S02_Att2A Addendum Memo to Correct Select Drawing Text_12272024.pdf
PDF 431 KB Posted
- Attached to
- Z1DA--556-23-101: Renovate CLC Building 134-2C
- Solicitation number
- 36C25225B0005
About this file
This is an addendum memo correcting drawing text for solicitation 36C25225B0005_1, which involves renovating 12,590 square feet of CLC Building 134-2C at Captain James A Lovell Federal Health Care Center. The project requires connecting the current roof HVAC system to new space on the 2nd floor.
The addendum specifically modifies the Specialty Equipment Schedule in drawing sheet QH101, clarifying VA versus contractor responsibilities for various items. Key changes include: VA will supply while contractor will install paper towel dispensers, sanitary napkin dispensers, toilet tissue dispensers, range equipment, televisions, ice dispensers, and lift systems. The contractor remains responsible for all installation work, electrical, structural support, and testing. The document also specifies exact models for contracted dispensers, including Georgia Pacific paper towel dispensers (ENMOTION 59460A), SC Johnson soap dispensers (Proline Manual HLC 155404), Purell hand sanitizer dispensers (CS8 7720-01), and other bathroom fixtures. All bid deduct alternates referenced in cost estimates and specifications are to be disregarded.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
556-23-101 Addendum correcting select drawing text (27DEC24)
SOLICITATION: 36C25225B0005_1
PROJECT: 556-23-101 Renovate CLC Building 134 – 2C
Drawing Set: 556-23-101 Combined Drawings 100% 21June2024
This construction project is required to have a contractor provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully functional project. This project shall provide professional services for construction to renovate 12,590 square feet of CLC Building 134-2C and tie-in the current HVAC system and all its components installed on the roof to the new space on the 2nd floor. The construction shall be conducted in accordance with (IAW) the drawings, specifications, and all other associated project documents at Captain James A Lovell Federal Health Care Center.
Disregard all options described as bid deduct alternates which are referenced in “P01_556-23-101 Cost Estimate 21JUN24” under the DEDUCT ALTERNATES tab. Any reference to the same DEDUCT ALTERNATES in the specifications, drawings, and any related notes are also to be disregarded.
Be advised that in the drawings sheet QH101 specific changes are to be addressed in the following schedules:
1) SPECIALTY EQUIPMENT SCHEDULE
a. JSN# A5080 – ACQ/INS RESPONSIBILITY – VC
i. Paper towel dispenser: VA will supply. Contractor will install.
b. JSN# A5090 – ACQ/INS RESPONSIBILITY – VC
i. Sanitary Napkin dispenser: VA will supply. Contractor will install.
c. JSN# A5195 – ACQ/INS RESPONSIBILITY – VC
i. Toilet Tissue dispenser: VA will supply. Contractor will install.
d. JSN# K4500 – ACQ/INS RESPONSIBILITY – VC
i. Contractor cannot provide this RANGE unless this is built in. As it is called out to be a standalone appliance, VA will need to supply.
Contractor will install.
e. JSN# M0515 – ACQ/INS RESPONSIBILITY – VC
i. Contractor cannot provide the TELEVISIONS. VA will need to supply. Contractor will install.
f. JSN# K4650 – ACQ/INS RESPONSIBILITY – VC
i. Contractor cannot provide this ICE DISPENSER, as it is called out to be a standalone appliance, VA will need to supply. Contractor will install.
g. JSN# A1200 – ACQ/INS RESPONSIBILITY – VC
i. Contractor cannot provide the LIFT SYSTEM OVERHEAD. VA will need to supply the rails and hoist. Contractor will install. Electric power, structural support, installation, testing, etc. are all supplied and installed by the contractor.
ii. Lift rails configuration will only be SURFACE. Disregard all mention for lift rails in the RECESSED configuration.
h. JSN# A1203 – ACQ/INS RESPONSIBILITY – VC
i. Contractor cannot provide the LIFT SYSTEM OVERHEAD, BARIATRIC, VA will need to supply the rails and hoist. Contractor will install. Electric power, structural support, installation, testing, etc. are all supplied and installed by the contractor.
ii. Lift rails configuration will only be SURFACE. Disregard all mention for lift rails in the RECESSED configuration.
i. Regarding both JSN# A1200 & A1203
i. Replace “PATIENT LIFT MANUFACTURER” with “CONTRACTOR” if this does occur, and if it does happen, show the change in the drawings.
2) SPECIALTY EQUIPMENT SCHEDULE
a. JSN# A5075 – ACQ/INS RESPONSIBILITY – VC
i. Soap dispenser: VA will need to supply. Contractor will install.
FHCC contracted dispensers as of DEC24
These are the consumables that we have by contract, so all the items below when integrated will be VA supplied and contractor installed.
1) Paper towel dispensers – Georgia Pacific, Surface Mounted, ENMOTION 59460A
2) Soap Dispensers – SC Johnson, Surface Mounted, 1L Proline Manual HLC Soap Dispenser 155404
3) Hand Sanitizer Dispensers – Purell CS8 Hand Sanitizer Dispenser 7720-01 with floor protectors (7745-WHT-18)
4) Toilet Tissue Dispensers – Georgia Pacific, surface mounted, GP Pro 56783A
5) Toilet seat dispenser – Tough Guy 2VEX9