S02 Attachment D Drawings Part 3.pdf
PDF 47 MB Posted
- Attached to
- Z2DA--691A4-20-201 Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
- Solicitation number
- 36C26221B0008_1
About this file
This document provides details on a federal contract opportunity for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services between $10,000,000 to $20,000,000 for Project 691A4-20-201 at the VA Greater Los Angeles Healthcare System, VA Sepulveda Ambulatory Care Center located in North Hills, California. Work will include general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns listed on Vendor Information Pages. An Invitation for Bid will be issued on June 23, 2021 via sam.gov. Interested vendors can attend a scheduled site visit, with date/time/location provided in the solicitation. The point of contact is James Barber, Contracting Specialist, Network Contracting Office 22 Long Beach and may be reached at james.barber@va.gov.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
F i l e
P a t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-402A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
RACK EQUIPMENT (EX)
CABLE INFORMATION
1 ALL CAT5E
WALL
RACK 1
FLOOR FLOOR
HORIZONTAL
BAR
SUPPORTS
(TYP.)
2 POST RACK
RACK 2
RACK 1RACK 2
2 POST RACK
WALL
WALL WALLWALL WALL
FLOOR FIBER ENTRY FLOOR FIBER ENTRY
1 PLYWOOD BACKBOARD TO REMAIN
2 WALL MOUNTED HIRSCH ENCLOSURE TO
3 WALL MOUNTED 110 BLOCK TO REMAIN
4 1U 12 PORT PATCH PANEL TO BE REMOVED
5 1U 24 PORT PATCH PANEL TO BE REMOVED
6 2U 48 PORT PATCH PANEL TO BE REMOVED
7 1U WIRE MANAGER TO BE REMOVED
8 2U WIRE MANAGER TO BE REMOVED
9 1U CISCO 3850 SWITCH TO BE REMOVED
10 1U PDU TO BE REMOVED
11 4U FIBER LIU TO BE REMOVED
12 2U UPS TO BE REMOVED
FLOOR
SCALE: NONESCALE: NONE
SCALE: NONE
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
REMAIN
BY VA OIT
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
ON E-001
8 PDU. SEE KEY NOTE 18 ON E-001
EXISTING FIBER
BOX TO BE
REMOVED
200.T-403
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 1001B
TR ROOM
1001B
SCALE: 1/4" = 1' - 0" NORTH
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE
REMOVED.
NEW TDU# 201-200-TR1001B (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
TR ROOM
1001B
SCALE: 1/4" = 1' - 0" NORTH
KEY NOTESKEY NOTES
1 PLYWOOD BACKBOARD TO REMAIN
2 1U 24 PORT PATCH PANEL TO BE REMOVED
3 2U 48 PORT PATCH PANEL TO BE REMOVED
4 1U WIRE MANAGER TO BE REMOVED
5 1U CISCO 3850 SWITCH TO BE REMOVED BY VA OIT
6 WALL MOUNTED 110 BLOCK TO REMAIN
7 WALL MOUNTED ACS TO REMAIN
8 4U AT&T FIBER ENCLOSURE TO BE REMOVED
1 ALL CAT3
2 ALL CAT5
54" X 54"
FLOOR HANDHOLE
WALL
RACK 1
FLOOR FLOOR
RACK 2
WALL
2 POST RACK
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
RACK EQUIPMENT
ELEVATION 1 AND 2 (EX)
CABLE INFORMATION
ELEVATION 1 AND 2 (EX)
SCALE: NONE SCALE: NONE
WALL WALL
2 POST RACK
200.T-403A
TELECOMMUNICATIONS RACK
ELEVATIONS
54" X 54"
FLOOR HANDHOLE
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
200.T-404
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 1356
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED.
EXISTING TELECOMMUNICATIONS GROUND BUS
BAR (TGB) TO REMAIN.
EXISTING 12”W CABLE LADDER RACK MOUNTED
AT 84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO BE REMOVED.
NEW 4-POST RACK WITH HORIZONTAL &
VERTICAL CABLE MANAGER.
EXISTING UNDER FLOOR PULL BOX WITH COVER
FOR INCOMING FIBER FROM MCR BLDG.201
WALL MOUNTED 110 BLOCK TO REMAIN.
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 4U FIBER LIU
2 1U FIBER PANEL
3 1U WIRE MANAGER
4 1U 24 PORT PATCH PANEL
5 1U CISCO 3850 SWITCH
6 2U ROUTER
7 1U PDU
1 ALL CAT5E
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
200.T-404A
TELECOMMUNICATIONS RACK
ELEVATIONS
RACK EQUIPMENT
ELEVATION 1 AND 2 (EX)
CABLE INFORMATION
ELEVATION 1 AND 2 (EX)
SCALE: NONE SCALE: NONE
FLOOR
WALL
WALL
RACK 2
FLOOR
RACK 2RACK 1
SCALE: NONE
RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 2U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO 9300
2 FIBER
RACK 1 RACK 2 RACK 3 RACK 4
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
6 4U 3000VA UPS. SEE KEY NOTE 18
7 PDU. SEE KEY NOTE 18 ON E-001
200.T-405
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 1525
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
NEW TDU #1356-1525-TR (TERMINATION
DISTRIBUTION UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR
(TGB) SEE RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT
84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0''
HIGH (DO NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
KEY NOTESKEY NOTES
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
EXISTING LADDER
RACK AND DATA
RACK TO BE
REMOVED.
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-405A
TELECOMMUNICATIONS RACK
ELEVATIONS
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
5 6
200.T-406
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 2466
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE
REMOVED.
NEW TDU# 201-200-TR2466 (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
KEY NOTESKEY NOTES
WALL MOUNTED
DATA RACK TO BE
REMOVED
110 BLOCK TO
REMAIN
EXISTING CONDUIT
TO REMAIN
1 ALL CAT3
3 ALL CAT5E
2 ALL CAT5
WALL
RACK 1
FLOOR FLOOR
1 PLYWOOD BACKBOARD TO REMAIN
2 WALL MOUNTED 110 BLOCK TO REMAIN
3 1U 24 PORT PATCH PANEL TO BE REMOVED
4 2U 48 PORT PATCH PANEL TO BE REMOVED
5 4U FIBER LIU TO BE REMOVED
6 4U DEAD EQUIPMENT TO BE REMOVED
7 1U CISCO 3850 SWITCH TO BE REMOVED BY VA OIT
HORIZONTAL
BAR
SUPPORTS
WALL WALL WALL
RACK 2RACK 2
2 POST RACK
2 POST RACK
4" CONDUIT
(TYP.)
4" CONDUIT
(TYP.)
4 250 PAIR
8 1U WIRE MANAGER TO BE REMOVED
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
200.T-406A
TELECOMMUNICATIONS RACK
ELEVATIONS TR 2466
RACK EQUIPMENT
ELEVATION 1 AND 2
CABLE INFORMATION
ELEVATION 1 AND 2
SCALE: NONE SCALE: NONE
2 4
2 1
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
200.T-407
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 2664
TR ROOM
SCALE: 1/4" = 1' - 0"
NORTH
SCALE: NONE
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE
REMOVED.
NEW TDU# 201-200-TR3664 (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
TR ROOM
SCALE: 1/4" = 1' - 0"
NORTH
KEY NOTESKEY NOTES
(EX) CONDUIT
TO REMAIN
EXISTING CABLE
TRAY PENETRATION
ABOVE TO REMAIN
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-407A
TELECOMMUNICATIONS RACK
ELEVATIONS TR 2664
SCALE: NONE
RACK EQUIPMENT
CABLE INFORMATION
1 ALL CAT3
2 ALL CAT5
WALL
RACK 2
FLOOR FLOOR
1 PLYWOOD BACKBOARD
2 WALL MOUNTED 110 BLOCK
3 1U 24 PORT PATCH PANEL
4 2U 48 PORT PATCH PANEL
5 1U WIRE MANAGER TO BE
6 1U CISCO 3850 SWITCH
7 4U FIBER LIU
HORIZONTAL
BAR
SUPPORTS
2 POST RACK
(TYP.)
4" CONDUIT
(TYP.)
WALL WALL WALL
RACK 1
RACK 2
4" CONDUIT
(TYP.)
SCALE: NONE
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
200.T-408
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 2165
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
NEW TDU# 201-200-TR2165 (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
KEY NOTESKEY NOTES
EXISTING CABLE
TRAY PENETRATION
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-408A
TELECOMMUNICATIONS RACK
ELEVATIONS TR 2165
RACK EQUIPMENT
CABLE INFORMATION
1 ALL CAT5E
WALL
RACK 1
FLOOR FLOOR
1 PLYWOOD BACKBOARD TO REMAIN
2 WALL MOUNTED 110 BLOCK TO REMAIN
3 WALL MOUNTED SM FIBER TO REMAIN
4 WALL MOUNTED DAS HUB TO REMAIN
5 WALL MOUNTED SPLITTER TO REMAIN
6 1U 24 PORT PATCH PANEL TO BE REMOVED
7 2U 48 PORT PATCH PANEL TO BE REMOVED
8 1U WIRE MANAGER TO BE REMOVED
9 3U DAS TO REMAIN
10 4U FIBER LIU TO BE REMOVED
11 1U FIBER PANEL TO BE REMOVED
HORIZONTAL
BAR
SUPPORTS
2 POST RACK
(TYP.)
WALL WALL WALL
RACK 2
RACK 2
2 POST RACK
(TYP.)
12 1U CISCO 3850 SWITCH TO BE REMOVED BY OIT
4" CONDUIT
(TYP.)
13 1U PDU TO BE REMOVED
4" CONDUIT
(TYP.)
SCALE: NONESCALE: NONE
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
CONDUIT RISER
TO REMAIN
FIBER PATCH PANEL
TO BE REMOVED
LADDER RACK
TO REMAIN
200.T-409
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
EXISTING 19" X 84" HIGH EQUIPMENT DATA
RACKS WITH VERTICAL AND HORIZONTAL CABLE
MANAGEMENT TO BE REMOVED.
NEW TDU# 201-200-TR2365 (TERMINATION
DISTRIBUTION UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR
(TGB) SEE RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT
84" AFF AND FIXED TO TOP OF EQUIPMENT
RACKS TO REMAIN (TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0''
HIGH (DO NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED.
SEE T-504.
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-409A
TELECOMMUNICATIONS RACK
ELEVATIONS TR 2365
SCALE: NONE
WALL
RACK 1
FLOOR FLOOR
HORIZONTAL
BAR
SUPPORTS
2 POST RACK
(TYP.)
WALL WALL WALL
RACK 2
2 POST RACK
(TYP.)
4" CONDUIT
(TYP.)
4" CONDUIT
(TYP.)
SCALE: NONE
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
200.T-410
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM 3406
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE
SCALE: NONE SCALE: NONESCALE: NONE
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO BE
REMOVED.
NEW TDU# 201-200-TR1001B (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
KEY NOTESKEY NOTES
EXISTING CABLE
TRAY PENETRATION
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA 200
200.T-410A
TELECOMMUNICATIONS RACK
ELEVATIONS TR 3406
SCALE: NONE
RACK EQUIPMENT
CABLE INFORMATION
1 ALL CAT5E
WALL
RACK 2
FLOOR FLOOR
1 PLYWOOD BACKBOARD
2 WALL MOUNTED 110 BLOCK
3 4U FIBER LIU
4 2U 48 PORT PATCH PANEL
5 1U WIRE MANAGER
6 1U CISCO 3850 SWITCH
7 1U PDU
8 UPS
9 TV CABINET
HORIZONTAL
BAR
SUPPORTS
2 POST RACK
(TYP.)
4" CONDUIT
(TYP.)
WALL WALL
RACK 1
RACK 2
2 POST RACK
2 APS 34-49
SCALE: NONE
SCALE: NONE
AFF
ROOM & RACK EQUIPMENT
1 1U WIRE MANAGER
2 2U WIRE MANAGER
CABLE INFORMATION
1 CAT6A
3 3U 48 PORT PATCH PANEL DIGITAL
4 2U FIBER PATCH
5 1U SWITCH CISCO
6 110 BLOCK
2 CAT3
3 FIBER
RACK (TYP.)
LADDER RACK (TYP.)
WIRE MANAGER (TYP.)
RACK 1 RACK 2
FOR CYBER POWER ENVIRONMENTAL SENSOR
MOUNTING AND LOCATIONS ON RACK SEE KEY
NOTE 25 ON E-001 AND DETAILS 5 AND 6 ON
E-504.
1.
7 4U 3000VA UPS. SEE KEY NOTE 18
CONDUIT RISER
TO REMAIN
LADDER RACK
TO BE REMOVED
5 6
200.T-411
TELECOMMUNICATIONS
ENLARGED PLAN TR ROOM
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
A
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 2' 4' 12'
SCALE: 1/4" = 1'-0"
SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE SCALE: NONE
SCALE: NONE SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE
SCALE: NONE SCALE: NONE
1 EXISTING 19" X 84" HIGH EQUIPMENT DATA RACKS WITH
VERTICAL AND HORIZONTAL CABLE MANAGEMENT TO
REMAIN.
NEW TDU# 201-200-TR3573 (TERMINATION DISTRIBUTION
UNIT).
NEW 4 POST DATA RACKS WITH VERTICAL AND
HORIZONTAL CABLE MANAGEMENT.
NEW TELECOMMUNICATIONS GROUND BUS BAR (TGB) SEE
RISER DIAGRAM E-702.
NEW 12”W CABLE LADDER RACK MOUNTED AT 84" AFF AND
FIXED TO TOP OF EQUIPMENT RACKS TO REMAIN
(TYPICAL).
NEW FIRE RATED TELEPHONE BACKBOARD 8'-0'' HIGH (DO
NOT PAINT)
EZ PATH SLEEVES. QUANTITY AS REQUIRED. SEE T-504.
EXISTING CAT 5 AND BELOW (INCLUDING UNUSED CAT
3 CABLES) SHALL BE REMOVED FROM TR ROOM
PATCH PANELS TO EACH EXISTING WAO OUTLETS.
THESE EXISTING CABLES ARE TO BE REMOVED FROM
CONDUIT DROPS FOR INSTALLATION OF NEW CAT6A
CABLES.
THE RE-CABLING OF WAO OUTLETS WILL BE DONE IN
TWO SHIFTS BY THE CABLE CONTRACTOR. THE DAY
CREW WILL INSTALL THE BUNDLE CABLES FROM TR, IN
THE CEILING ABOVE CORRIDOR, TO THE SUITE AND
COIL UP THE CABLE ABOVE CEILING AND LEAVE IT
THERE FOR THE NIGHT CREW. OIT NIGHT CREW WILL
COME IN AND UNPLUG THE USER END DEVICE. THE
CABLE CONTRACTOR NIGHT CREW WILL COME IN AND
DISCONNECT THE JACK FROM THE FACEPLATE AND
PULL OUT THE OLD CABLE FROM THE CONDUIT AND
PULL IN NEW CAT6A CABLE, TERMINATE INTO NEW
CAT6A COMPLIANT JACK AND NEW FACE PLATE.
TERMINATE THE CABLE AT 48 PORT PATCH PANEL IN
RESPECTIVE TR ROOM, TEST AND CERTIFY THE
CABLE AND LABEL THE JACK AND 48PORT PATCH
PANEL. OIT NIGHT CREW WILL COME IN AND PLUG THE
END USER DEVICE BEFORE DAY BREAK.
ALL NEW CAT6A CABLES TO BE ROUTED TO
RESPECTIVE TR ROOMS AS INDICATED. TERMINATE
NEW COLOR CODED (3 U.O.N) CAT6A (WHITE, GRAY
AND BLUE) IN NEW CAT6A COMPATIBLE JACKS ON
NEW FACEPLATE AT EACH WAO OUTLET AND LABEL IT
AS SHOWN. TERMINATE ON TR END IN A CAT6A
COMPATABLE RJ45 JACKS AND NEW CAT6A
COMPLIANT 48 PORT PATCH PANEL. EACH CABLE TO
WAO OUTLETS SHALL BE TESTED AND CERTIFIED BY
CABLE MANUFACTURER'S CERTIFIED INSTALLER.
SWITCHOVER FROM THE OLD CABLE SYSTEM SHALL
BE DONE ROOM BY ROOM AND FLOOR BY FLOOR IN
CLOSE COORDINATION WITH OIT.
INSTALL NEW 48 PORT CAT6A COMPATIBLE
PATCHPANEL IN EXISTING RACKS OR NEW RACKS (AS
CALLED OUT ON DRAWING) IN TR ROOM.
RING AND STRING METHOD WILL BE USED TO INSTALL
NEW CAT6A CABLES WHEN THERE IS NO EXISTING
CONDUIT DROPS.
OLD FACE PLATE WILL BE PULLED OUT AND
REPLACED WITH NEW FACEPLATE WITH NEW CAT6A
COMPATIBLE DATA JACKS AND NEW CAT6A CABLE.
ONCE THE NEW CABLES ARE TESTED AND CERTIFIED
THE EUD WILL BE CONNECTED TO NEW FACE PLATE
BY OIT. NEW FACEPLATE TO BE SS.
LAY-IN CEILING TO BE REMOVED IN TR. PROTECT ALL
EQUIPMENTS AND RACKS FROM DUST & DAMAGE.
POPULATE AVAILABLE SPACES IN THE EXISTING RACK
WITH NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
ONCE THESE NEW PATCH PANELS ARE POPULATED
REMOVE EXISTING PATCH PANEL TO MAKE ROOM FOR
NEW CAT6A COMPLIANT 48 PORT PATCH PANEL.
BEFORE DISCONNECTING AND REMOVINF EXISTING
PATCH PANEL, RING OUT AND VERIFY THAT THE DATA
CABLES ORIGINATING IN THOSE PATCH PANELS TO
WAO HAVE BEEN SUCCESSFULLY REPLACED WITH
NEW DATA CABLE AND CAT6A COMPLIANT PATCH
PANEL.
FOR CORE DRILLING SLAB REQUIREMENTS PLEASE
SEE GENERAL NOTE 7 ON STRUCTURE DRAWING
S-001.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
TR ROOM
SCALE: 1/4" = 1' - 0" NORTH
F i t h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611…