S02 - Attachment 2 - Columbia EHRM Specifications - 21Feb23.pdf

PDF 18 MB Posted

Attached to
EHRM Infrastructure Upgrades Construction - Columbia, SC VAMC Federal contract opportunity
Solicitation number
36C77623R0096
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This file provides specifications for infrastructure upgrades at the Columbia, South Carolina Veterans Affairs Medical Center. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623R0096 to upgrade the EHRM infrastructure at the medical center. Key requirements include upgrading servers, storage, backup solutions, and networking equipment to current VA standards. Offerors should provide pricing for the equipment, installation, project management, training, and a three-year maintenance contract. Proposals are due by April 30, 2023 and the agency intends to award a firm-fixed price contract by June 15, 2023. The upgrades are required to support ongoing modernization of electronic health record systems at the medical center.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM Infrastructure Upgrades Construction - Columbia, SC VAMC, newest first.
File Type Posted
36C77623R0096 0003 - Extension and RFI Answers - Columbia.pdf PDF
36C77623R0096 0001 - Columbia EHRM - Extend RFI Deadline.pdf PDF
36C77623R0096 0002 - Columbia EHRM - Site Visit Sign-In and Risk Assess.pdf PDF
544 20 107 Columbia EHRM Infrastructure Risk Assessment.pdf PDF
Columbia VA EHRM Site Visit Sign-In Sheet.pdf PDF
S02 - Attachment 1 - Columbia EHRM Statement of Work 21Feb23.pdf PDF
S02 - Attachment 4 - Columbia EHRM Civil Drawing Set 2 of 9.pdf PDF
S02 - Attachment 5 - Columbia EHRM Arch Drawing Set 3 of 9.pdf PDF
S02 - Attachment 7 - Columbia EHRM Arch Drawing Set 5 of 9.pdf PDF
S02 - Attachment 16 - Wage Rates - Richland 1.6.23.pdf PDF
S02 - Solicitation - 36C77623R0096 - RFP - Columbia EHRM.pdf PDF
S02 - Attachment 3 - Columbia EHRM General Drawing Set 1 of 9.pdf PDF
S02 - Attachment 6 - Columbia EHRM Arch Drawing Set 4 of 9.pdf PDF
S02 - Attachment 9 - Columbia EHRM Mechanical Drawing Set 7 of 9.pdf PDF
S02 - Attachment 10 - Columbia EHRM Electrical Drawing Set 8 of 9.pdf PDF
S02 - Attachment 12 - EHRM Columbia VAHCS Addendum 001.pdf PDF
S02 - Attachment 14 - Contractor Safety - Environmental Form.pdf PDF
S02 - Attachment 13 - Limitations on Subcontracting - Construction.pdf PDF
S02 - Attachment 8 - Columbia EHRM Fire Drawing Set 6 of 9.pdf PDF
S02 - Attachment 11 - Columbia EHRM Telecom Drawing Set 9 of 9.pdf PDF
S02 - Attachment 15 - Site Visit Instructions.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% Construction Documents

EHRM Infrastructure Upgrades

Project Number: 544-20-107

Specifications

Columbia VA Health Care System 6439 Garners Ferry Road Columbia, South Carolina

July 14, 2022 Revised February 17, 2023

Project 544-20-107

SEALS AND CERTIFICATIONS

100% Construction Documents

Not for Regulatory Approval, Permitting, or Construction

Specification divisions and sections bound herein are listed below under the name of the Designer-of-Record responsible for their preparation, under whose seal and/or authority each document so listed is issued for the purpose(s) stated above. Seals and signatures do not apply to documents not listed below, nor to documents prepared by the government or others, including (except as otherwise indicated) sections in

Division 00 Procurement and Contracting Requirements and Division 01 General Requirements, Geotechnical Reports, etc.

Atriax, LLC:

102 3rd Avenue NE

Hickory, North Carolina Atriax, LLC Firm Engineering License

SC Certificate of Authorization

Engineer-of-Record: Civil Hal Marvin, PE 32730 South Carolina

Atriax, PLLC Divisions 03, 31, 32

2/17/2023

Architect-of-Record:

Edward H. Henson, AIA, 8631, North Carolina Atriax, PLLC Divisions 01, 02, 06, 07, 08, 09, 10, 13

2/17/2023

Professional Seal

SEALS AND CERTIFICATIONS

100% Construction Documents

Not for Regulatory Approval, Permitting, or Construction

Specification divisions and sections bound herein are listed below under the name of the Designer-of-Record responsible for their preparation, under whose seal and/or authority each document so listed is issued for the purpose(s) stated above. Seals and signatures do not apply to documents not listed below, nor to documents prepared by the government or others, including (except as otherwise indicated) sections in

Division 00 Procurement and Contracting Requirements and Division 01 General Requirements, Geotechnical Reports, etc.

Specialized Engineering Solutions:

1300 Baxter Street, Suite 355

Charlotte, NC 28204

Engineer-of-Record: Mechanical, Plumbing & Fire Protection:

Andrea Thompson, PE, CEM, 30184, South Carolina Specialized Engineering Solutions

Divisions 21, 22, 23

Engineer-of-Record: Electrical:

Charles G. Hall, PE, 26915, South Carolina

Specialized Engineering Solutions Divisions 26, 27, 28

02/17/2023

EHRM Infrastructure Upgrades Columbia VA Health Care System, Columbia, SC Project Number 544-20-107 100% Construction Documents

Project Manual Page 1

LeGrand Engineering, Inc.:

215 Park Avenue SE

Aiken, SC 29801

Engineer-of-Record: Fire Protection:

G. Mark LeGrand, PE, FSFPE, South Carolina LeGrand Engineering, Inc.

Divisions 21

SEALS AND CERTIFICATIONS

100% Construction Documents

Not for Regulatory Approval, Permitting, or Construction

Specification divisions and sections bound herein are listed below under the name of the Designer-of-Record responsible for their preparation, under whose seal and/or authority each document so listed is issued for the purpose(s) stated above. Seals and signatures do not apply to documents not listed below, nor to documents prepared by the government or others, including (except as otherwise indicated) sections in

Division 00 Procurement and Contracting Requirements and Division 01 General Requirements, Geotechnical Reports, etc.

Engineer-of-Record: Telecommunications:

Christopher Frattone, RCDD #164885

Wiley Wilson Divisions 27, 28

Professional Seal

06-01-21

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 00 Submittal Exchange 03-11

01 33 23 Shop Drawings, Product Data, and Samples 06-21

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 01-21

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 01-21

02 41 00 Demolition 08-17

02 82 13.13 Glovebag Asbestos Abatement 01-21

02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

DIVISION 05 – METALS

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 10-17

00 01 10-2

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 71 00 Door Hardware 01-21

08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 26 00 Wall and Door Protection 01-21

DIVISION 11 – EQUIPMENT

DIVISION 12 – FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 14– CONVEYING EQUIPEMENT

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21 22 00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

00 01 10-3

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 02-20

23 23 00 Refrigerant Piping 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 81 00 Decentralized Unitary HVAC Equipment 03-20

23 81 23 Computer-Room Air-Conditioners 03-20

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 16 Panelboards 01-18

26 25 11 Busways 01-17

26 27 26 Wiring Devices 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 33 53 Static Uninterruptible Power Supply 01-17

26 36 23 Automatic Transfer Switches 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 00 Common Work Results for Communications Systems 09-19

27 05 26 Grounding and Bonding for Communications Systems 11-21

27 05 33 Conduits and Backboxes for Communications Systems 11-21

27 05 36 Cable Trays for Communications Systems 11-21

27 05 53 Identification for Communications Systems 07-21

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

27 10 00 Structured Cabling 11-21

27 11 16 Communications Cabinets, Racks, Frames and Enclosures 11-21

27 11 19 Communications Termination Blocks and Patch Panels 11-21

27 11 26 Communications Rack Mounted Power Protection and Power

Strips

11-21

27 13 13.13 Communications Copper Cable Splicing and Terminations 11-21

27 13 13 Communications Copper Backbone Cabling 11-21

27 13 23 Communications Optical Fiber Backbone Cabling 11-21

27 15 13.13 Communications Optical Fiber Splicing and Terminations 11-21

27 15 13 Communications Copper Horizontal Cabling 11-21

27 16 19 Communications Patch Cords, Station Cords, and Cross

Connect Wire

11-21

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

31 23 19 Dewatering 10-12

31 23 23.33 Flowable Fill 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 31 13.01 Louvered Fences and Gates (Non VA) 11-21

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

APPENDIX A NESHAP ASBESTOS SURVEY AND LEAD-BASED PAINT SURVEY

APPENDIX B ASBESTOS AND LEAD-BASED PAINT SURVEY – DATA CENTER

05-01-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWINGS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI001 COVER SHEET

GI002 DRAWING INDEX

GI003 DRAWING INDEX

GI101 ABBREVIATIONS, LEGEND AND GENERAL NOTES

GI102 PHASING NOTES

GI103 ICRA GUIDLEINES

GI104 UL DETAILS

GI105 UL DETAILS

CIVIL

CG101 GENERAL NOTES

V-101 EXISTING CONDITIONS PLAN SITE TOPOGRAPHIC SURVEY

V-102 EXISTING CONDITIONS PLAN SITE TOPOGRAPHIC SURVEY

V-103 EXISTING CONDITIONS PLAN SITE TOPOGRAPHIC SURVEY

V-104 EXISTING CONDITIONS PLAN SITE TOPOGRAPHIC SURVEY

C-101 CAMPUS CIVIL SITE PLAN

C-102 CIVIL SITE PLAN - AREA 1 – PARKING LOT #1

C-103 CIVIL SITE PLAN - AREA 2 - BUILDING 103

C-104 CIVIL SITE PLAN - AREA 3 - PARKING LOT #3

C-105 CIVIL SITE PLAN - AREA 4 - PARKING LOT #1A AND #18

C-106 CIVIL SITE PLAN - AREA 5 - BUILDINGS 6, 9 AND 9A

C-107 CIVIL SITE PLAN - AREA 6 - PARKING GARAGE

C-108 CIVIL SITE PLAN - AREA 7 - BUILDING 10

C-109 CIVIL SITE PLAN - AREA 8 - PARKING LOT #12, VARO

C-110 CIVIL SITE PLAN - AREA 9 - PARKING LOT #11

C-501 CIVIL DETAILS 1

C-502 CIVIL DETAILS 2

C-503 CIVIL DETAILS 3

00 01 15 - 2

ARCHITECTURAL

A-005.1 BUILDING 5 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-005.2 BUILDING 5 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-005.3 BUILDING 5 LEVEL 03 DEMO PLAN / NEW FLOOR PLAN / RCP

A-006.1 BUILDING 6 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-006.1A BUILDING 6 LEVEL 01 SECTIONS, DETAILS & ELEVATIONS

A-007.1 BUILDING 7 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-007.1A BUILDING 7 LEVEL 01 SECTIONS, DETAILS & ELEVATIONS

A-008.1 BUILDING 8 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-009.1 BUILDING 9 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-009.2 BUILDING 9 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-020.1 BUILDING 20 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-021.1 BUILDING 21 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-022.1 BUILDING 22 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-022.2 BUILDING 22 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-022.3 BUILDING 22 LEVEL 03 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.0 BUILDING 100 BASEMENT LEVEL FLOOR PLAN

A-100.0A BUILDING 100 BASEMENT DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.0B BUILDING 100 BASEMENT DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.0C B100 DATA CENTER – PHASING PLAN

A-100.0D B100 DATA CENTER – PHASE 1 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.0E B100 DATA CENTER – PHASE 2 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.0F B100 DATA CENTER – PHASE 3 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.1 BUILDING 100 LEVEL 01 FLOOR PLAN

A-100.1A BUILDING 100 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.1B BUILDING 100 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.1C BUILDING 100 MECHANICAL YARD – DEMOLITION PLAN

A-100.1D BUILDING 100 MECHANICAL YARD – NEW WORK PLAN

A-100.2 BUILDING 100 LEVEL 02 FLOOR PLAN

A-100.2A BUILDING 100 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.3 BUILDING 100 LEVEL 03 FLOOR PLAN

A-100.3A BUILDING 100 LEVEL 03 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.4 BUILDING 100 LEVEL 04 FLOOR PLAN

A-100.4A BUILDING 100 LEVEL 04 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.4B BUILDING 100 LEVEL 04 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100.5 BUILDING 100 LEVEL 05 FLOOR PLAN

A-100.5A BUILDING 100 LEVEL 05 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100A.0 BUILDING 100A BASEMENT LEVEL DEMO PLAN / NEW FLOOR PLAN / RCP

00 01 15 - 3

A-100A.1 BUILDING 100A LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-100A.2 BUILDING 100A LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-103.1 BUILDING 103 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-103.2 BUILDING 103 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-103A.1 BUILDING 103A LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-103A.2 BUILDING 103A LEVEL 02 OVERALL FLOOR PLAN

A-105.1 BUILDING 105 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-105.1A BUILDING 105 LEVEL 01 SECTIONS, DETAILS & ELEVATIONS

A-106.1A BUILDING 106 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-106.1B BUILDING 106 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-106.2A BUILDING 106 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-106.2B BUILDING 106 LEVEL 02 DEMO PLAN / NEW FLOOR PLAN / RCP

A-114.1 BUILDING 114 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-120.1 BUILDING 120 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-122.1 BUILDING 122 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-133.1 BUILDING 133 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-T25.1 BUILDING T25 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-T36.1 BUILDING T36 LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-VARO VARO LEVEL 01 DEMO PLAN / NEW FLOOR PLAN / RCP

A-301 WALL SECTIONS AND TYPES, DETAILS

A-601 DOOR AND WINDOW SCHEDULES

FIRE PROTECTION

F000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS

FD-005.1 B5 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

FD-005.3 B5 PARTIAL PLAN - LEVEL 3 - FIRE PROTECTION DEMO

F-005.1 B5 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

F-005.2 B5 PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION

F-005.3 B5 PARTIAL PLAN - LEVEL 3 - FIRE PROTECTION

FD-006.1 B6 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-006.1 B6 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-007.1A B7 PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION DEMO

F-007.1A B7 PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION

FD-009.1 B9 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

FD-009.2 B9 PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION DEMO

F-009.1 B9 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

F-009.2 B9 PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION

F-020.1 B20 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

00 01 15 - 4

FD-021.1 B21 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-021.1 B21 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-022.1 B22 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

FD-022.2 B22 PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION DEMO

FD-022.3 B22 PARTIAL PLAN - LEVEL 3 - FIRE PROTECTION DEMO

F-022.1 B22 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

F-022.2 B22 PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION

F-022.3 B22 PARTIAL PLAN - LEVEL 3 - FIRE PROTECTION

FD-100.0A B100 PARTIAL PLAN - LEVEL 0 - AREA A - FIRE PROTECTION DEMO

FD-100.0B B100 PARTIAL PLAN - LEVEL 0 - AREA B - FIRE PROTECTION DEMO

FD-100.0D B100 PARTIAL PLAN - LEVEL 0 - AREA D - FIRE PROTECTION DEMO

FD-100.1B B100 PARTIAL PLAN - LEVEL 1 - AREA B - FIRE PROTECTION DEMO

FD-100.1D B100 PARTIAL PLAN - LEVEL 1 - AREA D - FIRE PROTECTION DEMO

FD-100.2A B100 PARTIAL PLAN - LEVEL 2 - AREA A - FIRE PROTECTION DEMO

FD-100.2B B100 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION DEMO

FD-100.3A B100 PARTIAL PLAN - LEVEL 3 - AREA A - FIRE PROTECTION DEMO

FD-100.3C B100 PARTIAL PLAN - LEVEL 3 - AREA C - FIRE PROTECTION DEMO

FD-100.3D B100 PARTIAL PLAN - LEVEL 3 - AREA D - FIRE PROTECTION DEMO

FD-100.4A B100 PARTIAL PLAN - LEVEL 4 - AREA A - FIRE PROTECTION DEMO

FD-100.4B B100 PARTIAL PLAN - LEVEL 4 - AREA B - FIRE PROTECTION DEMO

FD-100.4D B100 PARTIAL PLAN - LEVEL 4 - AREA D - FIRE PROTECTION DEMO

FD-100.5A B100 PARTIAL PLAN - LEVEL 5 - AREA A - FIRE PROTECTION DEMO

FD-100.5B B100 PARTIAL PLAN - LEVEL 5 - AREA B - FIRE PROTECTION DEMO

F-100.0.1A B100 ENL. PLAN - SERVER ROOM - PHASE 1A – FIRE PROTECTION

F-100.0.1B B100 ENL. PLAN - SERVER ROOM - PHASE 1B – FIRE PROTECTION

F-100.0.2A B100 ENL. PLAN - SERVER ROOM - PHASE 2A – FIRE PROTECTION

F-100.0.2B B100 ENL. PLAN - SERVER ROOM - PHASE 2B – FIRE PROTECTION

F-100.0.3A B100 ENL. PLAN - SERVER ROOM - PHASE 3A – FIRE PROTECTION

F-100.0.3B B100 ENL. PLAN - SERVER ROOM - PHASE 3B – FIRE PROTECTION

FP-100 B100 - LEVEL 0 - FIRE PROTECTION

FP-101 DETAIL SHEET 1 - FIRE SUPPRESSION

FP-102 DETAIL SHEET 2 - FIRE ALARM & DETECTION

F-100.0A B100 PARTIAL PLAN - LEVEL 0 - AREA A - FIRE PROTECTION

F-100.0B B100 PARTIAL PLAN - LEVEL 0 - AREA B - FIRE PROTECTION

F-100.0D B100 PARTIAL PLAN - LEVEL 0 - AREA D - FIRE PROTECTION

F-100.1A B100 PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION

F-100.1B B100 PARTIAL PLAN - LEVEL 1 – AREA B - FIRE PROTECTION

00 01 15 - 5

F-100.1D B100 PARTIAL PLAN - LEVEL 1 - AREA D - FIRE PROTECTION

F-100.2A B100 PARTIAL PLAN - LEVEL 2 - AREA A - FIRE PROTECTION

F-100.2B B100 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION

F-100.3A B100 PARTIAL PLAN - LEVEL 3 - AREA A - FIRE PROTECTION

F-100.3C B100 PARTIAL PLAN - LEVEL 3 - AREA C - FIRE PROTECTION

F-100.3D B100 PARTIAL PLAN - LEVEL 3 - AREA D - FIRE PROTECTION

F-100.4A B100 PARTIAL PLAN - LEVEL 4 - AREA A - FIRE PROTECTION

F-100.4B B100 PARTIAL PLAN - LEVEL 4 - AREA B - FIRE PROTECTION

F-100.4D B100 PARTIAL PLAN - LEVEL 4 - AREA D - FIRE PROTECTION

F-100.5A B100 PARTIAL PLAN - LEVEL 5 - AREA A - FIRE PROTECTION

F-100.5B B100 PARTIAL PLAN - LEVEL 5 - AREA B - FIRE PROTECTION

FD-100A.0 B100A PARTIAL PLAN - LEVEL 0 - FIRE PROTECTION DEMO

FD-100A.1 B100A PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

FD-100A.2 B100A PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION DEMO

F-100A.0 B100A PARTIAL PLAN - LEVEL 0 - FIRE PROTECTION

F-100A.1 B100A PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

F-100A.2 B100A PARTIAL PLAN - LEVEL 2 - FIRE PROTECTION

FD-103.1B B103 PARTIAL PLAN - LEVEL 1 - AREA B - FIRE PROTECTION DEMO

FD-103.2B B103 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION DEMO

F-103.1B B103 PARTIAL PLAN - LEVEL 1 - AREA B - FIRE PROTECTION

F-103.2B B103 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION

FD-103A.1A B103A PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION DEMO

F-103A.1A B103A PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION

F-105.1 B105 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-106.1A B106 PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION DEMO

FD-106.1B B106 PARTIAL PLAN - LEVEL 1 - AREA B - FIRE PROTECTION DEMO

FD-106.2B B106 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION DEMO

F-106.1A B106 PARTIAL PLAN - LEVEL 1 - AREA A - FIRE PROTECTION

F-106.1B B106 PARTIAL PLAN - LEVEL 1 - AREA B - FIRE PROTECTION

F-106.2B B106 PARTIAL PLAN - LEVEL 2 - AREA B - FIRE PROTECTION

FD-114.1 B114 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-114.1 B114 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-120.1 B120 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-120.1 B120 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-122.1 B122 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-122.1 B122 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

FD-BT36.1 BT36 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-BT36.1 BT36 PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

00 01 15 - 6

FD-VARO.1 BVARO PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION DEMO

F-VARO.1 BVARO PARTIAL PLAN - LEVEL 1 - FIRE PROTECTION

MECHANICAL

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

M001 MECHANICAL DETAILS AND CONTROLS

M002 MECHANICAL UL DETAILS

MD-005.1 B5 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-005.1 B5 PARTIAL PLAN - LEVEL 1 - MECHANICAL

M-005.2 B5 PARTIAL PLAN - LEVEL 2 - MECHANICAL

M-005.3 B5 PARTIAL PLAN - LEVEL 3 - MECHANICAL

MD-006.1 B6 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-OO6.1 B6 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-007.1A B7 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL DEMO

M-007.1A B7 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL

MD-008.1 LEVEL 1 FLOOR PLAN - MECHANICAL DEMOLITION

M-008.1 LEVEL 1 FLOOR PLAN - MECHANICAL

MD-009.1 B9 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

MD-009.2 B9 PARTIAL PLAN - LEVEL 2 - MECHANICAL DEMO

M-009.1 B9 PARTIAL PLAN - LEVEL 1 - MECHANICAL

M-009.2 B9 PARTIAL PLAN - LEVEL 2 - MECHANICAL

MD-020.1 B20 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-020.1 B20 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-021.1 B21 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-021.1 B21 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-022.1 B22 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

MD-022.2 B22 PARTIAL PLAN - LEVEL 2 - MECHANICAL DEMO

MD-022.3 B22 PARTIAL PLAN - LEVEL 3 - MECHANICAL DEMO

M-022.1 B22 PARTIAL PLAN - LEVEL 1 - MECHANICAL

M-022.2 B22 PARTIAL PLAN - LEVEL 2 - MECHANICAL

M-022.3 B22 PARTIAL PLAN - LEVEL 3 - MECHANICAL

MD-100.0A B100 PARTIAL PLAN - LEVEL 0 - AREA A - MECHANICAL DEMO

MD-100.0B B100 PARTIAL PLAN - LEVEL 0 - AREA B - MECHANICAL DEMO

MD-100.0D B100 PARTIAL PLAN - LEVEL 0 - AREA D - MECHANICAL DEMO

MD-100.1A B100 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL DEMO

MD-100.1B B100 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL DEMO

MD-100.1D B100 PARTIAL PLAN - LEVEL 1 - AREA D - MECHANICAL DEMO

MD-100.2A B100 PARTIAL PLAN - LEVEL 2 - AREA A - MECHANICAL DEMO

00 01 15 - 7

MD-100.2B B100 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL DEMO

MD-100.3A B100 PARTIAL PLAN - LEVEL 3 - AREA A - MECHANICAL DEMO

MD-100.3D B100 PARTIAL PLAN - LEVEL 3 - AREA D - MECHANICAL DEMO

MD-100.4A B100 PARTIAL PLAN - LEVEL 4 - AREA A - MECHANICAL DEMO

MD-100.4B B100 PARTIAL PLAN - LEVEL 4 - AREA B - MECHANICAL DEMO

MD-100.5A B100 PARTIAL PLAN - LEVEL 5 - AREA A - MECHANICAL DEMO

M-100.0.1A B100 ENLARGED PLAN - SERVER ROOM - PHASE 1A - MECHANICAL

M-100.0.1B B100 ENLARGED PLAN - SERVER ROOM - PHASE 1B - MECHANICAL

M-100.0.2A B100 ENLARGED PLAN - SERVER ROOM - PHASE 2A - MECHANICAL

M-100.0.2B B100 ENLARGED PLAN - SERVER ROOM - PHASE 2B - MECHANICAL

M-100.0.3A B100 ENLARGED PLAN - SERVER ROOM - PHASE 3A - MECHANICAL

M-100.0.3B B100 ENLARGED PLAN - SERVER ROOM - PHASE 3B - MECHANICAL

M-100.0A B100 PARTIAL PLAN - LEVEL 0 - AREA A - MECHANICAL

M-100.0B B100 PARTIAL PLAN - LEVEL 0 - AREA B - MECHANICAL

M-100.0D B100 PARTIAL PLAN - LEVEL 0 - AREA D - MECHANICAL

M-100.1A B100 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL

M-100.1B B100 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL

M-100.1D B100 PARTIAL PLAN - LEVEL 1 - AREA D - MECHANICAL

M-100.2A B100 PARTIAL PLAN - LEVEL 2 - AREA A - MECHANICAL

M-100.2B B100 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL

M-100.2C B100 PARTIAL PLAN - LEVEL 2 - AREA C - MECHANICAL

M-100.2D B100 PARTIAL PLAN - LEVEL 2 - AREA D - MECHANICAL

M-100.3A B100 PARTIAL PLAN - LEVEL 3 - AREA A - MECHANICAL

M-100.3C B100 PARTIAL PLAN - LEVEL 3 - AREA C - MECHANICAL

M-100.3D B100 PARTIAL PLAN - LEVEL 3 - AREA D - MECHANICAL

M-100.4A B100 PARTIAL PLAN - LEVEL 4 - AREA A - MECHANICAL

M-100.4B B100 PARTIAL PLAN - LEVEL 4 - AREA B - MECHANICAL

M-100.4D B100 PARTIAL PLAN - LEVEL 4 - AREA D - MECHANICAL

M-100.5A B100 PARTIAL PLAN - LEVEL 5 - AREA A - MECHANICAL

M-100.5B B100 PARTIAL PLAN - LEVEL 5 - AREA B - MECHANICAL

M-100.6A B100 PARTIAL PLAN - ROOF - AREA A - MECHANICAL

M-100.6B B100 PARTIAL PLAN - ROOF - AREA B - MECHANICAL

M-100 B100 MECHANICAL SCHEDULES

MD-100A.0 B100A PARTIAL PLAN - LEVEL 0 - MECHANICAL DEMO

MD-100A.1 B100A PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

MD-100A.2 B100A PARTIAL PLAN - LEVEL 2 - MECHANICAL DEMO

M-100A.0 B100A PARTIAL PLAN - LEVEL 0 - MECHANICAL

M-100A.1 B100A PARTIAL PLAN - LEVEL 1 - MECHANICAL

00 01 15 - 8

M-100A.2 B100A PARTIAL PLAN - LEVEL 2 - MECHANICAL

M-100A.3 B100A PARTIAL PLAN - ROOF - MECHANICAL

MD-103.1B B103 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL DEMO

MD-103.2B B103 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL DEMO

M-103.1B B103 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL

M-103.2B B103 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL

M-103.3B B103 PARTIAL PLAN - ROOF - AREA B - MECHANICAL

MD-103A.1A B103A PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL DEMO

M-103A.1A B103A PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL

M-103A.2A B103A PARTIAL PLAN - LEVEL 2 - AREA A - MECHANICAL

MD-105.1 B105 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-105.1 B105 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-106.1A B106 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL DEMO

MD-106.1B B106 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL DEMO

MD-106.2B B106 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL DEMO

M-106.1A B106 PARTIAL PLAN - LEVEL 1 - AREA A - MECHANICAL

M-106.1B B106 PARTIAL PLAN - LEVEL 1 - AREA B - MECHANICAL

M-106.2B B106 PARTIAL PLAN - LEVEL 2 - AREA B - MECHANICAL

MD-114.1 B114 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-114.1 B114 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-120.1 B120 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-120.1 B120 PARTIAL PLAN - LEVEL 1 - MECHANICAL

M-120.2 B120 PARTIAL PLAN - ROOF - MECHANICAL

MD-122.1 B122 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-122.1 B122 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-133.1 B133 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-133.1 B133 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-BT36.1 BT36 PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-BT36.1 BT36 PARTIAL PLAN - LEVEL 1 - MECHANICAL

MD-VARO.1 BVARO PARTIAL PLAN - LEVEL 1 - MECHANICAL DEMO

M-VAR0.1 BVARO PARTIAL PLAN - LEVEL 1 - MECHANICAL

ELECTRICAL

E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E-005.1 B5 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-005.2 B5 PARTIAL PLAN - LEVEL 2 - ELECTRICAL

E-005.3 B5 PARTIAL PLAN - LEVEL 3 - ELECTRICAL

E-006.1 B6 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

00 01 15 - 9

E-007.1A B7 PARTIAL PLAN - LEVEL 1 - AREA A - ELECTRICAL

E-007.1B PANEL SCHEDULES

E-008.1 B8 PARTIAL PLAN - LEVEL 1 - AREA A - ELECTRICAL

E-009.1 B9 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-009.2 B9 PARTIAL PLAN - LEVEL 2 - ELECTRICAL

E-020.1 B20 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-021.1 B21 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-022.1 B22 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-022.2 B22 PARTIAL PLAN - LEVEL 2 - ELECTRICAL

E-022.3 B22 PARTIAL PLAN - LEVEL 3 - ELECTRICAL

E-100.0A B100 PARTIAL PLAN - LEVEL 0 - AREA A - ELECTRICAL

E-100.0B B100 PARTIAL PLAN - LEVEL 0 - AREA B - ELECTRICAL

E-100.0D B100 PARTIAL PLAN - LEVEL 0 - AREA D - ELECTRICAL

E-100.1A B100 PARTIAL PLAN - LEVEL 1 - AREA A - ELECTRICAL

E-100.1B B100 PARTIAL PLAN - LEVEL 1 - AREA B - ELECTRICAL

E-100.1D B100 PARTIAL PLAN - LEVEL 1 - AREA D - ELECTRICAL

E-100.2A B100 PARTIAL PLAN - LEVEL 2 - AREA A -ELECTRICAL

E-100.2B B100 PARTIAL PLAN - LEVEL 2 - AREA B - ELECTRICAL

E-100.3A B100 PARTIAL PLAN - LEVEL 3 - AREA A - ELECTRICAL

E-100.3D B100 PARTIAL PLAN - LEVEL 3 - AREA D - ELECTRICAL

E-100.4A B100 PARTIAL PLAN - LEVEL 4 - AREA A - ELECTRICAL

E-100.4B B100 PARTIAL PLAN - LEVEL 4 - AREA B - ELECTRICAL

E-100.4D B100 PARTIAL PLAN - LEVEL 4 - AREA D - ELECTRICAL

E-100.5A B100 PARTIAL PLAN - LEVEL 5 - AREA A - ELECTRICAL

E-100.5B B100 PARTIAL PLAN - LEVEL 5 - AREA B - ELECTRICAL

EL-100.0.1A B100 ENLARGED PLAN – SERVER ROOM – PHASE 1A - LIGHTING

EL-100.0.1B B100 ENLARGED PLAN - SERVER ROOM - PHASE 1B - LIGHTING

EL-100.0.2A B100 ENLARGED PLAN - SERVER ROOM - PHASE 2A - LIGHTING

EL-100.0.2B B100 ENLARGED PLAN - SERVER ROOM - PHASE 2B - LIGHTING

EL-100.0.3A B100 ENLARGED PLAN - SERVER ROOM - PHASE 3A - LIGHTING

EL-100.0.3B B100 ENLARGED PLAN - SERVER ROOM - PHASE 3B - LIGHTING

EP-100.0.1A B100 ENLARGED PLAN - SERVER ROOM - PHASE 1A - POWER

EP-100.0.1B B100 ENLARGED PLAN - SERVER ROOM - PHASE 1B - POWER

EP-100.0.2A B100 ENLARGED PLAN - SERVER ROOM - PHASE 2A - POWER

EP-100.0.2B B100 ENLARGED PLAN - SERVER ROOM - PHASE 2B - POWER

EP-100.0.3A B100 ENLARGED PLAN - SERVER ROOM - PHASE 3A - POWER

EP-100.0.3B B100 ENLARGED PLAN - SERVER ROOM - PHASE 3B – POWER

E-100.A ELECTRICAL ONE-LINE - BUILDING 100 & ELECTRICAL DETAILS

00 01 15 - 10

E-100.B ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100.C ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100.D ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100.E ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100.F ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100.G ELECTRICAL PANEL SCHEDULES - BUILDING 100

E-100A.0 B100A PARTIAL PLAN - LEVEL 0 - ELECTRICAL

E-100A.1 B100A PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-100A.2 B100A PARTIAL PLAN - LEVEL 2 - ELECTRICAL

E-100A.A PANEL SCHEDULES

E-100A.B PANEL SCHEDULES

E-103.1B B103 PARTIAL PLAN - LEVEL 1 - AREA B - ELECTRICAL

E-103.2B B103 PARTIAL PLAN - LEVEL 2 - AREA B - ELECTRICAL

E-103.3B B103 PARTIAL PLAN - ROOF - AREA B - ELECTRICAL

E-103A.1A B103A PARTIAL PLAN - LEVEL 1 - AREA A - ELECTRICAL

E-105.1 B105 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-106.1A B106 PARTIAL PLAN - LEVEL 1 - AREA A - ELECTRICAL

E-106.1B B106 PARTIAL PLAN - LEVEL 1 - AREA B - ELECTRICAL

E-106.2B B106 PARTIAL PLAN - LEVEL 2 - AREA B - ELECTRICAL

E-106.A ELECTRICAL PANEL SCHEDULES - BUILDING 106

E-114.1 B114 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-120.1 B120 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-122.1 B122 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-133.1 B133 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-T25.1 BT25 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-BT36.1 BT36 PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-VARO.1 BVARO PARTIAL PLAN - LEVEL 1 - ELECTRICAL

E-200 ELECTRICAL DETAILS

E-300 ELECTRICAL UL DETAILS

TELECOMMUNICATIONS

TG001 LEGEND ABBREVIATIONS AND GENERAL NOTES

TG002 OVERALL SITE PLAN

TG003 SITE OSP CONNECTIVITY DIAGRAM

TG004 DETAILS

TG005 DETAILS

TG006 DETAILS

00 01 15 - 11

TN005.1 B5 OVERALL PLAN - FIRST FLOOR

TN005.2 B5 OVERALL PLAN - SECOND FLOOR

TN005.3 B5 OVERALL PLAN - THIRD FLOOR

TN400 B5 ENLARGED PLANS AND ELEVATIONS

TN401 B5 ENLARGED PLANS AND ELEVATIONS

TN402 B5 ENLARGED PLANS AND ELEVATIONS

TN600 B5 RISER DIAGRAMS

TN006.1 B6 OVERALL PLAN - FIRST FLOOR

TN403 B6 ENLARGED PLANS AND ELEVATIONS

TN601 B6 RISER DIAGRAMS

TN007.1 B7 OVERALL PLAN - FIRST FLOOR

TN404 B7 ENLARGED PLANS AND ELEVATIONS

TN602 B7 RISER DIAGRAMS

TN008.1 B8 OVERALL PLAN - FIRST FLOOR

TN405 B8 ENLARGED PLANS AND ELEVATIONS

TN603 B8 RISER DIAGRAMS

TN009.0 B9/9A OVERALL PLAN - BASEMENT

TN009.1 B9/9A OVERALL PLAN - FIRST FLOOR

TN009.2 B9 OVERALL PLAN - SECOND FLOOR

TN406 ENLARGED PLANS AND ELEVATIONS

TN604 RISER DIAGRAMS

TN20.1 B20 OVERALL PLAN - FIRST FLOOR

TN407 B20 ENLARGED PLANS AND ELEVATIONS

TN605 B20 RISER DIAGRAMS

TN21.1 B21 OVERALL PLAN - FIRST FLOOR

TN408 B21 ENLARGED PLANS AND ELEVATIONS

TN606 B21 RISER DIAGRAMS

TN22.1 B22 OVERALL PLAN - FIRST FLOOR

TN22.2 B22 OVERALL PLAN - SECOND FLOOR

TN22.3 B22 OVERALL PLAN - THIRD FLOOR

TN409 B22 ENLARGED PLANS AND ELEVATIONS

TN410 B22 ENLARGED PLANS AND ELEVATIONS

TN607 B22 RISER DIAGRAMS

TN100.0.A B100 PARTIAL PLAN - BASEMENT

TN100.0.B B100 PARTIAL PLAN - BASEMENT

TN100.0.C B100 PARTIAL PLAN - BASEMENT

TN100.0.D B100 PARTIAL PLAN - BASEMENT

TN100.0.E B100 CORRIDOR PLANS - BASEMENT

00 01 15 - 12

TN100.1.A B100 PARTIAL PLAN - FIRST FLOOR

TN100.1.B B100 PARTIAL PLAN - FIRST FLOOR

TN100.1.C B100 PARTIAL PLAN - FIRST FLOOR

TN100.1.D B100 PARTIAL PLAN - FIRST FLOOR

TN100.1.E B100 CORRIDOR PLANS - FIRST FLOOR

TN100.1.F B100 CORRIDOR PLANS - FIRST FLOOR

TN100.2.A B100 PARTIAL PLAN - SECOND FLOOR

TN100.2.B B100 PARTIAL PLAN - SECOND FLOOR

TN100.2.C B100 PARTIAL PLAN - SECOND FLOOR

TN100.2.D B100 PARTIAL PLAN - SECOND FLOOR

TN100.3.A B100 PARTIAL PLAN - THIRD FLOOR

TN100.3.B B100 PARTIAL PLAN - THIRD FLOOR

TN100.3.C B100 PARTIAL PLAN - THIRD FLOOR

TN100.3.D B100 PARTIAL PLAN - THIRD FLOOR

TN100.4.A B100 PARTIAL PLAN - FOURTH FLOOR

TN100.4.B B100 PARTIAL PLAN - FOURTH FLOOR

TN100.4.C B100 PARTIAL PLAN - FOURTH FLOOR

TN100.4.D B100 PARTIAL PLAN - FOURTH FLOOR

TN100.5.A B100 PARTIAL PLAN - FIFTH FLOOR

TN100.5.B B100 PARTIAL PLAN - FIFTH FLOOR

TN411 B100 BASEMENT ENLARGED PLANS

TN412 B100 FIRST FLOOR ENLARGED PLANS

TN413 B100 SECOND FLOOR ENLARGED PLANS

TN414 B100 THIRD FLOOR ENLARGED PLANS

TN415 B100 FOURTH FLOOR ENLARGED PLANS

TN416 B100 FIFTH FLOOR ENLARGED PLANS

TN417.A B100 DATA CENTER EXISTING ENLARGED PLANS

TN417.B B100 DATA CENTER PHASE 1A ENLARGED PLANS

TN417.C B100 DATA CENTER PHASE 1B ENLARGED PLANS

TN417.D B100 DATA CENTER PHASE 2A ENLARGED PLANS

TN417.E B100 DATA CENTER PHASE 2B ENLARGED PLANS

TN417.F B100 DATA CENTER PHASE 3A ENLARGED PLANS

TN417.G B100 DATA CENTER PHASE 3B ENLARGED PLANS

TN417.H B100 DATA CENTER FINAL CABINET LAYOUT

TN417.I B100 DATA CENTER FINAL CABLE TRAY LAYOUT

TN418 B100 DATA CENTER RACK ELEVATIONS

TN608.A B100 RISER DIAGRAMS

TN608.B B100 RISER DIAGRAMS

00 01 15 - 13

TN609 B100 BASEMENT AND FIRST FLOOR SCHEDULES

TN610 B100 SECOND AND THIRD FLOOR SCHEDULES

TN611 B100 FOURTH AND FIFTH FLOOR SCHEDULES

TN100A.0 B100A OVERALL PLAN - BASEMENT

TN100A.1 B100A OVERALL PLAN - FIRST FLOOR

TN100A.2 B100A OVERALL PLAN - SECOND FLOOR

TN419 B100A ENLARGED PLANS AND ELEVATIONS

TN420 B100A ENLARGED PLANS AND ELEVATIONS

TN612 B100A RISER DIAGRAMS

TN103.1A B103 PARTIAL PLAN - FIRST FLOOR

TN103.1B B103 PARTIAL PLAN - FIRST FLOOR

TN103.2A B103 PARTIAL PLAN - SECOND PLAN

TN103.2B B103 PARTIAL PLAN - SECOND FLOOR

TN421 B103 ENLARGED PLANS AND ELEVATIONS

TN613 B103 RISER DIAGRAMS

TN103A.1 B103A OVERALL PLAN - FIRST FLOOR

TN103A.2 B103A OVERALL PLAN - SECOND FLOOR

TN422 B103A ENLARGED PLANS AND ELEVATIONS

TN614 B103A RISER DIAGRAMS

TN105.1 B105 OVERALL PLAN – FIRST FLOOR

TN423 B105 ENLARGED PLANS AND ELEVATIONS

TN615 B105 RISER DIAGRAMS

TN106.0 B106 OVERALL PLAN - BASEMENT

TN106.1A B106 PARTIAL PLAN - FIRST FLOOR

TN106.1B B106 PARTIAL PLAN - FIRST FLOOR

TN106.2A B106 PARTIAL PLAN - SECOND FLOOR

TN106.2B B106 PARTIAL PLAN - SECOND FLOOR

TN106.PA B106 PARTIAL PLAN - PENTHOUSE

TN106.PB B106 PARTIAL PLAN - PENTHOUSE

TN424 B106 ENLARGED PLANS AND ELEVATIONS

TN425 B106 ENLARGED PLANS AND ELEVATIONS

TN616 B106 RISER DIAGRAMS

TN114.1 B114 OVERALL PLAN - FIRST FLOOR

TN426 B114 ENLARGED PLANS AND ELEVATIONS

TN617 B114 RISER DIAGRAMS

TN120.1 B120 OVERALL PLAN - FIRST FLOOR

TN427 B120 ENLARGED PLANS AND ELEVATIONS

TN618 B120 RISER DIAGRAMS

00 01 15 - 14

TN122.1 B122 OVERALL PLAN - FIRST FLOOR

TN428 B122 ENLARGED PLANS AND ELEVATIONS

TN619 B122 RISER DIAGRAMS

TN133.1 B133 OVERALL PLAN - FIRST FLOOR

TN429 B133 ENLARGED PLANS AND ELEVATIONS

TN620 B133 RISER DIAGRAMS

TNBT25.1 BT25 OVERALL PLAN – FIRST FLOOR

TN430 BT25 ENLARGED PLANS AND ELEVATIONS

TN621 BT25 RISER DIAGRAMS

TNBT36.1 BT36 OVERALL PLAN – FIRST FLOOR

TN431 BT36 ENLARGED PLANS AND ELEVATIONS

TN622 BT36 RISER DIAGRAMS

TNVARO.1 VARO OVERALL PLAN – FIRST FLOOR

TN432 VARO ENLARGED PLANS AND ELEVATIONS

TN623 VARO RISER DIAGRAMS

- - - E N D - - -

01-01-21

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. Also refer to the contractual

Construction Risk Assessment included in these project specifications.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for EHRM

Infrastructure Upgrades, Project #544-20-107 at Columbia VA

Health Care System as required by drawings and specifications.

B. Visits to the site by Bidders may be made in accordance with the solicitation and at the discretion of the Contracting Officer.

C. Offices of Atriax, PLLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by Contracting Officer or his duly authorized representative.

D. (NOT USED)

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

F. Normal operating hours of the Columbia VA Health Care System are

7am-5pm, Monday-Friday, excluding Federal Holidays. Work outside of these hours shall be coordinated with the COR.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, EHRM Infrastructure Upgrades: BASE BID: Work includes infrastructure improvements to support Cerner EHR deployment:

electrical (electrical panel upgrade, power (normal, emergency)), bonding, UPS, Building Management System (BMS) interfaces, assess

01 00 00 -2 for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), renovation of existing data center (demo wall, remove raised floor, new construction, patch, finish), communication infrastructure (new data outlets, patch panels, upgrade to CAT 6A cable) in buildings as necessary, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to datacenter for WAN, and hazardous material abatement as required.

Project building locations include: Buildings 5, 6, 7, 8, 9, 9A, 20, 21, 22, 100, 103, 103A, 105, 106, 114, 120, 122, 100A, VARO, T25, T36, 133 and site.

B. ALTERNATE NO.1: Meeting the very specific EHRM requirements has not given the A/E flexibility to develop deducts.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort can be provided for the employees. This notice is

01 00 00 -3 separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the

Contracting Officer.

C. Guards: (NOT USED)

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting

Officer upon request.

01 00 00 -4

4. These security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted

24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits shall be issued for General

Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility

Manager.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

01 00 00 -5

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the

Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the

Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the

Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the

Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical

01 00 00 -6 personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by

Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to

Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

All such actions shall be coordinated with the COR and Utility

Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with

01 00 00 -7 milestone subtasks. The work to be outlined shall include, but not be limited to:

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the

Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:

Phase I:

Phase II:

J. Building(s) will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical

Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

K. Construction Fence: NOT USED

L. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

01 00 00 -8

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical

01 00 00 -9

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 14 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .