S06_Att4 CON-IFB Amendment 0005 Rev1 Addendum correcting select drawing text 556-23-101_03052025 (1).docx

DOCX document 771 KB Posted

Attached to
Z1DA--556-23-101: Renovate CLC Building 134-2C
Solicitation number
36C25225B0005
Issued by

About this file

This document is an Amendment (0005, Revision 1) for a VA construction solicitation to renovate Clinical Learning Center (CLC) Building 134-2C at Captain James A. Lovell Federal Health Care Center in North Chicago, IL. The project involves renovating approximately 12,590 square feet, including professional services for construction, HVAC system tie-ins, and comprehensive facility upgrades. Key specifics include tying current HVAC system components to the new second-floor space, selective demolition, installation of metal studs, gypsum wall board, painting, electrical modifications, and telecommunications cabling.

The solicitation (36C25225B0005) requires the contractor to provide all tools, materials, labor, and quality assurance for a complete, compliant renovation. Notable requirements include establishing dust-tight containment, maintaining negative air pressure, implementing infection control measures, and coordinating specialized equipment installations. The amendment clarifies specific equipment acquisition responsibilities, noting that certain items like paper towel dispensers, soap dispensers, and patient lift systems will be VA-supplied with contractor installation. The project involves precise technical specifications, including compatibility requirements for building systems, communications cabling, and specialized medical facility infrastructure.

View the file

Other files

File Type Posted
C01_Contract Award Notice CON 556-23-101 36C25225C0039_1.pdf PDF
S06_Att2 CON-IFB Amendment 0009 RFI Pre-Bid Responses 36C25225B0005 556-23-101_04102025.xlsx XLSX spreadsheet
S06_CON-IFB Amendment 0009 SF30 556-23-101 36C25225B0005_04102025.pdf PDF
S06_Att1 CON-IFB Amendment 0009 SF30 Continuation Page 36C25225B0005_04102025 1.pdf PDF
S06_Att4 CON-IFB Amendment 0009 VAAR 852.219-75 Limitations on Subcontracting 556-23-101 36C25225B0005_04102025.pdf PDF
S06_Att3 CON-IFB Amendment 0009 Executive Order Provision and Clause Changes 36C25225B0005_04102025.pdf PDF
36C25225B0005 Amendment 0008.pdf PDF
S06_CON-IFB Amendment 0007 SF30 556-23-101 36C25225B0005_03262025 1.docx DOCX document
S06_CON-IFB Amendment 0006 SF30 556-23-101 36C25225B0005_03192025.docx DOCX document
S06_Att1 CON-IFB Amendment 0006 RFI Pre-Bid Responses 36C25225B0005 556-23-101_03192025.xlsx XLSX spreadsheet
S06_CON-IFB Amendment 0005 SF30 556-23-101 36C25225B0005_03072025.pdf PDF
S06_Att5 CON-IFB Amendment 0005 Wage Rates SAM IL current as of 02202025.docx DOCX document
S06_Att1 CON-IFB Amendment 0005 RFI Pre-Bid Responses 36C25225B0005 556-23-101_03062025.xlsx XLSX spreadsheet
S06_Att2 CON-IFB Amendment 0005 Sheet MD100 in Response to RFI Question 13_03062025.pdf PDF
S06_Att3 CON-IFB Amendment 0005 SPECS Correction Plus Section 01 00 00 36C25225B0005 556-23-101_01282025.pdf PDF
1S06_CON-IFB Amendment 0004 SF30 556-23-101_36C25225B0005.pdf PDF
36C25225B0005 0003.docx DOCX document
36C25225B0005 0002.docx DOCX document
S04_Site Visit No. 2 Sign-In-Sheet 556-23-101 Renovate CLC Bldg. 134 - 2C_01282025.pdf PDF
36C25225B0005 0001.docx DOCX document
S04_Site Visit Sign-In-Sheet 556-23-101 Renovate CLC Bldg. 134 - 2C_01212025.pdf PDF
S02_Att9 Regulatory Requirements 01 41 00 24JAN22_556-23-101.pdf PDF
S02_Att2 Part 3 of 5 DRAWINGS-Finish Fire 100 Perent 556-23-101 21June2024.pdf PDF
S02_Att1 SPECS COMBINED 36C25225B0005 556-23-101_06212024.pdf PDF
S02_Att8 Quality Requirements 01 40 00 19MAY20_556-23-101.pdf PDF
S02_Att2 Part 2 of 5 DRAWINGS-Electrical 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att6 Safety Requirements 01 35 26 27AUG21_556-23-101.pdf PDF
S02_Att4 VHA Directive Seasonal Flu Shot 1192_01_D_2020-08-10_556-23-101.pdf PDF
S02_Att2 Part 4 of 5 DRAWINGS-General 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att1A SPECS Correction to Section 232113 and 232213 36C25225B0005 556-23-101_01082025.pdf PDF
S02_Att2 Part 1 of 5 DRAWINGS-Architectural 100 Percent 556-23-101 21June2024.pdf PDF
S02_Att2A Addendum Memo to Correct Select Drawing Text_12272024.pdf PDF
S02_Att5 Wage Rates SAM IL current as of 01032025.pdf PDF
36C25225B0005_1.docx DOCX document
S02_Att7 Infection Control Requirements 01 35 33 27AUG21_556-23-101.pdf PDF
S02_Att10 VAAR 852.219-75 Certification 36C25225B0005_556-23-101.pdf PDF
S02_Att3 FHCC Contracted Dispensers 36C25225B0005 556-23-101_12192024.pdf PDF
S02_Att2 Part 5 of 5 Drawings-Plumbing Mechanical 100 Percent 556-23-101 21June2024.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

556-23-101 Addendum correcting select drawing text (13DEC24) Comment by Ballen, Hudell D.: Consider making a statement on the drawing set referencing this addendum doc Comment by Brewner, Sean B.: That’s part of the problem. I cannot change the docs so we needed to use the addendum. I tried to make changes, but it is locked due to the stamps. Comment by Ballen, Hudell D.: Recommend removing all references concerning work shall be completed within 370 calendar days and Base Bid Lump Sum. Comment by Brewner, Sean B.: Removed.

SOLICITATION: 36C25225B0005_1

PROJECT: 556-23-101 Renovate CLC Building 134 – 2C Drawing Set: 556-23-101 Combined Drawings 100% 21June2024

This construction project is required to have a contractor provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully functional project. This project shall provide professional services for construction to renovate 12,590 square feet of CLC Building 134-2C and tie-in the current HVAC system and all its components installed on the roof to the new space on the 2nd floor. The construction shall be conducted in accordance with (IAW) the drawings, specifications, and all other associated project documents at Captain James A Lovell Federal Health Care Center.

Disregard all options described as bid deduct alternates which are referenced in “P01_556-23-101 Cost Estimate 21JUN24” under the DEDUCT ALTERNATES tab. Any reference to the same DEDUCT ALTERNATES in the specifications, drawings, and any related notes are also to be disregarded.

Be advised that in the drawings sheet QH101 specific changes are to be addressed in the following schedules:

1) SPECIALTY EQUIPMENT SCHEDULE

a. JSN# A5080 – ACQ/INS RESPONSIBILITY – VC

i. Paper towel dispenser: VA will supply. Contractor will install.

b. JSN# A5090 – ACQ/INS RESPONSIBILITY – VC

i. Sanitary Napkin dispenser: VA will supply. Contractor will install.

c. JSN# A5195 – ACQ/INS RESPONSIBILITY – VC

i. Toilet Tissue dispenser: VA will supply. Contractor will install.

d. JSN# K4500 – ACQ/INS RESPONSIBILITY – VC

i. Contractor cannot provide this RANGE unless this is built in. As it is called out to be a standalone appliance, VA will need to supply. Contractor will install.

e. JSN# M0515 – ACQ/INS RESPONSIBILITY – VC

i. Contractor cannot provide the TELEVISIONS. VA will need to supply. Contractor will install.

f. JSN# K4650 – ACQ/INS RESPONSIBILITY – VC

i. Contractor cannot provide this ICE DISPENSER, as it is called out to be a standalone appliance, VA will need to supply. Contractor will install.

g. JSN# A1200 – ACQ/INS RESPONSIBILITY – VC

i. VA provides material associated with LIFT SYSTEM OVERHEAD [added 05MAR25] Contractor cannot provide the LIFT SYSTEM OVERHEAD. VA will need to supply the rails and hoist. Contractor will install. Electric power, structural support, installation, testing, etc. are all supplied and installed by the contractor.

ii. Lift rails configuration will only be SURFACE. Disregard all mention for lift rails in the RECESSED configuration.

h. JSN# A1203 – ACQ/INS RESPONSIBILITY – VC

i. VA provides material associated with LIFT SYSTEM OVERHEAD, BARIATRIC [added 05MAR25], Contractor cannot provide the LIFT SYSTEM OVERHEAD, BARIATRIC, VA will need to supply the rails and hoist. Contractor will install. Electric power, structural support, installation, testing, etc. are all supplied and installed by the contractor.

ii. Lift rails configuration will only be SURFACE. Disregard all mention for lift rails in the RECESSED configuration.

i. Regarding both JSN# A1200 & A1203

i. Replace “PATIENT LIFT MANUFACTURER” with “CONTRACTOR” if this does occur, and if it does happen, show the change in the drawings.

2) SPECIALTY EQUIPMENT SCHEDULE

a. JSN# A5075 – ACQ/INS RESPONSIBILITY – VC

i. Soap dispenser: VA will need to supply. Contractor will install.

FHCC contracted dispensers as of DEC24

These are the consumables that we have by contract, so all the items below when integrated will be VA supplied and contractor installed.

1. Paper towel dispensers – Georgia Pacific, Surface Mounted, ENMOTION 59460A

1. Soap Dispensers – SC Johnson, Surface Mounted, 1L Proline Manual HLC Soap Dispenser 155404

1. Hand Sanitizer Dispensers – Purell CS8 Hand Sanitizer Dispenser 7720-01 with floor protectors (7745-WHT-18)

1. Toilet Tissue Dispensers – Georgia Pacific, surface mounted, GP Pro 56783A

1. Toilet seat dispenser – Tough Guy 2VEX9 image2.png image3.png image4.png image5.png image6.png image1.png