S02 Attachment D Drawings Part 3.pdf

PDF 47 MB Posted

Attached to
Z2DA--691A4-20-201 Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
Solicitation number
36C26221B0008_1
Issued by

About this file

This document provides details on a federal contract opportunity for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services between $10,000,000 to $20,000,000 for Project 691A4-20-201 at the VA Greater Los Angeles Healthcare System, VA Sepulveda Ambulatory Care Center located in North Hills, California. Work will include general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns listed on Vendor Information Pages. An Invitation for Bid will be issued on June 23, 2021 via sam.gov. Interested vendors can attend a scheduled site visit, with date/time/location provided in the solicitation. The point of contact is James Barber, Contracting Specialist, Network Contracting Office 22 Long Beach and may be reached at james.barber@va.gov.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

F i l e

P a t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-402A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

RACK EQUIPMENT (EX)

CABLE INFORMATION

1 ALL CAT5E

WALL

RACK 1

FLOOR FLOOR

HORIZONTAL

BAR

SUPPORTS

(TYP.)

2 POST RACK

RACK 2

RACK 1RACK 2

2 POST RACK

WALL

WALL WALLWALL WALL

FLOOR FIBER ENTRY FLOOR FIBER ENTRY

1 PLYWOOD BACKBOARD TO REMAIN

2 WALL MOUNTED HIRSCH ENCLOSURE TO

3 WALL MOUNTED 110 BLOCK TO REMAIN

4 1U 12 PORT PATCH PANEL TO BE REMOVED

5 1U 24 PORT PATCH PANEL TO BE REMOVED

6 2U 48 PORT PATCH PANEL TO BE REMOVED

7 1U WIRE MANAGER TO BE REMOVED

8 2U WIRE MANAGER TO BE REMOVED

9 1U CISCO 3850 SWITCH TO BE REMOVED

10 1U PDU TO BE REMOVED

11 4U FIBER LIU TO BE REMOVED

12 2U UPS TO BE REMOVED

FLOOR

SCALE: NONESCALE: NONE

SCALE: NONE

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

REMAIN

BY VA OIT

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

ON E-001

8 PDU. SEE KEY NOTE 18 ON E-001

EXISTING FIBER

BOX TO BE

REMOVED

200.T-403

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 1001B

TR ROOM

1001B

SCALE: 1/4" = 1' - 0" NORTH

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE

REMOVED.

NEW TDU# 201-200-TR1001B (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

TR ROOM

1001B

SCALE: 1/4" = 1' - 0" NORTH

KEY NOTESKEY NOTES

1 PLYWOOD BACKBOARD TO REMAIN

2 1U 24 PORT PATCH PANEL TO BE REMOVED

3 2U 48 PORT PATCH PANEL TO BE REMOVED

4 1U WIRE MANAGER TO BE REMOVED

5 1U CISCO 3850 SWITCH TO BE REMOVED BY VA OIT

6 WALL MOUNTED 110 BLOCK TO REMAIN

7 WALL MOUNTED ACS TO REMAIN

8 4U AT&T FIBER ENCLOSURE TO BE REMOVED

1 ALL CAT3

2 ALL CAT5

54" X 54"

FLOOR HANDHOLE

WALL

RACK 1

FLOOR FLOOR

RACK 2

WALL

2 POST RACK

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

RACK EQUIPMENT

ELEVATION 1 AND 2 (EX)

CABLE INFORMATION

ELEVATION 1 AND 2 (EX)

SCALE: NONE SCALE: NONE

WALL WALL

2 POST RACK

200.T-403A

TELECOMMUNICATIONS RACK

ELEVATIONS

54" X 54"

FLOOR HANDHOLE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

200.T-404

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 1356

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED.

EXISTING TELECOMMUNICATIONS GROUND BUS

BAR (TGB) TO REMAIN.

EXISTING 12”W CABLE LADDER RACK MOUNTED

AT 84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO BE REMOVED.

NEW 4-POST RACK WITH HORIZONTAL &

VERTICAL CABLE MANAGER.

EXISTING UNDER FLOOR PULL BOX WITH COVER

FOR INCOMING FIBER FROM MCR BLDG.201

WALL MOUNTED 110 BLOCK TO REMAIN.

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 4U FIBER LIU

2 1U FIBER PANEL

3 1U WIRE MANAGER

4 1U 24 PORT PATCH PANEL

5 1U CISCO 3850 SWITCH

6 2U ROUTER

7 1U PDU

1 ALL CAT5E

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

200.T-404A

TELECOMMUNICATIONS RACK

ELEVATIONS

RACK EQUIPMENT

ELEVATION 1 AND 2 (EX)

CABLE INFORMATION

ELEVATION 1 AND 2 (EX)

SCALE: NONE SCALE: NONE

FLOOR

WALL

WALL

RACK 2

FLOOR

RACK 2RACK 1

SCALE: NONE

RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 2U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO 9300

2 FIBER

RACK 1 RACK 2 RACK 3 RACK 4

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

6 4U 3000VA UPS. SEE KEY NOTE 18

7 PDU. SEE KEY NOTE 18 ON E-001

200.T-405

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 1525

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

NEW TDU #1356-1525-TR (TERMINATION

DISTRIBUTION UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR

(TGB) SEE RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT

84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0''

HIGH (DO NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

KEY NOTESKEY NOTES

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

EXISTING LADDER

RACK AND DATA

RACK TO BE

REMOVED.

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-405A

TELECOMMUNICATIONS RACK

ELEVATIONS

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

5 6

200.T-406

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 2466

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE

REMOVED.

NEW TDU# 201-200-TR2466 (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

KEY NOTESKEY NOTES

WALL MOUNTED

DATA RACK TO BE

REMOVED

110 BLOCK TO

REMAIN

EXISTING CONDUIT

TO REMAIN

1 ALL CAT3

3 ALL CAT5E

2 ALL CAT5

WALL

RACK 1

FLOOR FLOOR

1 PLYWOOD BACKBOARD TO REMAIN

2 WALL MOUNTED 110 BLOCK TO REMAIN

3 1U 24 PORT PATCH PANEL TO BE REMOVED

4 2U 48 PORT PATCH PANEL TO BE REMOVED

5 4U FIBER LIU TO BE REMOVED

6 4U DEAD EQUIPMENT TO BE REMOVED

7 1U CISCO 3850 SWITCH TO BE REMOVED BY VA OIT

HORIZONTAL

BAR

SUPPORTS

WALL WALL WALL

RACK 2RACK 2

2 POST RACK

2 POST RACK

4" CONDUIT

(TYP.)

4" CONDUIT

(TYP.)

4 250 PAIR

8 1U WIRE MANAGER TO BE REMOVED

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

200.T-406A

TELECOMMUNICATIONS RACK

ELEVATIONS TR 2466

RACK EQUIPMENT

ELEVATION 1 AND 2

CABLE INFORMATION

ELEVATION 1 AND 2

SCALE: NONE SCALE: NONE

2 4

2 1

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

200.T-407

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 2664

TR ROOM

SCALE: 1/4" = 1' - 0"

NORTH

SCALE: NONE

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE

REMOVED.

NEW TDU# 201-200-TR3664 (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

TR ROOM

SCALE: 1/4" = 1' - 0"

NORTH

KEY NOTESKEY NOTES

(EX) CONDUIT

TO REMAIN

EXISTING CABLE

TRAY PENETRATION

ABOVE TO REMAIN

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-407A

TELECOMMUNICATIONS RACK

ELEVATIONS TR 2664

SCALE: NONE

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT3

2 ALL CAT5

WALL

RACK 2

FLOOR FLOOR

1 PLYWOOD BACKBOARD

2 WALL MOUNTED 110 BLOCK

3 1U 24 PORT PATCH PANEL

4 2U 48 PORT PATCH PANEL

5 1U WIRE MANAGER TO BE

6 1U CISCO 3850 SWITCH

7 4U FIBER LIU

HORIZONTAL

BAR

SUPPORTS

2 POST RACK

(TYP.)

4" CONDUIT

(TYP.)

WALL WALL WALL

RACK 1

RACK 2

4" CONDUIT

(TYP.)

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

200.T-408

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 2165

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

NEW TDU# 201-200-TR2165 (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

KEY NOTESKEY NOTES

EXISTING CABLE

TRAY PENETRATION

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-408A

TELECOMMUNICATIONS RACK

ELEVATIONS TR 2165

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

WALL

RACK 1

FLOOR FLOOR

1 PLYWOOD BACKBOARD TO REMAIN

2 WALL MOUNTED 110 BLOCK TO REMAIN

3 WALL MOUNTED SM FIBER TO REMAIN

4 WALL MOUNTED DAS HUB TO REMAIN

5 WALL MOUNTED SPLITTER TO REMAIN

6 1U 24 PORT PATCH PANEL TO BE REMOVED

7 2U 48 PORT PATCH PANEL TO BE REMOVED

8 1U WIRE MANAGER TO BE REMOVED

9 3U DAS TO REMAIN

10 4U FIBER LIU TO BE REMOVED

11 1U FIBER PANEL TO BE REMOVED

HORIZONTAL

BAR

SUPPORTS

2 POST RACK

(TYP.)

WALL WALL WALL

RACK 2

RACK 2

2 POST RACK

(TYP.)

12 1U CISCO 3850 SWITCH TO BE REMOVED BY OIT

4" CONDUIT

(TYP.)

13 1U PDU TO BE REMOVED

4" CONDUIT

(TYP.)

SCALE: NONESCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

CONDUIT RISER

TO REMAIN

FIBER PATCH PANEL

TO BE REMOVED

LADDER RACK

TO REMAIN

200.T-409

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

EXISTING 19" X 84" HIGH EQUIPMENT DATA

RACKS WITH VERTICAL AND HORIZONTAL CABLE

MANAGEMENT TO BE REMOVED.

NEW TDU# 201-200-TR2365 (TERMINATION

DISTRIBUTION UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR

(TGB) SEE RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT

84" AFF AND FIXED TO TOP OF EQUIPMENT

RACKS TO REMAIN (TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0''

HIGH (DO NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED.

SEE T-504.

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-409A

TELECOMMUNICATIONS RACK

ELEVATIONS TR 2365

SCALE: NONE

WALL

RACK 1

FLOOR FLOOR

HORIZONTAL

BAR

SUPPORTS

2 POST RACK

(TYP.)

WALL WALL WALL

RACK 2

2 POST RACK

(TYP.)

4" CONDUIT

(TYP.)

4" CONDUIT

(TYP.)

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

200.T-410

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM 3406

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONESCALE: NONE

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE

REMOVED.

NEW TDU# 201-200-TR1001B (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

KEY NOTESKEY NOTES

EXISTING CABLE

TRAY PENETRATION

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200

200.T-410A

TELECOMMUNICATIONS RACK

ELEVATIONS TR 3406

SCALE: NONE

RACK EQUIPMENT

CABLE INFORMATION

1 ALL CAT5E

WALL

RACK 2

FLOOR FLOOR

1 PLYWOOD BACKBOARD

2 WALL MOUNTED 110 BLOCK

3 4U FIBER LIU

4 2U 48 PORT PATCH PANEL

5 1U WIRE MANAGER

6 1U CISCO 3850 SWITCH

7 1U PDU

8 UPS

9 TV CABINET

HORIZONTAL

BAR

SUPPORTS

2 POST RACK

(TYP.)

4" CONDUIT

(TYP.)

WALL WALL

RACK 1

RACK 2

2 POST RACK

2 APS 34-49

SCALE: NONE

SCALE: NONE

AFF

ROOM & RACK EQUIPMENT

1 1U WIRE MANAGER

2 2U WIRE MANAGER

CABLE INFORMATION

1 CAT6A

3 3U 48 PORT PATCH PANEL DIGITAL

4 2U FIBER PATCH

5 1U SWITCH CISCO

6 110 BLOCK

2 CAT3

3 FIBER

RACK (TYP.)

LADDER RACK (TYP.)

WIRE MANAGER (TYP.)

RACK 1 RACK 2

FOR CYBER POWER ENVIRONMENTAL SENSOR

MOUNTING AND LOCATIONS ON RACK SEE KEY

NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON

E-504.

1.

7 4U 3000VA UPS. SEE KEY NOTE 18

CONDUIT RISER

TO REMAIN

LADDER RACK

TO BE REMOVED

5 6

200.T-411

TELECOMMUNICATIONS

ENLARGED PLAN TR ROOM

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

A

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 2' 4' 12'

SCALE: 1/4" = 1'-0"

SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE

SCALE: NONE SCALE: NONE

SCALE: NONE

SCALE: NONE

SCALE: NONE

SCALE: NONE

SCALE: NONE SCALE: NONE

1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH

VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO

REMAIN.

NEW TDU# 201-200-TR3573 (TERMINATION DISTRIBUTION

UNIT).

NEW 4 POST DATA RACKS WITH VERTICAL AND

HORIZONTAL CABLE MANAGEMENT.

NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE

RISER DIAGRAM E-702.

NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND

FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN

(TYPICAL).

NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO

NOT PAINT)

EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.

EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT

3 CABLES) SHALL BE REMOVED FROM TR ROOM

PATCH PANELS TO EACH EXISTING WAO OUTLETS.

THESE EXISTING CABLES ARE TO BE REMOVED FROM

CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A

CABLES.

THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN

TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY

CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN

THE CEILING ABOVE CORRIDOR, TO THE SUITE AND

COIL UP THE CABLE ABOVE CEILING AND LEAVE IT

THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL

COME IN AND UNPLUG THE USER END DEVICE. THE

CABLE CONTRACTOR NIGHT CREW WILL COME IN AND

DISCONNECT THE JACK FROM THE FACEPLATE AND

PULL OUT THE OLD CABLE FROM THE CONDUIT AND

PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW

CAT6A COMPLIANT JACK AND NEW FACE PLATE.

TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN

RESPECTIVE TR ROOM, TEST AND CERTIFY THE

CABLE AND LABEL THE JACK AND 48PORT PATCH

PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE

END USER DEVICE BEFORE DAY BREAK.

ALL NEW CAT6A CABLES TO BE ROUTED TO

RESPECTIVE TR ROOMS AS INDICATED. TERMINATE

NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY

AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON

NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT

AS SHOWN. TERMINATE ON TR END IN A CAT6A

COMPATABLE RJ45 JACKS AND NEW CAT6A

COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO

WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY

CABLE MANUFACTURER'S CERTIFIED INSTALLER.

SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL

BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN

CLOSE COORDINATION WITH OIT.

INSTALL NEW 48 PORT CAT6A COMPATIBLE

PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS

CALLED OUT ON DRAWING) IN TR ROOM.

RING AND STRING METHOD WILL BE USED TO INSTALL

NEW CAT6A CABLES WHEN THERE IS NO EXISTING

CONDUIT DROPS.

OLD FACE PLATE WILL BE PULLED OUT AND

REPLACED WITH NEW FACEPLATE WITH NEW CAT6A

COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.

ONCE THE NEW CABLES ARE TESTED AND CERTIFIED

THE EUD WILL BE CONNECTED TO NEW FACE PLATE

BY OIT. NEW FACEPLATE TO BE SS.

LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL

EQUIPMENTS AND RACKS FROM DUST & DAMAGE.

POPULATE AVAILABLE SPACES IN THE EXISTING RACK

WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

ONCE THESE NEW PATCH PANELS ARE POPULATED

REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR

NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.

BEFORE DISCONNECTING AND REMOVINF EXISTING

PATCH PANEL, RING OUT AND VERIFY THAT THE DATA

CABLES ORIGINATING IN THOSE PATCH PANELS TO

WAO HAVE BEEN SUCCESSFULLY REPLACED WITH

NEW DATA CABLE AND CAT6A COMPLIANT PATCH

PANEL.

FOR CORE DRILLING SLAB REQUIREMENTS PLEASE

SEE GENERAL NOTE 7 ON STRUCTURE DRAWING

S-001.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

TR ROOM

SCALE: 1/4" = 1' - 0" NORTH

F i t h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611…