S02 Attachment D Drawings Part 3.pdf

PDF 14 MB Posted

Attached to
Z2DA--691A4-20-201 Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
Solicitation number
36C26221B0008_1
Issued by

About this file

This document describes a federal contract opportunity for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services between $10,000,000 to $20,000,000 for Project 691A4-20-201 at the VA Greater Los Angeles Healthcare System, VA Sepulveda Ambulatory Care Center located in North Hills, California. Work includes general construction, alterations, mechanical, electrical and utility systems, necessary demolition, and items required for completion. All work must be performed according to applicable codes and specifications. This requirement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed on Vendor Information Pages. An Invitation for Bid will be issued on June 23, 2021 via sam.gov. A site visit will also be scheduled. Interested parties should contact the contracting specialist James Barber at james.barber@va.gov.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E-001

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

T

FEATURES:

PENETRATION DETAIL BELOW.

FANNULAR

ON BOTH SIDES OF WALL ASSEMBLY.

MAX PIPE

OF OPENING IS 13-1/2 IN.

SPACED MAX 24 IN. OC.

SYSTEM (ITEM 3) IS 2 H. STEEL PIPES OR CONDUITS LARGER THAN NOM 4 IN. DIA

IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND THE HOURLY

SHOWN IN THE FOLLOWING TABLE. THE HOURLY T RATING OF THE FIRESTOP SYSTEM

THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS

A MIN 1/4 IN. DIA BEAD OF CAULK APPLIED TO PERIMETER OF PIPE OR CONDUIT AT

OF ONE PIPE OR CONDUIT IS PERMITTED IN THE FIRESTOP SYSTEM. PIPE OR CONDUIT

MAY ONLY BE USED IN WALLS CONSTRUCTED USING STEEL CHANNEL STUDS. A MAX

COPPER PIPE OR FLEXIBLE STEEL CONDUIT IS USED, MAX F RATING OF FIRESTOP

COPPER TUBING OR NOM 1 IN. DIA (OR SMALLER) FLEXIBLE STEEL CONDUIT. WHEN

(OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR TYPE L OR (OR HEAVIER)

IRON PRESSURE PIPE, NOM 6 IN. DIA (OR SMALLER) STEEL CONDUIT, NOM 4 IN. DIAM

PIPE OR CONDUIT-NOM 12 IN. DIA (OR SMALLER) SERVICE WEIGHT (OR HEAVIER)

U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX. DIAM.

FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL

TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS,

WALLBOARD, GYPSUM*-NOM 1/2 OR 5/8 IN. THICK, 4 FT. WIDE WITH SQUARE OR

BRACES. STEEL STUDS TO BE MIN. 3-5/8 IN. WIDE BY 1-3/8 IN. DEEP CHANNELS

LUMBER SPACE 16 IN OC WITH NOM 2 B Y 4 IN. LUMBER END PLATES AND CROSS

ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN.

STUDS-WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED

FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION

WALL ASSEMBLY-THE 1, 2, 3, OR 4 HR FIRE-RATED GYPSUM WALLBOARD/ STUD WALL

FIRE PENETRATIONS NOTE

EACH PENETRATION WITH ALL VARIABLES DEFINED. SEE TYPICAL FIRE

DETAILS, FURNISHED BY THE MANUFACTURER OF THE FIRE STOP MATERIAL,

HORIZONTAL OFFSET. THE CONTRACTOR SHALL SUBMIT SHOP DRAWING

RECESSED IN OPPOSITE SIDES OF RATED WALLS WITH LESS THAN A 24"

APPROVED BY THE FIRE MARSHAL. THIS INCLUDES, BUT IS NOT LIMITED

PENETRATION FIRE STOP SYSTEMS, AND SHALL BE A TESTED ASSEMBLY

BE PROTECTED BY MATERIALS AND INSTALLATION DETAILS THAT CONFORM

ALL PENETRATIONS OF FIRE RESISTIVE FLOORS, WALLS OR CEILING SHALL

ARCHITECT. THESE DRAWINGS SHALL BE AVAILABLE TO

THE FIRE MARSHAL. THE SHOP DRAWINGS SHALL BE SPECIFIC FOR

WHICH SHOW COMPLETE CONFORMANCE TO THE U.L. LISTING, TO THE

TO, ALL RACEWAY PENETRATIONS AND ELECTRICAL OUTLET BOXES

TO U.L. (UNDERWRITERS LABORATORY) LISTINGS FOR THROUGH

HOUR

0+, 1 OR 2

3 OR 4

3 OR 4

1 OR 2

HOUR

3 OR 4

1 OR 2

1 OR 2

1 OR 2

INCHES

0 TO 1/4

3/16 TO 3/8

0 TO 1-1/2#

1/4 TO 1/2

1/4 TO 1/2

0 TO 3/16

COMPLY WITH THIS DETAIL.

*BEARING THE UL CLASSIFICATION MARKING

FIRE PENETRATION DETAIL

NO SCALE

+WHEN COPPER PIPE IS USED, T RATING IS 0 H.

WB+ CAULK IS USED.

DIA, INCHES

MINNESOTA MINING & MFG. CO.-TYPES CP-25 S/L, CP-25 N/S, CP-25 WB,

CP-25 WB+. (NOTE: L RATINGS APPLY ONLY WHEN TYPE CP-25 WB CAULK IS USED.)

ALL CONDUIT PENETRATIONS THROUGH WALLS SHALL

#0 TO 1-1/2 IN. ANNULAR SPACE APPLIES ONLY WHEN TYPE CP-25

OR CONDUIT SPACE RATING, RATING,

11.

12.

10.

9.

8.

7.

4.

6.

5.

3.

2.

1.

13.

14.

ALL ELECTRICAL WORK TO BE IN ACCORDANCE WITH LATEST REQUIREMENTS OF

THE NEC AND ALL OTHER APPLICABLE CODES AND REGULATIONS OF

AUTHORITIES HAVING JURISDICTION OVER THE WORK AND VA TIL SPECIFICATION

DIVISION 26.

ALL ELECTRICAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE

PROJECT SPECIFICATIONS AND ALL OTHER RELATED CONTRACT DRAWINGS.

COORDINATE WORK WITH OTHER TRADES AND INSTALL CONDUIT AND BOXES TO

CLEAR, DUCTS, OPENINGS, ETC AND INCLUDING ALL STRUCTURAL FEATURES.

ALL WIRE SHALL BE A MINIMUM #12 (COPPER) UNLESS OTHERWISE NOTED. ALL

HOME RUNS 100 FT AND LONGER SHALL BE MINIMUM # 10 WIRE (120/208V SYSTEM

ONLY). INSULATION TYPE SHALL BE THHN.

CONDUIT RUNS SHOWN ARE DIAGRAMMATICAL. THE CONTRACTOR SHALL INSTALL

CONDUITS IN THE MOST EFFICIENT ROUTE BETWEEN TERMINATIONS AND

AVOIDING INTERFERENCE WITH OTHER UTILITY LINES AND FEATURES OF OTHER

DISCIPLINES.

EXPOSED CONDUITS ON WALLS AND CEILINGS TO RUN PARALLEL OR

PERPENDICULAR TO WALLS, CEILINGS AND FLOORS.

THE CONTRACTOR SHALL CAREFULLY EXAMINE ALL CONTRACT

DRAWINGS/SPECIFICATIONS AND BE RESPONSIBLE FOR THE PROPER FITTING OF

MATERIALS AND EQUIPMENT AT EACH LOCATIONS AS INDICATED, WITHOUT

SUBSTANTIAL ALTERATION. IN AS MUCH AS THE DRAWINGS ARE GENERALLY

DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE OF THE DRAWINGS IT IS NOT

POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS AND ACCESSORIES WHICH MAY

BE REQUIRED. FURNISHING SUCH FITTINGS TO MEET SUCH CONDITIONS SHALL BE

AT NO COST TO THE GOVERNMENT.

THE CONTRACTOR SHALL EXAMINE THE SITE AND OBSERVE THE CONDITIONS

UNDER WHICH THE WORK WILL BE DONE OR OTHER CIRCUMSTANCES WHICH

WILL EFFECT THE CONTEMPLATED WORK. NO ALLOWANCE WILL BE MADE

SUBSEQUENTLY IN CONNECTION WITH ANY ERROR OR NEGLIGENCE ON THE

CONTRACTORS PART.

THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND EXTENT OF ALL

EXISTING UTILITIES, OBSTRUCTIONS AND/OR OTHER CONDITIONS WHICH MAY

AFFECT THE PROPOSED WORK. THE CONTRACTOR SHALL TAKE EVERY

PRECAUTION TO PREVENT DAMAGE TO EXISTING WORK AND SHALL REPAIR ANY

DAMAGE AS A RESULT OF THIS WORK.

UNLESS OTHERWISE NOTED FOR INTERIOR WORK, THE FOLLOWING TYPES OF

CONDUITS SHALL BE USED:

A. CONCEALED IN SPACE ABOVE HUNG CEILING AND WALL: EMT CONDUIT.

ALL FEEDERS AND BRANCH CIRCUITS SHALL CONSIST OF CONDUITS AND WIRES.

SIZE AS SHOWN ON DRAWINGS AND SHALL MEET NEC REQUIREMENTS. INSTALL

GREEN GROUNDING WIRE IN ALL BRANCH CIRCUIT CONDUIT.

AC AND NM CABLES SHALL NOT BE USED.

NEW WORK IS SHOWN WITH DARK LINE WEIGHT AND EXISTING IS SHOWN WITH

LIGHT LINE WEIGHT U.O.N.

PANEL DIRECTORY SHALL BE TYPED WHEN UPDATED TO REFLECT NEW &

EXISTING WORK.

NO SET SCREW CONNECTOR SHALL BE USED AND NO POT METAL ELECTRICAL

FITTINGS.

FLEXIBLE CONDUIT LENGTH SHALL NOT EXCEED 6'-0'' AND SHALL BE STEEL.

ALL ELECTRICAL FITTINGS SHALL BE STEEL AND COMPRESSION TYPE.

PROVIDE TWO (SYSTEM A & B) 3000VA/2700 W UPS FOR EACH TR. MATCH EXISTING

UPS TYPE "CYBERPOWER". REUSE EXISTING "CYBERPOWER" UPS'S FOR

RELOCATED TR'S. PROVIDE ADDITIONAL 3000 VA/2700W UPS UNITS AS REQUIRED

DURING THE PHASING PROCESS.ALL SYSTEMS SHALL BE PROTECTED AT ALL

TIMES DURING THE PHASING PERIOD. PROVIDE & INSTALL TWO PDU PER RACK.

ONE FED FROM SYSTEM A UPS AND OTHER FROM SYSTEM B UPS. PDU SHALL BE

CYBERPOWER MODEL PDU 20MHVIEC8FNET BOTH PDU SHALL BE RACK MOUNTED.

CONTRACTOR SHALL PURCHASE AND INSTALL UPS FOR ALL TR. VA WILL FURNISH

ALL PDU REQUIRED FOR THE TR AND BE INSTALLED/WIRED BY ELECTRICAL

CONTRACTOR.

ANYTHING THAT IS NOT EXISTING IS NEW WHETHER IT IS CALLED OUT OR NOT.

CONTRACTOR SHALL PREPARE SHOP DRAWINGS SHOWING ALL CONDUIT

ROUTING & SUBMIT FOR APPROVAL BEFORE PROCEEDING WITH INSTALLATION.

ALL FIRE SYSTEM WIRING SHALL BE IN CONDUIT.

PROVIDE SMOKE DETECTORS FOR TR ROOMS. ALL SMOKE DETECTORS IN TR

ROOMS SHALL BE NEW & MATCH EXISTING MANUFACTURER. CONNECT TO

EXISTING SYSTEM USING CONDUIT & WIRE.

FOR FIRE STOPPING REQUIREMENTS SEE DRAWING 20.A-121.

SINCE EXACT LOCATION OF EXISTING BUILDING GROUND IS NOT AVAILABLE

CONTRACTOR TO ASSUME 200FT RUN FROM THE FIRST TGB TO EXISTING

BUILDING GROUND.

FURNISH AND INSTALL CYBER POWER ENVIRONMENTAL (ENVIROSENSOR)

SENSOR IN ONE OF THE 1, 2, 3, 4, 5, OR 6 RACKS (QTY 2 ONE AT 48" AND OTHER AT

72" AFF). THE SENSOR SHALL MEASURE THE TEMPERATURE AND HUMIDITY

WITHIN THE RACK. FOR CONNECTION PROVIDE AND INSTALL CAT6A ETHERNET

CABLE FOR CONNECTION OF THE SENOR WITHIN THE RACK TO REMOTE

MANAGEMENT CARD RM CARD/PDU AT UPS. SEE DETAILS 5 AND 6 ON SHEET

E-504.

15.

16.

GENERAL NOTES

AFF

AC

ATS

SYMBOL

MOUNTING

LIGHTING FIXTURE SCHEDULE

LAMP

WATTSQTY. TYPE

COLOR

TEMP.

TOTAL INPUT

FIXTURE

INPUT

VOLTS WATTS

TYPE

DRIVER

CATALOG NO. REMARK

MULTI LED 34 4000K 120/277

LED POWER

DRIVER

SURFACE ON

UNISTRUT

PHILIPS CAT#

SM 534C LED 40S/ 940 PSD34

APPLICABLE CODES

MOTOR TYPE

REVISION

RISER TAG

POINT OF CONNECTION

SCHEDULE NUMBER

LIGHT FIXTURE TYPE

INDICATES DETAIL NUMBER

SHEET NUMBER TO FIND DETAIL SPECIFIC NOTE/

POINT OF DISCONNECTION

REFERENCE NOTE

CONDUIT DOWN

CONDUIT UP

GROUND CONNECTION

HOME RUN. 3/4'' CONDUIT, 2 #12 & 1 #12 GROUND,

WIRING SYMBOLS

BRANCH CIRCUIT POWER WIRING

ANNOTATIONS

SEE GI001

LIGHTING SYMBOLS

SINGLE LINE SYMBOLS

PANELBOARD

AUTOMATIC TRANSFER SWITCH (ATS)

GROUNDED TRANSFORMER

CIRCUIT BREAKER WITH AMP TRIP OVER AMP FRAME

SWITCH

FUSE

POWER SYMBOLS

NON-FUSED DISCONNECT SWITCH

ELECTRICAL BRANCH CIRCUIT PANEL VOLTAGE

EXISTING 2 X 4 FIXTURE

NEW 1 X 4 FIXTURE

LIGHT SWITCH

FIRE ALARM SYMBOLS

AUTOMATIC FIRE ALARM SMOKE DETECTOR

SPRINKLER HEAD

UNLESS OTHERWISE NOTED (U.O.N.).

QUAD RECEPTACLE

FIRE PROTECTION WALL SYMBOLS

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

17.

18.

19.

20.

21.

22.

SPECIAL OUTLET

23.

RATING AS SHOWN

24.

25.

ABBREVIATIONS VA

OCCUPANCY SENSOR SWITCH

SHOP DRAWINGS

IN ADDITION TO REQUIREMENTS HEREIN, COMPLY WITH

SHOP DRAWING REQUIREMENTS ON SHEET GI003.

CONTRACTOR SHALL REPLACE EXISTING CORDS CONNECTED TO CISCO

SWITCHES WITH RED AND BLUE CORDS (10'-0" LENGTH) MANUFACTURED BY

CYBER POWER.

IF THERE IS DISCREPANCY BETWEEN DRAWING AND SPECIFICATION,

SPECIFICATIONS WILL GOVERN.

FOR GROUNDING TGB AND TGMB COORDINATE WITH FACILITIES.

ALL TELECOM SYSTEM GROUNDING REQUIREMENTS AS CALLED OUT ON BOTH

TELECOMMUNICATIONS AND ELECTRICAL SHALL BE ELECTRICAL CONTRACTOR'S

RESPONSIBILITY AND MUST BE COORDINATE WITH CABLE CONTRACTOR.

RIGID CONDUIT & ASSOCIATED FITTINGS SHALL BE USED FOR OUTDOOR, WET &

DAMP LOCATIONS.

CONTRACTOR TO PROVIDE ARC FLASH STICKERS ON ALL NEW ELECTRICAL

EQUIPMENT.

PROVIDE 120VAC TO NEW DDC I/O PANEL FROM EXISTING 120VAC RECEPTACLE

CIRCUIT IN EACH TR. COORDINATE WITH MECHANICAL CONTRACTOR ON THE

EXACT LOCATION OF DDC I/O PANEL.

26.

27.

28.

29.

30.

31.

32.

E-002

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

E-001 ELECTRICAL SYMBOL LIST, GENERAL NOTES ABBREVIATIONS, SCOPE

DESCRIPTION

E-002 ELECTRICAL DRAWING LIST

ES001 ELECTRICAL SITE PLAN

SHEET INDEX (CONTINUED)

SHEET NUMBER SHEET TITLE

1.E-112 ELECTRICAL FIRST FLOOR

10.E-102 ELECTRICAL BASEMENT FLOOR PLAN

10.E-103 ELECTRICAL BASEMENT FLOOR PLAN

10.E-111 ELECTRICAL FIRST FLOOR PLAN

10.E-121 ELECTRICAL SECOND FLOOR PLAN

10.E-122 ELECTRICAL SECOND FLOOR PLAN

20.E-111 ELECTRICAL FIRST FLOOR PLAN

20.E-121 ELECTRICAL SECOND FLOOR PLAN

22.E-111 ELECTRICAL FIRST FLOOR PLAN

22.E-121 ELECTRICAL SECOND FLOOR PLAN

23.E-111 ELECTRICAL FIRST FLOOR PLAN

24.E-111 ELECTRICAL FIRST FLOOR PLAN

25.E-111 ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL BASEMENT FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL BASEMENT FLOOR PLAN

ELECTRICAL BASEMENT FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL FIRST FLOOR PLAN

ELECTRICAL SECOND FLOOR PLAN

ELECTRICAL SECOND FLOOR PLAN

ELECTRICAL SECOND FLOOR PLAN

ELECTRICAL SECOND FLOOR PLAN

ELECTRICAL THIRD FLOOR PLAN

ELECTRICAL THIRD FLOOR PLAN

ELECTRICAL THIRD FLOOR PLAN

ELECTRICAL THIRD FLOOR PLAN

ELECTRICAL ENLARGED PLAN TR ROOM

45.E-101 63.E-111 70.E-111 99.E-101 99.E-102 99.E-111

200.E-111 200.E-112 200.E-113 200.E-114

1.E-401

200.E-121 200.E-122 200.E-123 200.E-124 200.E-131 200.E-132 200.E-133 200.E-134

ELECTRICAL ENLARGED PLAN TR ROOM10.E-401

ELECTRICAL ENLARGED PLAN TR ROOM20.E-401

ELECTRICAL ENLARGED PLAN TR ROOM22.E-401

ELECTRICAL ENLARGED PLAN TR ROOM23.E-401

ELECTRICAL ENLARGED PLAN TR ROOM24.E-401

ELECTRICAL ENLARGED PLAN TR ROOM25.E-401

45.E-401 ELECTRICAL ENLARGED PLAN TR ROOM

ELECTRICAL ENLARGED PLAN TR ROOM63.E-401

ELECTRICAL ENLARGED PLAN TR ROOM70.E-401

ELECTRICAL ENLARGED PLAN TR ROOM99.E-401

ELECTRICAL ENLARGED PLAN TR ROOM200.E-401

ELECTRICAL ENLARGED PLAN TR ROOM200.E-402

ELECTRICAL ENLARGED PLAN TR ROOM200.E-403

ELECTRICAL DETAILS - GROUNDINGE-501

SINGLE LINE DIAGRAM BLDG. 10, 20, 99E-601

23.E-131 ELECTRICAL ROOF PLAN

SINGLE LINE DIAGRAM BLDG. 1, 23, 63E-602

TGB GROUNDING RISER BLDG. 10, 22, 20E-701

TGB GROUNDING RISER BLDG. 23, 24, 25,45E-702

TGB GROUNDING RISER BLDG. 63, 70, 99, 200E-703

E-801 E-802 E-803

PANEL SCHEDULE

PANEL SCHEDULE

PANEL SCHEDULE

1.E-131 ELECTRICAL ROOF PLAN

10.E-131 ELECTRICAL ROOF PLAN

22.E-131 ELECTRICAL ROOF PLAN

ELECTRICAL ROOF PLAN99.E-131

ELECTRICAL ROOF PLAN200.E-141

ELECTRICAL DETAILS - GROUNDINGE-502

ELECTRICAL DETAILS - GROUNDINGE-503

ELECTRICAL DETAILS - GROUNDINGE-504

SINGLE LINE DIAGRAM BLDG. 200E-603

E-804 E-805

PANEL SCHEDULE

PANEL SCHEDULE

25.E-121 ELECTRICAL ROOF PLAN

20.E-131 ELECTRICAL ROOF PLAN

ELECTRICAL DETAILSE-505

BLDG. 45

ENGINEERING SHOP

BLDG. 46

WESTERN RESEARCH

WESTERN RESEARCH

INCINERATOR

AH-24

BLDG. 200

Audie Murphy Dr.

Audie M urphy Dr.

Chester W. Nimitz DrGeorge S. Patton Jr Dr Chester W. Nimitz Dr

Audie Murphy Dr.

George S. Patton Jr Dr

Geo rge

S. P att on Jr

D r

Ki nz ie S t

Kinzie St

W oodley Ave.

W oodley Ave.

Plummer St.

W oodley Ave.

Plummer St. Plummer St. Plummer St.

H askell Ave.

H askell Ave.

H askell Ave.

Chester W. Nimitz Dr

C hester W

. N im itz D r

H askell Ave.

C hester W

. N im itz D r

John Basilone Dr.

John Basilone Dr.

Lassen St.

W oodley Ave.

sen St. Lassen St. Lassen St. Lassen St.

John Basilone Dr. John Basilone Dr.

BLDG. 201

BLDG. 10

BLDG. 5

BLDG. 99

BLDG. 70

BLDG. 25BLDG. 20

BLDG. 23

WHEELCHAIR TRACK

BLDG. 7

BLDG. 1

CHAPEL

BLDG. 21

BLDG. 22

BLDG. 4

BLDG. 62

BLDG. 24

LAUNDRY

BLDG. 104

BLDG. 63

BLDG. 44

BLDG. 40

BLDG. 202

BLDG. 52

BLDG. 47

ELECTRICAL SITE PLAN

SCALE: 1/128" = 1' - 0"

NORTH

ES001

ELECTRICAL SITE PLAN

LEGEND

BUILDING IN SCOPE

(VA SEPULVEDA CAMPUS, NORTH HILLS)

BUILDING SCHEDULE

BLDG. NO. DESCRIPTION

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

A

C

D

20-SCE-08

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 64' 128' 256'

SCALE: 1/128" = 1'-0"

200 VA MEDICAL CENTER DEPARTMENT

PATIENT HOUSING

PATIENT HOUSING OUTPATIENT

N.P.

NURSE HOME CARE

RESEARCH

QUARTER HOUSEKEEPING

UNKNOWN

NEW DIRECTIONS SEPULVEDA 1

WHEELCHAIR TRACK

GYM & POOL

F.M. & R CLINIC

THEATRE

RECREATION & CHILD YOUTH CENTER

KITCHEN, WARE HOUSE & CANTEEN

CHAPEL

GERIATRICS

ADMINISTRATION & RESEARCH

WC

SCALE: 1/8" = 1' - 0"

1.E-112

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 1.E-401

1 EXISTING PANEL S 225A 208/120V.

FOR ENLARGED PLAN

SEE 1.E-401

NORTH

TR ROOM

A154

TR ROOM

B120A

AREA OF WORK

WP

GFI

WP

GFI

S-39,41

S-26

S-35,37

CU

1-B120A

CU

1-A154

SCALE: 3/32" = 1' - 0"

1.E-131

ELECTRICAL ROOF PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 16' 24'2' 8'

SCALE: 3/32" = 1'-0"

1 UNISTRUT RACK. SEE DETAIL ON E-503.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NORTH

(N) STAIR

UP

WHEELCHAIR

STAIR #2

(E)

UP

(N) STAIR #5

#4

UP

N N N

N

N

N

N

L

L

L

L

N

L

N

L

N

SCALE: 1/8" = 1' - 0"

10.E-102

ELECTRICAL BASEMENT FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

0.

E-

FO

R

C O

N

TI

N U

AT

IO

N

REFER TO 10.E-101 FOR CONTINUATION

FOR ENLARGED PLAN

SEE 10.E-401

1 EXISTING CRITICAL PANEL BSLA 100A 208/120V.

PHYSICIAN

STAIR

(E)

STAIR #1

(E)

ELEV.

(E)

ELEV.

(E)

(E)

STAIR # 3

S-13

P-12

UP

DN

SCALE: 1/8" = 1' - 0"

10.E-103

ELECTRICAL BASEMENT FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

0.

E-

FO

R

C O

N

TI

N U

AT

IO

N

REFER TO 10.E-101 FOR CONTINUATION

1 NEW 30A/ 2P 208V NEMA 3R DISCONNECT.

NEW 3/4''C- 2 #12 + 1 #12EG.

NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR B100C.

NORTH AREA OF WORK

1 (TYP)

BLSA-24,26 2

WP

WP

GFI

BLSA-22

CU

10-1-BB110

SCALE: 1/8" = 1' - 0"

10.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

0.

E-

FO

R

C O

N

TI

N U

AT

IO

N

1 NEW 30A/ 3P 208V NEMA 3R DISCONNECT.

NEW 3/4''C- 2 #12 + 1 #12EG.

NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR B-B110.

DN.

DN.

NO.4

(N) STAIR

NO.5

(E) STAIR

A29B

SCALE: 1/8" = 1' - 0"

10.E-121

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

0.

E-

FO

R

C O

N

TI

N U

AT

IO

N

FOR ENLARGED PLAN

SEE 10.E-401

DN.

DN.

NO.6

NO.7

(E) ELEV.

(E) ELEV.

(E) STAIR

(E) STAIR

NO. 3

C-00A

SCALE: 1/8" = 1' - 0"

10.E-122

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

0.

E-

FO

R

C O

N

TI

N U

AT

IO

N

FOR ENLARGED PLAN

SEE 10.E-401

1 EXISTING CRITICAL PANEL 2LSB.

GFI

WP

GFI

3 CU

10-C00A

CU

10-A29B 2LSB-22,24 2LSB-26,28

2LSB-163

SCALE: 1/16" = 1' - 0"

10.E-131

ELECTRICAL ROOF PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 8' 16' 32'

SCALE: 1/16" = 1'-0"

1 UNISTRUT RACK.

NEW 30A/ 2P 208V NEMA 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

HW-80

HW-85

HW

-87

HW

-85

HW

-85

HW

-28

HW

-87

HW-85

HW

-61

HW

-28

G-9,11

G-13

WP

GFI

CU

20-1A115

SCALE: 1/8" = 1' - 0"

NORTH

20.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE S.20.E-401

1 EXISTING PANEL A 225A 208/120V.

NOT USED.

NEW 30A/2P 208V NEMA 3R DISCONNECT.

NEW 3/4''C- 2 #12 + 1 #12EG.

NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NEW 3/4''C- 2 #12 + 1 #12EG

EXISTING DISTRIBUTION BOARD 1000A 208/120V.

NEW PANEL G 100A 208/ 120V.

NEW 1 1/4''C- 4 #2 + 1 #6EG.

20.E-121

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 20.E-401

FOR ENLARGED PLAN

SEE 20.E-401

G-10,12

G-14

CU

20-2A115

SCALE: 1/8" = 1' - 0"

20.E-131

ELECTRICAL ROOF PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 UNISTRUT RACK.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

125 176 144

176120240

192160160128

SCALE: 1/8" = 1' - 0"

NORTH

22.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 22.E-401

1 EXISTING PANEL A5 200A 208/120V.

EXISTING PANEL A4 175A 208/120V.

EXISTING DISTRIBUTION BOARD 1B 500A

208/120V. ADD 60A/ 3P CB TO FEED

SUB-PANEL A8.

NEW PANEL A8 60A 208/120V.

NEW 1''C- 4 #6 + 1 #10EG.

22.E-121

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 22.E-401

GFI 4

WP

GFI

CU

22-202

CU

22-103A8-11,13 A8-10,12

A8-9

SCALE: 1/8" = 1' - 0"

NORTH

22.E-131

ELECTRICAL ROOF PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 UNISTRUT RACK. SEE DETAIL ON E-503.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

SCALE: 1/8" = 1' - 0"

23.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 23.E-401

1 EXISTING PANEL A 225A 208/120V.

NEW PANEL A1 225A 208/120V.

NO

RT

H

CU

23-106

A1-6

A1-2,4

SCALE: 1/8" = 1' - 0"

23.E-131

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 UNISTRUT RACK. SEE DETAIL ON E-503.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NO

RT

NORTH

24.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 EXISTING PANEL A 225A 208/120V.

FOR ENLARGED PLAN

SEE 24.E-401

SCALE: 1/8" = 1' - 0"

25.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 25.E-401

1 EXISTING PANEL SW2 225A 208/120V.

EXISTING DISTRIBUTION PANEL MD 400A

208/120V 3P 4W.

TR ROOM

A-109

NO

RT

CU

25-A109

SW2-26

SW2-22,24

SCALE: 1/8" = 1' - 0"

25.E-121

ELECTRICAL ROOF FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 UNISTRUT RACK. SEE DETAIL ON E-503.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NO

RT

CU

45-105

WP

GFI

5 4

Q-2,4

Q-6

SCALE: 1/8" = 1' - 0"

45.E-101

ELECTRICAL BASEMENT FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 45.E-401

1 NOT USED.

EXISTING PANEL M 600A 208/120V.

NEW 30A/ 2P 208V 3R DISCONNECT.

NEW 3/4''C - 2 #12 + 1 #12EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NEW SUB PANEL Q 60A 208/120V.

NEW 1"C - 4 # 6 + 1 # 10 EG.

NORTH

SCALE: 1/8" = 1' - 0"

63.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 63.E-401

1 EXISTING DISTRIBUTION BOARD DB 600A

208/120V. INSTALL 40A/ 3P CB. INSTALL 40A/3P

CB.

NEW PANEL TR 40A 208/120V

1''C- 4 #8 + 1 #10EG.

DINING

ROOM

KITCHEN

STORAGE

STAFF

TOILET

RECREATION AREA

RECEPTION

CONFERENCE ROOM

OFFICE

O.T. OFFICE

MEDICAL

TREATMENT

PATIENT

TOILET

CLOS. CLINICAL

DIRECTOR MALE

TOILET

SCALE: 1/8" = 1' - 0"

70.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 70.E-401

1 EXISTING PANEL G 225A 208/120V. (SQD)

INSTALLED 40A/ 3P CB TO FEED SUB PANEL G1.

NEW RECESSED SUB PANEL G1 40A 208/120V.

EXISTING WIRE GUTTER.

EXISTING 50KVA 480-208/120V PAD MOUNTED

TRANSFORMER NEMA 3R.

99.E-101

ELECTRICAL GROUND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

REFER TO 99.E-102 FOR CONTINUATION

FOR ENLARGED PLAN

SEE 99.E-401

99.E-102

ELECTRICAL GROUND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

REFER TO 99.E-101 FOR CONTINUATION

1 EXISTING CRITICAL PANEL KP 225A 208/120V.

99.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED PLAN

SEE 99.E-401

FOR ENLARGED PLAN

SEE 99.E-401

G57A1

KP-30,32

WP

GFI

KP-42

CU

KP-37,39

WP

GFI

KP-42

SCALE: 1/16" = 1' - 0"

99.E-131

ELECTRICAL GROUND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 8' 16' 32'

SCALE: 1/16" = 1'-0"

1 NEW 30A/3P 208V DISCONNECT NEMA 3R.

MOUNT ON UNISTRUT RACK. FOR RACK DETAIL

SEE E-503.

NEW 3/4"C - 2 # 10 + 1 # 12 EG.

NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN

COIL UNIT IN RESPECTIVE TR.

NEW 3/4''C - 2 #12 + 1 #12EG.

200.E-111

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

REFER TO 200.E-112 FOR CONTINUATION

FOR ENLARGED 1533 PLAN SEE

200.E-401

1 EXISTING CRITICAL PANEL 225A 1LC 208/120V.

200.E-112

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

REFER TO 200.E-111 FOR CONTINUATION

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

FOR 1927 ENLARGED

PLAN SEE 200.E-401

1 EXISTING CRITICAL PANEL 225A 14LD 208/120V.

200.E-113

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

REFER TO 200.E-114 FOR CONTINUATION

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

FOR 1001B

ENLARGED PLAN

SEE 200.E-401

1 EXISTING CRITICAL PANEL 1LA 150A 208/120V.

T

T

T

SCALE: 1/8" = 1' - 0"

200.E-114

ELECTRICAL FIRST FLOOR PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

REFER TO 200.E-113 FOR CONTINUATION

FOR ENLARGED 1356

PLAN SEE 200.E-401

FOR ENLARGED PLAN

SEE 200.E-401 DETAIL 5

1 EXISTING CRITICAL PANEL 1LB 150A 208/120V.

EXISTING CRITICAL PANEL 1LBB 100A 480/277V.

EXISTING CRITICAL PANEL 1LFF 100A 480/277V.

EXISTING TRANSFORMER 30KVA 480-208/120V.

EXISTING CRITICAL PANEL 1LF 100A 208/120V.

NEW 60A/3P DISCONNECT.

NEW 45KVA 480-208/ 120V 3P 4W WALL

MOUNTED TRANSFORMER.

NEW CRITICAL PANEL 1LG 125A 208/120V

MOUNTED BELOW WALL MOUNTED

TRANSFORMER.

3/4''C- 3 # 4 + 1 # 10 EG.

NOT USED.

NEW CRITICAL PANEL 1LB1 208/ 120V 3P 4W.

1 1/2''C - 4 # 1 + 1 # 6 EG.

EX PANEL 2LC

SEE 200.E-124

SCALE: 1/8" = 1' - 0"

200.E-121

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 EXISTING PANEL 2LD 100A 208/120V.

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

REFER TO 200.E-122 FOR CONTINUATION

FOR ENLARGED 2466

PLAN SEE 200.E-402

200.E-122

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

1 EXISTING PANEL 2LB 100A 208/120V.

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

REFER TO 200.E-121 FOR CONTINUATION

FOR ENLARGED2664

PLAN SEE 200.E-402

200.E-123

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR FIRE/SMOKE BARRIER

3 HOUR FIRE BARRIER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMPCONSULTANT

Project Director

Revisions: Date:

691A4-20-201FINAL CONSTRUCTION

DOCUMENT

May 17, 2021 PM JB/EW

FULLY SPRINKLERED

ARCHITECT/ENGINEER OF RECORD

1611 PLUMMER ST, NORTH HILLS, CA, 91343

20801.13

Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA

0' 4' 8' 16'

SCALE: 1/8" = 1'-0"

FOR ENLARGED 2165

PLAN SEE 200.E-402

1 EXISTING PANEL 2LA 150A 208/120V.

R

EF

ER

T

O

.E

-1

F O

R C

O N

TI

N

U

AT

IO

N

REFER TO 200.E-124 FOR CONTINUATION

200-1356

WP

GFI

1LG-13

WP

1LG-9,11

SCALE: 1/8" = 1' - 0"

200.E-124

ELECTRICAL SECOND FLOOR

PLAN

A

Fi le

P at h

B

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

Key Plan

A

GENERAL NOTES

KEY NOTES

C

D

20-SCE-08

GENERAL NOTE

FIRE PROTECTION

1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO

ANY FIREPROOFED COMPONENTS.

SYMBOLS LIST

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

2 HOUR FIRE/SMOKE BARRIER

SMOKE BARRIER

SMOKE PARTITION

1 HOUR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .