S02. Drawings_FINAL CD SET.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--RENOVATE RADIATION THERAPY Federal contract opportunity
- Solicitation number
- 36C25021B0003_1
About this file
This file provides details on a federal solicitation to renovate the Radiation Therapy department at the Louis Stokes Cleveland VA Medical Center. The solicitation seeks to renovate approximately 5,000 square feet of the existing Radiation Therapy suite to create additional exam rooms and dressing areas and update infrastructure. The solicitation number is 36C25021B0003_1 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The goal of the project is to renovate the Radiation Therapy Department located at 10701 East Blvd. in Cleveland, Ohio.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02. Site Visit Information.pdf | ||
| S02. Calculation of Self-Performed and Sub-Contracted Work.pdf | ||
| S02. Solicitation 36C25021B0003_1.pdf | ||
| S02. Specs Vol 2.pdf | ||
| S02. JA Sole Source - Russwin_Redacted.pdf | ||
| S02. JA Sole Source - Notifier Fire Alarm_Redacted.pdf | ||
| S02. JA Sole Source - Hill-Rom_Redacted.pdf | ||
| S02. Brand Name or Equal Memo.pdf | ||
| S02. Safety.pdf | ||
| S02. Wage Determination.pdf | ||
| S02. Bid Opening Instructions.pdf | ||
| S02. Specs Vol 1.pdf | ||
| S02. JA Sole Source - Lenel_Redacted.pdf | ||
| S02. RFI Form.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
EAST BLVD.
E.
S
T.
EA
ST
B
LV
D
MAGNOLIA DR.
HA
ZE
L
DR
E. 108 ST.
MT. SINAI DR.
MARTIN LUTHER KING DR.
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231, OCT 1978
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
6"
6"
6"
6"
LOUIS STOKES CLEVELAND VA MEDICAL CENTER
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
DRAWING INDEX
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
ARCH JOB NO.:
SITE PLAN
Scale = None
True North
Fredrick, Fredrick & Heller Engineers, Inc.
Mechanical & Electrical Engineers 672 East Royalton Road, Broadview Heights, Ohio 44147
Plan North
Perspectus Architecture LLC Architect 13212 Shaker Square, Cleveland, Ohio 44120
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center U.S. Department of Veterans Affairs
PhaseARCHITECT OF RECORD STAMPCONSULTANT
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
541-20-102
RENOVATE RADIATION THERAPY
G-001
COVER SHEET RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
FINAL CONSTRUCTION DOCUMENTS
August 14, 2020 19-120
A-101 PARTIAL BASEMENT DEMOLITION PLANS
A-111 PARTIAL BASEMENT FLOOR PLANS
A-121 PARTIAL BASEMENT REFLECTED CEILING PLANS
A-401 INTERIOR ELEVATIONS
A-501 MILLWORK DETAILS
A-601 SCHEDULES & DETAILS
E-001 ELECTRICAL LEGEND AND GENERAL NOTES
E-002 PARTIAL BASEMENT ELECTRICAL AND TECHNOLOGY KEY PLAN
ED-101 PARTIAL BASEMENT LIGHTING DEMOLITION PLANS
ED-111 PARTIAL BASEMENT POWER DEMOLITION PLANS
ED-121 PARTIAL BASEMENT FA AND SECURITY DEMOLITION
EL-101 PARTIAL BASEMENT LIGHTING PLANS
EP-111 PARTIAL BASEMENT POWER PLANS
EP-121 PARTIAL SECOND FLOOR ROOF ELECTRICAL PLAN
EY-121 PARTIAL BASEMENT FIRE ALARM AND SECURITY PLANS
E-501 ELECTRICAL DETAILS
E-502 ACCESS CONTROL RISER AND DOOR DETAILS
E-503 FIRE ALARM RISER DIAGRAM
E-504 FIRE ALARM DETAILS
E-601 LIGHTING FIXTURE SCHEDULE
E-602 PANELBOARD SCHEDULE
M-001 HVAC LEGEND AND GENERAL NOTES
M-002 AIR BALANCE CRITERIA
MD-101 PARTIAL BASEMENT HVAC DUCTWORK DEMOLITION PLANS
MD-111 PARTIAL BASEMENT HVAC PIPING DEMOLITION PLANS
MH-101 PARTIAL BASEMENT DUCTWORK PLANS
MH-102 PARTIAL SECOND FLOOR ROOF MECHANICAL PLAN
MP-111 PARTIAL BASEMENT HVAC PIPING PLANS
M-501 HVAC DETAILS
M-601 HVAC SCHEDULES
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
M-801 PARTIAL BASEMENT AIR BALANCE PLAN
T-001 TECHNOLOGY LEGEND AND GENERAL NOTES
TD-101 PARTIAL BASEMENT TECHNOLOGY DEMOLITION PLANS
T-101 PARTIAL BASEMENT TECHNOLOGY PLANS
T-501 TECHNOLOGY DETAILS
T-502 TECHNOLOGY DETAILS
G-001 COVER SHEET
G-002 GENERAL INFORMATION
G-101 PARTIAL BASEMENT PHASING PLANS
G-102 PARTIAL BASEMENT LIFE SAFETY PLANS
GENERAL
ARCHITECTURAL
ELECTRICAL
MECHANICAL TECHNOLOGY
INTERIOR
I-101 PARTIAL BASEMENT FLOOR FINISH PLAN
I-102 PARTIAL BASEMENT WALL FINISH PLAN
I-601 FINISH SCHEDULE, LEGEND & DETAILS
PLUMBING
P-001 PLUMBING AND MEDICAL GAS LEGEND AND GENERAL NOTES
PD-101 PARTIAL UNDERGROUND PLUMBING DEMOLITION PLANS
PD-102 PARTIAL BASEMENT PLUMBING DEMOLITION PLANS
PD-111 PARTIAL BASEMENT MEDICAL GAS DEMOLITION PLANS
PL-101 PARTIAL UNDERGROUND PLUMBING PLANS
PL-102 PARTIAL BASEMENT PLUMBING PLANS
PG-111 PARTIAL BASEMENT MEDICAL GAS PLANS
P-501 PLUMBING AND MEDICAL GAS DETAILS
P-601 PLUMBING AND MEDICAL GAS SCHEUDLES AND ISOMETRICS
FIRE PROTECTION
FX-001 FIRE SUPPRESSION LEGEND AND GENERAL NOTES
FX-101 PARTIAL BASEMENT FIRE SUPPRESSION PLAN KEY PLAN - BASEMENT
REVISIONS DATE
FINAL CONSTRUCTION DOCUMENT SUBMISSION 08/14/2020
anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic ab abv a/c acous act adj aff alt alum anod approx arch auto board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing bd betw bldg blk blkhd bm bot brdg brg brk bsmt bur ci cj clg cl clr cll cntr cmu co col conc conn const cont coord corr cs ctr ctw cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center combined towel and waste d dbl dcs deg demo dia dim(s) disp dn dr ds det dwg dwr dw depth double diaper changing station degrees demolition diameter dimension(s) dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior ea ec eifs ej elec elev emerg eq equip es etr ew ewc exh exist exp exp'd ext fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant fa fb fcu f/f fd fdn fe fec fhc fin flr fluor fr ga galv gb gc gl gr gyp bd gauge galvanized grab bar general contractor glass grade gypsum board h hb hc hdbd hdcpd hdwr hdwd hm horiz hpdl hr ht htg htr hvac hw hwh high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater id in incl insul int inside diameter inch include (inclusive) insulation interior janitor joist jan jst knock down knock out kd ko l lam lav lb lf lim lt ltg lvr length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver marb mas mat max mech memb mfr mh mi min marble masonry material maximum mechanical membrane manufacturer manhole mirror minimum not applicable not in contract number nominal not to scale n/a nic no nom nts owner overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional o oa oc ocaff od ohdr oph ovrd o/o op'g opp opt plbg pmld pnl plywd pol pp pr prefin prefab proj psc psf psi in pt ptd pnt ptn pvc pvmt qty plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point paper towel dispenser painted partition polyvinylchloride pavement quantity r ra rad rag rd rec ref reg reinf req'd riser return air radius return air grille roof drain receptacle refrigerator register reinforcement (reinforcing) required solid core schedule soap dispenser smoke detector saddle section sheet similar sanitary napkin dispenser stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems sc sched sd smkd sdl sect sht sim snd sp spec spkr spklr spr sq sq in sy ss std stl stor struc sucp sys t t/g or t&g tg td tel temp temp'd terr thk thld toc tos tod tom toj top tow ttd typ thread tongue and groove tempered glass trench drain telephone temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall toilet tissue dispenser typical undercut underground unfinished unlimited unless noted otherwise urinal uc ug unfin unlim uno ur v vert vest vif vendor vertical vestibule verify in field w w/ w/o w/w wc wd wh win wg wt wwf width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric yd yard c c/c cab't cb cem cl cfm cg contractor center to center cabinet catch basin cement center line cubic feet per minute corner guard fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet frt frtwd ft ftg furr fvc misc mo mtd mtg mtl mull miscellaneous masonry opening mounted mounting metal mullion pbd pcf perim pg bd pl plas plam particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate res ret rev rh rm ro rvs resilient return revised (revision) robe hook room rough opening reverse
3' -6
1' -6
Shower valve
Shower head
Receptacle
Push plate
Thermostat
Humidistat
8"
4' -0
Phone jack
Light switch
CTW-1 MI-1 18"x36" MI-2 18"x18"
3'-0" 5'
PTD-1
4' -6
RH-1
1'
6"
SND-1
4'
0"
SD-1
2'
3/
4"
TTD-1
4'
6"
Fire extinguisher
Cabinet may occur
House Keeping
4'
6"5' -6
3' -0
Mop basin
Service faucet & controls
MBH-1, TYP
US-1
GB-36 3'-0"
6"
2' -1
0"
GB-18 1'-6"
GB-42 3'-6"
2' -1
0" 3'
-4 "1'-0" 3'-6"
3'-4"
Fa ce o f w al l
Fa ce o f w al l
6' -8
• Typical accessory items. Some items may not occur in project.
4' -0
4' -0
8" 8"
Finish Floor Line
3' -4
3'
-0
1'-6"
-Building, wall and detail section mark
-Interior/exterior elevation reference
-Enlarged plan or detail reference
-Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
1/A2-1
A
A
New Existing
XXX-XX Ceiling Type Ceiling HeightXX'-XX"
Back to back boxes NOT permitted Stagger Boxes
UNO
6"
Partition assembly
Door frame
TYP of all frames that occur at room corner locations, UNO
Joint compound and tape
5/8" GYP BD
MTL studs
Control joint
CONT stud track
CONT stud track
Channel stud REINF as required at wall mounted devices
Midpoint at door opening
CONT channel REINF
Double studs at jamb opening 20 GA MIN, 18 GA at openings over 3'-0"
Door Opening
Door Opening
EXIST STRUC above
GYP BD control joint
Hollow MTL frame
MTL studs coped to fit
TYP MTL studs A
See specifications for sealant type.
All joints 1" wide or more are to be laid up in beads and tooled to profile indicated.
All joints are to be primed before bond breaking rod is installed.
Install bond breaking rod with roller to proper depth. No sharp tools permitted.
1.
2.
3.
4.
Notes:
B C
Wall material varies
07 92 00 - Bond breaker rod
07 92 00 - Sealant
Joint Schedule Dimensions
A B C 3/8" 1/8" 1/4"
1/2" 1/8" 3/8"
5/8" 1/8"
3/4" 1/8"
7/8" 1/8"
1" 1/8"
3/8"
3/8"
3/8"
3/8"
5/8" Type X GYP BD MTL studs
Control joint, both sides
MAX
1/2"
5/8" Type X GYP BD
TYP of all control joints located in rated wall assemblies
MAX
1/2"
MAX
1/2"
1 13/16"
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:2
AM
G-002
GENERAL INFORMATION RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
STANDARD ABBREVIATIONS
STANDARD MOUNTING HEIGHTS
STANDARD SYMBOLS
TYP ELECTRICAL JUNCTION DETAIL TYP FRAME LOCATIONTYP GYP BD CONTROL JOINT
TYP GYP BD DETAILTYP SEALANT DETAIL
FIRE RESISTANT CONTROL JOINT
REVISIONS: DATE:
UP UP
35.5
35.5
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
PATIENT TRAVEL
PATIENT TRAVEL
EXAM 1
BB212
ELEC
BB245
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
TLT-B
BB220
EXAM 5
BB218
EXAM 5
BB218
MECH.
BB217
CORRIDOR
BB200B
EXAM 6 /
PROCEDURE
BB219
TLT-A
BB227
NURSE WORK
BB242A
TP
TP
TP
TP
TP
35.5
35.5
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
PATIENT TRAVEL
PATIENT TRAVEL
WORK
BB244
WORK
BB243
CONF. RM.
BB241
CORRIDOR
BB200C
ALCOVE
BB226A
CO
RR
ID
OR
BB
0D
SUB WAIT
BB226
NURSE WORK
BB240A
HALL
BB240 RECEPT. WORK
BB242
RECEPTION
BB210A
ENTRY
BB210 WAITING
BB211
WORK
BB246
CORRIDOR
BB200A
EXAM 2
BB213
EXAM 3
BB214
EXAM 4
BB215
TP
TP
TP
TP
All work in waiting and corridors during Phase 2 to be completed during off hours. Refer to individual plans for additional information.
Exam
BB214
Exam
BB215
Exam
BB216
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB225
Break
BB231
Control Area
BB230
Physicist
BB238
Nurse
BB240
Staff
BB242
Reception
BB211
Doctor
BB237
Chief
BB239
Wait BB212Corridor
BB210
Corridor
BB210A
Corridor
BB221
Corridor
BB210D
Corridor
BB210E
Bio Med
BB233
Linear Accelerator
BB232
Toilet
BB228
Chiller
BB234
Dosimetry
BB222
Stair 6
BS6
Mech
BB217
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB225
Control Area
BB230
Corridor
BB221
Bio Med
BB233
Linear Accelerator
BB232
Chiller
BB234
Dosimetry
BB222
Stair 6
BS6
Chief
BB239
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
NURSE WORK
BB242A
The following chart describes the amounts of time allotted for each phase. Also included is activation time for the VAMC to transition/move staff and equipment between phases.
The project will consist of 2 phases. Certain areas within each phase will need to occur in a certain order and for a specific period of time.
Phase Name: Duration in Days from Notice calendar days to Proceed (NTP)
Submission Phase 60 days day 1-60 Phase 1 90 days day 61-150
VA Activation 30 days day 151-180 Phase 2 90 days day 181-270
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:3
AM
G-101
PARTIAL BASEMENT PHASING
PLANS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"G-101
RADIOLOGY RENOVATION_PHASE 11
Scale: 1/8" = 1'-0"G-101
RADIOLOGY RENOVATION_PHASE 22
PHASING DURATIONS
LIFE SAFETY LEGEND
1 HR Fire Barrier 2 HR Fire Barrier
1 HR Smoke Barrier 0 HR Smoke Partition Hazardous Room
Fire Extinguisher Cabinet
Exit Sign
- indicates Illumination side and arrow direction
2 HR Fire and Smoke Barrier
Note: This sheet to be printed in color. If not printed in color, request color sheet from printer
E Exit
St ai r t o
Su b-
Ba se m en t
St ai r t o
Fi rs t F lo or
C
PT
7' -1
0"
TD
E=
'-1
1"
E
CPT = 57'-4"
Gray hatch indicates area under construction
EXAM 6 /
PROCEDURE
BB219
NURSE WORK
BB242A
EXAM 5
BB218
MECH.
BB217
TLT-B
BB220
STAFF BREAK
RM.
BB230
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
Design Code
Occupancy Separations (Table 6.1.14.4.1 & 6.1.14.4.3)
Fire Suppression
Construction Type (Table 20.1.6.1)
Fire Ratings (Table A.8.2.1.2) Exterior Bearing Walls
Interior Bearing Walls
Column/Beams/Girders
Floor-Ceiling Assemblies Roof-Ceiling Assemblies Interior Non-bearing Walls Exterior Non-bearing Walls
Exit Enclosures/Passageways (7.3.1.2.1.3)
Shaft Enclosures (8.6.5)
Exit Access Corridors (20.3.6.1.3)
Corridor width (20.2.3.2)
Dead End Corridors (20.2.5.2.1)
Smoke Compartments (20.3.7.3.2)
Smoke Barriers (20.3.7.1.1)
Hazardous Area Protection (20.3.2.1, 8.7.1.1) High hazard areas (20.3.2.3)
Travel Distances Room remote point to exit (20.2.6.2.2) Common path of travel (20.2.5.3.1)
2018 NFPA 101 Life Safety Code
2 hours between Ambulatory Healthcare and Healthcare 1 hour between Ambulatory Healthcare and Business 1 hour between Ambulatory Healthcare and Industrial
Fully Sprinklered
Type II (222), Greater than 2 stories
2 hours 1 hour supporting roof only 2 hours 1 hour support roof only 2 hours 1 hour supporting roof only 2 hours 1 hour 0 hour 0 hour
1 hour for less than 4 stories 2 hours for 4 stories or more
1 hour for existing if building is fully sprinklered 2 hours for 4 stories or more 1 hour for less than 4 stories
No rating
44" minimum
50' maximum
40,000 SF maximum
1 hour
1 hour or extinguishing system 1 hour and extinguishing system
200' maximum 100' maximum
New Ambulatory Healthcare Occupancies Code Information
St ai r t o
Su b-
Ba se m en t
St ai r t o
Fi rs t F lo or
C
PT
'-4
TD
E=
'-4
" E
Gray hatch indicates area under construction
CONF. RM.
BB241
WORK
BB243
WORK
BB244
WORK
BB246
ENTRY
BB210
WAITING
BB211
RECEPTION
BB210A
CORRIDOR
BB200A
RECEPT. WORK
BB242
SUB WAIT
BB226
CORRIDOR
BB200C
NURSE WORK
BB240A
HALL
BB240
EXAM 4
BB215
EXAM 3
BB214
EXAM 2
BB213
St ai r t o
Su b-
Ba se m en t
St ai r t o
Fi rs t F lo or
C
PT
9' -5
TD
E=
'-4
E
EXAM 2
BB213
EXAM 3
BB214
EXAM 4
BB215
CORRIDOR
BB200A
RECEPTION
BB210A
ENTRY
BB210
SUB WAIT
BB226NU
RS
E
W
OR
K
BB
0A
WORK
BB244
HALL
BB240
WORK
BB243
RECEPT. WORK
BB242
Elec
BB245
CONF. RM.
BB241
CORRIDOR
BB200D
ALCOVE
BB226A
CORRIDOR
BB200C
WORK
BB246
Bio Med
BB233
Linear Accelerator
BB232
MECH.
BB217NURSE WORK
BB200E
NUTRITION
BB213A
WAITING
BB211
Linear Accelerator
BB225
CT Scan
BB223
Dosimetry
BB222
Stair 6
BS6
Control Area
BB200F
Chiller
BB234
Corridor
BB221
Mechanical
BB224
Bio Med
BB233
Linear Accelerator
BB232
Exam
BB216
Exam
BB215
Exam
BB214
Corridor
BB210B
Corridor
BB210A
Corridor BB210 Wait
BB212
Staff
BB242
Corridor
BB210E
Nurse
BB240
Physicist
BB238
Mold Room
BB236
Doctor
BB237
Chief
BB239
Reception
BB211
Toilet
BB228
Corridor
BB210D
Linear Accelerator
BB225
CT Scan
BB223
Dosimetry
BB222
Stair 6
BS6
Control Area
BB230
Chiller
BB234
Corridor
BB221
Mechanical
BB224
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219
EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
MECH.
BB217NURSE WORK
BB242A
NUTRITION
BB213A
Bio Med
BB233
Linear Accelerator
BB232
Linear Accelerator
BB225
CT Scan
BB223
Dosimetry
BB222
Stair 6
BS6
Control Area
BB234
Chiller
BB235
Corridor
BB221
Mechanical
BB224
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:5
AM
G-102
PARTIAL BASEMENT LIFE SAFETY
PLANS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"G-102
BASEMENT LIFE SAFETY PLAN_PHASE 11
LIFE SAFETY CODE INFORMATION
BASEMENT - SMOKE COMPARTMENTS
Scale: 1/8" = 1'-0"G-102
BASEMENT LIFE SAFETY PLAN_PHASE 22
Scale: 1/8" = 1'-0"G-102
BASEMENT LIFE SAFETY PLAN_FINAL CONSTRUCTION3
CODED NOTES LIFE SAFETY
1 Cover exist sign durung Phase 1 2 Provide interim life safety measures to discourage egress into this dead end corridor
35.5
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
TP
TP
TP
TP
4'-2"
5' - 2"
5'
1/
2" 3'
1"
9'
5/
8" 4'
1" 6
1/ 8"
4'
6" 3'
1/ 8"
3'
7"
7/
8"
3'
7"
2'
1/
2"
3'
1"
3/ 8"
5' - 10"
5'
0"
5' - 0"
4'
0"
TP
6' - 0"
5'
0"
7 7
Exam
BB214
Exam
BB215
Exam
BB216
Mech
BB217
Office
BB218
Nutrition
BB219
Stretcher
BB220
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB225
Computer
BB229
Break
BB231
Control Area
BB230
Physicist
BB235
Mold Room
BB236
Physicist
BB238
Nurse
BB240
Electric
BB241
Staff
BB242
Reception
BB211
View/Cons
BB213
Locker Rm
BB226
HAC
BB227
Doctor
BB237
Chief
BB239
Wait BB212Corridor
BB210
Corridor
BB210A
Corridor
BB210B
Corridor
BB221
Corridor
BB210D
Corridor
BB210E
Bio Med
BB233
Linear Accelerator
BB232
Office
BB226B
Office
BB226C
Toilet
BB226A
Toilet
BB228
Chiller
BB234
Dosimetry
BB222
Stair 6
BS6
35.5
35.5
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
TP
TP
TP
6' - 11"
5' - 0"
5'
0"
5'
0" 17
9 9
TP
Exam
BB214
Exam
BB215
Exam
BB216
Mech
BB217
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB225
Control Area
BB230
Corridor
BB210
Corridor
BB210A
Corridor
BB221
Corridor
BB210D
Bio Med
BB233
Linear Accelerator
BB232
Chiller
BB234
Dosimetry
BB222
Stair 6
BS6
Toilet
BB228
Chief
BB239
Reception
BB211
Doctor
BB237
Corridor
BB210E
Staff
BB242
Nurse
BB240
Physicist
BB238
Mold Room
BB236
A. Refer to specifications section Demolition for additional requirements and information.
B. Contractor shall construct and maintain at all times temporary partitions in accordance with 'Temporary
Partition Detail' located this sheet. Temporary partitions shall be located to separate all occupied areas from construction areas.
C. Coordinate all new penetrations and/or openings with other associated trades.
D. The VA shall remove, prior to construction, all items that VA desires to salvage, U.N.O. All remaining items indicated to be demolished shall be removed by the contractor and legally disposed of in accordance with the project specifications.
E. Contractor shall coordinate all demolition with the entire set of contract documents for full scope of demolition work required for the project.
F. Existing conditions shown on the drawings are not guaranteed to be complete. The contractor shall verify all existing conditions, dimensions, and materials required for the contracted work. Report all discrepancies to architect prior to fabrication, erection, and/or installation.
G. Contractor shall provide dust proof barricades & vestibule with dust removing walk off mat (tacky mat) to separate scope of work from occupied areas.
H. Contractor shall provide HEPA filtered negative air machine(s) to maintain negative pressure to scope of work area ensuring no dust will be transferred to occupied areas. Provide visual pressure monitoring device at dust proof barricade to confirm pressure. Dust monitoring shall be by VA COR. See specification section General Requirements
I. All demolition work being done outside temporary partitions is to be appropriately sealed off to prevent the transmission of dust and debris and minimize disruption to visitors, residents, and staff. Coordinate location of barriers with VA COR.
J. The hospital's smoke and fire suppression system shall remain in operation within the scope of work during the entire construction phase.
K. Field verify locations of all existing walls. Report any discrepancies to field COR.
L. Some items may be indicated in the demolition drawings and demolition notes which are not necessarily demolition work, but are included to describe the overall scope of the project and aid in the demolition coordination. The contractor is responsible for all work required to complete the work of the overall project.
M. Flooring demolition includes the removal of existing floor finishes, including VCT, sheet vinyl, ceramic tile, quarry tile, carpet and other finishes, grouts, mastics, and setting beds complete to existing concrete floor slab or other substrate ready for new floor finishes. Concealed multiple floor finishes may be present in several locations. Floor preparation shall be by the installing contractor.
O. Remove partitions indicated to the underside of the structure above.
P. Remove existing ceilings only where new ceilngs are indicated on Reflected Ceiling Plans. Demolition of ceilings includes grid, tile, supports, soffits and related items as any ceiling mounted electrical and mechanical fixtures and supports contained within. See Reflected Ceiling Plans for areas noted to patch/repair existing ceilings. Salvage ceiling tiles these areas as necessary to complete patch work.
Q. Plug abandoned floor openings with new concrete. Plug shall match existing slab depth and shall be structurally sound to carry floor load of 100 lbs/sf unless noted otherwise. Coordinate with structural Drawings.
R. All fire rated assemblies (columns, shafts, walls, etc.) Shall be maintained or be relocated/patched.
Match existing fire rating unless noted otherwise.
S. Where new doors are indicated, cut openings in existing wall. Prepare openings for new door. Patch adjacent walls to match existing. Provide lintels as required for new openings.
T. After removal of existing partitions, contractor shall provide cementitious infill and floor leveler to prepare floor surface for new finishes. Refer to finish plan and schedule for new finishes and where patching/ repair of existing finishes occurs.
U. Where new wall finishes are scheduled to occur, remove all vinyl wallcovering, wall protection and other finishes. Prepare wall substrate as required for new paint finish.
V. Additional temporary partitions may be required due to sequencing of work. Contractor shall determine location and quantity of all temporary partitions in accordance with ICRA and VA requirements prior to submittal of bid.
W. See mechanical drawings for plumbing, HVAC and fire protection demolition. See electrical drawings for all power and lighting demolition.
X. Debris removal shall not interfere with VA operations and shall occur during off hours as determined by VA
COR.
Y. All noise generating operations, including cutting of ceilings, walls and floor, coring, drilling, etc. shall be scheduled in accordance with the project specifications Section General Requirements.
Existing construction to remain
Construction to be demolished
Temporary Partition
PROJECT AREA
Area Accessible to Public
Construction Area
Corrugated Polypropylene Medium Duty Fire-Rated Boards (Global Plastic Sheeting - GPS Ultra Corr FR Plastic Boards or equal) both sides on, 09 22 16 - 3 5/8" Metal studs @ 24" o.c.
Seal perimeter (deck, walls, floor) and all penetrations to comply with ICRA requirements
Provide new ceiling, trim, wall angle on public side
Notes:
1. See also 01 00 00 General Requirements.
2. Contractor to frame around existing duct work, pipes, etc. that interfere with temporary partition.
3. Provide "Ball-in-the-wall" pressure monitors at all contractor entrances.
Remove portion of existing ceilings and patch @ temporary partitions
Continuous sound batt insulation
Use continuous white tape to cover seams, cover screw head locations and seal perimeter, Typ.
Note: Plastic sheeting and white tape shall meet the NFPA 101 requirements for a Class A interior finish for flame spread and smoke development
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
NURSE WORK
BB242A
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:2
AM
A-101
PARTIAL BASEMENT DEMOLITION
PLANS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"A-101
PARTIAL BASEMENT DEMOLITION PLAN_PHASE 11
Scale: 1/8" = 1'-0"A-101
PARTIAL BASEMENT DEMOLITION PLAN_PHASE 22
GENERAL NOTES DEMOLITION
LEGEND_DEMOLITION PLAN
CODED NOTES DEMOLITION PLAN
1 Remove existing plumbing fixtures. See MEP drawings for additional information, cap utilities if fixture will not be replaced. Remove all accessories associated with plumbing fixtures including partitions, grab bars, dispensers, racks, shelving, sink base, disposals, etc.
2 Rough opening for new door. See new construction plan for location. Patch and repair wall to match existing.
3 Refer to finish plan for partial Ph.1 flooring this area. Prepare substrate to receive new rubber flooring.
4 Access to existing Imaging areas must be maintained and protected for patient transport during required hours (as set by VA). Work within corridor to be completed during off hours.
5 Remove existing ceiling systems, supports and ties. See RCP for new ceiling system.
6 Existing - no work this area.
7 Where existing walls are to remain, remove any existing wallcovering, trim and wall protection. Patch and repair substrate to receive new paint/scheduled finish.
8 Remove existing glass block. Maintain base of wall as anchor for new wall construction at ramped area.
9 Remove existing flooring and base. Prepare substrate as required to receive new flooring. See finish plan and schedule for new scheduled finishes.
10 Remove existing door, frame, anchors, thresholds, and hardware as indicated within limits of construction.
Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
11 Remove existing millwork.
12 Remove existing locker units.
13 Remove existing transaction window and sill.
14 Existing thermostat to be removed. Consult with Owner for special reqirements for handling items that may contain mercury.
15 Existing fume hood to be removed and all associated utilites to removed/capped. See engineeing drawings.
16 Existing headwall devices and utilites to removed/capped. See engineeing drawings.
17 Existing wall mounted light boxes to be removed from corridor, see engineering drawings 18 Temporary worksurface to be removed only when new quartz counter is ready to be installed. Coordinate with active nurse users this area for best schedule of change out of countertop and coordination of equipment.
19 Portion of existing waiting area to remain operational through entire construction duration. All work in existing waiting area to be done during off hours. Contractor to coordinate with VA for optimal timing of work that can be completed during off hours. Temporary partition may be required.
TP Temporary Partition
KEY PLAN - BASEMENT
Scale: 1/2" = 1'-0"A-101
TEMPORARY PARTITION, TYP.5
35.532.5
32 36.5 38.5
B
C
A
D
E
38.6
PROJECT SCOPE
PROJECT SCOPE
7/A-401 6/A-401
4/A-401
/A
-4
12/A-401
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219 EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
2 22
A6 3
A6
A-111
A-111
EXAM 1
BB212
5/A-401
MECH.
BB217
8/ A-
/A
-4
9' - 6"
2'
1" 6'
5'
5/
8" 5'
5/ 8"
8'
3/
8"
2'
6"
6' - 2"
19' - 11 1/8"
9' - 4"
8' - 4"
8'
0"
8' - 0"
8'
0"
8' - 0"
/A
-4
NURSE WORK
BB242A12
BB218
BB219
BB217
BB220
BB230BB231
BB229
BB228
BB227
NUTRITION
BB213A
19' - 11 3/4"
/A
-4
O pp
Sim.
4' - 2" 8' - 5"
BB
A6
Bio Med
BB233
Linear Accelerator
BB232
Exam
BB216
Exam
BB215
Exam
BB214
Corridor
BB210B
Corridor
BB210A
Corridor
BB210
Wait
BB212
Staff
BB242
Corridor
BB210E
Nurse
BB240
Physicist
BB238
Mold Room
BB236
Doctor
BB237
Chief
BB239
Reception
BB211
Toilet
BB228
Corridor
BB210D
CT Scan
BB223
Corridor
BB221
Dosimetry
BB222
Stair 6
BS6
Mechanical
BB224
Linear Accelerator
BB225
Control Area
BB230
Chiller
BB234
35.532.5
32 36.5 38.5
B
C
A
D
E
38.6
5/A-401
3/A-401
9/ A-
2/A-401
1/A-40116/A-401
/A
-4
10/A-401
/A
-4
PROJECT SCOPE
PROJECT SCOPE
EXAM 2
BB213
EXAM 3
BB214
EXAM 4
BB215
CORRIDOR
BB200A
RECEPTION
BB210A
ENTRY
BB210
SUB WAIT
BB226NU
RS
E
W
OR
K
BB
0A
5/A-4015/A-401
Opp.
WORK
BB244
HALL
BB240
WORK
BB243
RECEPT. WORK
BB242
Elec
BB245
CONF. RM.
BB241
CORRIDOR
BB200D
ALCOVE
BB226A
CORRIDOR
BB200C
WORK
BB246
17/A-401
/A
-4
A6A6
2'
0"
8'
0"
5'
0"
8'
1/
2"
BB
BB
BB215
BB
0B
BB241
BB240A
BB210A
WAITING
BB211
16/A-401
16171717
18 1820 /A
-4
3'
2"
TP 20
EQ EQ
11 17
1. All partitions are type A1 unless noted otherwise. Refer to A-601, General Information for Partition Types.
2. Dashed equipment items shown for reference only and are not part of the General Contract. These items will be provided and installed by Owner. Contractor may need to coordinate specific fixture and equipment requirements if noted.
3. All cabinets shall be locking, unless noted otherwise.
4. Refer to I- series finish plans and schedules for new finishes per area, and where patch/match of existing finishes occurs.
5. Toilet Rooms: See A-401 for wall elevations, and A-601 for toilet accessory schedule
6. All dimensions are to face of GYP BD, U.N.O.
7. Contractor to verify all dimensions and conditions in the field prior to commencement of work. If drawings conflict with actual field conditions, contact COR before proceeding with work.
8. Provide concealed in-wall reinforcing/blocking for attachment of all millwork, casework, and/or accessories as required.
PROJECT AREA
24/A-401
/A
-4
25/A-401 23 /A
-4
TLT-A
BB227
36.5
36.5
28/A-401
/A
-4
29/A-401
/A
-4
TLT-B
BB220
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219
EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
MECH.
BB217NURSE WORK
BB242A
NUTRITION
BB213A
Bio Med
BB233
Linear Accelerator
BB232
Chiller
BB235
Control Area
BB234
Linear Accelerator
BB225
Corridor
BB221
Stair 6
BS6
Dosimetry
BB222
CT Scan
BB223
Mechanical
BB224
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:4
AM
A-111
PARTIAL BASEMENT FLOOR
PLANS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"A-111
PARTIAL BASEMENT FLOOR PLAN_PHASE 11
Scale: 1/8" = 1'-0"A-111
PARTIAL BASEMENT FLOOR PLAN_PHASE 22
GENERAL NOTES FLOOR PLAN
CODED NOTES FLOOR PLAN
1 Room is exising to remain. Refer to MEP drawings for extent of work within this area.
2 Patch and repair surface of existing column to receive new paint finish. Sheath with 5/8"
Gyp. Bd. on furring strips if required.
3 Access to toilet room must be maintained for patient use during hours of operation 4 Refer to MEP drawings for extent of work within this area.
5 Access to existing Imaging areas must be maintained and protected for patient transport during required hours (as set by VA). Work within corridor to be completed during off hours.
6 Temporary VCT flooring installed for use in Phase 1 portion of this area. See finish plan and schedule.
7 Headwall this location, see elevations and engineering drawings.
8 Work at corridor side of Reception & Nurse to be completed during off hours.
9 Infill area of removed window/door. Match wall construction of remaining partition.
10 Maintain existing slope of ramp this area.
11 Quartz surface countertop, exposed support angles. See elevations of Work area
BB233/232 for similar design intent.
12 Temporary plastic laminate countertop. Height at 2'-6", full width of wall. Provide counertop supports to be re-used upon final insallation of quartz surface (phase two) 13 Existing door and hardware to remain. Patch and repair door panel as needed to remove scratches and marks. Repaint door frame.
16 Installation of new Quartz surface to be coordinated with removal of temporary laminate counter.Coordinate with active nurse users this area for best schedule of change out of countertop and coordination of equipment.
17 Grommet locations, typ. (2"dia) , provide every 48"min. at open kneespaces - coordinate with locations of undercounter bracket to avoid overlapping. See countertop section detail.
18 Install new handrail at ramp location, see elevation.
19 Align 20 Temporary partition may remain in place depending on phasing requirements of Nurse
Station users.
21 Work to be completed during off hours.
22 Fire extinguisher cabinet TP Temporary Partition
KEY PLAN - BASEMENT
Scale: 1/4" = 1'-0"A-111
ENLARGED PLAN - TLT. A4
Scale: 1/4" = 1'-0"A-111
ENLARGED PLAN - TLT. B5
REVISIONS: DATE:
SCHEMATIC DESIGN SUBMISSION 01/31/2020
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
EX
ACT-1
8' - 0"
ACT-1
8' - 0"
ACT-1
8' - 0"
ACT-1
8' - 4"
ACT-1
8' - 0"
ACT-1
8' - 0"
ACT-1
8' - 0"
ACT-1
8' - 4"
EX
EX
EX
EX
EX
EX
EX EX EX
EX
EX
ACT-2
8' - 4"
ACT-1
8' - 4"
EXAM 1
BB212
NURSE WORK
BB242A
CORRIDOR
BB200B
EXAM 5
BB218
TLT-B
BB220
EXAM 6 /
PROCEDURE
BB219
ELEC
BB245
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
NUTRITION
BB213A
7 7
GYP.
7' - 2"
GYP.
7' - 2"
ACT-1
8' - 4"
1. See Interior Elevations for soffit heights at millwork.
2. See ceiling plan legend for ceiling types.
3. Ceiling heights on reflected ceiling plan are from finish floor to finish ceiling.
4. Unless noted otherwise, light fixtures shall be located as shown on the reflected ceiling plan.
5. Where the lights and accessories are shown to be recessed in ceiling tiles, they shall be centered in the ceiling tile unless noted otherwise.
6. Provide access panels in GYP BD ceilings as required by applicable codes and as required for mechanical, electrical and plumbing equipment. Access panels located in finished areas shall be painted to match adjacent surfaces.
7. No mechanical equipment requiring normal maintenance shall be installed above a gypsum board ceiling. Locate such items above acoustical tiles only. Notify architect if any such items are indicated above the gypsum board ceilings.
8. Exit signs and smoke detectors located shall be centered in corridors and located a distance of 1'-0" from wall to the center of the fixture unless noted otherwise. Locate exit signs as required by the authority having jurisdiction.
9. Soffits and bulkheads shall be laterally braced to resist horizontal movement.
10. Contractor shall coordinate all types of fixtures with electrical drawings. Fixtures shown on architectural drawings are for reference only and are indicated for location only.
Linear wall mounted light fixture
Recessed can light fixture
Directional recessed can light fixture
Pendant light fixture
2x2 Recessed light fixture
2x4 Recessed light fixture
5' x4" Recessed linear light fixture
GYP BD CLG or Soffit
1. Ceilings to be painted unless noted optherwise.
2. Epoxy paint in wet locations
ACT-1 Acoustical Ceiling system, Armstrong / Ultima Health Zone High NRC,
0.80 NRC/35 CAC - #1445
Size: 24" x 24" / Sq. lay in Grid: Prelude 15/16" White
ACT-2 Acoustical Ceiling system Armstrong / Ultima Health Zone High NRC,
0.80 NRC/35 CAC - #1935
Size: 24" x 48" / Sq. lay in Grid: Prelude 15/16" White
Exposed Structure suspended linear light fixture
Vanity light fixture
Wall sconce
Exit sign
Radiant Heat Ceiling Panel
Supply grill
Return grill(ES)
PROJECT AREA
Bio Med
BB233
Linear Accelerator
BB232
Exam
BB216
Exam
BB215
Exam
BB214
Corridor
BB210B
Corridor
BB210A
Corridor
BB210
Wait
BB212
Staff
BB242
Corridor
BB210E
Nurse
BB240
Physicist
BB238
Mold Room
BB236
Doctor
BB237
Chief
BB239
Reception
BB211
Toilet
BB228
Corridor
BB210D
Chiller
BB234
Control Area
BB230
Linear Accelerator
BB225
Corridor
BB221
Stair 6
BS6
Dosimetry
BB222
CT Scan
BB223
Mechanical
BB224
TLT-A
BB227
CHG.
BB228
CHG.
BB229
SPS STO.
BB231
STAFF BREAK
RM.
BB230
EXAM 6 /
PROCEDURE
BB219
EXAM 5
BB218
TLT-B
BB220
CORRIDOR
BB200B
EXAM 1
BB212
MECH.
BB217NURSE WORK
BB242A
Linear Accelerator
BB225
Corridor
BB221
Dosimetry
BB222
Stair 6
BS6
CT Scan
BB223
Mechanical
BB224
Linear Accelerator
BB232
Bio Med
BB233
Control Area
BB234
Chiller
BB235
32.5
32.5
D
E
ACT-2
8' - 4"
ACT-2
8' - 4"
GYP.
8' - 0"
ACT-1
8' - 4"
GYP.
8' - 0"
GYP.
8' - 0"
ACT-2
8' - 4"
ENTRY
BB210
RECEPTION
BB210A
RECEPT. WORK
BB242
6"
4'
0" 2'
0"
A-601
Sim
A-601
Sim35.5
35.5
32.5
32.5
36.5
36.5
38.5
38.5
BB
CC
AA
DD
EE
38.6
38.6
PROJECT SCOPE
PROJECT SCOPE
ACT-1
8' - 4"
ACT-1
8' - 4"
GYP.
9' - 0"
GYP.
9' - 0"
ACT-2
8' - 4"
GYP.
9' - 0"
GYP.
7' - 2"
ACT-1
8' - 4"
ACT-1
8' - 4"
ACT-1
8' - 4"
ACT-1
8' - 4"EX
ACT-2
8' - 4"
EXAM 2
BB213
EXAM 3
BB214
EXAM 4
BB215
CORRIDOR
BB200ARECEPTION
BB210A
ENTRY
BB210
WORK
BB246Elec
BB245
WORK
BB244
WORK
BB243
CONF. RM.
BB241
HALL
BB240
RECEPT. WORK
BB242
SUB WAIT
BB226
NU
RS
E W
OR
K
BB
0A
CORRIDOR
BB200C
CORRIDOR
BB200D
A-121
Sim
GYP.
8' - 0"
A-121
WAITING
BB211
GYP.
8' - 4"
ACT-1
8' - 4"
ACT-1
8' - 4"
ACT-1
8' - 4"
ACT-1
8' - 4"
GYP.
9' - 0"
Gyp Bd Headers to align with adjacent ACP ceiling system
8' - 4" U.N.O.
Recessed light fixture centered in square Gyp. Bd inset, see engineering drawings. Al ig n
Al ig n
Align
EQ EQ
EQ
EQ
A-601
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Louis Stokes Cleveland
VA Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consulting Engineers
BARBER & HOFFMAN, INC.
2217 East 9th Street, Suite 350 Cleveland, OH 44115-1257 216-875-0100/ (F) 216-875-0111 barberhoffman.com
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED WITHOUT THE
EXPRESSED WRITTEN CONSENT OF PERSPECTUS
ARCHITECTURE.
COPYRIGHT C 2019.
13212 Shaker Square Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CLEVELAND, OHIO
C :\U se rs
\b ga st on
\D oc um en ts \V
AM
P_
R R
T_ M en ta l H ea lth _R
_2
4_ bg as to n@ pe rs pe ct us ar ch .c om .rv t 8/
/2
9:
:0
AM
A-121
PARTIAL BASEMENT REFLECTED
CEILING PLANS
RENOVATE RADIATION THERAPY 541-20-102
08/14/2020 TEH EEV
Scale: 1/8" = 1'-0"A-121
PARTIAL BASEMENT REFLECTED CEILING PLAN _PHASE 14
GENERAL NOTES_CEILING PLAN
LEGEND_CEILING PLAN
KEY PLAN - BASEMENT
CODED REFLECTED CEILING PLAN...
1 No work this area, existing to remain.
2 Ceiling work in Corridor to be completed during off hours.
3 Privacy curtain track by contractor. Curtain provided by owner.
4 Gyp. Bd. soffit above wall cabinets, 7'-2" typical height U.N.O. Exposed faces are to be painted to match adjacent wall finish.
5 Gyp. Bd. header at 8'-0" AFF 6 Patch and extend ceiling grid from Phase 1 construction into new Reception area 7 Wall sconce, see elevation.
8 Wall washer, see engineering drawings 9 Provide temporary finished ceiling this area, to be removed during Phase 2 construction.
10 Gyp. Bd. accent plane - see typical detail "ENLARGED CEILING PLAN - 2" this sheet
Scale: 1/4" = 1'-0"A-121
ENLARGED CEILING PLAN - 11
Scale: 1/8" = 1'-0"A-121
PARTIAL BASEMENT REFLECTED CEILING PLAN _PHASE 23
Scale: 1/4" = 1'-0"A-121
ENLARGED CEILING PLAN - 22
S AOV
NC
S AOV
NC
1' - 7"
MST-1 lattice pattern wall tile at full extents of window surround.
Metal tile trim at exposed edge
Sliding glass transaction windows
2'
5'
2"
3' - 10" 3' - 0" 3' - 10" 3 5/8"
A-501
Terminate at full tile
12' - 6 5/8" +/-
Painted Gyp. Bd.
8'
0"
8'
4"
SSB-1
SSB-1 joint 2'
6"
FP2' - 9"2' - 9"
2'
6" 2'
2"
A-501
Worksurface supports.
Max. spacing 3'-6" O.C.
A-501
A-501
2' - 9" 2' - 9" 2' - 9"
Open kneespace
FP 3' - 0" 2' - 6" 2' - 9" 3' - 0" FP
2'
6" 2'
2"
2'
6"
4" 6'
7'
2"
Worksurface supports.
Max. spacing 3'-6" O.C. 7
A-501
A-501
A-501
A-501
A-501
3'
2" 4'
2"
EQ EQ
7'
2"
ICE
REF
2'
1'
2'
6"
Gyp. Bd. soffit
Glass window with HM perimeter framing.
Interior butt-joined panels.
Clear tempered glass.
Glass film GF-1
1'
0"
8' - 5"
3' - 0"FP
MST-2 mosaic tile full extent of backsplash, to underside of cabinet and soffit.
A-601
A-601
A-501
SD-1 TD-1HS-1
A-501
2'
7'
2"
1'
2' - 6" 1' - 6"FP
2'
6"
MST-2 mosaic tile full extent of backsplash.
Metal tile edge trim at exposed edge
Gyp. Bd soffit to ceiling.
All cabinets in exam room to be locking, typ.
TD-1SD-1 HS-1
A-501
A-501
A-501
7'
2"
2'
1'
2'
6"
FP 2' - 9" 2' - 9"
MST-2 mosaic tile full extent of backsplash.
All cabinets in exam room to be locking, typ.
Gyp. Bd. soffit to ceiling
FP
TD-1SD-1 HS-1
A-501
A-501
A-501
Wall protection see finish plan.
9" 1'
2"
1'
6"
4 1/2"4 1/2"4 1/2"
Headwall outlets, see engineering drawings.
3' - 4" Column
1' - 10" 6"6" 1' - 8"
8 1/2"
2'
4'
4"
7'
2"
Vision windows with partial privacy film. See opposite side elevation for additional information
2' - 3" 4' - 2" 2' - 3"
1'
8"
2'
6"
Worksurface supports.
Max. spacing 3'-6" O.C.
A-501
7'
2" 2'
6"
FP2' - 9"2' - 6"FP
Gyp. Bd soffit
A-501
REF
2'
6" 1'
2'
7'
2"
2' - 6" 2' - 9" 2' - 9" FP
HOLD
MIN. 32"
FP 2' - 9"
2' - 6" 1' - 6"1' - 3" 2' - 9" FP
Open for trash
Gyp. Bd soffit
Outlets above counter, see engineering drawings
MST-2 mosaic tile full extent of backsplash.
Metal tile edge trim at exposed edges
HS-1TD-1
SD-1
A-501
A-501
A-501
A-501
1'
9"
Similar to CSWK_WALL CABINET detail. Adjust height, no undercabinet light
Total qty. 14 metal locker units - 15" W each
Sloped top
FP2' - 6"
3'
0" 3'
0"
4"
4'
4" 2'
7'
2"
2' - 3" 9"2' - 3" 4' - 2"
TV, by owner
5'
4"
Glass window with HM perimeter framing. Clear tempered glass.
Glass film GF-1
1'
6"
See finish plan for wall protection
A-601
A-601
3'
6"
2'
6"
Worksurface
Worksurface supports.
Max. spacing 3'-6" O.C.
A-501
2'
6"
Worksurface supports.
Max. spacing 3'-6" O.C.
Column
A-501
Provide additional countertop bracing as required at column protrusion
Sloped top
3'
0" 3'
0"
4"
1'-6" min. 6' - 3" ea.
1' - 3"
7'
2"
1'
2'
2'
6"
FP 2' - 9" 2' - 9" 3' - 0" 3' - 0" 1' - 6" FP
Open kneespace
MST-2 mosaic tile full extent of backsplash.
All cabinets in exam room to be locking, typ.
Gyp. Bd soffit to ceiling
Worksurface supports.
Max. spacing 3'-6" O.C.
A-501
TD-1
SD-1 HS-1
A-501
A-501
A-501
FP
3 eq.
4' - 6"FP FP
2 eq.
2' - 9"FP
6'
4"
7'
2"
Gyp. enclosed column
All cabinets in exam room to be locking, typ.
Gyp. Bd soffit to ceiling
A-501
Wall protection see finish plans
9" 1'
2"
1'
6"
4 1/2"4 1/2"4 1/2"
Headwall outlets, see engineering drawings.
3'
2"
4'
4"
7' - 7"
8 1/2"
1' - 1"
6" 1' - 8" 1' - 10" 6"
PCTW-1
MST-2 to ceiling, full length of wall
MTB-1 base
3'
0" 2'
0"
1'
0" 2'
0"
PCTW-1
MST-2 to ceiling, full length of wall
2'
0" 1'
0"
2'
0"
MTB-1 base
RH-1
GB-18
GB-42
3'
0"
SD-1
PCTW-1
MTB-1 base
MST-2 to ceiling, full length of wall
2'
0" 1'
0"
2'
0" 3'
0"
PCTW-1
MTB-1 base
MST-2 to ceiling, full length of wall
TD-1
MI-1830
GB-36
Wall sconce
SD-12'
0" 1'
0"
2'
0" 3'
0"
1'
3"
PCTW-1
MST-2 to ceiling, full length of wall
MTB-1 base
GB-36
3'
0" 2'
0"
1'
0" 2'
0"
PCTW-1
MST-2 to ceiling, full length of wall
MTB-1 base
2'
0" 1'
0"
2'
0"
GB-18
GB-42
TTD-1
3'
0"
PCTW-1
MST-2 to ceiling, full length of wall
MTB-1 base
Metal tile trim at outside corner
TD-1
SD-1
MI-1830
Wall sconce
2'
0" 1'
0"
2'
0"
1'
3"3'
0"
PCTW-1
MST-2 banding, full length of wall
MTB-1 base
2'
0" 1'
0"
2'
0" 3'
0"
FP 1' - 6"
Eq
6'
4"
Gyp. Bd. Soffit
1'
6"
1' - 9" 1' - 9" FP
Bench, quartz top surface
A-501 6
A-501
Sim
Handrail at ramp location See specifications.
Provide same configuration at opposite elevation of ramp
3'
0"
1' - 0"
3'
0"
2"
1/
8" ø 2 1/2"
Stainless steel wall bracket
Stainless steel handrail
Refer to specification section 057300 Decorative Metal Railings
Manufacturers wall connection hardware
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2021
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
Project…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .