S02 Attachment D Drawings Part 3.pdf
PDF 14 MB Posted
- Attached to
- Z2DA--691A4-20-201 Electronic Health Records Modernization (EHRM) Infrastructure Upgrades
- Solicitation number
- 36C26221B0008_1
About this file
This document describes a federal contract opportunity for Electronic Health Records Modernization (EHRM) Infrastructure Upgrades. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking construction services between $10,000,000 to $20,000,000 for Project 691A4-20-201 at the VA Greater Los Angeles Healthcare System, VA Sepulveda Ambulatory Care Center located in North Hills, California. Work includes general construction, alterations, mechanical, electrical and utility systems, necessary demolition, and items required for completion. All work must be performed according to applicable codes and specifications. This requirement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses listed on Vendor Information Pages. An Invitation for Bid will be issued on June 23, 2021 via sam.gov. A site visit will also be scheduled. Interested parties should contact the contracting specialist James Barber at james.barber@va.gov.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E-001
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
T
FEATURES:
PENETRATION DETAIL BELOW.
FANNULAR
ON BOTH SIDES OF WALL ASSEMBLY.
MAX PIPE
OF OPENING IS 13-1/2 IN.
SPACED MAX 24 IN. OC.
SYSTEM (ITEM 3) IS 2 H. STEEL PIPES OR CONDUITS LARGER THAN NOM 4 IN. DIA
IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND THE HOURLY
SHOWN IN THE FOLLOWING TABLE. THE HOURLY T RATING OF THE FIRESTOP SYSTEM
THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS
A MIN 1/4 IN. DIA BEAD OF CAULK APPLIED TO PERIMETER OF PIPE OR CONDUIT AT
OF ONE PIPE OR CONDUIT IS PERMITTED IN THE FIRESTOP SYSTEM. PIPE OR CONDUIT
MAY ONLY BE USED IN WALLS CONSTRUCTED USING STEEL CHANNEL STUDS. A MAX
COPPER PIPE OR FLEXIBLE STEEL CONDUIT IS USED, MAX F RATING OF FIRESTOP
COPPER TUBING OR NOM 1 IN. DIA (OR SMALLER) FLEXIBLE STEEL CONDUIT. WHEN
(OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR TYPE L OR (OR HEAVIER)
IRON PRESSURE PIPE, NOM 6 IN. DIA (OR SMALLER) STEEL CONDUIT, NOM 4 IN. DIAM
PIPE OR CONDUIT-NOM 12 IN. DIA (OR SMALLER) SERVICE WEIGHT (OR HEAVIER)
U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX. DIAM.
FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL
TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS,
WALLBOARD, GYPSUM*-NOM 1/2 OR 5/8 IN. THICK, 4 FT. WIDE WITH SQUARE OR
BRACES. STEEL STUDS TO BE MIN. 3-5/8 IN. WIDE BY 1-3/8 IN. DEEP CHANNELS
LUMBER SPACE 16 IN OC WITH NOM 2 B Y 4 IN. LUMBER END PLATES AND CROSS
ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN.
STUDS-WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED
FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION
WALL ASSEMBLY-THE 1, 2, 3, OR 4 HR FIRE-RATED GYPSUM WALLBOARD/ STUD WALL
FIRE PENETRATIONS NOTE
EACH PENETRATION WITH ALL VARIABLES DEFINED. SEE TYPICAL FIRE
DETAILS, FURNISHED BY THE MANUFACTURER OF THE FIRE STOP MATERIAL,
HORIZONTAL OFFSET. THE CONTRACTOR SHALL SUBMIT SHOP DRAWING
RECESSED IN OPPOSITE SIDES OF RATED WALLS WITH LESS THAN A 24"
APPROVED BY THE FIRE MARSHAL. THIS INCLUDES, BUT IS NOT LIMITED
PENETRATION FIRE STOP SYSTEMS, AND SHALL BE A TESTED ASSEMBLY
BE PROTECTED BY MATERIALS AND INSTALLATION DETAILS THAT CONFORM
ALL PENETRATIONS OF FIRE RESISTIVE FLOORS, WALLS OR CEILING SHALL
ARCHITECT. THESE DRAWINGS SHALL BE AVAILABLE TO
THE FIRE MARSHAL. THE SHOP DRAWINGS SHALL BE SPECIFIC FOR
WHICH SHOW COMPLETE CONFORMANCE TO THE U.L. LISTING, TO THE
TO, ALL RACEWAY PENETRATIONS AND ELECTRICAL OUTLET BOXES
TO U.L. (UNDERWRITERS LABORATORY) LISTINGS FOR THROUGH
HOUR
0+, 1 OR 2
3 OR 4
3 OR 4
1 OR 2
HOUR
3 OR 4
1 OR 2
1 OR 2
1 OR 2
INCHES
0 TO 1/4
3/16 TO 3/8
0 TO 1-1/2#
1/4 TO 1/2
1/4 TO 1/2
0 TO 3/16
COMPLY WITH THIS DETAIL.
*BEARING THE UL CLASSIFICATION MARKING
FIRE PENETRATION DETAIL
NO SCALE
+WHEN COPPER PIPE IS USED, T RATING IS 0 H.
WB+ CAULK IS USED.
DIA, INCHES
MINNESOTA MINING & MFG. CO.-TYPES CP-25 S/L, CP-25 N/S, CP-25 WB,
CP-25 WB+. (NOTE: L RATINGS APPLY ONLY WHEN TYPE CP-25 WB CAULK IS USED.)
ALL CONDUIT PENETRATIONS THROUGH WALLS SHALL
#0 TO 1-1/2 IN. ANNULAR SPACE APPLIES ONLY WHEN TYPE CP-25
OR CONDUIT SPACE RATING, RATING,
11.
12.
10.
9.
8.
7.
4.
6.
5.
3.
2.
1.
13.
14.
ALL ELECTRICAL WORK TO BE IN ACCORDANCE WITH LATEST REQUIREMENTS OF
THE NEC AND ALL OTHER APPLICABLE CODES AND REGULATIONS OF
AUTHORITIES HAVING JURISDICTION OVER THE WORK AND VA TIL SPECIFICATION
DIVISION 26.
ALL ELECTRICAL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
PROJECT SPECIFICATIONS AND ALL OTHER RELATED CONTRACT DRAWINGS.
COORDINATE WORK WITH OTHER TRADES AND INSTALL CONDUIT AND BOXES TO
CLEAR, DUCTS, OPENINGS, ETC AND INCLUDING ALL STRUCTURAL FEATURES.
ALL WIRE SHALL BE A MINIMUM #12 (COPPER) UNLESS OTHERWISE NOTED. ALL
HOME RUNS 100 FT AND LONGER SHALL BE MINIMUM # 10 WIRE (120/208V SYSTEM
ONLY). INSULATION TYPE SHALL BE THHN.
CONDUIT RUNS SHOWN ARE DIAGRAMMATICAL. THE CONTRACTOR SHALL INSTALL
CONDUITS IN THE MOST EFFICIENT ROUTE BETWEEN TERMINATIONS AND
AVOIDING INTERFERENCE WITH OTHER UTILITY LINES AND FEATURES OF OTHER
DISCIPLINES.
EXPOSED CONDUITS ON WALLS AND CEILINGS TO RUN PARALLEL OR
PERPENDICULAR TO WALLS, CEILINGS AND FLOORS.
THE CONTRACTOR SHALL CAREFULLY EXAMINE ALL CONTRACT
DRAWINGS/SPECIFICATIONS AND BE RESPONSIBLE FOR THE PROPER FITTING OF
MATERIALS AND EQUIPMENT AT EACH LOCATIONS AS INDICATED, WITHOUT
SUBSTANTIAL ALTERATION. IN AS MUCH AS THE DRAWINGS ARE GENERALLY
DIAGRAMMATIC AND BECAUSE OF THE SMALL SCALE OF THE DRAWINGS IT IS NOT
POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS AND ACCESSORIES WHICH MAY
BE REQUIRED. FURNISHING SUCH FITTINGS TO MEET SUCH CONDITIONS SHALL BE
AT NO COST TO THE GOVERNMENT.
THE CONTRACTOR SHALL EXAMINE THE SITE AND OBSERVE THE CONDITIONS
UNDER WHICH THE WORK WILL BE DONE OR OTHER CIRCUMSTANCES WHICH
WILL EFFECT THE CONTEMPLATED WORK. NO ALLOWANCE WILL BE MADE
SUBSEQUENTLY IN CONNECTION WITH ANY ERROR OR NEGLIGENCE ON THE
CONTRACTORS PART.
THE CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND EXTENT OF ALL
EXISTING UTILITIES, OBSTRUCTIONS AND/OR OTHER CONDITIONS WHICH MAY
AFFECT THE PROPOSED WORK. THE CONTRACTOR SHALL TAKE EVERY
PRECAUTION TO PREVENT DAMAGE TO EXISTING WORK AND SHALL REPAIR ANY
DAMAGE AS A RESULT OF THIS WORK.
UNLESS OTHERWISE NOTED FOR INTERIOR WORK, THE FOLLOWING TYPES OF
CONDUITS SHALL BE USED:
A. CONCEALED IN SPACE ABOVE HUNG CEILING AND WALL: EMT CONDUIT.
ALL FEEDERS AND BRANCH CIRCUITS SHALL CONSIST OF CONDUITS AND WIRES.
SIZE AS SHOWN ON DRAWINGS AND SHALL MEET NEC REQUIREMENTS. INSTALL
GREEN GROUNDING WIRE IN ALL BRANCH CIRCUIT CONDUIT.
AC AND NM CABLES SHALL NOT BE USED.
NEW WORK IS SHOWN WITH DARK LINE WEIGHT AND EXISTING IS SHOWN WITH
LIGHT LINE WEIGHT U.O.N.
PANEL DIRECTORY SHALL BE TYPED WHEN UPDATED TO REFLECT NEW &
EXISTING WORK.
NO SET SCREW CONNECTOR SHALL BE USED AND NO POT METAL ELECTRICAL
FITTINGS.
FLEXIBLE CONDUIT LENGTH SHALL NOT EXCEED 6'-0'' AND SHALL BE STEEL.
ALL ELECTRICAL FITTINGS SHALL BE STEEL AND COMPRESSION TYPE.
PROVIDE TWO (SYSTEM A & B) 3000VA/2700 W UPS FOR EACH TR. MATCH EXISTING
UPS TYPE "CYBERPOWER". REUSE EXISTING "CYBERPOWER" UPS'S FOR
RELOCATED TR'S. PROVIDE ADDITIONAL 3000 VA/2700W UPS UNITS AS REQUIRED
DURING THE PHASING PROCESS.ALL SYSTEMS SHALL BE PROTECTED AT ALL
TIMES DURING THE PHASING PERIOD. PROVIDE & INSTALL TWO PDU PER RACK.
ONE FED FROM SYSTEM A UPS AND OTHER FROM SYSTEM B UPS. PDU SHALL BE
CYBERPOWER MODEL PDU 20MHVIEC8FNET BOTH PDU SHALL BE RACK MOUNTED.
CONTRACTOR SHALL PURCHASE AND INSTALL UPS FOR ALL TR. VA WILL FURNISH
ALL PDU REQUIRED FOR THE TR AND BE INSTALLED/WIRED BY ELECTRICAL
CONTRACTOR.
ANYTHING THAT IS NOT EXISTING IS NEW WHETHER IT IS CALLED OUT OR NOT.
CONTRACTOR SHALL PREPARE SHOP DRAWINGS SHOWING ALL CONDUIT
ROUTING & SUBMIT FOR APPROVAL BEFORE PROCEEDING WITH INSTALLATION.
ALL FIRE SYSTEM WIRING SHALL BE IN CONDUIT.
PROVIDE SMOKE DETECTORS FOR TR ROOMS. ALL SMOKE DETECTORS IN TR
ROOMS SHALL BE NEW & MATCH EXISTING MANUFACTURER. CONNECT TO
EXISTING SYSTEM USING CONDUIT & WIRE.
FOR FIRE STOPPING REQUIREMENTS SEE DRAWING 20.A-121.
SINCE EXACT LOCATION OF EXISTING BUILDING GROUND IS NOT AVAILABLE
CONTRACTOR TO ASSUME 200FT RUN FROM THE FIRST TGB TO EXISTING
BUILDING GROUND.
FURNISH AND INSTALL CYBER POWER ENVIRONMENTAL (ENVIROSENSOR)
SENSOR IN ONE OF THE 1, 2, 3, 4, 5, OR 6 RACKS (QTY 2 ONE AT 48" AND OTHER AT
72" AFF). THE SENSOR SHALL MEASURE THE TEMPERATURE AND HUMIDITY
WITHIN THE RACK. FOR CONNECTION PROVIDE AND INSTALL CAT6A ETHERNET
CABLE FOR CONNECTION OF THE SENOR WITHIN THE RACK TO REMOTE
MANAGEMENT CARD RM CARD/PDU AT UPS. SEE DETAILS 5 AND 6 ON SHEET
E-504.
15.
16.
GENERAL NOTES
AFF
AC
ATS
SYMBOL
MOUNTING
LIGHTING FIXTURE SCHEDULE
LAMP
WATTSQTY. TYPE
COLOR
TEMP.
TOTAL INPUT
FIXTURE
INPUT
VOLTS WATTS
TYPE
DRIVER
CATALOG NO. REMARK
MULTI LED 34 4000K 120/277
LED POWER
DRIVER
SURFACE ON
UNISTRUT
PHILIPS CAT#
SM 534C LED 40S/ 940 PSD34
APPLICABLE CODES
MOTOR TYPE
REVISION
RISER TAG
POINT OF CONNECTION
SCHEDULE NUMBER
LIGHT FIXTURE TYPE
INDICATES DETAIL NUMBER
SHEET NUMBER TO FIND DETAIL SPECIFIC NOTE/
POINT OF DISCONNECTION
REFERENCE NOTE
CONDUIT DOWN
CONDUIT UP
GROUND CONNECTION
HOME RUN. 3/4'' CONDUIT, 2 #12 & 1 #12 GROUND,
WIRING SYMBOLS
BRANCH CIRCUIT POWER WIRING
ANNOTATIONS
SEE GI001
LIGHTING SYMBOLS
SINGLE LINE SYMBOLS
PANELBOARD
AUTOMATIC TRANSFER SWITCH (ATS)
GROUNDED TRANSFORMER
CIRCUIT BREAKER WITH AMP TRIP OVER AMP FRAME
SWITCH
FUSE
POWER SYMBOLS
NON-FUSED DISCONNECT SWITCH
ELECTRICAL BRANCH CIRCUIT PANEL VOLTAGE
EXISTING 2 X 4 FIXTURE
NEW 1 X 4 FIXTURE
LIGHT SWITCH
FIRE ALARM SYMBOLS
AUTOMATIC FIRE ALARM SMOKE DETECTOR
SPRINKLER HEAD
UNLESS OTHERWISE NOTED (U.O.N.).
QUAD RECEPTACLE
FIRE PROTECTION WALL SYMBOLS
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
17.
18.
19.
20.
21.
22.
SPECIAL OUTLET
23.
RATING AS SHOWN
24.
25.
ABBREVIATIONS VA
OCCUPANCY SENSOR SWITCH
SHOP DRAWINGS
IN ADDITION TO REQUIREMENTS HEREIN, COMPLY WITH
SHOP DRAWING REQUIREMENTS ON SHEET GI003.
CONTRACTOR SHALL REPLACE EXISTING CORDS CONNECTED TO CISCO
SWITCHES WITH RED AND BLUE CORDS (10'-0" LENGTH) MANUFACTURED BY
CYBER POWER.
IF THERE IS DISCREPANCY BETWEEN DRAWING AND SPECIFICATION,
SPECIFICATIONS WILL GOVERN.
FOR GROUNDING TGB AND TGMB COORDINATE WITH FACILITIES.
ALL TELECOM SYSTEM GROUNDING REQUIREMENTS AS CALLED OUT ON BOTH
TELECOMMUNICATIONS AND ELECTRICAL SHALL BE ELECTRICAL CONTRACTOR'S
RESPONSIBILITY AND MUST BE COORDINATE WITH CABLE CONTRACTOR.
RIGID CONDUIT & ASSOCIATED FITTINGS SHALL BE USED FOR OUTDOOR, WET &
DAMP LOCATIONS.
CONTRACTOR TO PROVIDE ARC FLASH STICKERS ON ALL NEW ELECTRICAL
EQUIPMENT.
PROVIDE 120VAC TO NEW DDC I/O PANEL FROM EXISTING 120VAC RECEPTACLE
CIRCUIT IN EACH TR. COORDINATE WITH MECHANICAL CONTRACTOR ON THE
EXACT LOCATION OF DDC I/O PANEL.
26.
27.
28.
29.
30.
31.
32.
E-002
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
E-001 ELECTRICAL SYMBOL LIST, GENERAL NOTES ABBREVIATIONS, SCOPE
DESCRIPTION
E-002 ELECTRICAL DRAWING LIST
ES001 ELECTRICAL SITE PLAN
SHEET INDEX (CONTINUED)
SHEET NUMBER SHEET TITLE
1.E-112 ELECTRICAL FIRST FLOOR
10.E-102 ELECTRICAL BASEMENT FLOOR PLAN
10.E-103 ELECTRICAL BASEMENT FLOOR PLAN
10.E-111 ELECTRICAL FIRST FLOOR PLAN
10.E-121 ELECTRICAL SECOND FLOOR PLAN
10.E-122 ELECTRICAL SECOND FLOOR PLAN
20.E-111 ELECTRICAL FIRST FLOOR PLAN
20.E-121 ELECTRICAL SECOND FLOOR PLAN
22.E-111 ELECTRICAL FIRST FLOOR PLAN
22.E-121 ELECTRICAL SECOND FLOOR PLAN
23.E-111 ELECTRICAL FIRST FLOOR PLAN
24.E-111 ELECTRICAL FIRST FLOOR PLAN
25.E-111 ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL BASEMENT FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL BASEMENT FLOOR PLAN
ELECTRICAL BASEMENT FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL FIRST FLOOR PLAN
ELECTRICAL SECOND FLOOR PLAN
ELECTRICAL SECOND FLOOR PLAN
ELECTRICAL SECOND FLOOR PLAN
ELECTRICAL SECOND FLOOR PLAN
ELECTRICAL THIRD FLOOR PLAN
ELECTRICAL THIRD FLOOR PLAN
ELECTRICAL THIRD FLOOR PLAN
ELECTRICAL THIRD FLOOR PLAN
ELECTRICAL ENLARGED PLAN TR ROOM
45.E-101 63.E-111 70.E-111 99.E-101 99.E-102 99.E-111
200.E-111 200.E-112 200.E-113 200.E-114
1.E-401
200.E-121 200.E-122 200.E-123 200.E-124 200.E-131 200.E-132 200.E-133 200.E-134
ELECTRICAL ENLARGED PLAN TR ROOM10.E-401
ELECTRICAL ENLARGED PLAN TR ROOM20.E-401
ELECTRICAL ENLARGED PLAN TR ROOM22.E-401
ELECTRICAL ENLARGED PLAN TR ROOM23.E-401
ELECTRICAL ENLARGED PLAN TR ROOM24.E-401
ELECTRICAL ENLARGED PLAN TR ROOM25.E-401
45.E-401 ELECTRICAL ENLARGED PLAN TR ROOM
ELECTRICAL ENLARGED PLAN TR ROOM63.E-401
ELECTRICAL ENLARGED PLAN TR ROOM70.E-401
ELECTRICAL ENLARGED PLAN TR ROOM99.E-401
ELECTRICAL ENLARGED PLAN TR ROOM200.E-401
ELECTRICAL ENLARGED PLAN TR ROOM200.E-402
ELECTRICAL ENLARGED PLAN TR ROOM200.E-403
ELECTRICAL DETAILS - GROUNDINGE-501
SINGLE LINE DIAGRAM BLDG. 10, 20, 99E-601
23.E-131 ELECTRICAL ROOF PLAN
SINGLE LINE DIAGRAM BLDG. 1, 23, 63E-602
TGB GROUNDING RISER BLDG. 10, 22, 20E-701
TGB GROUNDING RISER BLDG. 23, 24, 25,45E-702
TGB GROUNDING RISER BLDG. 63, 70, 99, 200E-703
E-801 E-802 E-803
PANEL SCHEDULE
PANEL SCHEDULE
PANEL SCHEDULE
1.E-131 ELECTRICAL ROOF PLAN
10.E-131 ELECTRICAL ROOF PLAN
22.E-131 ELECTRICAL ROOF PLAN
ELECTRICAL ROOF PLAN99.E-131
ELECTRICAL ROOF PLAN200.E-141
ELECTRICAL DETAILS - GROUNDINGE-502
ELECTRICAL DETAILS - GROUNDINGE-503
ELECTRICAL DETAILS - GROUNDINGE-504
SINGLE LINE DIAGRAM BLDG. 200E-603
E-804 E-805
PANEL SCHEDULE
PANEL SCHEDULE
25.E-121 ELECTRICAL ROOF PLAN
20.E-131 ELECTRICAL ROOF PLAN
ELECTRICAL DETAILSE-505
BLDG. 45
ENGINEERING SHOP
BLDG. 46
WESTERN RESEARCH
WESTERN RESEARCH
INCINERATOR
AH-24
BLDG. 200
Audie Murphy Dr.
Audie M urphy Dr.
Chester W. Nimitz DrGeorge S. Patton Jr Dr Chester W. Nimitz Dr
Audie Murphy Dr.
George S. Patton Jr Dr
Geo rge
S. P att on Jr
D r
Ki nz ie S t
Kinzie St
W oodley Ave.
W oodley Ave.
Plummer St.
W oodley Ave.
Plummer St. Plummer St. Plummer St.
H askell Ave.
H askell Ave.
H askell Ave.
Chester W. Nimitz Dr
C hester W
. N im itz D r
H askell Ave.
C hester W
. N im itz D r
John Basilone Dr.
John Basilone Dr.
Lassen St.
W oodley Ave.
sen St. Lassen St. Lassen St. Lassen St.
John Basilone Dr. John Basilone Dr.
BLDG. 201
BLDG. 10
BLDG. 5
BLDG. 99
BLDG. 70
BLDG. 25BLDG. 20
BLDG. 23
WHEELCHAIR TRACK
BLDG. 7
BLDG. 1
CHAPEL
BLDG. 21
BLDG. 22
BLDG. 4
BLDG. 62
BLDG. 24
LAUNDRY
BLDG. 104
BLDG. 63
BLDG. 44
BLDG. 40
BLDG. 202
BLDG. 52
BLDG. 47
ELECTRICAL SITE PLAN
SCALE: 1/128" = 1' - 0"
NORTH
ES001
ELECTRICAL SITE PLAN
LEGEND
BUILDING IN SCOPE
(VA SEPULVEDA CAMPUS, NORTH HILLS)
BUILDING SCHEDULE
BLDG. NO. DESCRIPTION
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
A
C
D
20-SCE-08
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 64' 128' 256'
SCALE: 1/128" = 1'-0"
200 VA MEDICAL CENTER DEPARTMENT
PATIENT HOUSING
PATIENT HOUSING OUTPATIENT
N.P.
NURSE HOME CARE
RESEARCH
QUARTER HOUSEKEEPING
UNKNOWN
NEW DIRECTIONS SEPULVEDA 1
WHEELCHAIR TRACK
GYM & POOL
F.M. & R CLINIC
THEATRE
RECREATION & CHILD YOUTH CENTER
KITCHEN, WARE HOUSE & CANTEEN
CHAPEL
GERIATRICS
ADMINISTRATION & RESEARCH
WC
SCALE: 1/8" = 1' - 0"
1.E-112
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 1.E-401
1 EXISTING PANEL S 225A 208/120V.
FOR ENLARGED PLAN
SEE 1.E-401
NORTH
TR ROOM
A154
TR ROOM
B120A
AREA OF WORK
WP
GFI
WP
GFI
S-39,41
S-26
S-35,37
CU
1-B120A
CU
1-A154
SCALE: 3/32" = 1' - 0"
1.E-131
ELECTRICAL ROOF PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 16' 24'2' 8'
SCALE: 3/32" = 1'-0"
1 UNISTRUT RACK. SEE DETAIL ON E-503.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NORTH
(N) STAIR
UP
WHEELCHAIR
STAIR #2
(E)
UP
(N) STAIR #5
#4
UP
N N N
N
N
N
N
L
L
L
L
N
L
N
L
N
SCALE: 1/8" = 1' - 0"
10.E-102
ELECTRICAL BASEMENT FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
0.
E-
FO
R
C O
N
TI
N U
AT
IO
N
REFER TO 10.E-101 FOR CONTINUATION
FOR ENLARGED PLAN
SEE 10.E-401
1 EXISTING CRITICAL PANEL BSLA 100A 208/120V.
PHYSICIAN
STAIR
(E)
STAIR #1
(E)
ELEV.
(E)
ELEV.
(E)
(E)
STAIR # 3
S-13
P-12
UP
DN
SCALE: 1/8" = 1' - 0"
10.E-103
ELECTRICAL BASEMENT FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
0.
E-
FO
R
C O
N
TI
N U
AT
IO
N
REFER TO 10.E-101 FOR CONTINUATION
1 NEW 30A/ 2P 208V NEMA 3R DISCONNECT.
NEW 3/4''C- 2 #12 + 1 #12EG.
NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR B100C.
NORTH AREA OF WORK
1 (TYP)
BLSA-24,26 2
WP
WP
GFI
BLSA-22
CU
10-1-BB110
SCALE: 1/8" = 1' - 0"
10.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
0.
E-
FO
R
C O
N
TI
N U
AT
IO
N
1 NEW 30A/ 3P 208V NEMA 3R DISCONNECT.
NEW 3/4''C- 2 #12 + 1 #12EG.
NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR B-B110.
DN.
DN.
NO.4
(N) STAIR
NO.5
(E) STAIR
A29B
SCALE: 1/8" = 1' - 0"
10.E-121
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
0.
E-
FO
R
C O
N
TI
N U
AT
IO
N
FOR ENLARGED PLAN
SEE 10.E-401
DN.
DN.
NO.6
NO.7
(E) ELEV.
(E) ELEV.
(E) STAIR
(E) STAIR
NO. 3
C-00A
SCALE: 1/8" = 1' - 0"
10.E-122
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
0.
E-
FO
R
C O
N
TI
N U
AT
IO
N
FOR ENLARGED PLAN
SEE 10.E-401
1 EXISTING CRITICAL PANEL 2LSB.
GFI
WP
GFI
3 CU
10-C00A
CU
10-A29B 2LSB-22,24 2LSB-26,28
2LSB-163
SCALE: 1/16" = 1' - 0"
10.E-131
ELECTRICAL ROOF PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 8' 16' 32'
SCALE: 1/16" = 1'-0"
1 UNISTRUT RACK.
NEW 30A/ 2P 208V NEMA 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
HW-80
HW-85
HW
-87
HW
-85
HW
-85
HW
-28
HW
-87
HW-85
HW
-61
HW
-28
G-9,11
G-13
WP
GFI
CU
20-1A115
SCALE: 1/8" = 1' - 0"
NORTH
20.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE S.20.E-401
1 EXISTING PANEL A 225A 208/120V.
NOT USED.
NEW 30A/2P 208V NEMA 3R DISCONNECT.
NEW 3/4''C- 2 #12 + 1 #12EG.
NEW 3/4''C- 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NEW 3/4''C- 2 #12 + 1 #12EG
EXISTING DISTRIBUTION BOARD 1000A 208/120V.
NEW PANEL G 100A 208/ 120V.
NEW 1 1/4''C- 4 #2 + 1 #6EG.
20.E-121
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 20.E-401
FOR ENLARGED PLAN
SEE 20.E-401
G-10,12
G-14
CU
20-2A115
SCALE: 1/8" = 1' - 0"
20.E-131
ELECTRICAL ROOF PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 UNISTRUT RACK.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
125 176 144
176120240
192160160128
SCALE: 1/8" = 1' - 0"
NORTH
22.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 22.E-401
1 EXISTING PANEL A5 200A 208/120V.
EXISTING PANEL A4 175A 208/120V.
EXISTING DISTRIBUTION BOARD 1B 500A
208/120V. ADD 60A/ 3P CB TO FEED
SUB-PANEL A8.
NEW PANEL A8 60A 208/120V.
NEW 1''C- 4 #6 + 1 #10EG.
22.E-121
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 22.E-401
GFI 4
WP
GFI
CU
22-202
CU
22-103A8-11,13 A8-10,12
A8-9
SCALE: 1/8" = 1' - 0"
NORTH
22.E-131
ELECTRICAL ROOF PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 UNISTRUT RACK. SEE DETAIL ON E-503.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
SCALE: 1/8" = 1' - 0"
23.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 23.E-401
1 EXISTING PANEL A 225A 208/120V.
NEW PANEL A1 225A 208/120V.
NO
RT
H
CU
23-106
A1-6
A1-2,4
SCALE: 1/8" = 1' - 0"
23.E-131
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 UNISTRUT RACK. SEE DETAIL ON E-503.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NO
RT
NORTH
24.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 EXISTING PANEL A 225A 208/120V.
FOR ENLARGED PLAN
SEE 24.E-401
SCALE: 1/8" = 1' - 0"
25.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 25.E-401
1 EXISTING PANEL SW2 225A 208/120V.
EXISTING DISTRIBUTION PANEL MD 400A
208/120V 3P 4W.
TR ROOM
A-109
NO
RT
CU
25-A109
SW2-26
SW2-22,24
SCALE: 1/8" = 1' - 0"
25.E-121
ELECTRICAL ROOF FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 UNISTRUT RACK. SEE DETAIL ON E-503.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NO
RT
CU
45-105
WP
GFI
5 4
Q-2,4
Q-6
SCALE: 1/8" = 1' - 0"
45.E-101
ELECTRICAL BASEMENT FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 45.E-401
1 NOT USED.
EXISTING PANEL M 600A 208/120V.
NEW 30A/ 2P 208V 3R DISCONNECT.
NEW 3/4''C - 2 #12 + 1 #12EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NEW SUB PANEL Q 60A 208/120V.
NEW 1"C - 4 # 6 + 1 # 10 EG.
NORTH
SCALE: 1/8" = 1' - 0"
63.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 63.E-401
1 EXISTING DISTRIBUTION BOARD DB 600A
208/120V. INSTALL 40A/ 3P CB. INSTALL 40A/3P
CB.
NEW PANEL TR 40A 208/120V
1''C- 4 #8 + 1 #10EG.
DINING
ROOM
KITCHEN
STORAGE
STAFF
TOILET
RECREATION AREA
RECEPTION
CONFERENCE ROOM
OFFICE
O.T. OFFICE
MEDICAL
TREATMENT
PATIENT
TOILET
CLOS. CLINICAL
DIRECTOR MALE
TOILET
SCALE: 1/8" = 1' - 0"
70.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 70.E-401
1 EXISTING PANEL G 225A 208/120V. (SQD)
INSTALLED 40A/ 3P CB TO FEED SUB PANEL G1.
NEW RECESSED SUB PANEL G1 40A 208/120V.
EXISTING WIRE GUTTER.
EXISTING 50KVA 480-208/120V PAD MOUNTED
TRANSFORMER NEMA 3R.
99.E-101
ELECTRICAL GROUND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
REFER TO 99.E-102 FOR CONTINUATION
FOR ENLARGED PLAN
SEE 99.E-401
99.E-102
ELECTRICAL GROUND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
REFER TO 99.E-101 FOR CONTINUATION
1 EXISTING CRITICAL PANEL KP 225A 208/120V.
99.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED PLAN
SEE 99.E-401
FOR ENLARGED PLAN
SEE 99.E-401
G57A1
KP-30,32
WP
GFI
KP-42
CU
KP-37,39
WP
GFI
KP-42
SCALE: 1/16" = 1' - 0"
99.E-131
ELECTRICAL GROUND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 8' 16' 32'
SCALE: 1/16" = 1'-0"
1 NEW 30A/3P 208V DISCONNECT NEMA 3R.
MOUNT ON UNISTRUT RACK. FOR RACK DETAIL
SEE E-503.
NEW 3/4"C - 2 # 10 + 1 # 12 EG.
NEW 3/4''C - 2 #12 + 1 #12EG TO RESPECTIVE FAN
COIL UNIT IN RESPECTIVE TR.
NEW 3/4''C - 2 #12 + 1 #12EG.
200.E-111
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
REFER TO 200.E-112 FOR CONTINUATION
FOR ENLARGED 1533 PLAN SEE
200.E-401
1 EXISTING CRITICAL PANEL 225A 1LC 208/120V.
200.E-112
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
REFER TO 200.E-111 FOR CONTINUATION
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
FOR 1927 ENLARGED
PLAN SEE 200.E-401
1 EXISTING CRITICAL PANEL 225A 14LD 208/120V.
200.E-113
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
REFER TO 200.E-114 FOR CONTINUATION
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
FOR 1001B
ENLARGED PLAN
SEE 200.E-401
1 EXISTING CRITICAL PANEL 1LA 150A 208/120V.
T
T
T
SCALE: 1/8" = 1' - 0"
200.E-114
ELECTRICAL FIRST FLOOR PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
REFER TO 200.E-113 FOR CONTINUATION
FOR ENLARGED 1356
PLAN SEE 200.E-401
FOR ENLARGED PLAN
SEE 200.E-401 DETAIL 5
1 EXISTING CRITICAL PANEL 1LB 150A 208/120V.
EXISTING CRITICAL PANEL 1LBB 100A 480/277V.
EXISTING CRITICAL PANEL 1LFF 100A 480/277V.
EXISTING TRANSFORMER 30KVA 480-208/120V.
EXISTING CRITICAL PANEL 1LF 100A 208/120V.
NEW 60A/3P DISCONNECT.
NEW 45KVA 480-208/ 120V 3P 4W WALL
MOUNTED TRANSFORMER.
NEW CRITICAL PANEL 1LG 125A 208/120V
MOUNTED BELOW WALL MOUNTED
TRANSFORMER.
3/4''C- 3 # 4 + 1 # 10 EG.
NOT USED.
NEW CRITICAL PANEL 1LB1 208/ 120V 3P 4W.
1 1/2''C - 4 # 1 + 1 # 6 EG.
EX PANEL 2LC
SEE 200.E-124
SCALE: 1/8" = 1' - 0"
200.E-121
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 EXISTING PANEL 2LD 100A 208/120V.
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
REFER TO 200.E-122 FOR CONTINUATION
FOR ENLARGED 2466
PLAN SEE 200.E-402
200.E-122
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
1 EXISTING PANEL 2LB 100A 208/120V.
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
REFER TO 200.E-121 FOR CONTINUATION
FOR ENLARGED2664
PLAN SEE 200.E-402
200.E-123
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR FIRE/SMOKE BARRIER
3 HOUR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMPCONSULTANT
Project Director
Revisions: Date:
691A4-20-201FINAL CONSTRUCTION
DOCUMENT
May 17, 2021 PM JB/EW
FULLY SPRINKLERED
ARCHITECT/ENGINEER OF RECORD
1611 PLUMMER ST, NORTH HILLS, CA, 91343
20801.13
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades - Sepulveda, CA
0' 4' 8' 16'
SCALE: 1/8" = 1'-0"
FOR ENLARGED 2165
PLAN SEE 200.E-402
1 EXISTING PANEL 2LA 150A 208/120V.
R
EF
ER
T
O
.E
-1
F O
R C
O N
TI
N
U
AT
IO
N
REFER TO 200.E-124 FOR CONTINUATION
200-1356
WP
GFI
1LG-13
WP
1LG-9,11
SCALE: 1/8" = 1' - 0"
200.E-124
ELECTRICAL SECOND FLOOR
PLAN
A
Fi le
P at h
B
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
Key Plan
A
GENERAL NOTES
KEY NOTES
C
D
20-SCE-08
GENERAL NOTE
FIRE PROTECTION
1. DO NOT MAKE ANY ATTACHMENTS OR MODIFICATIONS TO
ANY FIREPROOFED COMPONENTS.
SYMBOLS LIST
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
SMOKE BARRIER
SMOKE PARTITION
1 HOUR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .