This file contains architectural and engineering drawings for the renovation of Building 134-2C CLC at the Captain James A. Lovell Federal Healthcare Center in North Chicago, IL. The drawings include detailed floor plans, interior elevations, finish schedules, fire protection plans, and construction details for a healthcare facility renovation project (#556-23-101).

The drawings show second floor plans with resident rooms, bathrooms, nursing stations, dining areas, and support spaces. Key details include wall finishes, flooring materials, ceiling types, fire alarm systems, sprinkler layouts, and signage plans. Specific finish materials are specified, including Armstrong ceiling tiles, Tarkett flooring, Wilsonart laminates, and Benjamin Moore paint colors. The drawings indicate fully sprinklered protection throughout and include life safety elements like smoke detectors, fire barriers, and emergency egress. The plans demonstrate ADA-compliant healthcare design with bariatric accommodations and medical support infrastructure. Construction must maintain infection control measures and interim life safety requirements during renovation of the approximately 12,590 square foot space.

View the file

Other files

File Type Posted
C01_Contract Award Notice CON 556-23-101 36C25225C0039_1.pdf PDF
S06_Att2 CON-IFB Amendment 0009 RFI Pre-Bid Responses 36C25225B0005 556-23-101_04102025.xlsx XLSX spreadsheet
S06_CON-IFB Amendment 0009 SF30 556-23-101 36C25225B0005_04102025.pdf PDF
S06_Att1 CON-IFB Amendment 0009 SF30 Continuation Page 36C25225B0005_04102025 1.pdf PDF
S06_Att4 CON-IFB Amendment 0009 VAAR 852.219-75 Limitations on Subcontracting 556-23-101 36C25225B0005_04102025.pdf PDF
S06_Att3 CON-IFB Amendment 0009 Executive Order Provision and Clause Changes 36C25225B0005_04102025.pdf PDF
36C25225B0005 Amendment 0008.pdf PDF
S06_CON-IFB Amendment 0007 SF30 556-23-101 36C25225B0005_03262025 1.docx DOCX document
S06_CON-IFB Amendment 0006 SF30 556-23-101 36C25225B0005_03192025.docx DOCX document
S06_Att1 CON-IFB Amendment 0006 RFI Pre-Bid Responses 36C25225B0005 556-23-101_03192025.xlsx XLSX spreadsheet
S06_CON-IFB Amendment 0005 SF30 556-23-101 36C25225B0005_03072025.pdf PDF
S06_Att5 CON-IFB Amendment 0005 Wage Rates SAM IL current as of 02202025.docx DOCX document
S06_Att1 CON-IFB Amendment 0005 RFI Pre-Bid Responses 36C25225B0005 556-23-101_03062025.xlsx XLSX spreadsheet
S06_Att2 CON-IFB Amendment 0005 Sheet MD100 in Response to RFI Question 13_03062025.pdf PDF
S06_Att3 CON-IFB Amendment 0005 SPECS Correction Plus Section 01 00 00 36C25225B0005 556-23-101_01282025.pdf PDF
S06_Att4 CON-IFB Amendment 0005 Rev1 Addendum correcting select drawing text 556-23-101_03052025 (1).docx DOCX document
1S06_CON-IFB Amendment 0004 SF30 556-23-101_36C25225B0005.pdf PDF
36C25225B0005 0003.docx DOCX document
36C25225B0005 0002.docx DOCX document
S04_Site Visit No. 2 Sign-In-Sheet 556-23-101 Renovate CLC Bldg. 134 - 2C_01282025.pdf PDF
36C25225B0005 0001.docx DOCX document
S04_Site Visit Sign-In-Sheet 556-23-101 Renovate CLC Bldg. 134 - 2C_01212025.pdf PDF
S02_Att9 Regulatory Requirements 01 41 00 24JAN22_556-23-101.pdf PDF
S02_Att1 SPECS COMBINED 36C25225B0005 556-23-101_06212024.pdf PDF
S02_Att8 Quality Requirements 01 40 00 19MAY20_556-23-101.pdf PDF
S02_Att2 Part 2 of 5 DRAWINGS-Electrical 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att6 Safety Requirements 01 35 26 27AUG21_556-23-101.pdf PDF
S02_Att4 VHA Directive Seasonal Flu Shot 1192_01_D_2020-08-10_556-23-101.pdf PDF
S02_Att2 Part 4 of 5 DRAWINGS-General 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att1A SPECS Correction to Section 232113 and 232213 36C25225B0005 556-23-101_01082025.pdf PDF
S02_Att2 Part 1 of 5 DRAWINGS-Architectural 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att2A Addendum Memo to Correct Select Drawing Text_12272024.pdf PDF
S02_Att5 Wage Rates SAM IL current as of 01032025.pdf PDF
36C25225B0005_1.docx DOCX document
S02_Att7 Infection Control Requirements 01 35 33 27AUG21_556-23-101.pdf PDF
S02_Att10 VAAR 852.219-75 Certification 36C25225B0005_556-23-101.pdf PDF
S02_Att3 FHCC Contracted Dispensers 36C25225B0005 556-23-101_12192024.pdf PDF
S02_Att2 Part 5 of 5 Drawings-Plumbing Mechanical 100 Percent 556-23-101 21June2024.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REDUCER

FINISHED CONCRETE

FLOORING MATERIAL

TYPE - SB

FLOOR APPLICATION ONLY

WALL TYPE - SHC

APPLICATION

FLOOR APPLICATION

WALL

APPLICATION

FLOOR APPLICATION

TILE

OTHER FLOORING MATERIAL

DECORATIVE PROFILE

SUBSTRATE

TYPE - SHA

FLOOR APPLICATION ONLY

TYPE - SHB

VERTICAL VERTICAL VERTICAL

ALIGN EDGES

CORNER CORNER

TILE

GROUT

DECORATIVE PROFILE

SUBSTRATE

HORIZONTAL

TYPE - WC

HORIZONTAL

TYPE - WB

HORIZONTAL

TYPE - WA

CORNER

HANDRAIL

DOOR FRAME

6"

HANDRAIL

CORNER GUARD

2"

HANDRAIL,

RE: FINISH SCHEDULE

STAINLESS STEEL SCREW WITH

STAINLESS STEEL TOGGLE, FLAT WASHER

AND LOCK WASHER @ 16" O.C. MAX.

METAL STRAPPING

TYPICAL WALL CONSTRUCTION,

RE: FLOOR PLANS AND WALL TYPES

IMPACT RESISTANT WALL PROTECTION

FROM FLOOR UP TO BOTTOM OF HANDRAIL

MOUNTING BRACKET WHERE HANDRAIL IS

INDICATED. REFER TO FINISH SCHEDULE

RESILIENT BASE. INSTALL OVER

WALL PROTECTION

TYPE - SB

TYPE - SHC

TYPE - SHB

TYPE - SHA

AE510

E1

TYP

EXISTING

CONCRETE SLAB

0' - 0"

EXISTING CONCRETE SLAB

0' - 0"

EXISTING CONCRETE SLAB

PATIENT

BATHROOM

SV FLOORING W/ ZINC

STRIP

SLIP RESISTIVE MARBLE THRESHOLD (RAMP),

CONTRACTOR TO FIELD CUT AND PLANE AS

REQUIRED TO MATCH FIELD CONDITIONS.

NOTCH THRESHOLD AT DOOR FRAME RABBET.

SV-1 TO RES-2 AT PATIENT BATHROOM DOOR

SILICONE ADHESIVE

SCH DOOR & FRAME

PATIENT ROOM

1/8" SELF LEVELING

CEMENTITIOUS COMPOUND

/8

SCH DEPTH

U N

D E

R C

U T

S C

H D

MAX. SLOPE

M A

X /4

M

A X

/2

RESINOUS FLOORING MEMBRANE

WITH INTEGRAL BASE (RES-2) (&

BEDDING COMPOUND)

SCHEDULED FINISH FLOORING

TAPERED UPWARD BEYOND

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED

VA FORM 08 - 6231

A

FULLY SPRINKLERED

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANTS

321 4 5 6 7 8 9 10

HARRELL DESIGN GROUP PC

10720 SIKES PLACE, SUITE 100

CHARLOTTE, NC 28277

704-814-1346

POC: LEE HARRELL PE, LEED AP, QCxP

PRESIDENT

COPYRIGHT © 2024

HDG PROJECT: 22015

A u to d e s k D o c s /2

N o rt h C h ic a g o P ro je c t N o

-2

-1

R e n o v a te B u ild in g

-2

C C

L C

/2

-A

R C

H -R

.r v t

/2

/2

:1

:5

A

M

556-23-101

AI601

KNJCJUNE 14, 2024

CAPTAIN JAMES A. LOVELL FEDERAL HEALTHCARE

CENTER (FHCC)

RENOVATE B134-2C CLCINTERIOR FINISH SCHEDULE 100% CONSTRUCTION

DOCUMENTS - FOR

CONSTRUCTION

FINISH SCHEDULE

FINISH MARK FINISH MANUFACTURER PATTERN/STYLE COLOR SIZES COMMENTS

AT-1 ARMSTRONG CEILINGS ARMSTRONG CEILINGS WHITE 2' X 2'

B-1 WALL BASE TARKETT/JOHNSONITE CLAY 09 4"

CG-1 CORNER GUARD INPRO 130 HIGH IMPACT CORNER GUARD CHINO 0258

CPT-1 CARPET TILE TARKETT G0045 SWEATER KNIT G0045 PRAIRIE WIND 77209

EPY-1 EPOXY FLOORING DUR-A-FLEX MICROCHIP SAHARA ELECTRICAL CLOSETS

GT-1 ACCENT TILE DALTILE CASCADING WATERS CW45 CERULEAN SWELL 1" X 4" RESTROOM

GT-2 ACCENT TILE TILEBAR ARCADIA SOLARIA GLASS AND SLATE TILE COOKIE RANDOM MOSAIC KITCHEN/LOUNGE BACKSPLASH

GYP-1 GYPSUM WALL BOARD CEILING ARMSTRONG CEILINGS P-4

HR-1 HANDRAIL INPRO 800 HANDRAIL CHINO 0258

P-1 PAINT BENJAMIN MOORE CARRINTON BEIGE HC-93 FIELD COLOR

P-2 PAINT BENJAMIN MOORE CEDAR GROVE #444 KITCHEN

P-3 PAINT BENJAMIN MOORE BRANDON BEIGE 977 DOOR TRIM

P-4 PAINT BENJAMIN MOORE SNOWFALL WHITE OC-118 GYP. CEILINGS

PL-1 PLASTIC LAMINATE WILSONART FINE VELVET FINISH NEO WALNUT CASEWORK

PT-1 TILE DALTILE KEYSTONE ALMOND D335 2" X 2" FLOOR

PT-3 TILE DALTILE MEDIAN BEIGE MN41 12" X 24" WALL

PT-4 TILE DALTILE MEDIAN WHITE MN40 24" X 24" KITCHEN FLOOR

RES-2 RESINOUS FLOORING KEY RESIN COMPANY CHIPS/FLAKES TUNDRA PATIENT BATHROOM FLOOR

SPF-1A RESIN PANEL 3FORM VARIA ECO-RESIN FOSSIL LEAF SPADE RANDOM NOTE 1 ALL HEAD WALLS

SS-1 SOLID SURFACE WILSONART JOVIAN KITCHEN AND PUBLIC RESTROOMS

SS-2 SOLID SURFACE CORIAN ARTISTA CANVAS WINDOW SILLS

SV-1 SHEET VINYL MANNINGTON RIDGEWOOD FIELD MAPLE

SV-2 SHEET VINYL MANNINGTON MANNINGTON ADVANTAGE BLOOM COLLECTION:

WELLSPRING; RENEWAL B301

CHARTING/CORRIDORS

SV-3 SHEET VINYL MANNINGTON MANNINGTON ADVANTAGE BLOOM COLLECTION:

MEANDER; SHADE B203

CORRIDOR ACCENT

SV-4 SHEET VINYL MANNINGTON MANNINGTON ADVANTAGE BLOOM COLLECTION:

WILDFLOWER; SEEDLING

B108

CORRIDOR ACCENT

TS-1 TRANSITION STRIP SCHLUTER SCHLUTER RENO-U ALUMINUM CERAMIC TO RESILIENT FLOORING

TS-2 TRANSITION STRIP SCHLUTER SCHLUTER SCHIENE ALUMINUM CERAMIC TO CARPET

WP-1 WALL PROTECTION INPRO SOLID COLORS SAGE GREEN #660 CORRIDORS

WP-2 WALL PROTECTION ACROVYN SOLID COLORS DARK MOSS #1113 LIVING ROOM & LOUNGE

6" = 1'-0" F4

SLOPED TRANSITION DETAILS1

6" = 1'-0"

F6

SAME - HEIGHT TRANSITION DETAILS1

6" = 1'-0" E2

WALL EDGING TRANSITION DETAILS1

1 1/2" = 1'-0" F1

TYPICAL PLAN DETAIL -

HANDRAIL/CRASHRAIL 1

1 1/2" = 1'-0" E1

DETAIL - HANDRAIL/WALL

PROTECTION 1

0 1 1/2'1'1/2' 1" 2" 4"0 3"

0 1 1/2'1'1/2' 1" 2" 4"0 3" 1" 2" 4"0 3"

FINISH SCHEDULE NOTES :

1. SPF-1A: PANELS ARE 3'-0" x 3'-0" x 3/4" THICK. SEE SHEET AI200 FOR TYPICAL

MOUNTING LOCATIONS. FURNISH MANUFACTURER'S STANDOFF HARDWARE

"SIMPLESPEC 300.01" WITH THICKER GAUGE 2-PIECE CAP HEAD KITS, AND PROVIDE IN-

WALL BLOCKING FOR SUPPORT. FURNISH PANELS WITH EDGE SEALING AND 1/8"

BEVELED EDGE FINISHING ON ALL EDGES. SUBMIT THIS PRODUCT UNDER SPEC

SECTION 088000. THIS PRODUCT IS INSTALLED IN ALL PRIVATE RESIDENT ROOMS ON

THE WALL BEHIND THE BED.

ROOM FINISH SCHEDULE COMMENTS:

1. WALL PROTECTION WITH MANUFACTURER'S EDGING PROFILE STRIP VERTICALLY AND HORIZONTALLY AT SEAMS AND TRANSITIONS.

2. INSTALL DECORATIVE RESIN PANEL SPF-1A AT ALL RESIDENT BEDROOM HEADWALLS. SEE TYPICAL ELEVATIONS F1 AND C6/AI200.

3. INSTALL VERTICAL AND HORIZONTAL ANODIZED ALUMINUM EDGING PROFILE STRIPS AT MATERIAL TRANSITIONS, CORNERS, AND TERMINATIONS. BASIS OF DESIGN (OR EQUAL): SCHLUTER.

4. SEE DETAILS F1 AND F7 ON SHEET AI101 FOR ADDITIONAL PLYWOOD FINISH REQUIREMENTS.

5. IN SHELL SPACE ROOMS, APPLY FINISH PAINT TO NEW DOOR FRAMES ON SHELL SIDE (AS WELL AS CORRIDOR SIDE).

6. INSTALL INTEGRAL, FLASH-COVED WALL BASE WITH ALUMINUM TERMINATION STRIPS.

ROOM SCHEDULE

Room No. Room Name Floor Finish Base Finish Wall Finish

Ceiling Finish

Millwork Horizontal

Millwork Vertical Comments

LEVEL 2

213 PUBLIC TLT PT-1 PT-1 PT-3/P-1 GYP-1

258 SOILED UTILITY SV-2 B-1 P-1 GYP-1

259 LAUNDRY SV-2 B-1 P-1 GYP-1 SS-1 PL-1

260 CLEAN SUPPLY SV-2 B-1 P-1 GYP-1

261 CLEAN LINEN SV-2 B-1 P-1 GYP-1

262 NURSE MANAGER OFFICE SV-1 B-1 WP-1/P-1 AT-1

263 STAFF TLT PT-1 PT-1 PT-3/P-1 GYP-1 SS-1 PL-1

265 TEAM CONFERENCE CPT-1 B-1 P-1 AT-1

266 CLOSET EPY-1 B-1 P-1 GYP-1

267 UNIT SECURITY SV-2 B-1 P-1 AT-1

268 LIVING ROOM SV-1 B-1 WP-2/P-1 AT-1 1

269 MEDS SV-2 B-1 P-1 AT-1

270 DEN SV-1 B-1 P-1 AT-1/GYP-1 3

270A DINING SV-1 B-1 P-1 AT-1/GYP-1 3

270B KITCHEN PT-4 PT-4 P-2/GT-2 AT-1/GYP-1 SS-1 PL-1 3

272 PANTRY PT-4 PT-4 P-2 GYP-1

273 STORAGE SV-2 B-1 P-1 GYP-1

274 SECONDARY CART STORAGE SV-2 B-1 P-1 AT-1

275 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

275A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

275B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

276 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

276A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

276B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

277 PRIVATE RESIDENT ROOM - BARIATRIC SV-1 B-1 P-1 AT-1 2

277A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

277B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

278 PRIVATE RESIDENT ROOM - BARIATRIC SV-1 B-1 P-1 AT-1 2

278A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

278B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

279 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

279A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

279B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

280 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

280A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

280B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

281 ELECTRICAL EPY-1 B-1 P-1 ---

283 HAC/SOILED TRASH EPY-1 B-1 P-1 GYP-1

284 BARIATRIC RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

284A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

284B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

285 PRIVATE RESIDENT ROOM - BARIATRIC SV-1 B-1 P-1 AT-1 2

285A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

285B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

286 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

286A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

286B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

287 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

287A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

287B RESIDENT CLOSET SV-1 B-1 P-1 AT-1

288 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

288A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

288B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

289 PRIVATE RESIDENT ROOM SV-1 B-1 P-1 AT-1 2

289A RES BATH RES-2 RES-2 P-1, PT-3, GT-1 GYP-1 SS-1 PL-1 3

289B RESIDENT CLOSET SV-1 B-1 P-1 GYP-1

A249 SERVICE ELEVATOR LOBBY SV-2 SV-2 P-1 ---

A251 OIT EPY-1 B-1 P-1 ---

A253 STORAGE EPY-1 B-1 P-1 ---

A255 OFFICE CPT1 B-1 WP-1/P-1 AT-1

A257 SHELL SPACE (FUTURE CONFERENCE) --- --- --- --- 5

C4 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C4 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C4 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C4 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C5 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C6 CORRIDOR SV-2/SV-3/SV-4 SV-2 WP-1/P-1 AT-1 1,6

C208 SHELL SPACE (FUTURE DINING) --- --- --- --- 5

S-4 STAIR SV-2 SV-2 WP-1/P-1 AT-1 1,6

S-5 STAIR SV-2 SV-2 WP-1/P-1 AT-1 1,6

12" = 1'-0" F8

THRESHOLD DETAIL AT BATHROOM

0 1" 2"

Revision Number Revisions: Date:

jcarr JC NC Electronic Seal.jpg

File details come from the government source that posted it. Updated .