About this file

This file provides details on a federal solicitation to renovate the Radiation Therapy department at the Louis Stokes Cleveland VA Medical Center. The solicitation seeks to renovate approximately 5,000 square feet of the existing Radiation Therapy suite to create additional exam rooms and dressing areas and update infrastructure. The solicitation number is 36C25021B0003_1 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The goal of the project is to renovate the Radiation Therapy Department located at 10701 East Blvd. in Cleveland, Ohio.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--RENOVATE RADIATION THERAPY, newest first.
File Type Posted
S02. Site Visit Information.pdf PDF
S02. Calculation of Self-Performed and Sub-Contracted Work.pdf PDF
S02. Solicitation 36C25021B0003_1.pdf PDF
S02. Specs Vol 2.pdf PDF
S02. JA Sole Source - Russwin_Redacted.pdf PDF
S02. JA Sole Source - Notifier Fire Alarm_Redacted.pdf PDF
S02. JA Sole Source - Hill-Rom_Redacted.pdf PDF
S02. Brand Name or Equal Memo.pdf PDF
S02. Safety.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Opening Instructions.pdf PDF
S02. Specs Vol 1.pdf PDF
S02. JA Sole Source - Lenel_Redacted.pdf PDF
S02. RFI Form.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT AREA

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

EAST BLVD.

E.

S

T.

EA

ST

B

LV

D

MAGNOLIA DR.

HA

ZE

L

DR

E. 108 ST.

MT. SINAI DR.

MARTIN LUTHER KING DR.

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

VA FORM 08-6231, OCT 1978

2 3 4 5 6 7 8 9

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A B

C D

E F

6"

6"

6"

6"

LOUIS STOKES CLEVELAND VA MEDICAL CENTER

10701 EAST BLVD. CLEVELAND, OH. 44106

PROJECT NO.

DRAWING INDEX

U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285

ARCH JOB NO.:

SITE PLAN

Scale = None

True North

Fredrick, Fredrick & Heller Engineers, Inc.

Mechanical & Electrical Engineers 672 East Royalton Road, Broadview Heights, Ohio 44147

Plan North

Perspectus Architecture LLC Architect 13212 Shaker Square, Cleveland, Ohio 44120

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center U.S. Department of Veterans Affairs

PhaseARCHITECT OF RECORD STAMPCONSULTANT

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

541-20-102

RENOVATE RADIATION THERAPY

G-001

COVER SHEET RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

FINAL CONSTRUCTION DOCUMENTS

August 14, 2020 19-120

A-101 PARTIAL BASEMENT DEMOLITION PLANS

A-111 PARTIAL BASEMENT FLOOR PLANS

A-121 PARTIAL BASEMENT REFLECTED CEILING PLANS

A-401 INTERIOR ELEVATIONS

A-501 MILLWORK DETAILS

A-601 SCHEDULES & DETAILS

E-001 ELECTRICAL LEGEND AND GENERAL NOTES

E-002 PARTIAL BASEMENT ELECTRICAL AND TECHNOLOGY KEY PLAN

ED-101 PARTIAL BASEMENT LIGHTING DEMOLITION PLANS

ED-111 PARTIAL BASEMENT POWER DEMOLITION PLANS

ED-121 PARTIAL BASEMENT FA AND SECURITY DEMOLITION

EL-101 PARTIAL BASEMENT LIGHTING PLANS

EP-111 PARTIAL BASEMENT POWER PLANS

EP-121 PARTIAL SECOND FLOOR ROOF ELECTRICAL PLAN

EY-121 PARTIAL BASEMENT FIRE ALARM AND SECURITY PLANS

E-501 ELECTRICAL DETAILS

E-502 ACCESS CONTROL RISER AND DOOR DETAILS

E-503 FIRE ALARM RISER DIAGRAM

E-504 FIRE ALARM DETAILS

E-601 LIGHTING FIXTURE SCHEDULE

E-602 PANELBOARD SCHEDULE

M-001 HVAC LEGEND AND GENERAL NOTES

M-002 AIR BALANCE CRITERIA

MD-101 PARTIAL BASEMENT HVAC DUCTWORK DEMOLITION PLANS

MD-111 PARTIAL BASEMENT HVAC PIPING DEMOLITION PLANS

MH-101 PARTIAL BASEMENT DUCTWORK PLANS

MH-102 PARTIAL SECOND FLOOR ROOF MECHANICAL PLAN

MP-111 PARTIAL BASEMENT HVAC PIPING PLANS

M-501 HVAC DETAILS

M-601 HVAC SCHEDULES

M-701 HVAC CONTROLS

M-702 HVAC CONTROLS

M-801 PARTIAL BASEMENT AIR BALANCE PLAN

T-001 TECHNOLOGY LEGEND AND GENERAL NOTES

TD-101 PARTIAL BASEMENT TECHNOLOGY DEMOLITION PLANS

T-101 PARTIAL BASEMENT TECHNOLOGY PLANS

T-501 TECHNOLOGY DETAILS

T-502 TECHNOLOGY DETAILS

G-001 COVER SHEET

G-002 GENERAL INFORMATION

G-101 PARTIAL BASEMENT PHASING PLANS

G-102 PARTIAL BASEMENT LIFE SAFETY PLANS

GENERAL

ARCHITECTURAL

ELECTRICAL

MECHANICAL TECHNOLOGY

INTERIOR

I-101 PARTIAL BASEMENT FLOOR FINISH PLAN

I-102 PARTIAL BASEMENT WALL FINISH PLAN

I-601 FINISH SCHEDULE, LEGEND & DETAILS

PLUMBING

P-001 PLUMBING AND MEDICAL GAS LEGEND AND GENERAL NOTES

PD-101 PARTIAL UNDERGROUND PLUMBING DEMOLITION PLANS

PD-102 PARTIAL BASEMENT PLUMBING DEMOLITION PLANS

PD-111 PARTIAL BASEMENT MEDICAL GAS DEMOLITION PLANS

PL-101 PARTIAL UNDERGROUND PLUMBING PLANS

PL-102 PARTIAL BASEMENT PLUMBING PLANS

PG-111 PARTIAL BASEMENT MEDICAL GAS PLANS

P-501 PLUMBING AND MEDICAL GAS DETAILS

P-601 PLUMBING AND MEDICAL GAS SCHEUDLES AND ISOMETRICS

FIRE PROTECTION

FX-001 FIRE SUPPRESSION LEGEND AND GENERAL NOTES

FX-101 PARTIAL BASEMENT FIRE SUPPRESSION PLAN KEY PLAN - BASEMENT

REVISIONS DATE

FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020

anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic ab abv a/c acous act adj aff alt alum anod approx arch auto board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing bd betw bldg blk blkhd bm bot brdg brg brk bsmt bur ci cj clg cl clr cll cntr cmu co col conc conn const cont coord corr cs ctr ctw cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center combined towel and waste d dbl dcs deg demo dia dim(s) disp dn dr ds det dwg dwr dw depth double diaper changing station degrees demolition diameter dimension(s) dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior ea ec eifs ej elec elev emerg eq equip es etr ew ewc exh exist exp exp'd ext fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant fa fb fcu f/f fd fdn fe fec fhc fin flr fluor fr ga galv gb gc gl gr gyp bd gauge galvanized grab bar general contractor glass grade gypsum board h hb hc hdbd hdcpd hdwr hdwd hm horiz hpdl hr ht htg htr hvac hw hwh high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater id in incl insul int inside diameter inch include (inclusive) insulation interior janitor joist jan jst knock down knock out kd ko l lam lav lb lf lim lt ltg lvr length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver marb mas mat max mech memb mfr mh mi min marble masonry material maximum mechanical membrane manufacturer manhole mirror minimum not applicable not in contract number nominal not to scale n/a nic no nom nts owner overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional o oa oc ocaff od ohdr oph ovrd o/o op'g opp opt plbg pmld pnl plywd pol pp pr prefin prefab proj psc psf psi in pt ptd pnt ptn pvc pvmt qty plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point paper towel dispenser painted partition polyvinylchloride pavement quantity r ra rad rag rd rec ref reg reinf req'd riser return air radius return air grille roof drain receptacle refrigerator register reinforcement (reinforcing) required solid core schedule soap dispenser smoke detector saddle section sheet similar sanitary napkin dispenser stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems sc sched sd smkd sdl sect sht sim snd sp spec spkr spklr spr sq sq in sy ss std stl stor struc sucp sys t t/g or t&g tg td tel temp temp'd terr thk thld toc tos tod tom toj top tow ttd typ thread tongue and groove tempered glass trench drain telephone temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall toilet tissue dispenser typical undercut underground unfinished unlimited unless noted otherwise urinal uc ug unfin unlim uno ur v vert vest vif vendor vertical vestibule verify in field w w/ w/o w/w wc wd wh win wg wt wwf width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric yd yard c c/c cab't cb cem cl cfm cg contractor center to center cabinet catch basin cement center line cubic feet per minute corner guard fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet frt frtwd ft ftg furr fvc misc mo mtd mtg mtl mull miscellaneous masonry opening mounted mounting metal mullion pbd pcf perim pg bd pl plas plam particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate res ret rev rh rm ro rvs resilient return revised (revision) robe hook room rough opening reverse

3' -6

1' -6

Shower valve

Shower head

Receptacle

Push plate

Thermostat

Humidistat

8"

4' -0

Phone jack

Light switch

CTW-1 MI-1 18"x36" MI-2 18"x18"

3'-0" 5'

PTD-1

4' -6

RH-1

1'

6"

SND-1

4'

0"

SD-1

2'

3/

4"

TTD-1

4'

6"

Fire extinguisher

Cabinet may occur

House Keeping

4'

6"5' -6

3' -0

Mop basin

Service faucet & controls

MBH-1, TYP

US-1

GB-36 3'-0"

6"

2' -1

0"

GB-18 1'-6"

GB-42 3'-6"

2' -1

0" 3'

-4 "1'-0" 3'-6"

3'-4"

Fa ce o f w al l

Fa ce o f w al l

6' -8

• Typical accessory items. Some items may not occur in project.

4' -0

4' -0

8" 8"

Finish Floor Line

3' -4

3'

-0

1'-6"

-Building, wall and detail section mark

-Interior/exterior elevation reference

-Enlarged plan or detail reference

-Column reference grids

Revision reference number

Wall type

Window type

New level line, control point, or datum

New door

Indicates drawing sheet on which plan/detail is shown.

Indicates detail number

Indicates drawing sheet on which elevation is shown Indicates elevation number

Indicates drawing sheet on which section is shown

Indicates section number

Door number46

XX

A

A2-1

A2-1

1/A2-1

A

A

New Existing

XXX-XX Ceiling Type Ceiling HeightXX'-XX"

Back to back boxes NOT permitted Stagger Boxes

UNO

6"

Partition assembly

Door frame

TYP of all frames that occur at room corner locations, UNO

Joint compound and tape

5/8" GYP BD

MTL studs

Control joint

CONT stud track

CONT stud track

Channel stud REINF as required at wall mounted devices

Midpoint at door opening

CONT channel REINF

Double studs at jamb opening 20 GA MIN, 18 GA at openings over 3'-0"

Door Opening

Door Opening

EXIST STRUC above

GYP BD control joint

Hollow MTL frame

MTL studs coped to fit

TYP MTL studs A

See specifications for sealant type.

All joints 1" wide or more are to be laid up in beads and tooled to profile indicated.

All joints are to be primed before bond breaking rod is installed.

Install bond breaking rod with roller to proper depth. No sharp tools permitted.

1.

2.

3.

4.

Notes:

B C

Wall material varies

07 92 00 - Bond breaker rod

07 92 00 - Sealant

Joint Schedule Dimensions

A B C 3/8" 1/8" 1/4"

1/2" 1/8" 3/8"

5/8" 1/8"

3/4" 1/8"

7/8" 1/8"

1" 1/8"

3/8"

3/8"

3/8"

3/8"

5/8" Type X GYP BD MTL studs

Control joint, both sides

MAX

1/2"

5/8" Type X GYP BD

TYP of all control joints located in rated wall assemblies

MAX

1/2"

MAX

1/2"

1 13/16"

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:2

AM

G-002

GENERAL INFORMATION RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

STANDARD ABBREVIATIONS

STANDARD MOUNTING HEIGHTS

STANDARD SYMBOLS

TYP ELECTRICAL JUNCTION DETAIL TYP FRAME LOCATIONTYP GYP BD CONTROL JOINT

TYP GYP BD DETAILTYP SEALANT DETAIL

FIRE RESISTANT CONTROL JOINT

REVISIONS: DATE:

UP UP

35.5

35.5

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

PATIENT TRAVEL

PATIENT TRAVEL

EXAM 1

BB212

ELEC

BB245

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

TLT-B

BB220

EXAM 5

BB218

EXAM 5

BB218

MECH.

BB217

CORRIDOR

BB200B

EXAM 6 /

PROCEDURE

BB219

TLT-A

BB227

NURSE WORK

BB242A

TP

TP

TP

TP

TP

35.5

35.5

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

PATIENT TRAVEL

PATIENT TRAVEL

WORK

BB244

WORK

BB243

CONF. RM.

BB241

CORRIDOR

BB200C

ALCOVE

BB226A

CO

RR

ID

OR

BB

0D

SUB WAIT

BB226

NURSE WORK

BB240A

HALL

BB240 RECEPT. WORK

BB242

RECEPTION

BB210A

ENTRY

BB210 WAITING

BB211

WORK

BB246

CORRIDOR

BB200A

EXAM 2

BB213

EXAM 3

BB214

EXAM 4

BB215

TP

TP

TP

TP

All work in waiting and corridors during Phase 2 to be completed during off hours. Refer to individual plans for additional information.

Exam

BB214

Exam

BB215

Exam

BB216

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB225

Break

BB231

Control Area

BB230

Physicist

BB238

Nurse

BB240

Staff

BB242

Reception

BB211

Doctor

BB237

Chief

BB239

Wait BB212Corridor

BB210

Corridor

BB210A

Corridor

BB221

Corridor

BB210D

Corridor

BB210E

Bio Med

BB233

Linear Accelerator

BB232

Toilet

BB228

Chiller

BB234

Dosimetry

BB222

Stair 6

BS6

Mech

BB217

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB225

Control Area

BB230

Corridor

BB221

Bio Med

BB233

Linear Accelerator

BB232

Chiller

BB234

Dosimetry

BB222

Stair 6

BS6

Chief

BB239

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219 EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

NURSE WORK

BB242A

The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases.

The project will consist of 2 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.

Phase Name: Duration in Days from Notice calendar days to Proceed (NTP)

Submission Phase 60 days day 1-60 Phase 1 90 days day 61-150

VA Activation 30 days day 151-180 Phase 2 90 days day 181-270

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:3

AM

G-101

PARTIAL BASEMENT PHASING

PLANS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"G-101

RADIOLOGY RENOVATION_PHASE 11

Scale: 1/8" = 1'-0"G-101

RADIOLOGY RENOVATION_PHASE 22

PHASING DURATIONS

LIFE SAFETY LEGEND

1 HR Fire Barrier 2 HR Fire Barrier

1 HR Smoke Barrier 0 HR Smoke Partition Hazardous Room

Fire Extinguisher Cabinet

Exit Sign

- indicates Illumination side and arrow direction

2 HR Fire and Smoke Barrier

Note: This sheet to be printed in color. If not printed in color, request color sheet from printer

E Exit

St ai r t o

Su b-

Ba se m en t

St ai r t o

Fi rs t F lo or

C

PT

7' -1

0"

TD

E=

'-1

1"

E

CPT = 57'-4"

Gray hatch indicates area under construction

EXAM 6 /

PROCEDURE

BB219

NURSE WORK

BB242A

EXAM 5

BB218

MECH.

BB217

TLT-B

BB220

STAFF BREAK

RM.

BB230

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

Design Code

Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)

Fire Suppression

Construction Type (Table 20.1.6.1)

Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls

Interior Bearing Walls

Column/Beams/Girders

Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls

Exit Enclosures/Passageways (7.3.1.2.1.3)

Shaft Enclosures (8.6.5)

Exit Access Corridors (20.3.6.1.3)

Corridor width (20.2.3.2)

Dead End Corridors (20.2.5.2.1)

Smoke Compartments (20.3.7.3.2)

Smoke Barriers (20.3.7.1.1)

Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)

Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)

2018 NFPA 101 Life Safety Code

2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial

Fully Sprinklered

Type II (222), Greater than 2 stories

2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour

1 hour for less than 4 stories 2 hours for 4 stories or more

1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories

No rating

44" minimum

50' maximum

40,000 SF maximum

1 hour

1 hour or extinguishing system 1 hour and extinguishing system

200' maximum 100' maximum

New Ambulatory Healthcare Occupancies Code Information

St ai r t o

Su b-

Ba se m en t

St ai r t o

Fi rs t F lo or

C

PT

'-4

TD

E=

'-4

" E

Gray hatch indicates area under construction

CONF. RM.

BB241

WORK

BB243

WORK

BB244

WORK

BB246

ENTRY

BB210

WAITING

BB211

RECEPTION

BB210A

CORRIDOR

BB200A

RECEPT. WORK

BB242

SUB WAIT

BB226

CORRIDOR

BB200C

NURSE WORK

BB240A

HALL

BB240

EXAM 4

BB215

EXAM 3

BB214

EXAM 2

BB213

St ai r t o

Su b-

Ba se m en t

St ai r t o

Fi rs t F lo or

C

PT

9' -5

TD

E=

'-4

E

EXAM 2

BB213

EXAM 3

BB214

EXAM 4

BB215

CORRIDOR

BB200A

RECEPTION

BB210A

ENTRY

BB210

SUB WAIT

BB226NU

RS

E

W

OR

K

BB

0A

WORK

BB244

HALL

BB240

WORK

BB243

RECEPT. WORK

BB242

Elec

BB245

CONF. RM.

BB241

CORRIDOR

BB200D

ALCOVE

BB226A

CORRIDOR

BB200C

WORK

BB246

Bio Med

BB233

Linear Accelerator

BB232

MECH.

BB217NURSE WORK

BB200E

NUTRITION

BB213A

WAITING

BB211

Linear Accelerator

BB225

CT Scan

BB223

Dosimetry

BB222

Stair 6

BS6

Control Area

BB200F

Chiller

BB234

Corridor

BB221

Mechanical

BB224

Bio Med

BB233

Linear Accelerator

BB232

Exam

BB216

Exam

BB215

Exam

BB214

Corridor

BB210B

Corridor

BB210A

Corridor BB210 Wait

BB212

Staff

BB242

Corridor

BB210E

Nurse

BB240

Physicist

BB238

Mold Room

BB236

Doctor

BB237

Chief

BB239

Reception

BB211

Toilet

BB228

Corridor

BB210D

Linear Accelerator

BB225

CT Scan

BB223

Dosimetry

BB222

Stair 6

BS6

Control Area

BB230

Chiller

BB234

Corridor

BB221

Mechanical

BB224

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219

EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

MECH.

BB217NURSE WORK

BB242A

NUTRITION

BB213A

Bio Med

BB233

Linear Accelerator

BB232

Linear Accelerator

BB225

CT Scan

BB223

Dosimetry

BB222

Stair 6

BS6

Control Area

BB234

Chiller

BB235

Corridor

BB221

Mechanical

BB224

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:5

AM

G-102

PARTIAL BASEMENT LIFE SAFETY

PLANS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"G-102

BASEMENT LIFE SAFETY PLAN_PHASE 11

LIFE SAFETY CODE INFORMATION

BASEMENT - SMOKE COMPARTMENTS

Scale: 1/8" = 1'-0"G-102

BASEMENT LIFE SAFETY PLAN_PHASE 22

Scale: 1/8" = 1'-0"G-102

BASEMENT LIFE SAFETY PLAN_FINAL CONSTRUCTION3

CODED NOTES LIFE SAFETY

1 Cover exist sign durung Phase 1 2 Provide interim life safety measures to discourage egress into this dead end corridor

35.5

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

TP

TP

TP

TP

4'-2"

5' - 2"

5'

1/

2" 3'

1"

9'

5/

8" 4'

1" 6

1/ 8"

4'

6" 3'

1/ 8"

3'

7"

7/

8"

3'

7"

2'

1/

2"

3'

1"

3/ 8"

5' - 10"

5'

0"

5' - 0"

4'

0"

TP

6' - 0"

5'

0"

7 7

Exam

BB214

Exam

BB215

Exam

BB216

Mech

BB217

Office

BB218

Nutrition

BB219

Stretcher

BB220

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB225

Computer

BB229

Break

BB231

Control Area

BB230

Physicist

BB235

Mold Room

BB236

Physicist

BB238

Nurse

BB240

Electric

BB241

Staff

BB242

Reception

BB211

View/Cons

BB213

Locker Rm

BB226

HAC

BB227

Doctor

BB237

Chief

BB239

Wait BB212Corridor

BB210

Corridor

BB210A

Corridor

BB210B

Corridor

BB221

Corridor

BB210D

Corridor

BB210E

Bio Med

BB233

Linear Accelerator

BB232

Office

BB226B

Office

BB226C

Toilet

BB226A

Toilet

BB228

Chiller

BB234

Dosimetry

BB222

Stair 6

BS6

35.5

35.5

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

TP

TP

TP

6' - 11"

5' - 0"

5'

0"

5'

0" 17

9 9

TP

Exam

BB214

Exam

BB215

Exam

BB216

Mech

BB217

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB225

Control Area

BB230

Corridor

BB210

Corridor

BB210A

Corridor

BB221

Corridor

BB210D

Bio Med

BB233

Linear Accelerator

BB232

Chiller

BB234

Dosimetry

BB222

Stair 6

BS6

Toilet

BB228

Chief

BB239

Reception

BB211

Doctor

BB237

Corridor

BB210E

Staff

BB242

Nurse

BB240

Physicist

BB238

Mold Room

BB236

A. Refer to specifications section Demolition for additional requirements and information.

B. Contractor shall construct and maintain at all times temporary partitions in accordance with 'Temporary

Partition Detail' located this sheet. Temporary partitions shall be located to separate all occupied areas from construction areas.

C. Coordinate all new penetrations and/or openings with other associated trades.

D. The VA shall remove, prior to construction, all items that VA desires to salvage, U.N.O. All remaining items indicated to be demolished shall be removed by the contractor and legally disposed of in accordance with the project specifications.

E. Contractor shall coordinate all demolition with the entire set of contract documents for full scope of demolition work required for the project.

F. Existing conditions shown on the drawings are not guaranteed to be complete. The contractor shall verify all existing conditions, dimensions, and materials required for the contracted work. Report all discrepancies to architect prior to fabrication, erection, and/or installation.

G. Contractor shall provide dust proof barricades & vestibule with dust removing walk off mat (tacky mat) to separate scope of work from occupied areas.

H. Contractor shall provide HEPA filtered negative air machine(s) to maintain negative pressure to scope of work area ensuring no dust will be transferred to occupied areas. Provide visual pressure monitoring device at dust proof barricade to confirm pressure. Dust monitoring shall be by VA COR. See specification section General Requirements

I. All demolition work being done outside temporary partitions is to be appropriately sealed off to prevent the transmission of dust and debris and minimize disruption to visitors, residents, and staff. Coordinate location of barriers with VA COR.

J. The hospital's smoke and fire suppression system shall remain in operation within the scope of work during the entire construction phase.

K. Field verify locations of all existing walls. Report any discrepancies to field COR.

L. Some items may be indicated in the demolition drawings and demolition notes which are not necessarily demolition work, but are included to describe the overall scope of the project and aid in the demolition coordination. The contractor is responsible for all work required to complete the work of the overall project.

M. Flooring demolition includes the removal of existing floor finishes, including VCT, sheet vinyl, ceramic tile, quarry tile, carpet and other finishes, grouts, mastics, and setting beds complete to existing concrete floor slab or other substrate ready for new floor finishes. Concealed multiple floor finishes may be present in several locations. Floor preparation shall be by the installing contractor.

O. Remove partitions indicated to the underside of the structure above.

P. Remove existing ceilings only where new ceilngs are indicated on Reflected Ceiling Plans. Demolition of ceilings includes grid, tile, supports, soffits and related items as any ceiling mounted electrical and mechanical fixtures and supports contained within. See Reflected Ceiling Plans for areas noted to patch/repair existing ceilings. Salvage ceiling tiles these areas as necessary to complete patch work.

Q. Plug abandoned floor openings with new concrete. Plug shall match existing slab depth and shall be structurally sound to carry floor load of 100 lbs/sf unless noted otherwise. Coordinate with structural Drawings.

R. All fire rated assemblies (columns, shafts, walls, etc.) Shall be maintained or be relocated/patched.

Match existing fire rating unless noted otherwise.

S. Where new doors are indicated, cut openings in existing wall. Prepare openings for new door. Patch adjacent walls to match existing. Provide lintels as required for new openings.

T. After removal of existing partitions, contractor shall provide cementitious infill and floor leveler to prepare floor surface for new finishes. Refer to finish plan and schedule for new finishes and where patching/ repair of existing finishes occurs.

U. Where new wall finishes are scheduled to occur, remove all vinyl wallcovering, wall protection and other finishes. Prepare wall substrate as required for new paint finish.

V. Additional temporary partitions may be required due to sequencing of work. Contractor shall determine location and quantity of all temporary partitions in accordance with ICRA and VA requirements prior to submittal of bid.

W. See mechanical drawings for plumbing, HVAC and fire protection demolition. See electrical drawings for all power and lighting demolition.

X. Debris removal shall not interfere with VA operations and shall occur during off hours as determined by VA

COR.

Y. All noise generating operations, including cutting of ceilings, walls and floor, coring, drilling, etc. shall be scheduled in accordance with the project specifications Section General Requirements.

Existing construction to remain

Construction to be demolished

Temporary Partition

PROJECT AREA

Area Accessible to Public

Construction Area

Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.

Seal perimeter (deck, walls, floor) and all penetrations to comply with ICRA requirements

Provide new ceiling, trim, wall angle on public side

Notes:

1. See also 01 00 00 General Requirements.

2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.

3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.

Remove portion of existing ceilings and patch @ temporary partitions

Continuous sound batt insulation

Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.

Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219 EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

NURSE WORK

BB242A

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:2

AM

A-101

PARTIAL BASEMENT DEMOLITION

PLANS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"A-101

PARTIAL BASEMENT DEMOLITION PLAN_PHASE 11

Scale: 1/8" = 1'-0"A-101

PARTIAL BASEMENT DEMOLITION PLAN_PHASE 22

GENERAL NOTES DEMOLITION

LEGEND_DEMOLITION PLAN

CODED NOTES DEMOLITION PLAN

1 Remove existing plumbing fixtures. See MEP drawings for additional information, cap utilities if fixture will not be replaced. Remove all accessories associated with plumbing fixtures including partitions, grab bars, dispensers, racks, shelving, sink base, disposals, etc.

2 Rough opening for new door. See new construction plan for location. Patch and repair wall to match existing.

3 Refer to finish plan for partial Ph.1 flooring this area. Prepare substrate to receive new rubber flooring.

4 Access to existing Imaging areas must be maintained and protected for patient transport during required hours (as set by VA). Work within corridor to be completed during off hours.

5 Remove existing ceiling systems, supports and ties. See RCP for new ceiling system.

6 Existing - no work this area.

7 Where existing walls are to remain, remove any existing wallcovering, trim and wall protection. Patch and repair substrate to receive new paint/scheduled finish.

8 Remove existing glass block. Maintain base of wall as anchor for new wall construction at ramped area.

9 Remove existing flooring and base. Prepare substrate as required to receive new flooring. See finish plan and schedule for new scheduled finishes.

10 Remove existing door, frame, anchors, thresholds, and hardware as indicated within limits of construction.

Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.

11 Remove existing millwork.

12 Remove existing locker units.

13 Remove existing transaction window and sill.

14 Existing thermostat to be removed. Consult with Owner for special reqirements for handling items that may contain mercury.

15 Existing fume hood to be removed and all associated utilites to removed/capped. See engineeing drawings.

16 Existing headwall devices and utilites to removed/capped. See engineeing drawings.

17 Existing wall mounted light boxes to be removed from corridor, see engineering drawings 18 Temporary worksurface to be removed only when new quartz counter is ready to be installed. Coordinate with active nurse users this area for best schedule of change out of countertop and coordination of equipment.

19 Portion of existing waiting area to remain operational through entire construction duration. All work in existing waiting area to be done during off hours. Contractor to coordinate with VA for optimal timing of work that can be completed during off hours. Temporary partition may be required.

TP Temporary Partition

KEY PLAN - BASEMENT

Scale: 1/2" = 1'-0"A-101

TEMPORARY PARTITION, TYP.5

35.532.5

32 36.5 38.5

B

C

A

D

E

38.6

PROJECT SCOPE

PROJECT SCOPE

7/A-401 6/A-401

4/A-401

/A

-4

12/A-401

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219 EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

2 22

A6 3

A6

A-111

A-111

EXAM 1

BB212

5/A-401

MECH.

BB217

8/ A-

/A

-4

9' - 6"

2'

1" 6'

5'

5/

8" 5'

5/ 8"

8'

3/

8"

2'

6"

6' - 2"

19' - 11 1/8"

9' - 4"

8' - 4"

8'

0"

8' - 0"

8'

0"

8' - 0"

/A

-4

NURSE WORK

BB242A12

BB218

BB219

BB217

BB220

BB230BB231

BB229

BB228

BB227

NUTRITION

BB213A

19' - 11 3/4"

/A

-4

O pp

Sim.

4' - 2" 8' - 5"

BB

A6

Bio Med

BB233

Linear Accelerator

BB232

Exam

BB216

Exam

BB215

Exam

BB214

Corridor

BB210B

Corridor

BB210A

Corridor

BB210

Wait

BB212

Staff

BB242

Corridor

BB210E

Nurse

BB240

Physicist

BB238

Mold Room

BB236

Doctor

BB237

Chief

BB239

Reception

BB211

Toilet

BB228

Corridor

BB210D

CT Scan

BB223

Corridor

BB221

Dosimetry

BB222

Stair 6

BS6

Mechanical

BB224

Linear Accelerator

BB225

Control Area

BB230

Chiller

BB234

35.532.5

32 36.5 38.5

B

C

A

D

E

38.6

5/A-401

3/A-401

9/ A-

2/A-401

1/A-40116/A-401

/A

-4

10/A-401

/A

-4

PROJECT SCOPE

PROJECT SCOPE

EXAM 2

BB213

EXAM 3

BB214

EXAM 4

BB215

CORRIDOR

BB200A

RECEPTION

BB210A

ENTRY

BB210

SUB WAIT

BB226NU

RS

E

W

OR

K

BB

0A

5/A-4015/A-401

Opp.

WORK

BB244

HALL

BB240

WORK

BB243

RECEPT. WORK

BB242

Elec

BB245

CONF. RM.

BB241

CORRIDOR

BB200D

ALCOVE

BB226A

CORRIDOR

BB200C

WORK

BB246

17/A-401

/A

-4

A6A6

2'

0"

8'

0"

5'

0"

8'

1/

2"

BB

BB

BB215

BB

0B

BB241

BB240A

BB210A

WAITING

BB211

16/A-401

16171717

18 1820 /A

-4

3'

2"

TP 20

EQ EQ

11 17

1. All partitions are type A1 unless noted otherwise. Refer to A-601, General Information for Partition Types.

2. Dashed equipment items shown for reference only and are not part of the General Contract. These items will be provided and installed by Owner. Contractor may need to coordinate specific fixture and equipment requirements if noted.

3. All cabinets shall be locking, unless noted otherwise.

4. Refer to I- series finish plans and schedules for new finishes per area, and where patch/match of existing finishes occurs.

5. Toilet Rooms: See A-401 for wall elevations, and A-601 for toilet accessory schedule

6. All dimensions are to face of GYP BD, U.N.O.

7. Contractor to verify all dimensions and conditions in the field prior to commencement of work. If drawings conflict with actual field conditions, contact COR before proceeding with work.

8. Provide concealed in-wall reinforcing/blocking for attachment of all millwork, casework, and/or accessories as required.

PROJECT AREA

24/A-401

/A

-4

25/A-401 23 /A

-4

TLT-A

BB227

36.5

36.5

28/A-401

/A

-4

29/A-401

/A

-4

TLT-B

BB220

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219

EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

MECH.

BB217NURSE WORK

BB242A

NUTRITION

BB213A

Bio Med

BB233

Linear Accelerator

BB232

Chiller

BB235

Control Area

BB234

Linear Accelerator

BB225

Corridor

BB221

Stair 6

BS6

Dosimetry

BB222

CT Scan

BB223

Mechanical

BB224

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:4

AM

A-111

PARTIAL BASEMENT FLOOR

PLANS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"A-111

PARTIAL BASEMENT FLOOR PLAN_PHASE 11

Scale: 1/8" = 1'-0"A-111

PARTIAL BASEMENT FLOOR PLAN_PHASE 22

GENERAL NOTES FLOOR PLAN

CODED NOTES FLOOR PLAN

1 Room is exising to remain. Refer to MEP drawings for extent of work within this area.

2 Patch and repair surface of existing column to receive new paint finish. Sheath with 5/8"

Gyp. Bd. on furring strips if required.

3 Access to toilet room must be maintained for patient use during hours of operation 4 Refer to MEP drawings for extent of work within this area.

5 Access to existing Imaging areas must be maintained and protected for patient transport during required hours (as set by VA). Work within corridor to be completed during off hours.

6 Temporary VCT flooring installed for use in Phase 1 portion of this area. See finish plan and schedule.

7 Headwall this location, see elevations and engineering drawings.

8 Work at corridor side of Reception & Nurse to be completed during off hours.

9 Infill area of removed window/door. Match wall construction of remaining partition.

10 Maintain existing slope of ramp this area.

11 Quartz surface countertop, exposed support angles. See elevations of Work area

BB233/232 for similar design intent.

12 Temporary plastic laminate countertop. Height at 2'-6", full width of wall. Provide counertop supports to be re-used upon final insallation of quartz surface (phase two) 13 Existing door and hardware to remain. Patch and repair door panel as needed to remove scratches and marks. Repaint door frame.

16 Installation of new Quartz surface to be coordinated with removal of temporary laminate counter.Coordinate with active nurse users this area for best schedule of change out of countertop and coordination of equipment.

17 Grommet locations, typ. (2"dia) , provide every 48"min. at open kneespaces - coordinate with locations of undercounter bracket to avoid overlapping. See countertop section detail.

18 Install new handrail at ramp location, see elevation.

19 Align 20 Temporary partition may remain in place depending on phasing requirements of Nurse

Station users.

21 Work to be completed during off hours.

22 Fire extinguisher cabinet TP Temporary Partition

KEY PLAN - BASEMENT

Scale: 1/4" = 1'-0"A-111

ENLARGED PLAN - TLT. A4

Scale: 1/4" = 1'-0"A-111

ENLARGED PLAN - TLT. B5

REVISIONS: DATE:

SCHEMATIC DESIGN SUBMISSION 01/31/2020

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

EX

ACT-1

8' - 0"

ACT-1

8' - 0"

ACT-1

8' - 0"

ACT-1

8' - 4"

ACT-1

8' - 0"

ACT-1

8' - 0"

ACT-1

8' - 0"

ACT-1

8' - 4"

EX

EX

EX

EX

EX

EX

EX EX EX

EX

EX

ACT-2

8' - 4"

ACT-1

8' - 4"

EXAM 1

BB212

NURSE WORK

BB242A

CORRIDOR

BB200B

EXAM 5

BB218

TLT-B

BB220

EXAM 6 /

PROCEDURE

BB219

ELEC

BB245

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

NUTRITION

BB213A

7 7

GYP.

7' - 2"

GYP.

7' - 2"

ACT-1

8' - 4"

1. See Interior Elevations for soffit heights at millwork.

2. See ceiling plan legend for ceiling types.

3. Ceiling heights on reflected ceiling plan are from finish floor to finish ceiling.

4. Unless noted otherwise, light fixtures shall be located as shown on the reflected ceiling plan.

5. Where the lights and accessories are shown to be recessed in ceiling tiles, they shall be centered in the ceiling tile unless noted otherwise.

6. Provide access panels in GYP BD ceilings as required by applicable codes and as required for mechanical, electrical and plumbing equipment. Access panels located in finished areas shall be painted to match adjacent surfaces.

7. No mechanical equipment requiring normal maintenance shall be installed above a gypsum board ceiling. Locate such items above acoustical tiles only. Notify architect if any such items are indicated above the gypsum board ceilings.

8. Exit signs and smoke detectors located shall be centered in corridors and located a distance of 1'-0" from wall to the center of the fixture unless noted otherwise. Locate exit signs as required by the authority having jurisdiction.

9. Soffits and bulkheads shall be laterally braced to resist horizontal movement.

10. Contractor shall coordinate all types of fixtures with electrical drawings. Fixtures shown on architectural drawings are for reference only and are indicated for location only.

Linear wall mounted light fixture

Recessed can light fixture

Directional recessed can light fixture

Pendant light fixture

2x2 Recessed light fixture

2x4 Recessed light fixture

5' x4" Recessed linear light fixture

GYP BD CLG or Soffit

1. Ceilings to be painted unless noted optherwise.

2. Epoxy paint in wet locations

ACT-1 Acoustical Ceiling system, Armstrong / Ultima Health Zone High NRC,

0.80 NRC/35 CAC - #1445

Size: 24" x 24" / Sq. lay in Grid: Prelude 15/16" White

ACT-2 Acoustical Ceiling system Armstrong / Ultima Health Zone High NRC,

0.80 NRC/35 CAC - #1935

Size: 24" x 48" / Sq. lay in Grid: Prelude 15/16" White

Exposed Structure suspended linear light fixture

Vanity light fixture

Wall sconce

Exit sign

Radiant Heat Ceiling Panel

Supply grill

Return grill(ES)

PROJECT AREA

Bio Med

BB233

Linear Accelerator

BB232

Exam

BB216

Exam

BB215

Exam

BB214

Corridor

BB210B

Corridor

BB210A

Corridor

BB210

Wait

BB212

Staff

BB242

Corridor

BB210E

Nurse

BB240

Physicist

BB238

Mold Room

BB236

Doctor

BB237

Chief

BB239

Reception

BB211

Toilet

BB228

Corridor

BB210D

Chiller

BB234

Control Area

BB230

Linear Accelerator

BB225

Corridor

BB221

Stair 6

BS6

Dosimetry

BB222

CT Scan

BB223

Mechanical

BB224

TLT-A

BB227

CHG.

BB228

CHG.

BB229

SPS STO.

BB231

STAFF BREAK

RM.

BB230

EXAM 6 /

PROCEDURE

BB219

EXAM 5

BB218

TLT-B

BB220

CORRIDOR

BB200B

EXAM 1

BB212

MECH.

BB217NURSE WORK

BB242A

Linear Accelerator

BB225

Corridor

BB221

Dosimetry

BB222

Stair 6

BS6

CT Scan

BB223

Mechanical

BB224

Linear Accelerator

BB232

Bio Med

BB233

Control Area

BB234

Chiller

BB235

32.5

32.5

D

E

ACT-2

8' - 4"

ACT-2

8' - 4"

GYP.

8' - 0"

ACT-1

8' - 4"

GYP.

8' - 0"

GYP.

8' - 0"

ACT-2

8' - 4"

ENTRY

BB210

RECEPTION

BB210A

RECEPT. WORK

BB242

6"

4'

0" 2'

0"

A-601

Sim

A-601

Sim35.5

35.5

32.5

32.5

36.5

36.5

38.5

38.5

BB

CC

AA

DD

EE

38.6

38.6

PROJECT SCOPE

PROJECT SCOPE

ACT-1

8' - 4"

ACT-1

8' - 4"

GYP.

9' - 0"

GYP.

9' - 0"

ACT-2

8' - 4"

GYP.

9' - 0"

GYP.

7' - 2"

ACT-1

8' - 4"

ACT-1

8' - 4"

ACT-1

8' - 4"

ACT-1

8' - 4"EX

ACT-2

8' - 4"

EXAM 2

BB213

EXAM 3

BB214

EXAM 4

BB215

CORRIDOR

BB200ARECEPTION

BB210A

ENTRY

BB210

WORK

BB246Elec

BB245

WORK

BB244

WORK

BB243

CONF. RM.

BB241

HALL

BB240

RECEPT. WORK

BB242

SUB WAIT

BB226

NU

RS

E W

OR

K

BB

0A

CORRIDOR

BB200C

CORRIDOR

BB200D

A-121

Sim

GYP.

8' - 0"

A-121

WAITING

BB211

GYP.

8' - 4"

ACT-1

8' - 4"

ACT-1

8' - 4"

ACT-1

8' - 4"

ACT-1

8' - 4"

GYP.

9' - 0"

Gyp Bd Headers to align with adjacent ACP ceiling system

8' - 4" U.N.O.

Recessed light fixture centered in square Gyp. Bd inset, see engineering drawings. Al ig n

Al ig n

Align

EQ EQ

EQ

EQ

A-601

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consulting Engineers

BARBER & HOFFMAN, INC.

2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE

EXPRESSED WRITTEN CONSENT OF PERSPECTUS

ARCHITECTURE.

COPYRIGHT C 2019.

13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CLEVELAND, OHIO

C :\U se rs

\b ga st on

\D oc um en ts \V

AM

P_

R R

T_ M en ta l H ea lth _R

_2

4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/

/2

9:

:0

AM

A-121

PARTIAL BASEMENT REFLECTED

CEILING PLANS

RENOVATE RADIATION THERAPY 541-20-102

08/14/2020 TEH EEV

Scale: 1/8" = 1'-0"A-121

PARTIAL BASEMENT REFLECTED CEILING PLAN _PHASE 14

GENERAL NOTES_CEILING PLAN

LEGEND_CEILING PLAN

KEY PLAN - BASEMENT

CODED REFLECTED CEILING PLAN...

1 No work this area, existing to remain.

2 Ceiling work in Corridor to be completed during off hours.

3 Privacy curtain track by contractor. Curtain provided by owner.

4 Gyp. Bd. soffit above wall cabinets, 7'-2" typical height U.N.O. Exposed faces are to be painted to match adjacent wall finish.

5 Gyp. Bd. header at 8'-0" AFF 6 Patch and extend ceiling grid from Phase 1 construction into new Reception area 7 Wall sconce, see elevation.

8 Wall washer, see engineering drawings 9 Provide temporary finished ceiling this area, to be removed during Phase 2 construction.

10 Gyp. Bd. accent plane - see typical detail "ENLARGED CEILING PLAN - 2" this sheet

Scale: 1/4" = 1'-0"A-121

ENLARGED CEILING PLAN - 11

Scale: 1/8" = 1'-0"A-121

PARTIAL BASEMENT REFLECTED CEILING PLAN _PHASE 23

Scale: 1/4" = 1'-0"A-121

ENLARGED CEILING PLAN - 22

S AOV

NC

S AOV

NC

1' - 7"

MST-1 lattice pattern wall tile at full extents of window surround.

Metal tile trim at exposed edge

Sliding glass transaction windows

2'

5'

2"

3' - 10" 3' - 0" 3' - 10" 3 5/8"

A-501

Terminate at full tile

12' - 6 5/8" +/-

Painted Gyp. Bd.

8'

0"

8'

4"

SSB-1

SSB-1 joint 2'

6"

FP2' - 9"2' - 9"

2'

6" 2'

2"

A-501

Worksurface supports.

Max. spacing 3'-6" O.C.

A-501

A-501

2' - 9" 2' - 9" 2' - 9"

Open kneespace

FP 3' - 0" 2' - 6" 2' - 9" 3' - 0" FP

2'

6" 2'

2"

2'

6"

4" 6'

7'

2"

Worksurface supports.

Max. spacing 3'-6" O.C. 7

A-501

A-501

A-501

A-501

A-501

3'

2" 4'

2"

EQ EQ

7'

2"

ICE

REF

2'

1'

2'

6"

Gyp. Bd. soffit

Glass window with HM perimeter framing.

Interior butt-joined panels.

Clear tempered glass.

Glass film GF-1

1'

0"

8' - 5"

3' - 0"FP

MST-2 mosaic tile full extent of backsplash, to underside of cabinet and soffit.

A-601

A-601

A-501

SD-1 TD-1HS-1

A-501

2'

7'

2"

1'

2' - 6" 1' - 6"FP

2'

6"

MST-2 mosaic tile full extent of backsplash.

Metal tile edge trim at exposed edge

Gyp. Bd soffit to ceiling.

All cabinets in exam room to be locking, typ.

TD-1SD-1 HS-1

A-501

A-501

A-501

7'

2"

2'

1'

2'

6"

FP 2' - 9" 2' - 9"

MST-2 mosaic tile full extent of backsplash.

All cabinets in exam room to be locking, typ.

Gyp. Bd. soffit to ceiling

FP

TD-1SD-1 HS-1

A-501

A-501

A-501

Wall protection see finish plan.

9" 1'

2"

1'

6"

4 1/2"4 1/2"4 1/2"

Headwall outlets, see engineering drawings.

3' - 4" Column

1' - 10" 6"6" 1' - 8"

8 1/2"

2'

4'

4"

7'

2"

Vision windows with partial privacy film. See opposite side elevation for additional information

2' - 3" 4' - 2" 2' - 3"

1'

8"

2'

6"

Worksurface supports.

Max. spacing 3'-6" O.C.

A-501

7'

2" 2'

6"

FP2' - 9"2' - 6"FP

Gyp. Bd soffit

A-501

REF

2'

6" 1'

2'

7'

2"

2' - 6" 2' - 9" 2' - 9" FP

HOLD

MIN. 32"

FP 2' - 9"

2' - 6" 1' - 6"1' - 3" 2' - 9" FP

Open for trash

Gyp. Bd soffit

Outlets above counter, see engineering drawings

MST-2 mosaic tile full extent of backsplash.

Metal tile edge trim at exposed edges

HS-1TD-1

SD-1

A-501

A-501

A-501

A-501

1'

9"

Similar to CSWK_WALL CABINET detail. Adjust height, no undercabinet light

Total qty. 14 metal locker units - 15" W each

Sloped top

FP2' - 6"

3'

0" 3'

0"

4"

4'

4" 2'

7'

2"

2' - 3" 9"2' - 3" 4' - 2"

TV, by owner

5'

4"

Glass window with HM perimeter framing. Clear tempered glass.

Glass film GF-1

1'

6"

See finish plan for wall protection

A-601

A-601

3'

6"

2'

6"

Worksurface

Worksurface supports.

Max. spacing 3'-6" O.C.

A-501

2'

6"

Worksurface supports.

Max. spacing 3'-6" O.C.

Column

A-501

Provide additional countertop bracing as required at column protrusion

Sloped top

3'

0" 3'

0"

4"

1'-6" min. 6' - 3" ea.

1' - 3"

7'

2"

1'

2'

2'

6"

FP 2' - 9" 2' - 9" 3' - 0" 3' - 0" 1' - 6" FP

Open kneespace

MST-2 mosaic tile full extent of backsplash.

All cabinets in exam room to be locking, typ.

Gyp. Bd soffit to ceiling

Worksurface supports.

Max. spacing 3'-6" O.C.

A-501

TD-1

SD-1 HS-1

A-501

A-501

A-501

FP

3 eq.

4' - 6"FP FP

2 eq.

2' - 9"FP

6'

4"

7'

2"

Gyp. enclosed column

All cabinets in exam room to be locking, typ.

Gyp. Bd soffit to ceiling

A-501

Wall protection see finish plans

9" 1'

2"

1'

6"

4 1/2"4 1/2"4 1/2"

Headwall outlets, see engineering drawings.

3'

2"

4'

4"

7' - 7"

8 1/2"

1' - 1"

6" 1' - 8" 1' - 10" 6"

PCTW-1

MST-2 to ceiling, full length of wall

MTB-1 base

3'

0" 2'

0"

1'

0" 2'

0"

PCTW-1

MST-2 to ceiling, full length of wall

2'

0" 1'

0"

2'

0"

MTB-1 base

RH-1

GB-18

GB-42

3'

0"

SD-1

PCTW-1

MTB-1 base

MST-2 to ceiling, full length of wall

2'

0" 1'

0"

2'

0" 3'

0"

PCTW-1

MTB-1 base

MST-2 to ceiling, full length of wall

TD-1

MI-1830

GB-36

Wall sconce

SD-12'

0" 1'

0"

2'

0" 3'

0"

1'

3"

PCTW-1

MST-2 to ceiling, full length of wall

MTB-1 base

GB-36

3'

0" 2'

0"

1'

0" 2'

0"

PCTW-1

MST-2 to ceiling, full length of wall

MTB-1 base

2'

0" 1'

0"

2'

0"

GB-18

GB-42

TTD-1

3'

0"

PCTW-1

MST-2 to ceiling, full length of wall

MTB-1 base

Metal tile trim at outside corner

TD-1

SD-1

MI-1830

Wall sconce

2'

0" 1'

0"

2'

0"

1'

3"3'

0"

PCTW-1

MST-2 banding, full length of wall

MTB-1 base

2'

0" 1'

0"

2'

0" 3'

0"

FP 1' - 6"

Eq

6'

4"

Gyp. Bd. Soffit

1'

6"

1' - 9" 1' - 9" FP

Bench, quartz top surface

A-501 6

A-501

Sim

Handrail at ramp location See specifications.

Provide same configuration at opposite elevation of ramp

3'

0"

1' - 0"

3'

0"

2"

1/

8" ø 2 1/2"

Stainless steel wall bracket

Stainless steel handrail

Refer to specification section 057300 Decorative Metal Railings

Manufacturers wall connection hardware

R E G

I STERED ARC

H

I T E C T

WILLIAM

CURTISS

AYARS

ST

AT

E OF OHIO

William C. Ayars, License #7259 Expiration Date 12/31/2021

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440) 546-9696

FAX: (440) 546-9699

Project…