This document describes a federal contract opportunity for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services between $10,000,000 to $20,000,000 for Project 691A4-20-201 at the VA Greater Los Angeles Healthcare System, VA Sepulveda Ambulatory Care Center located in North Hills, California. Work will include general construction, alterations, mechanical, electrical and utility systems, necessary demolition, and other items to complete the project. The solicitation will be issued on June 23, 2021 via sam.gov as a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed on VIP. The NAICS code is 236220 with a size standard of $39.5M. A site visit will be scheduled after solicitation release. James Barber of the Network Contracting Office 22 Long Beach is the point of contact and may be reached at james.barber@va.gov.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PENETRATIONS NOTE

- M -

MAIN CIRCUIT BREAKER

NEUTRAL

MCB

N

- N -

PHASE

POWER

PANEL

PWR

PNL

- R -

- P -

ROOM

RECEPTACLE

RM

RECEPT

- B -

AMPERE

- A -

A

- C -

CIRCUIT

CIRCUIT BREAKER

BUILDING

CONDUIT

BLDG

CKT

C

CB

- E -

EG

- G -

GROUNDG, GND

EQUIPMENT GROUND

ABBREVIATIONS

VOLT OR VOLTAGE

VOLT AMPEREVA

V

- V -

WATTW

- W -

- J -

- K -

KILOVOLT AMPERE

KILOVOLT

JUNCTION BOX

KV

KW

KVA

JB

KILOWATT

ABOVE FINISHED FLOORAFF

UON UNLESS OTHERWISE NOTED

- U -

E1.01

AC

X

MOTOR TYPE

REVISION

RISER TAGPOINT OF CONNECTION

SCHEDULE NUMBER

# LIGHT FIXTURE TYPE

INDICATES DETAIL NUMBER

SHEET NUMBER TO FIND DETAIL

SPECIFIC NOTE/

POINT OF DISCONNECTION

REFERENCE NOTE

ANNOTATIONS

EWC ELECTRIC WATER COOLER

T-001

TELECOMMUNICATIONS

GENERAL NOTES:

ABBREVIATIONS VA

EHRM ELECTRONIC HEALTH RECORD MODERNINATION

CERNER INFORMATION TECHNOLOGY COMPANY

CEDT CERNER EHRM DEPLOYMENT TEAM

EUD END USER DEVICE

CIH CERTIFIED INDUSTRIAL HYGIENIST

LBVAMC LONG BEACH VA MEDICAL CENTER

MDF MAIN DISTRIBUTION FRAME

TR TELECOMMUNICATIONS ROOM

OIT OFFICE OF INFORMATION TECHNOLOGY

3D

3D

WALL MTD DATA OUTLET

W/3 CAT 6A DROPS

FLOOR MTD DATA OUTLET

W/3 CAT 6A DROPS

SEE DRAWING T-504

ABBREVIATIONS IT

SM

MM

SFP

ORL

OTDR

UTP

LAN

SINGLE MODE FIBER

MULTI MODE FIBER

SMALL FORM FACTOR PLUGGABLE TRANSCEIVER

OPTICAL RETURN LOSS

OPTICAL TIME DOMAIN REFLECTOMETER

UNSHIELDED TWISTED PAIR

LOCAL AREA NETWORK

EIA

TIA

OS1, OS2

OS2

ELECTRONIC INDUSTRIES ASSOCIATION

TELECOMMUNICATION INDUSTRY ASSOCIATION

TYPE OF SINGLE MODE FIBER

AIR BLOWN SINGLE MODE FIBER

1. PROVIDE EQUIPMENT SUBMITTALS AND SHOP DRAWINGS IN ACCORDANCE

WITH THE SPECIFICATIONS AND THE PROJECT SCHEDULE. NO INSTALLATION

SHALL PROCEED WITHOUT APPROVAL OF THE SHOP DRAWINGS.

2. MINIMAL STORAGE WILL BE AVAILABLE ON THE CONSTRUCTION SITE. CABLING

CONTRACTOR RESPONSIBLE FOR RECEIVING AND STORING MATERIALS AND

FOR COORDINATING MATERIAL DELIVERY TO THE JOB-SITE.

3. COMMUNICATION CABLES INSTALLED SHALL BE INSTALLED IN ACCORDANCE

WITH THE REQUIREMENTS DETAILED HEREIN AND SHALL BE FREE OF KINKS,

TWISTS, SHARP BENDS, UNNECESSARY LOOPS OR WORKMANSHIP DEFECT.

4. PROPERLY SEAL WALL PENETRATIONS THROUGH FIRE RATED WALL & FLOOR

USING EZ PATH DETAILED ON T-504.

5. RUN OPEN CABLE FOR EACH SYSTEM IN SLEEVES, J-HOOKS DEDICATED FOR

THE SYSTEM.

6. SEPARATE AND BUNDLE CABLE BY SYSTEM.

7. MAINTAIN EIA/ TIA RECOMMENDED SEPARATIONS BETWEEN CABLING OF

DIFFERENT SYSTEMS. 6'' FROM LIGHT FIXTURES. 24'' FROM 480V & 12'' FROM

208V.

8. MAINTAIN RECOMMENDED SEPARATIONS BETWEEN CABLING AND

INTERFERENCE PRODUCING ELECTRICAL DEVICES SUCH AS POWER CABLING,

ELECTRICAL PANELS, FLUORESCENT LIGHTS, BALLAST RELAYS, ELECTRIC

MOTORS, MOTOR CONTROLLERS, VFD, TRANSFORMERS AND OTHER

ELECTROMAGNETIC DEVICES. SEE NOTE 7.

9. WHERE CABLE IS OPEN ON J-HOOK SYSTEM, RUN PARALLEL OR

PERPENDICULAR TO WALLS AND SUPPORT A MINIMUM OF EVERY 5 FEET USING

APPROVED J-HOOKS.

10. ALL CABLE HOOKS AND OTHER CABLE SUPPORT DEVICES SHALL BE ATTACHED

TO THE BUILDING STRUCTURE IN ACCORDANCE WITH CODES AND

SPECIFICATIONS.

11. NO OPEN CABLE SHALL BE DRAPED OVER OR SUPPORTED ON PLUMBING,

ELECTRICAL, MEDICAL GAS, FIRE SUPPRESSION, OR OTHER PIPING OR

DUCTWORK OR DROP CEILING.

12. ALL CABLES TO BE PLENUM RATED.

13. THE CABLE LENGTH FROM THE TERMINATION POINT IN TR TO EUD IN THE

WORK AREA SHALL NOT EXCEED 295FEET INDEPENDENT OF MEDIA TYPE.

14. THE 295FEET INCLUDES AN ALLOWANCE OF 10FEET FROM EUD TO DEVICE AND

AN ADDITIONAL 24 FEET FROM PATCH PANEL TO ACTIVE COMPONENTS IN TR.

15. VISUALLY INSPECT CONNECTIONS ON CABLE TO ENSURE PROPER

COMPLIANCE

WITH EIA/TIA 568B TERMINATION.

16. INSPECT ALL EXPOSED PORTIONS OF THE CABLE TO INSURE A MINIMUM OF 4

TIMES THE CABLE DIAMETER BEND RADIUS AT ANY POINT.

17. ENSURE NO CABLE BUNDLES OR TIE POINTS DISPLAY KINKS, SHARP BENDS,

CREASING OR DEFORMATION OF OUTER SHEATH OR SIGNS OF EXCESSIVE

PULLING FORCE.

18. IN TR, CABLES SHOULD BE COMBED AND DRESSED UP BEFORE BUNDLING AND

USING VELCRO STRAPS. ZIP TIES OR TWIST TIES SHALL NOT BE USED. STRAPS

SHALL BE SPACED AT APPROPRIATE DISTANCE TO ENSURE CABLES ARE HELD

TOGETHER.

19. ON THE RACK THE CABLES SHOULD BE DIVIDED IN THE MIDDLE, WHERE HALF

FLOWS TO THE LEFT AND HALF FLOWS TO THE RIGHT.

20. ALL CABLING SHALL BE INSTALLED BY CABLE MANUFACTURER'S CERTIFIED

INSTALLER.

21. BEFORE ACCEPTANCE OF ANY NEWLY INSTALLED COMMUNICATION WIRING,

THE CABLE WILL UNDERGO SEVERAL LEVELS OF TESTING TO ENSURE THAT ALL

MATERIALS AND INSTALLATION CONFORM TO STANDARD INCLUDED IN THE

DRAWINGS AND SPECIFICATIONS. THIS WILL INCLUDE BOTH THE UTP AND FIBER

OPTICS SYSTEMS. FAILURE TO MEET THE DRAWINGS AND SPECIFICATIONS

SHALL CONSTITUTE REASON TO REJECT THE INSTALLATION UNTIL ALL

PROBLEMS ARE SOLVED.

22. ALL RECORDED TESTING RESULTS SHALL REMAIN IN THE APPROPRIATE TR.

TEST BOTH CABLES AND THEIR CORRESPONDING CONNECTING SYSTEMS AS A

WHOLE UNIT TO ENSURE SYSTEM INTEGRITY.

23. TEST ALL FIBER OPTIC CABLE AND COMPONENTS COMPRISING THE

BACKBONE SYSTEM. TEST ALL FIBER STRAND IN BOTH DIRECTION. USE OTDR

OPERATING AT BOTH 1310 AND 1550 NM WAVELENGTHS.

24. PHYSICAL LABELING FOR ALL CABLES AND RELATED COMPONENTS IS

REQUIRED. COMPONENTS LABELING WILL DEPEND HEAVILY ON ADHERING TO A LOGICAL

LABELING SCHEME TO ENABLE EXPEDIENT PATCH PANEL, DATA JACK AND

SWITCH PORT IDENTIFICATION.

25. PROVIDE FOR ALL NEW CABLING IN THE BUILDINGS WITH AN AS-BUILT, DRAWINGS

ELECTRONICALLY AND PAPER, FOR THE CABLE PLANT. EACH TR WIRING

CLOSETS CABLE PLANT AS-BUILT WILL BE INSTALLED IN A FOLDER ON THE

BACK OF THE DOOR SECURED IN A HOLDER ATTACHED TO THE DOOR.

METHOD OF PROCEDUREMOP

SPECIFIC NOTE/

REFERENCE NOTE

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

26. PROVIDE A DETAILED AND COMPLETE CABLING SHOP DRAWING. SUBMIT FOR APPROVAL BY VA.

CABLING SHOP DRAWING SHALL INDICATE QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS TO SHOW QUANTITIES AND PART NUMBERS FOR ALL COMPONENTS INCLUDING BUT NOT LIMITED TO PATCH PANELS, CABLE, SERVER CABINETS AND EQUIPMENT RACKS AND ALL OTHER ASSOCIATED COMPONENTS.

INCLUDE THE FOLLOW:

1). DETAIL AND ELEVATION DRAWINGS: PROVIDE DETAIL TR RACK ELEVATION, ENLARGED TR

ROOM LAYOUT.

2). BUILDING COMPOSITE FLOOR PLANS: PROVIDE BUILDING FLOOR PLANS SHOWING END USER

DEVICE (EUD) OUTLET LOCATIONS AND CONFIGURATION, TYPES OF JACKS, DISTANCE FOR EACH

CABLE, AND CABLE ROUTING LOCATIONS.

3). FLOOR PLANS TO INCLUDE:

a. FINAL ROOM NUMBERS AND ACTUAL BACKBONE CABLING AND PATHWAY LOCATIONS

(HORIZONTAL AND VERTICAL) AND LABELING.

b. RISER FLOOR PENETRATION / DATA POLE LOCATION. SCAN THE FLOOR FOR REBARS

c. INPUTS AND OUTPUTS OF EQUIPMENT IDENTIFIED ACCORDING TO LABELS INSTALLED ON

CABLES AND EQUIPMENT.

d. DEVICE LOCATIONS WITH LABELS.

e. EZ PATH SLEEVES.

f. WIRING DIAGRAM.

g. LABELING AND ADMINISTRATION DOCUMENTATION.

ALL TEST RESULTS SHOULD BE INDICATED ON SPREAD SHEET THAT WILL

PROVIDE CABLING INVENTORY, LOCATIONS, ETC.

27. ALL DATA & TELEPHONE CABLES THAT ARE REMOVED WILL BE RECYCLED BY VA.

PLEASE DISPOSE OFF CABLES TO VA PROVIDED DUMPSTERS.

28. THE LOCATION OF END USER DEVICES (EUD) SHOWN ON THESE DRAWINGS ARE

APPROXIMATE AND ARE SUBJECT TO VERIFICATION BY THE CONTRACTOR.

CONTRACTOR SHALL REMOVE EXISTING EUD DATA OUTLETS AND PROVIDE NEW

EUD DATA OUTLETS AT THE SAME LOCATION.

29. CONTRACTOR SHALL INCLUDE INSTALLED COST FOR ADDITIONAL 15% OF CABLE

REQUIRED FOR THE PROJECT, INCLUDING ADDITIONAL 15% SPACE IN 48 PORT

PATCH PANEL AND ADDITIONAL FACEPLATE WITH RJ45 JACKS (ASSUMING 3 JACKS

PER FACEPLATE).

30. ALL CAT 6A CABLES TO BE PLENUM AND POE RATED.

31. THE CONTRACTOR TO COORDINATE WITH VA AND REMOVE ABANDONED SYSTEMS/

ITEM IDENTIFIED BY VA. EXAMPLE INCLUDE OLD FIRE ALARM PANELS, BATTERIES

AND CHARGERS, TELEPHONE EQUIPMENT NOT IN USE, OLD 110 BLOCKS NOT IN

USE, EXISTING FIBERS, EXISTING FIBER DISTRIBUTED LINE MODULE (FOLM).

32. ALL UNUSED CABLES IN UNDERGROUND CONDUIT SYSTEM INCLUDING

ASSOCIATED MANHOLES SHALL BE PULLED OUT AND REMOVED BY CONTRACTOR

AND TRANSPORTED TO VA SUPPLIED DUMPSTERS INTENDED FOR RECYCLING BY

VA. CONTRACTOR SHALL COORDINATE WITH VA WHO WILL IDENTIFY UNUSED

CABLES WITHIN EACH MANHOLE. THERE ARE EXISTING LEAD SHEATHED CABLES

THAT WILL REQUIRE SPECIAL HANDLING AND COORDINATE WITH VA.

PATCH CORDS TABLE

SHOP DRAWINGS

IN ADDITION TO REQUIREMENTS HEREIN, COMPLY WITH

SHOP DRAWING REQUIREMENTS ON SHEET GI003.

T-002

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

T-001 TELECOMMUNICATIONS SYMBOL LIST, GENERAL NOTES ABBREVIATIONS,

SCOPE DESCRIPTION

T-002 TELECOMMUNICATIONS DRAWING LIST

TS001 TELECOMMUNICATIONS SITE PLAN - FIBER & CELL TUBE DISTRIBUTION

1.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

SHEET INDEX (CONTINUED)

SHEET NUMBER SHEET TITLE

1.T-112 TELECOMMUNICATIONS FIRST FLOOR PLAN

1.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN

10.T-102 TELECOMMUNICATIONS BASEMENT FLOOR PLAN

10.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

10.T-112 TELECOMMUNICATIONS FIRST FLOOR PLAN

10.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN

10.T-122 TELECOMMUNICATIONS SECOND FLOOR PLAN

20.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

20.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN

22.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

22.T-121 TELECOMMUNICATIONS SECOND FLOOR PLAN

23.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

24.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

25.T-111 TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS BASEMENT FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS BASEMENT FLOOR PLAN

TELECOMMUNICATIONS BASEMENT FLOOR PLAN

TELECOMMUNICATIONS BASEMENT FLOOR PLAN

TELECOMMUNICATIONS BASEMENT FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS SECOND FLOOR PLAN

TELECOMMUNICATIONS SECOND FLOOR PLAN

TELECOMMUNICATIONS SECOND FLOOR PLAN

TELECOMMUNICATIONS SECOND FLOOR PLAN

TELECOMMUNICATIONS THIRD FLOOR PLAN

TELECOMMUNICATIONS THIRD FLOOR PLAN

TELECOMMUNICATIONS THIRD FLOOR PLAN

TELECOMMUNICATIONS THIRD FLOOR PLAN

TELECOMMUNICATIONS FIRST FLOOR PLAN

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM A154 & B120A

TELECOMMUNICATIONS RACK ELEVATIONS TR B120A

45.T-101 45.T-111 63.T-111 70.T-111 99.T-101 99.T-102 99.T-103 99.T-104 99.T-111

200.T-111 200.T-112 200.T-113 200.T-114

201.T-111 1.T-401

1.T-401A

SHEET INDEX (CONTINUED)

SHEET NUMBER SHEET TITLE

200.T-121 200.T-122 200.T-123 200.T-124 200.T-131 200.T-132 200.T-133 200.T-134

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM B-B110

TELECOMMUNICATIONS RACK ELEVATIONS

10.T-401 10.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 1A-115

TELECOMMUNICATIONS RACK ELEVATIONS 1A-115

20.T-401 20.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2-A118C

TELECOMMUNICATIONS RACK ELEVATIONS 2-A118C

20.T-402 20.T-402A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 103

TELECOMMUNICATIONS RACK ELEVATIONS 103

22.T-401 22.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 106

TELECOMMUNICATIONS RACK ELEVATIONS 106

23.T-401 23.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 102A

TELECOMMUNICATIONS RACK ELEVATIONS 102A

24.T-401 24.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM A109

TELECOMMUNICATIONS RACK ELEVATIONS A109

25.T-401 25.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM B125

TELECOMMUNICATIONS RACK ELEVATIONS B125

25.T-402 25.T-402A 45.T-401

45.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 105

TELECOMMUNICATIONS RACK ELEVATIONS 105

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 102

TELECOMMUNICATIONS RACK ELEVATIONS 102

63.T-401

63.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM

TELECOMMUNICATIONS RACK ELEVATIONS

70.T-401

70.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM G104

TELECOMMUNICATIONS RACK ELEVATIONS G104

99.T-401

99.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM G105

TELECOMMUNICATIONS RACK ELEVATIONS G105

99.T-402

99.T-402A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM

TELECOMMUNICATIONS RACK ELEVATIONS

200.T-401

200.T-401A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM

TELECOMMUNICATIONS RACK ELEVATIONS

200.T-402

200.T-402A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 1001B

TELECOMMUNICATIONS RACK ELEVATIONS 1001B

200.T-403

200.T-403A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 1356

TELECOMMUNICATIONS RACK ELEVATIONS 1356

200.T-404

200.T-404A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 1525

TELECOMMUNICATIONS RACK ELEVATIONS 1525

200.T-405

200.T-405A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2466

TELECOMMUNICATIONS RACK ELEVATIONS 2466

200.T-406

200.T-406A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2664

TELECOMMUNICATIONS RACK ELEVATIONS 2664

200.T-407

200.T-407A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2165

TELECOMMUNICATIONS RACK ELEVATIONS 2165

200.T-408

200.T-408A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 2365

TELECOMMUNICATIONS RACK ELEVATIONS 2365

200.T-409

200.T-409A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 3406

TELECOMMUNICATIONS RACK ELEVATIONS 3406

200.T-410

200.T-410A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 3573

TELECOMMUNICATIONS RACK ELEVATIONS 3573

200.T-411

200.T-411A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 3143

TELECOMMUNICATIONS RACK ELEVATIONS 3143

200.T-412

200.T-412A

ELECTRICAL ENLARGED PLAN - MCR ROOM 115 (MODIFIED)201.T-401

TELECOMMUNICATIONS DETAILST-501

TELECOMMUNICATIONS DETAILST-502

TELECOMMUNICATIONS DETAILST-503

TELECOMMUNICATIONS DETAILST-504

TELECOMMUNICATIONS DETAILST-505

T-507

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDAT-508

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDAT-509

OPTICAL SINGLE MODE FIBER HORIZONTAL & VERTICAL RISERT-601

4.T-101 TELECOMMUNICATIONS BASEMENT FLOOR PLAN

4.T-401

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM A29B10.T-403

TELECOMMUNICATIONS RACK ELEVATIONS A29B10.T-403A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM

TELECOMMUNICATIONS RACK ELEVATIONS1.T-402A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM10.T-404

TELECOMMUNICATIONS RACK ELEVATIONS C-00410.T-404A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 202

TELECOMMUNICATIONS RACK ELEVATIONS 202

22.T-402 22.T-402A

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 112

TELECOMMUNICATIONS RACK ELEVATIONS 112

99.T-403 99.T-403A

TELECOMMUNICATIONS ENLARGED PLAN TR 57A & 115 & ELEVATION99.T-404

TELECOMMUNICATIONS ENLARGED PLAN TR ROOM 3326

TELECOMMUNICATIONS RACK ELEVATIONS 3326

200.T-413 200.T-413A

201.T-401A 201.T-401B

TELECOMMUNICATIONS RACK ELEVATIONS

TELECOMMUNICATIONS RACK ELEVATIONS

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDAT-506

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDAT-510

NOT USED

NOT USED

10.T-402 10.T-402A

TELECOMMUNICATIONS MANHOLE FOLDOUTS - SEPULVEDA

ENGINEERING SHOP

MOTOR POOL

WESTERN RESEARCH

WESTERN RESEARCH

INCINERATOR MH-32

MH-2

MH-3

MH-1

MH-5

MH-1

MH-31

MH-30

MH-29MH-28MH-27

MH-26

MH-25

MH-24

MH-25

MH-21

MH-22

MH-20

MH-9

MH-10 MH-11

MH-8

MH-12

MH-13

MH-14

MH-15

MH-16

MH-17

MH-18

MH-19

MH-33

MH-34

18 14

20 20 22

BLDG. 200

Audie Murphy Dr.

Audie M urphy Dr.

Chester W. Nimitz DrGeorge S. Patton Jr Dr Chester W. Nimitz Dr

Audie Murphy Dr.

George S. Patton Jr Dr

Geo rge

S. P att on Jr

D r

Ki nz ie S t Kinzie St

W oodley Ave.

W oodley Ave.

Plummer St.

W oodley Ave.

Plummer St. Plummer St. Plummer St.

H askell Ave.

H askell Ave.

H askell Ave.

Chester W. Nimitz Dr

C hester W

. N im itz D r

H askell Ave.

C hester W

. N im itz D r

John Basilone Dr.

John Basilone Dr.

Lassen St.

W oodley Ave.

en St. Lassen St. Lassen St. Lassen St.

John Basilone Dr. John Basilone Dr.

BLDG. 201

BLDG. 10

BLDG. 5

BLDG. 99

BLDG. 70

BLDG. 25BLDG. 20

BLDG. 23

WHEELCHAIR TRACK

BLDG. 7

BLDG. 1

CHAPEL

BLDG. 21BLDG. 22

BLDG. 4

BLDG. 62

BLDG. 45

BLDG. 104

BLDG.

BLDG. 202

BLDG. 44 BLDG. 46

BLDG. 52BLDG. 47

BLDG. 60

BLDG. 63

BLDG. 24

4 5

5 4

5 4

SEE GENERAL

NOTE 4

SEE GENERAL

NOTE 4

SEE GENERAL

NOTE 2

SEE GENERAL

NOTE 4

MH-6

MH-7

TELECOMMUNICATIONS SITE PLAN (REFERENCE ONLY)

SCALE: 1/128" = 1' - 0"

NORTH

TS001

TELECOMMUNICATIONS SITE PLAN

FIBER & CELL TUBE DISTRIBUTION

5 - 3'' DUCTS

2 - TELEPHONE

1 - 2 #12 RL. - F.A.

2 - SPARE

3'' DUCTS

2 - TELEPHONE

1 - 2 #12 RL. - F.A.

1 - OXYGEN ALARM CIR.

2 - SPARE

1 1/2'' - COND. TELEPHONE

1 1/4'' - COND. #12 RL. - F.A.

2'' - COND. OXYGEN ALARM CIR.

2'' - COND. SPARE

3'' DUCTS

1 - TELEPHONE

1 - 2 #12 RL. - F.A.

1 - 4 PR. #14 RL. - RADIO

2 - 13 #14 RL. - COC. PAGING

1 - 5C PR. CABLE - R.D.

1 - SPARE

2'' - COND. TELEPHONE

1 1/4'' - COND. 2 -#12 RL. - F.A.

2'' - COND. 4 - PR. #14 RL. RADIO

2'' - COND. 13 - #14 RL. DOC PAGING

2'' - COND. 32 - PR. CABLE - RD.

2'' - COND. SPARE

3'' DUCTS

2 - TELEPHONE

1 - 4 #12 RL. - F.A.

1 - 4 PR. #14 RL. - RADIO

1 - 13 #14 RL. - DOC PAGING

1 - 3 PR. CABLE RD.

1- OXYGEN ALARM

1 - SPARE

1 1/2'' - COND. TELEPHONE

1 1/4'' - COND. 2 #12 RL. - F.A.

2'' - COND. - 4 PR #14 R.L. RADIO

1 1/4'' - COND. 1 PR. #14 R.L. MICRO

2'' - COND. 13 #14 RL.

2 - 2'' COND. DOC. PAGING

SPARE

3'' - COND. - TELEPHONE

1 1/4'' - COND. 2 #12 RL. - F.A.

2'' - COND. - 4 PR #14 R.L. RADIO

1 1/4'' - COND. 1 PR. #14 R.L. MICRO

2''- COND. OXYGEN ALARM CIR.

3''- COND. - 1 - 32 PR. & CABLE - R.D.

2'' - COND. 13 #14 R.L.

1 - 3''C. SPARE

3'' - COND. - TELEPHONE

3'' - COND. - 3 PR #14 R.L. RADIO

2''- COND. OXYGEN ALARM CIR.

3''- COND. - 51 PR. CABLE - R.D.

2 - 2'' COND. - FUT. T.V. & 1-2''C. SPARE

3'' DUCTS

2 - TELEPHONE

1 - 2 - #12 RL. - F.A.

1 - 2 - PR. #14 R.L. RADIO

1 - 13 - #14 RL. DOC. PAGING

1 - 16 - PR. CABLE - R.D. & 2 SPACES

2 - 2'' COND. TELEPHONE

1 1/ 2'' - COND. - 6 #12 RL. F.A.

2'' - COND. - 4 PR. #14 RL. - RADIO

2'' - COND. - 13 #14 RL. - DR. PAGING

0 - COND. - 16 PR. CABLE & 1 - 3''C SPARE

2 - 3'' COND. TELEPHONE

1 1/ 2'' - COND. - 6 #12 RL. F.A.

2'' - COND. - 13 #14 RL. DOC. PAGING

2 - 3'' COND. SPARE

6 -4

3 6 -

12 8 -

20 8 -

26 8 -

8 -30

3'' DUCTS

2 - TELEPHONE

1 - 6 - #12 RL. - F.A.

1 - 13 - #14 RL. DOC. PAGING

2 - DOCTORS IN & OUT

1 - FUT. INTERCOM & 1 - SPACES

2 - TELEPHONE

1 1/ 2'' - COND. - 10 #12 RL. F.A.

2'' - COND. - 4 PR. #14 RL. - RADIO

2 - COND. 13 - #14 RL. DOC. PAGING

2'' - COND

0 - COND. INTERCOM

2 - COND DR. IN & OUT & 1 - 3'' SPARE

3'' DUCTS

1 - TELEPHONE

1 - 4 #12 RL. - F.A.

1 - 4 PR. #14 R.L. - RADIO

1 - 13 - #14 RL. DOC. PAGING

1 - PR CABLE R.D.

1 - INTERCOM

2 - SPACES

3'' - COND. - TELEPHONE

1 1/4'' - COND. 4 #12 RL. - F.A.

2'' - COND. - 4 PR #14 R.L. RADIO

2'' - COND. 13 #14 RL. - DOC. PAGING

2'' - COND. PR CABLE R.D.

0 - COND. INTERCO

3'' - COND. SPARE

2'' - COND. TELEPHONE

1 1/4'' - COND. 2 -#12 RL. - F.A.

2'' - COND. 4 PR. #14 RL. RADIO

2'' - COND. 13 #14 RL. - DR. PAGING

2'' COND. 32 PR CABLE - 1 - 2''C - SPARE

2'' - COND. TELEPHONE

1 1/4'' - COND. 2 -#12 RL. - F.A.

2'' - COND. 3 #14 RL. - DR PACING

3'' - COND. 65 PR. CABLE - R.D.

2 - 2'' COND. SPARE

3'' DUCTS

1 - TELEPHONE

1 - 2 -#12 RL. - F.A.

1 - 13 #14 RL. - DOC. PAGING

1 - 6 PR CABLE R.D.

2 - SPARE

3'' DUCTS

1 - TELEPHONE

1 - 2 -#12 RL. - F.A.

1 - 4 PR #14 RL - RADIO

1 - 13 #14 RL. - DOC. PAGING

2 - SPARE

2'' - COND. TELEPHONE

1 1/4'' - COND. 2 -#12 RL. - F.A.

2'' - COND. 4 - PR. #14 RL. RADIO

2'' - COND. 13 - #14 RL. DOC PAGING

3'' - COND. SPARE

2'' - COND. 4 - PR. #14 RL. RADIO

3'' - COND. SPARE

38 6 -

40 6 -

(VA SEPULVEDA CAMPUS, NORTH HILLS)

LEGEND

BUILDING IN SCOPE

0' 64' 128' 256'

SCALE: 1/128" = 1'-0"

NEW TUBE CELL/FIBER IN EXISTING DUCT BANK.

# KEY NUMBER SIGNAL DUCT BANK. SEE ABOVE.

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

PHASE 1 CONCEPTUAL STEP BY STEP INSTALLATION OF

NEW FIBERS TO ALL THE BUILDINGS FROM

MCR (SEPULVEDA)

STEP 1 IN COORDINATION WITH VA IDENTIFY ALL UNUSED

COPPER CABLES IN EACH MANHOLE AND DUCT BANK

STEP 2 PULL OUT ALL EXISTING UNUSED COPPER CABLES AND

DISPOSE OFF SITE

STEP 3 MANDREL EXISTING SPARE CONDUIT AND CONDUITS

FROM WHICH COPPER HAS BEEN PULLED OUT. MANDREL

SHALL BE DONE MANHOLE TO MANHOLE.

STEP 4 BLOW PULL WIRE THROUGH THE CONDUIT DUCT BANKS

STEP 5 REPEAT STEP 1 THROUGH STEP 4 UNTILL ALL MANHOLES

ARE COMPLETE

STEP 6 PULL TUBE CELL IN ALL CONDUITS/MANHOLES AS SHOWN

ON PLANS

STEP 7 TEST TUBE CELL TO MAKE SURE THERE IS NO

OBSTRUCTION. LABEL EACH TUBE CELL “FROM TO”

STEP 7 INSTALL AIR BLOWN FIBERS FORM MCR TO EACH

BUILDING AS SPECIFIED IN THE PLANS

STEP 8 INSTALL FIBER TO EACH TR WITHIN THE BUILDING PER

FIBER RISER DIAGRAM

STEP 9 TERMINATE FIBER ON FIBER PATCH PANEL IN EACH TR

AND MCR

STEP 10 LABELL FIBER/TUBE CELL AS PER LABELING

REQUIREMENTS

STEP 11 TEST ALL FIBERS USING OTDR EQUIPMENT

STEP 12 REPLACE ALL FIBER THAT FAILED THE TEST

SEE DRAWING T-506 TO T-510 FOR

EXISTING MANHOLE FOLDOUTS. USE EXISTING

SPARE CONDUITS WHERE AVAILABLE TO PULL IN

NEW TUBE CELL/FIBER OR USE EXISTING CONDUIT

WHICH HAS FIBER TO PULL IN NEW TUBE

CELL/FIBER. EXISTING FIBER WILL BE REMOVED

AFTER NEW FIBER SYSTEM IS IN PLACE AND

COMMISSIONED.

ALL EXISTING SPARE AND REUSED CONDUITS SHALL BE

MANDREL AND CLEANED OUT BEFORE PULLING

NEW CELL/TUBE FIBER

THE MAIN TRUNK LINES FOUR (4) NINETEEN (19)

CELL TUBE INCLUSIVE OF THIS AND ANOTHER PROJECT

AS SHOWN (MANUFACTURED BY FUTUREFLEX OR EQUAL)

THE MAIN TRUNK LINES ORIGINATES IN THE EXISTING

MCR ON GROUND LEVEL OF BUILDING 201. SEE TABLE THIS

DRAWING INSTALL ABOVE GROUND TUBE DISTRIBUTION

CABINET (NEMA 3R) PER DETAIL 1 DRAWING T-505 AND

EXTEND CELL TUBE TO BUILDINGS THROUGH

EXISTING CONDUIT AFTER IT HAS BEEN CLEARED

OF ALL UNUSED CABLES. CONTRACTOR WILL THEN

INSTALL AIR BLOWN FIBER STRANDS PER TABLE,

SHOWN ON THIS DRAWING, FROM THE MCR

(BUILDING 201) ALL THE WAY TO THE RESPECTIVE

BUILDINGS LISTED IN THE TABLE. EACH FIBER

STRANDS WILL BE TERMINATED USING LC

CONNECTORS ON NEW FIBER PATCH PANEL AT

EACH END. FIBER WILL THEN BE TESTED AND TEST

RESULTS SUBMITTED TO THE VA FOR APPROVAL.

IN FEW CASES THE EXISTING SIGNAL DUCTBANK GOES

THROUGH EXISTING BUILDING TO NEXT BUILDING. IN

THESE BUILDINGS INSTALL BUILDING TDU IN TR ROOM

AND DROP OFF CELL TUBES REQUIRED FOR THE

BUILDING (SEE TABLE ON THIS SHEET) IN THE TDU AND

CONTINUE WITH REMAINDER OF TUBE CELLS TO NEXT

BUILDING. THESE ARE GRAPHICALLY SHOWN ON SITE PLAN.

IN OTHER CASES THE EXISTING SIGNAL DUCTBANK

DOES NOT GO THROUGH EXISTING BUILDING TO NEXT

BUILDING. IN THESE BUILDINGS INSTALL BUILDING

OUTDOOR TDU ON PEDESTAL AND DROP OFF CELL

TUBES REQUIRED FOR THE BUILDING (SEE TABLE THIS

SHEET) IN THE OUTDOOR TDU AND CONTINUE WITH

REMAINDER OF TUBE CELLS TO NEXT BUILDING. THESE

GENERAL NOTES

1.

2.

3.

KEY NOTES

1 INSTALL FOUR (4) 19 CELL TUBE (FUTURE FLEX OR

EQUAL) IN EXISTING 3 - 4”C.

INSTALL THREE (3) 19 CELL TUBE (FUTURE FLEX OR

EQUAL) IN EXISTING 2 - 4”C UNDER THIS PROJECT.

SEE DRAWING 201.T-401.

INSTALL ONE (1) 19 CELL TUBE (FUTUREFLEX OR

EQUAL) IN EXISTING 1 - 4"C.

SEE DETAIL 1 SHEET T-505.

TDU PEDESTAL.

INSTALL TWO (2) 19 CELL TUBE (FUTUREFLEX OR

EQUAL) IN 1 - 4"C.

BUILDING SCHEDULE

BLDG. NO. DESCRIPTION

200 VA MEDICAL CENTER DEPARTMENT

PATIENT HOUSING

PATIENT HOUSING OUTPATIENT

N.P.

NURSE HOME CARE

RESEARCH

QUARTER HOUSEKEEPING

UNKNOWN

NEW DIRECTIONS SEPULVEDA 1

WHEELCHAIR TRACK

GYM & POOL

F.M. & R CLINIC

THEATRE

RECREATION & CHILD YOUTH CENTER

KITCHEN, WARE HOUSE & CANTEEN

CHAPEL

GERIATRICS

ADMINISTRATION & RESEARCH

WC

KEY NOTES SIGNAL DUCT BANK (EXISTING)

PER VA DOCUMENTS

4.

5.

ARE GRAPHICALLY SHOWN ON SITE PLAN.

FOR REMOVAL OF EXISTING CABLES FROM U/G CONDUIT.

SEE GENERAL NOTE.

6.

1 FIBER AND CELL TUBE TO LISTED BUILDING FROM TDU AT MANHOLE OR AT BUILDING WILL BE INSTALLED UNDER ANOTHER VA PROJECT.

SCALE: 1/8" = 1' - 0"

NORTH

1.T-111

TELECOMMUNICATIONS FIRST

FLOOR PLAN

REFER TO 1.T-112FOR CONTINUATION

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING S-001

& DETAIL 18 ON S-001.

1.

2.

RECOMMENDED ROUTING OF NEW CAT6A BUNDLE

CABLE ON PENDANT MOUNTED U-HOOKS. SEE

DETAILS ON STRUCTURAL DRAWING.

EXISTING CABLE TRAY ABOVE CEILING OR

INTERSTITIAL LEVEL. BUNDLE CABLE SHALL BE

ROUTED ON NEW OR EXISTING CABLE TRAY TO TR

ROOM FROM WAO.

NEW PLENUM RATED 3 (U.O.N) CAT6A (GRAY, BLUE

WHITE) DROP IN FREE AIR WITHIN WALL CAVITY

(WHEN THERE IS NO EXISTING CONDUIT DROP) .

SUPPORT USING WALL MOUNTED J-HOOKS OR

SUSPENDED FROM STRUCTURE ABOVE. PLEASE SEE

DETAIL ON DRAWING T-501

NEW FACEPLATE (SS) WITH GRAY, BLLUE AND WHITE

CAT6A COMPLIANT RJ45 JACK.

FOR FLOOR MOUNTED DATA OUTLETS REMOVE (BY

NIGHT CREW) EXISTING CABLE FROM UNDERFLOOR

FEED AND INSTALL NEW CAT6A AND RJ45 JACKS.

AT LAB BENCHES WITH MULTIRACEWAY DATA

OUTLETS REMOVE (BY NIGHT CREW) EXISTING CABLE

FROM MULTIRACEAY FEED AND INSTALL NEW CAT6A

AND RJ45 JACKS.

FOR PRE-WIRED SYSTEM FURNITURE DATA OUTLETS

REMOVE (BY NIGHT CREW) EXISTING CABLE FROM

SYSTEM FURNITURE WHIP FEED AND INSTALL NEW

CAT6A AND RJ45 JACKS.

(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)

KEY NOTES

3.

4.

5.

6.

7.

8.

9.

10.

SCALE: 1/8" = 1' - 0"

NORTH

1.T-112

TELECOMMUNICATIONS FIRST

FLOOR PLAN

FOR ENLARGED PLAN

SEE 1.T-401 DETAIL 1

REFER TO 1.T-111 FOR CONTINUATION

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 1.T-401 DETAIL 2

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING S-001

& DETAIL 18 ON S-001.

1.

2.

RECOMMENDED ROUTING OF NEW CAT6A BUNDLE

CABLE ON PENDANT MOUNTED U-HOOKS. SEE

DETAILS ON STRUCTURAL DRAWING.

EXISTING CABLE TRAY ABOVE CEILING OR

INTERSTITIAL LEVEL. BUNDLE CABLE SHALL BE

ROUTED ON NEW OR EXISTING CABLE TRAY TO TR

ROOM FROM WAO.

NEW PLENUM RATED 3 (U.O.N) CAT6A (GRAY, BLUE

WHITE) DROP IN FREE AIR WITHIN WALL CAVITY

(WHEN THERE IS NO EXISTING CONDUIT DROP) .

SUPPORT USING WALL MOUNTED J-HOOKS OR

SUSPENDED FROM STRUCTURE ABOVE. PLEASE SEE

DETAIL ON DRAWING T-501

NEW FACEPLATE (SS) WITH GRAY, BLLUE AND WHITE

CAT6A COMPLIANT RJ45 JACK.

FOR FLOOR MOUNTED DATA OUTLETS REMOVE (BY

NIGHT CREW) EXISTING CABLE FROM UNDERFLOOR

FEED AND INSTALL NEW CAT6A AND RJ45 JACKS.

AT LAB BENCHES WITH MULTIRACEWAY DATA

OUTLETS REMOVE (BY NIGHT CREW) EXISTING CABLE

FROM MULTIRACEAY FEED AND INSTALL NEW CAT6A

AND RJ45 JACKS.

FOR PRE-WIRED SYSTEM FURNITURE DATA OUTLETS

REMOVE (BY NIGHT CREW) EXISTING CABLE FROM

SYSTEM FURNITURE WHIP FEED AND INSTALL NEW

CAT6A AND RJ45 JACKS.

(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)

KEY NOTES

3.

4.

5.

6.

7.

8.

1.T-121

TELECOMMUNICATIONS

BASEMENT FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING S-001

& DETAIL 18 ON S-001.

1.

2.

RECOMMENDED ROUTING OF NEW CAT6A BUNDLE

CABLE ON PENDANT MOUNTED U-HOOKS. SEE

DETAILS ON STRUCTURAL DRAWING.

EXISTING CABLE TRAY ABOVE CEILING OR

INTERSTITIAL LEVEL. BUNDLE CABLE SHALL BE

ROUTED ON NEW OR EXISTING CABLE TRAY TO TR

ROOM FROM WAO.

NEW PLENUM RATED 3 (U.O.N) CAT6A (GRAY, BLUE

WHITE) DROP IN FREE AIR WITHIN WALL CAVITY

(WHEN THERE IS NO EXISTING CONDUIT DROP) .

SUPPORT USING WALL MOUNTED J-HOOKS OR

SUSPENDED FROM STRUCTURE ABOVE. PLEASE SEE

DETAIL ON DRAWING T-501

NEW FACEPLATE (SS) WITH GRAY, BLLUE AND WHITE

CAT6A COMPLIANT RJ45 JACK.

FOR FLOOR MOUNTED DATA OUTLETS REMOVE (BY

NIGHT CREW) EXISTING CABLE FROM UNDERFLOOR

FEED AND INSTALL NEW CAT6A AND RJ45 JACKS.

AT LAB BENCHES WITH MULTIRACEWAY DATA

OUTLETS REMOVE (BY NIGHT CREW) EXISTING CABLE

FROM MULTIRACEAY FEED AND INSTALL NEW CAT6A

AND RJ45 JACKS.

FOR PRE-WIRED SYSTEM FURNITURE DATA OUTLETS

REMOVE (BY NIGHT CREW) EXISTING CABLE FROM

SYSTEM FURNITURE WHIP FEED AND INSTALL NEW

CAT6A AND RJ45 JACKS.

(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)

KEY NOTES

3.

4.

5.

6.

7.

8.

4.T-101

TELECOMMUNICATIONS

BASEMENT FLOOR PLAN

R

EF

ER

T

O

.T -1

F

O R

C O

N

TI

N U

AT

IO

N

FOR ENLARGED PLAN

SEE 4.T-401 DETAIL 1

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING S-001

& DETAIL 18 ON S-001.

1.

2.

RECOMMENDED ROUTING OF NEW CAT6A BUNDLE

CABLE ON PENDANT MOUNTED U-HOOKS. SEE

DETAILS ON STRUCTURAL DRAWING.

EXISTING CABLE TRAY ABOVE CEILING OR

INTERSTITIAL LEVEL. BUNDLE CABLE SHALL BE

ROUTED ON NEW OR EXISTING CABLE TRAY TO TR

ROOM FROM WAO.

NEW PLENUM RATED 3 (U.O.N) CAT6A (GRAY, BLUE

WHITE) DROP IN FREE AIR WITHIN WALL CAVITY

(WHEN THERE IS NO EXISTING CONDUIT DROP) .

SUPPORT USING WALL MOUNTED J-HOOKS OR

SUSPENDED FROM STRUCTURE ABOVE. PLEASE SEE

DETAIL ON DRAWING T-501

NEW FACEPLATE (SS) WITH GRAY, BLLUE AND WHITE

CAT6A COMPLIANT RJ45 JACK.

FOR FLOOR MOUNTED DATA OUTLETS REMOVE (BY

NIGHT CREW) EXISTING CABLE FROM UNDERFLOOR

FEED AND INSTALL NEW CAT6A AND RJ45 JACKS.

AT LAB BENCHES WITH MULTIRACEWAY DATA

OUTLETS REMOVE (BY NIGHT CREW) EXISTING CABLE

FROM MULTIRACEAY FEED AND INSTALL NEW CAT6A

AND RJ45 JACKS.

FOR PRE-WIRED SYSTEM FURNITURE DATA OUTLETS

REMOVE (BY NIGHT CREW) EXISTING CABLE FROM

SYSTEM FURNITURE WHIP FEED AND INSTALL NEW

CAT6A AND RJ45 JACKS.

(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)

KEY NOTES

3.

4.

5.

6.

7.

8.

(N) STAIR

UP

WHEELCHAIR

STAIR #2

(E)

UP

(N) STAIR #5

#4

UP

N N N

N

N

N

N

L

L

L

L

N

L

N

L

N

SCALE: 1/8" = 1' - 0"

NORTH

10.T-102

TELECOMMUNICATIONS

BASEMENT FLOOR PLAN

R

EF

ER

T

O

0.

T-

FO

R

C O

N

TI

N U

AT

IO

N

REFER TO 10.T-101 FOR CONTINUATION

FOR ENLARGED PLAN

SEE 10.T-401

DETAIL 1

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING S-001

& DETAIL 18 ON S-001.

1.

2.

RECOMMENDED ROUTING OF NEW CAT6A BUNDLE

CABLE ON PENDANT MOUNTED U-HOOKS. SEE

DETAILS ON STRUCTURAL DRAWING.

EXISTING CABLE TRAY ABOVE CEILING OR

INTERSTITIAL LEVEL. BUNDLE CABLE SHALL BE

ROUTED ON NEW OR EXISTING CABLE TRAY TO TR

ROOM FROM WAO.

NEW PLENUM RATED 3 (U.O.N) CAT6A (GRAY, BLUE

WHITE) DROP IN FREE AIR WITHIN WALL CAVITY

(WHEN THERE IS NO EXISTING CONDUIT DROP) .

SUPPORT USING WALL MOUNTED J-HOOKS OR

SUSPENDED FROM STRUCTURE ABOVE. PLEASE SEE

DETAIL ON DRAWING T-501

NEW FACEPLATE (SS) WITH GRAY, BLLUE AND WHITE

CAT6A COMPLIANT RJ45 JACK.

FOR FLOOR MOUNTED DATA OUTLETS REMOVE (BY

NIGHT CREW) EXISTING CABLE FROM UNDERFLOOR

FEED AND INSTALL NEW CAT6A AND RJ45 JACKS.

AT LAB BENCHES WITH MULTIRACEWAY DATA

OUTLETS REMOVE (BY NIGHT CREW) EXISTING CABLE

FROM MULTIRACEAY FEED AND INSTALL NEW CAT6A

AND RJ45 JACKS.

FOR PRE-WIRED SYSTEM FURNITURE DATA OUTLETS

REMOVE (BY NIGHT CREW) EXISTING CABLE FROM

SYSTEM FURNITURE WHIP FEED AND INSTALL NEW

CAT6A AND RJ45 JACKS.

(NOT ALL KEY NOTES ARE APPLICABLE TO THIS SHEET)

KEY NOTES

3.

4.

5.

6.

7.

8.

1 (TYP)

NEW 3D NEW 3D

3D+3D

NEW

NEW3D+3D

3D+3D

NEW

4D

NEW

3D

4D

NEW

NEW

4D

NEW

5D

4D

NEW

3D

NEW

NEW

3D

NEW

3D

NEW 3D

3D

NEW

3D

NEW

NEW 3D

3D

NEW

NEW 3D 3D+3D

NEW

3D

NEW

4D

NEW

3D NEW

3D

NEW

3D

NEW

3DNEW

NEW

4D

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

3D

NEW

NEW

3D

1D

NEW

NEW 3D

NEW 3D

NEW 3D

NEW3D

NEW3D

NEW3D

NEW

3D

5D

NEW

3D

NEW

3D

NEW

NEW

3D

NEW 3D

3D

NEW

3D

NEW

NEW3D

NEW 3D NEW 3D

3D

NEW

3D+3D

NEW

NEW 3D

NEW 3D

NEW

3D

NEW

3D

4D

NEW

SCALE: 1/8" = 1' - 0"

NORTH

10.T-111

TELECOMMUNICATIONS FIRST

FLOOR PLAN

R

EF

ER

T

O

0.

T-

FO

R

C O

N

TI

N U

AT

IO

N

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE WAO WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .