-4 SECOND FLOOR ELECTRICAL KEYPLAN
0-E1-5 THIRD FLOOR ELECTRICAL KEYPLAN
0-E1-6 NORMAL AND LIFE SAFETY POWER DISTRIBUTION ONE-LINE DIAGRAM
0-E1-7 EMERGENCY POWER DISTRIBUTION ONE-LINE DIAGRAM
0-E1-8 PANELBOARD SCHEDULES
0-E1-9 PANELBOARD SCHEDULES
0-E1-10 PANELBOARD SCHEDULES
0-E1-11 ISOLATED POWER PANELBOARD SCHEDULES
0-E1-12 ISOLATED POWER PANELBOARD SCHEDULES
0-E1-13 ISOLATED POWER PANELBOARD SCHEDULES
0-E1-14 ELECTRICAL DETAILS
1-E2-2 SECOND FLOOR - LIGHTING - PHASE 1
1-E3-2 SECOND FLOOR - POWER - PHASE 1
00 01 19-5
1-E4-2 SECOND FLOOR - AUDIO/VISUAL - PHASE 1
1-E5-2 ROOF MECHANICAL CONNECTIONS PLAN - PH 1
1-ES2-2 SECOND FLOOR - SYSTEMS - PHASE 1
2-E2-1 SECOND FLOOR DEMOLITION - LIGHTING - PHASE 2
2-E2-2 SECOND FLOOR - LIGHTING - PHASE 2
2-E3-1 SECOND FLOOR DEMOLITION - POWER - PHASE 2
2-E3-2 SECOND FLOOR - POWER - PHASE 2
2-E4-2 SECOND FLOOR - AUDIO/VISUAL - PHASE 2
2-E5-1 ROOF MECH CONNECTIONS DEMOLITION PLAN – PH2
2-E5-2 ROOF MECH CONNECTIONS PLAN – PH2
2-ES2-1 SECOND FLOOR DEMOLITION - SYSTEMS - PHASE 2
2-ES2-2 SECOND FLOOR - SYSTEMS - PHASE 2
3-E2-1 SECOND FLOOR DEMOLITION - LIGHTING - PHASE 3
3-E2-2 SECOND FLOOR - LIGHTING - PHASE 3
3-E3-1 SECOND FLOOR DEMOLITION - POWER - PHASE 3
3-E3-2 SECOND FLOOR - POWER - PHASE 3
3-E4-2 SECOND FLOOR - AUDIO/VISUAL - PHASE 3
3-E5-1 ROOF MECHANICAL CONNECTIONS DEMOLITION PLAN - PH 3
3-E5-2 ROOF MECHANICAL CONNECTIONS PLAN - PH 3
3-E5-3 FIRST FLOOR MECH CONNECTION DEMO PLAN - PH 3
3-E5-4 FIRST FLOOR MECH CONNECTION PLAN - PH 3
3-E5-5 ENLARGED 7TH FLOOR ROOF PLAN – POWER – PHASE 3
3-ES2-1 SECOND FLOOR DEMOLITION - SYSTEMS - PHASE 3
3-ES2-2 SECOND FLOOR - SYSTEMS - PHASE 3
0-T1-1 TECHNOLOGY COVERSHEET
0-T1-2 SECOND FLOOR - TECHNOLOGY KEYPLAN
0-T1-3 SECOND FLOOR - TECH CABLE TRAY & CONDUIT ROUTING PLAN
0-T1-4 TECHNOLOGY ENLARGEMENTS
0-T1-5 TECHNOLOGY DETAILS
0-T1-6 TECHNOLOGY DETAILS
0-T1-7 TECHNOLOGY DETAILS
0-T1-8 TECHNOLOGY DIAGRAMS
0-T1-9 TECHNOLOGY SCHEDULES
1-T2-2 SECOND FLOOR - TECHNOLOGY - PHASE 1
2-T2-1 SECOND FLOOR DEMOLITION- TECHNOLOGY - PHASE 2
2-T2-2 SECOND FLOOR - TECHNOLOGY - PHASE 2
3-T2-1 SECOND FLOOR DEMOLITION - TECHNOLOGY - PHASE 3
3-T2-2 SECOND FLOOR - TECHNOLOGY - PHASE 3
Final Construction Document 08/20/2025
LOUIS STOKES CLEVELAND, VAMC
COMMISSIONING OF FIRE SUPPRESSION
SYSTEMS 21 08 00 - 1
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00, GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00 General Commissioning Requirements.
B. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the Commissioning Agent.
B. The Fire Suppression systems commissioning will include the systems listed in Section 01 91 00, General Commissioning Requirements.
LOUIS STOKES CLEVELAND, VAMC
SYSTEMS 21 08 00 - 2
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00, GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00 and the Commissioning plan to schedule inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning Agent will select a broader sample of checklists for review. If the Commissioning Agent determines that a significant number of the broader
LOUIS STOKES CLEVELAND, VAMC
SYSTEMS 21 08 00 - 3
sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00, GENERAL REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days notice of testing. The Commissioning Agent will witness selected Contractor tests at the sole discretion of the Commissioning Agent. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems Functional Performance Test procedures for review and approval by the COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing.
The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled
LOUIS STOKES CLEVELAND, VAMC
SYSTEMS 21 08 00 - 4
in coordination with the COR after submission and approval of formal training plans. Refer to Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.
----- END -----
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 1
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in accordance with
NFPA 13.
B. The design and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation, for all portions of project scope area, including the penthouse, mechanical rooms, and electrical rooms.
C. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 07 84 00, FIRESTOPPING.
C. Section 09 91 00, PAINTING.
D. Section 22 05 23, GENERAL-DUTY VALVES FOR PLUMBING PIPING.
E. Section 28 31 00, FIRE DETECTION AND ALARM.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 2
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical Equipment Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply Processing and Distribution (SPD).
3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4. Water Supply: Base water supply on most recent flow test data (to be provided by VA).
5. Zoning:
a. For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve.
b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 3
compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA
13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and Calculations chapter of NFPA 13.
5. Valve Charts: Provide a valve chart that identifies the location of each control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.
6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 4
addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA
13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.
d. One paper copy of the Material and Testing Certificates and the Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.
e. Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of Ohio fire sprinkler contractor's license. The installer shall have been
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 5
actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-19 ..................Installation of Sprinkler Systems 25-17 ..................Inspection, Testing, and Maintenance of Water-
Based Fire Protection Systems 101-18 .................Life Safety Code 170-18 .................Fire Safety Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Piping and fittings for sprinkler systems shall be in accordance with
NFPA 13.
1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.
2. Piping sizes 50 mm (2 inches) and smaller shall be black steel
Schedule 40 with threaded end connections.
3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel
Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.
4. Use nonferrous piping in MRI Scanning Rooms.
5. Plastic piping shall not be permitted except for drain piping.
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 6
6. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. Control Valve: The control valves shall be a listed indicating type.
Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.
C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
2.3 SPRINKLERS
A. All sprinklers shall be FM approved quick response except “institutional” type sprinklers shall be permitted to be UL Listed quick response. Provide FM approved quick response sprinklers in all areas, except that standard response sprinklers shall be provided in freezers, refrigerators, elevator hoistways, elevator machine rooms, and generator rooms.
B. Temperature Ratings: In accordance with NFPA 13 except that sprinklers in elevator shafts and elevator machine rooms shall be no less than intermediate temperature rated and sprinklers in generator rooms shall be no less than high temperature rated.
C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.
2.4 SPRINKLER SYSTEM SIGNAGE
Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 7
2.5 SWITCHES:
A. OS&Y Valve Supervisory Switches shall be in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at 24 VDC.
B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.
C. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.
2.6 GAUGES
Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.
2.7 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING
Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.
2.8 WALL, FLOOR AND CEILING PLATES
Provide chrome plated steel escutcheon plates.
2.9 VALVE TAGS
Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 8
utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by NFPA 101. Pipe hangers, supports, and restraint of system piping, shall be installed accordance with NFPA 13.
C. Welding: Conform to the requirements and recommendations of NFPA 13.
D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.
E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.
F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.
G. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the respective waterflow switch or pipe connection near to the pipe from where they were cut.
H. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
I. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm (1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
J. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 9
floors and ceilings of other types of construction, in accordance with Section 07 84 00, FIRESTOPPING.
K. Provide pressure gauges at each water flow alarm switch location and at each main drain connection.
L. For each fire department connection, provide the symbolic sign given in NFPA 170 and locate 2400 to 3000 mm (8 to 10 feet) above each connection location. Size the sign to 450 by 450 mm (18 by 18 inches) with the symbol being at least 350 by 350 mm (14 by 14 inches).
M. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
N. MRI Suite: Provide no more than one penetration of the MRI shield enclosure.
O. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09 91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
P. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:
1. Identification Signs:
a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.
b. Provide valve tags for each operable valve. Coordinate nomenclature and identification of operable valves with COR.
Where existing nomenclature does not exist, the Tag Identification shall include no less than the following: (FP-B- F/SZ-#) Fire Protection, Building Number, Floor Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.)
2. Instruction/Information Signs:
a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 10
b. Provide signage indicating the number and location of low point drains.
3. Hydraulic Placards:
a. Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each alarm check valve.
Q. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.
R. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.
3.2 INSPECTION AND TEST
A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system, including the fire department connections, as specified in NFPA 13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.
B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test.
Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test.
LOUIS STOKES CLEVELAND, VAMC
WET-PIPE SPRINKLER SYSTEMS 21 13 13 - 11
3.3 INSTRUCTIONS
Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.
- - - E N D - - -
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 1
SECTION 22 05 11
COMMON WORK RESULTS FOR PLUMBING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 2
27. DO: Digital Output
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hand-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 3
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 4
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
E. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
F. Section 03 30 53, CAST-IN-PLACE CONCRETE: Concrete and Grout.
G. Section 05 50 00, METAL FABRICATIONS.
H. Section 07 84 00, FIRESTOPPING.
I. Section 07 92 00, JOINT SEALANTS.
J. Section 09 91 00, PAINTING.
K. Section 22 07 11, PLUMBING INSULATION.
L. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
M. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
N. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
O. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.
P. Section 26 29 11, MOTOR CONTROLLERS.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code - BPVC Section IX-2013 ...Welding, Brazing, and Fusing Qualifications B31.1-2012 .............Power Piping
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 5
C. American Society for Testing and Materials (ASTM):
A36/A36M-2012 ..........Standard Specification for Carbon Structural
Steel A575-96(R2013)e1 .......Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades E84-2013a ..............Standard Test Method for Surface Burning
Characteristics of Building Materials E119-2012a .............Standard Test Methods for Fire Tests of
Building Construction and Materials F1760-01(R2011) ........Standard Specification for Coextruded
Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic Pipe Having Reprocessed-Recycled Content
D. International Code Council, (ICC):
IBC-2012 ...............International Building Code IPC-2012 ...............International Plumbing Code
E. Manufacturers Standardization Society (MSS) of the Valve and Fittings Industry, Inc:
SP-58-2009 .............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and Installation
SP-69-2003 .............Pipe Hangers and Supports - Selection and Application
F. Military Specifications (MIL):
P-21035B ...............Paint High Zinc Dust Content, Galvanizing
Repair (Metric) G. National Electrical Manufacturers Association (NEMA):
MG 1-2011 ..............Motors and Generators H. National Fire Protection Association (NFPA):
51B-2019 ...............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
54-2018 ................National Fuel Gas Code 70-2017 ................National Electrical Code (NEC)
I. NSF International (NSF):
5-2012 .................Water Heaters, Hot Water Supply Boilers, and
Heat Recovery Equipment
LOUIS STOKES CLEVELAND, VAMC
COMMON WORK RESULTS FOR PLUMBING 22 05 11 - 6
14-2012 ................Plastic Piping System Components and Related Materials
61-2012 ................Drinking Water System Components – Health Effects
372-2011 ...............Drinking Water System Components – Lead Content J. Department of Veterans Affairs (VA):
PG-18-10 ...............Plumbing Design Manual PG-18-13-2011 ..........Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required…
This is the start of the file's text. The full file is on GovTribe.