This document provides details on a federal contract solicitation. Solicitation number 36C77623R0050 is for the construction of a Women's Health Clinic at the Manchester VA Medical Center. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency. The solicitation seeks construction services for the 608-317 Women's Health Clinic project through a design-bid-build project delivery method. Responses were due on an unspecified date, and the award date was not stated. No other terms or conditions were included in this brief description.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
E
J
E
J
E
J
E
J
E
J
E
J
D102
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
GENERAL NOTES:
1/4" = 1'-0"
ROOMS IN ZONE FUNCTION OF SPACE
PRESSURE
RELATIONSHIP
TO ADJACENT
AREAS
MINIMUM
OUTDOOR ACH
MINIMUM
TOTAL ACH ACTUAL SUPPLY ACH
ALL ROOM AIR
EXHAUSTED
DIRECTLY
OUTDOORS
DESIGN TEMPERATURE (°F)
DESIGN RELATIVE
HUMIDITY (%)
MECHANICAL
EQUIPMENT NOTES
CONFERENCE/GROUP CONFERENCE - - - 6 - - - 2
LACTATION OFFICE SPACE - - - 6 - - - 2
WAITING AREA WAITING NR 2 12 12 NR 68-73 MAX 60 1
RECEPTION OFFICE SPACE - - - 6 - - - 2
CLEAN CLEAN HOLDING POSITIVE 2 4 4 NR - NR 1
SOILED SOILED WORKROOM NEGATIVE 2 10 N/A YES - NR 1
HK JANITOR'S CLOSET NEGATIVE NR 10 N/A YES - NR 1
TEAMWORK ZONE A OFFICE SPACE - - - 4 - - - 2
STAFF AISLE CORRIDOR - - - 4 - - - 2
PROCEDURE PROCEDURE ROOM POSITIVE 3 15 15 YES 68-73 20-60 1
EXAM 1 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
EXAM 2 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
EXAM 3 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
EXAM 4 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
EXAM 5 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
VITALS PATIENT ROOM NR 2 4 6 NR 68-73 MAX 60 1
PATIENT CORRIDOR CORRIDOR - - - 6 - - - 2
CONSULT 1 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
CONSULT 2 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
CONSULT 3 EXAMINATION ROOM NR 2 6 6 NR 68-73 MAX 60 1
TEAMWORK ZONE B OFFICE SPACE - - - 4 - - - 2
OFFICE OFFICE SPACE - - - 4 - - - 2
OPEN OFFICE OFFICE SPACE - - - 4 - - - 2
STORAGE STORAGE - - - 4 - - - 2
STAFF ENTRY CORRIDOR - - - 4 - - - 2
BREAK ROOM BREAK ROOM - - - 6 - - - 2
NOTES: 1) FUNCTION OF SPACE AS DEFINED IN ASHRAE 170-2017.
2) FUNCTION OF SPACE AS DEFINED IN ASHRAE 62.1-2013.
(EX)LPS
CAP
CAP
CAP (R) LPS
(R) LPR(R) LPR
(R) LPS(R) LPS
(R) LPR(R) LPR
(R) LPS
CAP
(EX) LPS RISERS
TO REMAIN
CAP
(EX) LPR RISER
TO REMAIN
(EX) LPS RISERS
TO REMAIN
(EX) LPS RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) EXHAUST
FAN TO REMAIN
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
1/4" = 1'-0"
KEY NOTES:
(R)8x6 SA(R)10x8 SA
(R)12x10 SA
(R)14x12 SA (R)20x12 SA
(R)24x12 SA
R x
S
A
(R)30x12 SA
(R)32x12 SA
(R)34x12 SA
(R)12x8 SA
(R)8x8 SA
(R)14x8 SA
(R)12x8 SA
(R)8x6 SA
(R)14x12 RA
(R)14x10 RA (R)12x10 RA (R)10x8 RA
(R)14x12 RA
(R)18x12 RA
R x
R
A R x
R
A
(R)14x10 RA
(R)12x10
RA
S
S
S
S
S
S
S
S
S
S
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R)
(R) EF
(R) RTU
(ON ROOF)
(R) H
(R)36x12 SA
R
L P
S
R
L P
R
R
L P
S
R
L P
R
(R)8x8 TA
(R)10x10 RA
(R)8"Ø SA
(R)14x12 RA
(R)14x12 RA
(EX)18x12 R
(R) VAV (R) VAV
(EX) 3/4" HWS
(EX) 3/4" HWR
(EX) BY PASS
0.5 GPM
S S
CAP
(R) (R)
CAP
CAP
(EX) DUCTS (VERIFY DUCTS
ARE NOT CONNECTED TO
ACTIVE DISTRIBUTION)
CAP
EXISTING FIRE DAMPERS
TO BE REMOVED
(EX) LPS RISERS
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPS RISERS
TO REMAIN
(EX) LPS RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPS RISER
TO REMAIN
E
X
L P
S
E
X
L P
R
(R) CU
(R) CU
(EX) CU
(R) AC
(R) AC
(R) EF
TAKE PRECONSTRUCTION AIR FLOW
MEASUREMENTS OF ALL DIFFUSERS
ASSOCIATED WITH AIR HANDLING UNIT
1-AHU1E (TYP. OF ±32) AND GRILLES
ASSOCIATED WITH RETURN FAN
1-RF1E (TYP. OF ±21). RESET
REMAINING TO PRECONSTRUCTION
VALVES FOLLOWING DEMO/CAPPING
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
(EX) EXHAUST
FAN TO REMAIN
4"Ø BOILER VENT
AND 4"Ø INTAKE UP.
(TYP. EACH BOILER)
EYE
WASH
4"Ø WATER HEATER VENT
AND 4"Ø INTAKE UP. (TYP.
EACH WATER HEATER)
16x16 SA x
S
A
14"Ø SA14"Ø SA
x
S
A
14"x16" RA
16x10 SA x
16"x14"
RA UP
16"x26"
SA UP
10"x10" TRANSFER DUCT
THRU WALL. OPEN ENDED
AT BOTH ENDS WITH
TURNED UP ELBOWS AND
BIRD SCREEN
12"x12" OPEN
ENDED DUCT WITH
TURNED UP ELBOW
AND BIRD SCREEN
12"x12" OPEN ENDED
DUCT WITH 45°
TURNED DN ELBOW
AND INSECT SCREEN
12"x12" EA
10"Ø SA
FIRE DAMPER AT
FLOOR ABOVE
VDVD
VD
FIRE DAMPER AT
FLOOR ABOVE
VDVD
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
1/4" = 1'-0"
KEY NOTES:
(EX)18x12 RA
(EX)12"Ø SA
14"X14"EA UP TO
EF-1 (ON ROOF)
10"Ø RA
10"Ø SA
6"Ø EA
12"Ø RA
x
E
A
46"x18" SA
12"x12" SA
26x14 RA
14x14 RA
34"x18" RA x
R
A x
S
A
8"Ø RA
(EX) DUCTS (VERIFY DUCTS
ARE NOT CONNECTED TO
ACTIVE DISTRIBUTION)
E
X x
R
A
E
X x
R
A x
R
18x14 RA
10"Ø RA
12"x10" RA 14"x12" RA
6"Ø EA
8"x8" EA
14"x14" EA x
E
A
14"x14" SA
6"Ø EA
8"x8" EA
Ø
E A
8"Ø SA
Ø
S A
12"x12" RA
12"Ø SA
x
R
A
12"Ø SA10"Ø SA
14"x12" SA
20"x14" SA
18x14 RA
12"x12" SA x
S
A
18"x14" RA
(IN SOFFIT)
x
S
A
18"x14"
RA - DN
x
S
A
8"x8" EA
8"x8" EA
12"Ø RA
26"x16"
SA - DN
14"x18" SA
10"Ø SA
10"Ø SA
7 7 x
R
A
18"x14" RA
18"x10" SA
Ø
S A
8"Ø SA
8"Ø SA
8"Ø SA
6"Ø SA
8"Ø SA
Ø
S A
Ø
S A
10"Ø SA
8"Ø SA
8"Ø SA
Ø
S A
Ø
S A
Ø
S A
Ø
S A
Ø
S A
Ø
S A
Ø
S A
6"Ø SA
6"Ø RA
6"Ø EA
Ø
S A
8"Ø SA
6"Ø SA
6"Ø SA
6"Ø SA
6"Ø RA
10"Ø SA
8"Ø SA
10"Ø SA
10"Ø SA
10"Ø RA
10"Ø RA
10"Ø SA
10"Ø SA
10"Ø SA
10"Ø RA
8"Ø RA 8"Ø RA
8"Ø SA
Ø
S A
Ø
S A
Ø
S A
8"Ø SA
8"Ø SA
8"Ø RA
8"Ø RA
8"Ø RA
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD VD
VD VD
VD
VD
VD
VD
VD
VD
VDVD
VD
VD
VD
VD
VD
VD VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
VD
6"Ø EA
VD
VD
VD
VD
VD VD
Ø
R A
Ø
S A
10"Ø RA
12"x10" EA
12"X12"EA UP TO
EF-3 (ON ROOF)
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
1/4" = 1'-0"
KEY NOTES:
NEW ROOF
EXISITNG ROOF
(PHARMACY)
EXISTING
BUILDING 1
CONCENTRIC VENT
(TYP. EACH BOILER /
WATER HEATER)
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
(EX)LPS
(EX) LPS RISERS
(EX) LPR RISER
(EX) LPS RISERS
(EX) LPS RISER
TO REMAIN
(EX) LPR RISER
(EX) LPR RISER
TO REMAIN
(EX) LPS RISER
(EX)LPR
2"GHS &
2"GHR UP
H W
S
H W
R
H W
S
EYE
WASH
HWR
HWR
HWR
HWS
G H
R
(UNDER)
H W
R
H W
S
TO VAV-16
TO VAV-14
1 1/4"HWS &
1 1/4"HWR UP
1 1/2"
1 1/2"
1 1/2"
2"
2 1/2"
2 1/2"
2 1/2"
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
(E) 3/4" HWS
(E) 3/4" HWR
(E) 1" HWS
(E) BY PASS
0.5 GPM
HWS
HWR
HWS
HWR
HWS
HWR
HWS
HWR
H W
S
HWRHWR
HWS
H W
S
H W
R
H W
S
(EX) LPS RISERS
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPS RISERS
TO REMAIN
(EX) LPS RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPR RISER
TO REMAIN
(EX) LPS RISER
TO REMAIN
HWR
HWS
H W
R
HWS
HWR
HWS
HWS HWS
H W
R
GHS & GSR UP TO
AHU-1 (ON ROOF)
GHS & GSR DN
1 1/4"HWS &
1 1/4"HWR DN
(EX) CU
H W
R
H W
S
TO VAV-9
TO VAV-6
TO VAV-8
TO VAV-7TO VAV-5
TO VAV-1
TO VAV-2
TO VAV-3
TO VAV-4
TO VAV-11
& (3) RCP-1
TO VAV-10
TO VAV-13 & (2)
EXISTING
RADIATORS
TO VAV-12
3/4" 3/4"
3/4"3/4"3/4"3/4"1"1" 1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
3/4"
3/4"
3/4"
3/4"
3/4"3/4"3/4"
3/4"
1"
1"
1" 1 1/4" 1 1/4"
MV
MV
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
NEW ROOF
EXISITNG ROOF
(PHARMACY)
EXISTING
BUILDING 1
D240
" RS
" RL
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
MPE Consultant:
Architecture Engineering Planning
BLDG 1
BLDG 15
MENTAL
HEALTH
URGENT
CARE
BLDG 18
KEY PLAN
CSB
BLDG
SCOPE
OF WORK
AREA
GENERAL NOTES:
1/8" = 1'-0"
B1
NTS
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [51mm] RADIUS, 1 1/2" [38mm] MAXIMUM
SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [508mm] VANES SHALL BE DOUBLE VANE
TYPE.
B3
NTS
VANE
VANE
NOTE:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS. ALL
SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED, SUPPORTED
AND FASTENED AS RECOMMENDED BY SMACNA.
R SHALL
EQUAL OR
BE
GREATER
THAN W.
R SHALL
EQUAL OR
BE
GREATER
THAN 1/3W.
R
R SHALL
EQUAL OR
BE
GREATER
THAN 1/6W.
STANDARD RADIUS OR LONG
RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
B5
NTS
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
M
A
X
M
A
X
E Q
U I P
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
M
A
X
M
A
X
M A
X
M
A
X
NTS
AIR SPLIT DUCT TAKE-OFF PLAN
VIEW
BRANCH DUCT TAKE-OFF PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
AIR
FLOW
AIR
FLOW
A I R
F L
O W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN FOR
SPLIT DIMENSION
PROVIDE
VOLUME
DAMPER
PROVIDE VOLUME
DAMPER
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE FROM
FULLY CLOSED POSITION TO CFM NOTED
ON FLOOR PLANS
AIR
FLOW
AIR
FLOW
1/4 W OR 4"
[100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
A I R
F L
O W
NTS
RIGID DUCT TO AIR TERMINAL
UNIT.
ROUND SHEET METAL DUCT.
MAIN SUPPLY
PLAN VIEW
NTS
SMACNA FIGURE 4-6
45° LEED IN RIGID
DUCT TO AIR
TERMINAL UNIT.
MAIN SUPPLY
PLAN VIEW
FLOW
F L
O W
NTS
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW
AIR
FLOW
PROVIDE VOLUME DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [102mm]
MIN.
BRANCH DUCT
VD
B7
NTS
NOTE:
1.
2.
DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [3mm]
CLEARANCE
ALL AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND
ROD PIN
DUCT
STIFFEN BLADE
AS REQUIRED
SECTION "A" CROSS SECTION
SECTION "A-A"
"B" "B"
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
B9
NTS
HOUSING WELDED
TO DUCT SECTION
ROUND OR
FLAT OVAL
DUCT SECTION
COVER WITH HANDLE
AND CHAIN RETAINER
GASKETED AND
PRESSURE SEALED
NTS
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION
ON FAN SIDE
WASHER
1-1/2" [38mm] MIN. TO 3" [76mm] MAX.
INSTALLED. 6" [152mm] NOMINAL WITH
MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [102mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON
12" [305mm] CENTERS
RIVET ON 4"
[102mm] CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [102mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION
OF BOLT
1 1/2" [38mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[13mm] [13mm]
[38mm]
1 1/2" [38mm] MIN. TO 3" [76mm] MAX.
INSTALLED. 6" [152mm] NOMINAL WITH
MATERIAL TAUT
FLANGED
CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
NOTE:
1.
2.
3.
4.
5.
6.
A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW
DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR
SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST BE INSTALLED IN THE PARTITION OR
FLOOR AND NOT OUTSIDE THE PENETRATION.
GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER
FRAME AND TO PERIMETER ANGLES.
PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [38x38mm], 14 GAGE, TO
PROVIDE 1" [25mm] MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA.
ACCESS PANELS: SIZE AND LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
PROVIDE 1/4" TO 1/2" [6 TO 13mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH
ROCK WOOL FIRESTOP FIBER.
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND
MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [76mm] HIGH CONCRETE CURB
AROUND OPENING FOR DUCT.
SLEEVE, NOTE 2
DUCT
CONNECTION
NOTE 4
DAMPER,
NOTE 1
DAMPER COLLAR
EXTENSION INTEGRAL
PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6
FIRE BARRIER
PARTITION OR CHASE
TYPICAL DUCT
INSULATION
PERIMETER ANGLE, NOTE 3
(NOTE FASTENED TO PARTITION)
ACCESS
PANEL
NOTE 5
m m
NTS
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [914]
TWO 1/2 [13]Ø RODS
TWO 3/8 [10]Ø. RODS
ONE 1 [25] x 16 GA STRAP
84 [2134]
60 [1524]
50 [1270] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZE
MAX. DUCT Ø
26 [660]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3658]
IN. [mm]
SPACING
IN. [mm]
IN. [mm]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.
BAND
OVER 50"
[1270mm]Ø
HANGER RODS
BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" [1270mm]Ø
& UNDER
NOTE:
ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS
AND FAN ROOM FLOORS SHALL BE PROVIDED WITH A 3" [76mm] HIGH CONCRETE
CURB AROUND OPENING FOR DUCT.
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
2"x2"x1/4" [51x51x6mm] ANGLE
INSTALL ON BOTH LONG
DIMENSION SIDES OF DUCT.
DUCT RISER - SEE FLOOR
PLANS FOR DETAILS
SEAL HOLE WITH FIREPROOFING
MATERIAL AFTER DUCT INSTALLATION
FLOOR
EXTEND ANGLE 3"
[76mm] BEYOND DUCT
DUCT RISER - SEE FLOOR
PLANS FOR SIZES
SHEET METAL SCREWS 4" [100mm]
ON CENTER
1 1/2"x1 1/2"x1/8" [38x38x3mm] ANGLE
INSTALL ON BOTH LONG DIMENSION
SIDES OF DUCT. FOR DUCTS OVER 60"
[1524mm] USE 2"x2"x1/8" [51x51x3mm]
ANGLE.
HOLE IN STRUCTURAL FLOOR
DUCT RISER
ARRANGE RISER SO REINFORCER
TRANSVERSE JOINT IS AT RISER
SUPPORT POINT
FLOOR
2 INCHES WG [500Pa] TO 4 INCHES WG [1000Pa] DUCT RISER SUPPORT
HOLE IN STRUCTURAL FLOOR
DUCT RISER
NTS
NOTE:
1.
2.
3.
4.
5.
6.
RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A
MINIMUM OF 3 TIMES THE DIAMETER OF INLET
A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS
BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH
3'-0" [914mm].
A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE
BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS
SHOWN, DOES NOT EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS,
INCREASE THE DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE
DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].
FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY
AIR DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1524mm]. USE RIGID ELBOWS
FOR CHANGE OF DIRECTION GREATER THAN 45°.
COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE
INSULATION W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.
USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE
DEDICATED AHU SERVING THE SURGICAL SUITE.
AIR TERMINAL UNIT
(CV OR VAV)
REHEAT COIL
SOUND ATTENUATOR
SEE EQUIPMENT
SCHEDULE
FLEXIBLE AIR DUCT
CONNECTOR. SEE DETAIL
DIFFUSER (TYP.)
SEE SPECIFICATIONS FOR
CLAMPS AND SEALANT (TYP.)
SEE NOTE 5
144 [3658]
144 [3658]
144 [3658]
144 [3658]
"A"
"A"
FLOW
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
8"x8"x
" STEEL PLATE
WELD PLATE TO
PIPE
SECURE TO ROOF SLAB WITH
(4)
"Ø EXPANSION BOLTS
OR WELD TO STEEL DECK
CONCRETE ROOF SLAB OR
STEEL ROOF DECK
ROOF SYSTEM
INSULATION AND
MEMBRANE
PRE-MOULDED
FLEXIBLE PIPE
COUNTER FLASHING
CLAMPING RING
ROOF SURFACE
WELD PIPE SADDLE
SUPPORT TO PIPE.
PROVIDE WATER
TIGHT CONNECTION
HIGH COMPRESSIVE
STRENGTH INSULATION
INSERT UNDER SHIELD
PIPE AND
INSULATION
INSULATION
PROTECTION
SHIELD
SEALANT
2" STEEL PIPE
2-
" STEEL PIPE
PROVIDE VAPOR
BARRIER AS SPECIFIED
ON PIPING CONVEYING
FLUID TO DEGREE °F
OR LOWER
NOTES:
PROVIDE RESTRAINING CLAMPS 8'-0" O.C.
PROVIDE ALUMINUM
JACKET
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM, CONDENSATE
& HEATING WATER.
NOTE:
WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO
FABRICATED STEEL ANCHOR
D+ 2
D+ 4
D+1
D+3
5/16"
ANCHOR BOLTS
N=NUMBER
S=SIZE
DRILL Ø = S+
STL PIPE OR
COPPER TUBE
D=PIPE
O.D.
NOTE
A
PIPE ANCHOR SCHEDULE
D P C N S BOLT PATTERN
mm in mm in mm in mm in mm in
102 4
NOTES:
1. PROVIDE ANCHORS ONLY WHERE
SHOWN ON DRAWINGS.
2. EXTEND SLEEVE ABOVE FLOOR
WHERE SPECIFIED.
INSULATION BOLT
(TYPICAL)
FLOOR
SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPE
PIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
PIPE
PIPE SLEEVE
WHERE
SPECIFIED
RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.
ELEVATION
PLAN
RISER
CLAMP
PIPE ANCHOR SCHEDULE
D L P T E N S BOLT PATTERN
mm
NOTES:
A. INSTALL WALL PLATE FIRST THEN
WELD ON REMAINING ASSEMBLY.
ONE WALL PLATE FOR BOTH
CHILLED WATER S.&R. IS
OPTIONAL.
ANCHOR BOLTS
N=NUMBER S=SIZE
DRILL Ø = S+
in mm in mm in mm in mm in mm in mm in
25 1
508 20
216 8
INSULATE AS INDICATED FOR ALL CHILLED WATER.
INSULATE PIPE ONLY FOR STEAM, CONDENSATE &
HEATING WATER.
NOTE A
D=PIPE O.D.
TYPICAL MANUAL AIR VENT
AIR VENT
1/2" BALL VALVE
1/4" COPPER TUBING
1/2"x 4"NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.
HEATING ONLY PANELS
HWS
HWR
RUNOUT & INTERCONNECTING
PIPING. PROVIDE DIELECTRIC
FITTINGS AS REQUIRED. CIRCUIT TO
COMPLY WITH SPECIFIED CAPACITY
& PRESSURE DROP. (TYP.)
NOTES:
1. MINIMUM FLOW SHALL BE NO LESS THAN 0.5 GPM
2. INSULATE TOP OF PANEL WITH MINIMUM 2" THICK FOIL
BACKED BATT INSULATION.
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE
43 - SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE
CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA. HANGER RODS
WITH 900mm [36"] MAX. SPACING
ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION
(VAPOR BARRIER
TYPE IS REQUIRED
FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
m m
NOTE:
SEE SPECIFER FOR DETAILED HANGER
REQUIREMENTS
mm
[IN]
mm
[FT]
mm
[FT]
S
N
O
T
WORKING
SPACE
PIPING ALLOWED
STRUCTURAL
CEILING, FLOOR
ABOVE OR ROOF
DEDICATED
ELECTRICAL
SPACE. SEE NOTE 2.
PANELBOARD,
SWITCHBOARD
OR SIMILAR
ELECTRICAL
EQUIPMENT
DEDICATED
ELECTRICAL SPACE.
FLOOR
NTS
AUTOMATIC FLOW
BALANCING VALVE (TYP.)
NOTES:
1. MAKE OPENING 1/8" PER LINEAL FOOT LARGER THAN DAMPER
DIMENSIONS WITH 1/4" MIN REQ'D.
2. SLEEVE GAUGE > GAUGE OF DUCT WHERE DUCT CONSTRUCTION
AND JOINTS PER NFPA 90. DUCT 20 GA. MIN.
3. DAMPER CONSTRUCTED AND TESTED PER UL 555, UL LABELED,
1-1/2 HOUR FIRE RATING W/165°F FUSIBLE LINK.
4. SEAL BETWEEN WALL AND SLEEVE W/APPROVED FIRE STOP
MATERIAL.
5. FIRE DAMPER SHALL BE CONFIGURED SUCH THAT UNACTIVATED
FIRE DAMPER CURTAIN SHALL BE OUTSIDE OF THE AIRSTREAM.
6. DUCT DETECTOR BY DIV 16 (SMOKE DAMPERS ONLY).
NOTE:
1. SECURING STRAP MUST BE FIELD INSTALLED TO
PREVENT MOVEMENT OF TERMINATION
2. INSTALL PIPE PER MANUFACTURER'S WRITTEN
INSTRUCTIONS.
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
NOTES:
1. SEE EXPANSION TANK SYSTEM
SCHEDULE FOR COMPONENT SIZES.
2. FOR HOT WATER SYSTEMS 2" AND
SMALLER AND CHILLED WATER
SYSTEMS USE IN-LINE AIR PURGER
IN LIEU OF AIR SEPARATOR.
3. SET PRESSURE REDUCING VALVE SO
PRESSURE AT HIGHEST POINT IN
SYSTEM HAS A MINIMUM OF 4 PSIG.
4. PROVIDE STRAINER IN AIR
SEPARATOR IF INDICATED IN
EXPANSION TANK SCHEDULE.
5. RELIEF VALVE FOR CHILLED WATER
SYSTEM IS SHOWN. OMIT WHEN
RELIEF VALVE IS SHOWN ON HEAT
EXCHANGER DETAIL AND SYSTEM IS
USED ONLY FOR HOT WATER
HEATING.
D
FLOOR MOUNTING BASE RING WITH
DRAIN ACCESS OPENING SHOWN.
ANGLE IRON LEGS MAY BE USED AS
AN OPTION.
6"HOUSEKEEPING
PAD
COLD WATER FILL LINE.
SEE EXPANSION TANK
SCHEDULE FOR SIZE
DRAIN
FROM SYSTEM
RUN DRAIN LINE TO
NEAREST FD UNLESS
INDICATED OTHERWISE
DRAIN
TO PUMP
SUCTION
AIR SEPARATOR
SEE NOTES 1 & 2
HANGER
RODS (TYP)
CONNECTOR PIPE.
BLADDER
EXPANSION
TANK
REDUCED PRESSURE ZONE
BACKFLOW PREVENTER
NC
BUTTERFLY OR BALL
ISOLATION VALVE
D
RUN DRAIN LINE
TO NEAREST FD
AIR CHARGING
SHRAEDER VALVE
MV
AUTO. AIR VENT TO DRAIN
PI
OMIT PRESSURE GAUGE
LINE IF STRAINER IS NOT
INCLUDED.
DESIGNER'S NOTE:
GATE VALVES SHALL BE INDICATED ON EITHER SIDE OF AIR SEPARATOR AS REQUIRED BY CLOSENESS OF VALVES SERVING
ADJACENT EQUIPMENT. WHERE CHARGING OF TANK IS PROPOSED PROVIDE NECESSARY TAPPINGS. PROVIDE AND SHOW A
LOW WATER ALARM ON CHARGED SYSTEMS TO INDICATE NO WATER IN TANK.
NTS
NOTES:
1. PROVIDE LOW WATER LEVEL ALARM. PROVIDE A LOW WATER LEVEL AT ECC. RELIEF VALVE DRAIN SHALL
RETURN TO TANK AS SHOWN ON THIS DETAIL.
2. SET REGULATING VALVE TO MAINTAIN MAKE-UP PRESSURE AT 15 PSIG ABOVE HIGHEST SYSTEM PRV
SETTING.
3. MAKE-UP PIPING SYSTEM DOES NOT REQUIRE INSULATION.
4. OPERATE PUMP MANUALLY AS REQUIRED TO FILL.
3/4"
GLYCOL-WATER
MAKE-UP PUMP
5 GPM @ 30 PSIG
WALL MOUNTED
"ON-OFF" MOTOR
CONTROL-SEE
NOTE NO. 4
D
EXPANSION TANK
3/4"
TO OTHER
GLYCOL-WATER
SYSTEMS
LOW WATER
LEVEL ALARM
SEE NOTE NO. 1
AIR SEPARATOR
FROM OTHER GLYCOL-WATER
RELIEF VALVES
BACK PRESSURE REGULATING VALVE
SEE NOTE NO. 2
55 GALLON
GLYCOL-WATER
STORAGE TANK
3" THICK
CONCRETE PAD
FLOOR
PUMP
SUCTION
NTS
COIL
TEST PLUG (TYP.)
REDUCER, IF REQUIRED
WATER RETURN
MANUAL AIR VENT
UNION CONNECTIONS
(TYP.)
WATER SUPPLY
SHUT OFF VALVE
DRAIN WITH HOSE
CONNECTION
MV
MODULATION CONTROL VALVE
NTS
PIPE HANGERS - PROVIDE DOUBLE
DEFLECTION NEOPRENE (TYPE
HN) FOR FIRST TWO ON EACH SIDE
OF PUMP (SEE NOTE NO. 1)
PRESSURE GAGE
1/2"
STRAINER
FLEXIBLE
CONNECTION
BALL OR BUTTERFLY
TYP.
NOTES:
1. SUPPORT PUMP FROM PIPING ONLY. DO
NOT SUPPORT PUMP FROM MOTOR.
BALANCING
DEVICE
NTS
NTS
NOTE:
TOP OF CHEMICAL POT FEEDER
TANK SHALL NOT BE MORE THAN
4'-0" ABOVE FINISHED FLOOR.
1"
CHEMICAL POT FEEDER-
MINIMUM CAPACITY 5
GALLONS
1"
FUNNEL
3/4"
TO
DRAIN
FROM PUMP
DISCHARGE
TO PUMP SUCTION
AUTOMATIC FLOW
CONTROL AND
BALANCE DEVICE
NTS
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
DRAIN WHEN COIL IS
NOT SELF-DRAINING
TEST PLUG
(TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
REDUCER, IF REQUIRED
DRAIN
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
TEST PLUG (TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
WATER COIL
REDUCER, IF REQUIRED
FLOW ELEMENT
DRAIN WHEN COIL
IS NOT SELF-DRAINING
DRAIN
DOUBLE COIL
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR
EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" FOR 4"Ø PIPE & SMALLER. TYPE "H-P" FOR
5"Ø PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF
ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR
EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM
AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.
FE
MV
MV
MV
MV
MV
FE
TI
TI
TEMPERATURE INDICATION
TO ECC SEE CONTROL
DIAGRAM
MV
CALIBRATED BALANCING
VALVE (TYP.)
AUTOMATIC FLOW
BALANCING VALVE (TYP.)
CO
CO
NOTES:
3. MOUNT IN AHU-1. COORDINATE FINAL DISPERSION PANEL SIZE WITH AHU SUBMITTAL.
1. SEE MANUFACTURER'S PIPING RECOMMENDATIONS FOR FINAL LAYOUT.
2. PIPE IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
FLFLFL
NTS
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
BOILER SCHEDULE - HOT WATER
TAG LOCATION FUEL TYPE
INPUT
MBH
OUTPUT
MBH
MAX / MIN
INLET (IN
W.C.)
THERMAL EFF.
FLUID TYPE EWT LWT GPM
ELECTRICAL DATA
FLUE SIZE (IN.)
OPERATING
WT. LBS.
TYPICAL UNIT
MFG
& MODEL NO.
NOTES:
VOLTS/Ø AMPS
B-1 MECH ROOM
NATURAL
GAS
400 392 14 / 4 98 WATER 100 140 20 120/1 <12 4 542
LOCHINVAR
FTX400
1 THRU 11
B-2 MECH ROOM
NATURAL
GAS
400 392 14 / 4 98 WATER 100 140 20 120/1 <12 4 542
LOCHINVAR
FTX400
1 THRU 11
B-3 MECH ROOM
NATURAL
GAS
400 392 14 / 4 98 WATER 100 140 20 120/1 <12 4 542
LOCHINVAR
FTX400
1 THRU 11
NOTES: 1. BOILER SHALL BE INSTALLED PER MANUFACTURER RECOMMENDATIONS. MAINTAIN ALL REQUIRED CLEARANCES FOR ACCESS AND SERVICE.
2. BOILER SHALL BE PROVIDED WITH FACTORY MOUNTED CONTROLS AND SHALL BE INTEGRATED INTO BMS.
3. BOILER SHALL BE PROVIDED WITH 10 TO 1 TURNDOWN.
4. PROVIDE 4" POLYPROPYLENE COMBUSTION AIR PIPE AND 4" AL29-4C STAINLESS STEEL VENT THROUGH ROOF. TERMINATE PER MANUFACTURER'S INSTRUCTIONS.
5. BOILER SHALL BE PROVIDED WITH CONDENSATE NEUTRALIZER KIT
6. BOILER SHALL BE PROVIDED WITH VENTLESS GAS PRESSURE REGULATOR.
7. BOILER SHALL BE PROVIDED WITH BACNET COMMUNICATIONS KIT.
8. COORDINATE CONTROLS REQUIREMENTS WITH CONTROLS CONTRACTOR.
9. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR.
10. COORDINATE GAS PIPING AND CONDENSATE PIPING REQUIREMENTS WITH PLUMBING CONTRACTOR.
11. UNIT MANUFACTURERS AND MODELS ARE BASIS OF DESIGN. BASIS OF DESIGN OR ENGINEER APPROVED EQUAL ARE ACCEPTABLE.
PUMP SCHEDULE
TAG TYPE LOCATION SERVICE GPM FLUID TYPE
IMPELLER
SIZE (IN)
NOMINAL
RPM
HD
(FT.)
ELECTRICAL DATA
ECM (Y/N)
DIV. 26
PROVIDE
DISCONNECT
DIV. 26 PROVIDE
STANDBY POWER
TYPICAL UNIT MFG
& MODEL NO.
NOTES:
BHP HP VOLTS/Ø
BP-1 ECM INLINE MECH ROOM BOILER B-1 20 WATER * 830-4300 15 * 1.5 AMPS 208/1 Y Y Y TACO 0034e-F2 3
BP-2 ECM INLINE MECH ROOM BOILER B-2 20 WATER * 830-4300 15 * 1.5 AMPS 208/1 Y Y Y TACO 0034e-F2 3
BP-3 ECM INLINE MECH ROOM BOILER B-3 20 WATER * 830-4300 15 * 1.5 AMPS 208/1 Y Y Y TACO 0034e-F2 3
HWP-1 INLINE MECH ROOM HEATING HOT WATER 55 WATER 7.9 1750 60 1.59 2 208/3 N Y Y TACO 1919-4P-PD 2
HWP-2 INLINE MECH ROOM HEATING HOT WATER 55 WATER 7.9 1750 60 1.59 2 208/3 N Y Y TACO 1919-4P-PD 2
HWP-3 ECM INLINE MECH ROOM
HEATING 35% PG
LOOP
25 35% PG * 0-3000 40 0.91 0.9 208/1 Y Y Y VR15H-F 1-3
HWP-4 ECM INLINE MECH ROOM
HEATING 35% PG
LOOP
25 35% PG * 0-3000 40 0.91 0.9 208/1 Y Y Y VR15H-F 1-3
NOTES: 1. PUMPS SELECTED WITH 35% PROPYLENE GLYCOL
2. PUMPS ARE 100% REDUNDANT WITH LEAD/STANDBY SEQUENCING
3. EC MOTOR
FAN SCHEDULE
TAG LOCATION SERVICE TYPE
ROOF
OPENING
CFM
ESP
(IN W.G.)
BHP RPM MAX SONES
ELECTRICAL DATA
VFD (Y/N)
DIV. 26 PROVIDE
VFD (Y/N)
DIV. 26 PROVIDE
DISCONNECT (Y/N)
DIV. 26 PROVIDE
STANDBY POWER
(Y/N)
TYPICAL UNIT MFG & MODEL NO. NOTES:
DRIVE TYPE MOTOR TYPE VOLTS/Ø HP
EF-1 ROOF GENERAL EXHAUST
ROOF
DOWNBLAST
14.5" x 14.5" 685 1.00 0.21 1,619
7.8 DIRECT ECM 115 / 1 0.25 N N Y Y GREENHECK G-100-VG
1,2
EF-2 ROOF MECH ROOM EXHAUST
CENTRIFUGAL
INLINE
14" x 14" 1,200
0.38 0.2 1,633
10.4 DIRECT ECM 115 / 1 0.25 N N Y Y GREENHECK SQ-100-VG 2
EF-3 ROOF
PROCEDURE ROOM
EXHAUST
ROOF
DOWNBLAST
12.5" x 12.5" 535 0.50 0.09 1,643
8.1 DIRECT ECM 115 / 1 0.1 N N Y Y GREENHECK G-090-VG 1-3
NOTES: 1. PROVIDE FAN / MOTOR ASSEMBLY ON 24" HIGH CURB.
2. AMCA CERTIFIED FOR SOUND & AIR PERFORMANCE. PROVIDE WITH: EC MOTOR, MOTOR MOUNTED DIAL SPEED CONTROLLER, INSULATED HOUSING, DISCHARGE CONTROL DAMPER, MOUNTING BRACKETS FOR HORIZONTAL INSTALLATION, VIBRATION ISOLATION KIT AND POWER DISCONNECT.
3. PROVIDE CURB ADAPTER TO MATCH EXISTING CURB.
RADIANT PANEL SCHEDULE
TAG MANUFACTURER MODEL BTU/FT
PANEL DIMENSION WATER DATA
REMARKS
LENGTH (FT.) WIDTH (IN.) TUBE (#)
EWT LWT GPM
P.D. (FT.)
RCP-1 STERLING LINEAR 246
(2) 4' MODULES
24 7 140 120 0.5 NOTE 1
NOTES:
1. PRESSURE DROP IS DEPENDENT UPON LENGTH OF TOTAL PANEL RUN.
EXPANSION TANK SCHEDULE
TAG LOCATION SERVED TANK VOLUME
ACCEPT.
GAL.
DIA
(IN.)
HEIGHT
(IN.)
WEIGHT FULL
(LBS.)
TYPICAL UNIT
MFG
& MODEL NO.
NOTES:
ET-1 MECH RM 112
HEATING HOT
WATER
22 12 16 38-9/16" 250
TACO /
CBX84-125
1 THRU 5
ET-2 MECH RM 112
HEATING
35% LOOP
8 5 14 22-3/16" 132
TACO /
CBX30-125
1 THRU 5
NOTES:
1. EXPANSION TANK SHALL BE SEAMLESS BLADDER TYPE FOR PERMANENT SEPARATION OF
AIR AND WATER.
2. SHELL SHALL BE FABRICATED STEEL DESIGNED AND CONSTRUCTER PER ASME
SECTION VIII, DIV 1.
3. BLADDER SHALL BE MADE OF HEAVY DUTY BUTYL REMOVABLE FOR INSPECTION.
4. EXPANSION TANK SHALL BE VERTICAL INSTALLATION ONLY.
5. UNIT MANUFACTURERS AND MODELS ARE BASIS OF DESIGN. BASIS OF DESIGN
OR EQUAL ARE ACCEPTABLE.
HEAT EXCHANGER SCHEDULE - BRAZED PLATE
TAG LOCATION SERVES TYPE
HOT SIDE COLD SIDE
WEIGHT
TYPICAL UNIT MFG
& MODEL NO.
NOTES:
FLUID GPM MBH
EWT/LWT (°F)
MAX WPD
(FT. HD)
CONN. SIZE
PIPING
RUNOUT SIZE
(IN.)
FLUID GPM MBH
EWT/LWT (°F)
MAX WPD
(FT. HD)
CONN. SIZE/
MAT.
PIPING
RUNOUT SIZE
(IN.)
HX-1 MECH
HW GLYCOL
LOOP
BRAZED
PLATE
WATER 28.67 282.8 140/120 0.9 1.65 35% PG 23 217.9 115 / 135 1.1 1.65 226
TACO
TB120TX140
NOTES: 1. BRAZED PLATE HX WITH 10% EXCESS SURFACE AREA
HUMIDIFIER SCHEDULE
TAG LOCATION SERVICE
GAS WATER STEAM AIR DATA AHU DIMENSIONS STEAM DISPERSION
APPROX.
WEIGHT (LB)
ELECTRICAL
DIV. 26
PROVIDE
STANDBY
POWER (Y/N)
TYPICAL UNIT MFG
& MODEL NO.
NOTES
TYPE
INPUT
(MBH)
WATER
USAGE
(GPH)
STEAM
CAPACITY
(LBS/HR)
AIRFLOW
(MAX/MIN
CFM)
WINTER OA
DESIGN
(DB / %RH)
SPACE
DESIGN (DB /
%RH)
% OA
VELOCITY
(FPM)
EAT
(°F DB/ %RH)
LAT
(°F DB/ %RH)
APD
(IN WC)
W (IN.) H (IN.)
QUANITITY No. TUBES
TUBE
DIAMETER (IN)
TUBE
SPACING (IN)
ABSORPTION
DIST. (IN.)
FACE
DIMENSIONS
VOLTS/Ø FLA
H-1 ROOF AHU-1 NAT 91 9 69.17
8,500
12.4 / 45.7 72 / 35 30 460.15 55 / 44% 55.93 / 61% - 80 59 1 8 1.5 9.0 - 73 X 47 479 120 / 1 7.0 Y DRI-STEEM GTS-LX-75
AIR HANDLING UNIT SCHEDULE
TAG UNIT TYPE LOCATION AREA SERVED
SUPPLY AIR
(CFM)
RELIEF AIR
(CFM)
RETURN AIR
(CFM)
MIN. OA
(CFM)
MAX OA
(CFM)
FAN AND FAN MOTOR DATA ELECTRICAL DATA
SUPPLY FAN RETURN/EXHAUST FAN CIRCUIT 1 - SUPPLY/ RETURN FAN MOTORS CIRCUIT 2 - UV LIGHTS CIRCUIT 3 - LIGHTS & SWITCH CIRCUIT 4 - RECEPTACLE
ECMS
(Y/N)
DIV. 26
PROVID
E
VFDS
(Y/N)
DIV. 26
PROVIDE
DISCONNEC
TS
(Y/N)
DIV. 26
PROVIDE
STANDBY
POWER
(Y/N)
QUANTITY FAN TYPE
T.S.P./E.S.P
(IN. WC)
BHP
(TOTAL)
HP
(EACH)
VFD SPEED
(HZ)
RPM QUANTITY FAN TYPE
T.S.P./E.S.P
(IN. WC)
BHP
(TOTAL)
HP
(EACH)
VFD SPEED
(HZ)
RPM VOLTS/Ø MCA MOCP VOLTS/Ø MCA MOCP VOLTS/Ø MCA MOCP VOLTS/Ø MCA MOCP
AHU-1
VAV
DX-COOLING
ROOF WOMEN'S CARE
8,200
6,200 2,000 8,200
IMPELLER
FAN
4.94 / 1.50 16.08 4.02 N/A 3393 3
IMPELLER
FAN
2.32 / 1.25 12.06 4.02 N/A 2734 208 / 3 70.01 80 115 / 1 1.63 15 115 / 1 3.26 15 115 / 1 10 15 Y N/A Y Y
NOTES:
1. PROVIDE ONE 208/3 POWER CONNECTION FOR ALL FANS AND TWO 120/1 POWER CONNECTIONS (ONE FOR LIGHTS AND ONE FOR GFCI OUTLET)
2. PROVIDE DOUBLE-WALL INSULATED (R-13 MIN.) AIR HANDLING UNIT SUITABLE FOR OUTDOOR APPLICATIONS W/: 2" SPRING ISOLATORS, SEISMIC SNUBBER, THRUST RESTRAINT.
3. PROVIDE INSPECTION WINDOWS IN EACH ACCESS DOOR.
4. AIR FILTERS AND FILTER RACK ASSEMBLIES SHALL BE FURNISHED BY THE AIR FILTER MANUFACTURER FOR INSTALLATION BY THE AIR HANDLING UNIT MANUFACTURER.
5. REFER TO SPECIFICATIONS AND CONTROL SEQUENCES FOR ADDITIONAL INFORMATION. PROVIDE 26" CURB AND SMOKE DAMPERS.
6. PROVIDE A 65KA SCCR HIGH FAULT RATING ETL LISTING.
AIR HANDLING UNIT SCHEDULE CONT.
TAG UNIT TYPE LOCATION
AREA
SERVED
SUPPLY AIR
(CFM)
RELIEF AIR
(CFM)
RETURN AIR
(CFM)
MIN. OA
(CFM)
MAX OA
(CFM)
COIL DATA
TOTAL
ENERGY
RECOVERY
WHEEL
OPERATING
WEIGHT (LBS)
FILTERS
ELECTRICAL
REQUIREMENTS
TRANE
MODEL NO.
NOTES:
DX COOLING COIL
HOT WATER HEATING COIL (35% GLYCOL)
TOTAL MBH SENS MBH
FACE AREA
SQ FT.
ROWS
EAT °F
DB/WB
LAT °F DB/WB
APD
IN-W.C.
GPM
WPD
FT-W.C.
MBH
FACE AREA
SQ FT.
ROWS EAT °F LAT °F
APD
IN-W.C.
GPM
WPD
FT-W.C.
V/PH
ECM(S)
AHU-1
VAV
DX-COOLING
ROOF
WOMEN'S
CARE
8,200
6,200 2,000 8,200
310.66 222.31 20.81 4 79.1/65.2 54.4/52.4 0.468 N/A N/A 217.88 19.83 1 135 114.61 0.05 23 2.51 N/A 6289 MERV 8 & 15 208/3 Y
TRANE
CSAA021
1-6
NOTES:
1. PROVIDE ONE 208/3 POWER CONNECTION FOR ALL FANS AND TWO 120/1 POWER CONNECTIONS (ONE FOR LIGHTS AND ONE FOR GFCI OUTLET)
2. PROVIDE DOUBLE-WALL INSULATED (R-13 MIN.) AIR HANDLING UNIT SUITABLE FOR OUTDOOR APPLICATIONS W/: 2" SPRING ISOLATORS, SEISMIC SNUBBER, THRUST RESTRAINT.
3. PROVIDE INSPECTION WINDOWS IN EACH ACCESS DOOR.
4. AIR FILTERS AND FILTER RACK ASSEMBLIES SHALL BE FURNISHED BY THE AIR FILTER MANUFACTURER FOR INSTALLATION BY THE AIR HANDLING UNIT MANUFACTURER.
5. REFER TO SPECIFICATIONS AND CONTROL SEQUENCES FOR ADDITIONAL INFORMATION. PROVIDE 26" CURB AND SMOKE DAMPERS.
6. PROVIDE A 65KA SCCR HIGH FAULT RATING ETL LISTING.
AIR COOLED CONDENSER UNIT SCHEDULE
TAG LOCATION SERVES
NOMINAL
TONS
MAXIMUM
MBH
REFRIGERANT
REFRIGERA
NT
CIRCUITS
ELECTRICAL DATA
DIV. 26
PROVIDE
STANDBY
POWER
(Y/N)
OPERATING
WEIGHT
(LBS.)
TYPICAL
UNIT MFG
& MODEL
NO.
NOTES:
COMPRESSOR
VOLT / Ø MCA MOP
QTY KW FLA LRA QTY EER RLA C1
CU-1 ROOF AHU-1 25 308.19 R-410A 1 3 2.6 4.1 20.7 1 12.1 89.2 208/3 124 200 Y 1921
TRANE
RAUJ-C25
1-7
NOTES: 1. PROVIDE WITH PREMIUM EFFICENCY MOTORS AND FACTORY MOUNTED AND WIRED LOCKABLE DISCONNECT.
2. SINGLE COMPRESSOR SHALL BE VARIABLE SPEED (VZH170).
3. PROVIDE WITH STRUCTURAL BASERAIL.
4. MECHANICAL WORK CONTRACTOR SHALL PROVIDE WORKING REFRIGERANT CHARGE.
5. LOW AMBIENT CONTROL DOWN TO 0F
6. REFRIGERANT R-410A, SUCTION RISER 1.375", SUCTION HORIZONTAL 1.625", LIQUID LINE 0.875"
7. PROVIDE A 65KA SCCR HIGH FAULT RATING ETL LISTING.
GLYCOL FEED UNIT SCHEDULE
TAG LOCATION SERVICE FLUID TANK CAPACITY TANK TYPE
ROTARY VANE FEEDER PUMP AND ELECTRICAL
MANUFACTURER & MODEL
(AS BASIS OF DESIGN)
NOTES:
GPM PSI RPM HP VOLTS PHASE
GF-1 MECHANICAL ROOM HW TO AHU 40% PG 50 GALLONS VERTICAL 1.5 100 - 1/3 115 1 NEPTUNE G-50-2A 1,2,3,4,5
NOTES:
1. UNIT SHALL HAVE STEEL FRAME, 50 GALLON POLYETHYLENE TANK, LOW LEVEL LIGHT, AUDIBLE ALARM AND SILENCE SWITCH.
2. SUCTION AND DISCHARGE PIPING SHALL INCLUDE PRESSURE SWITCH, DISCHARGE CHECK VALVE, INLET STRAINER, ISOLATION VALVES, PRESSURE GAUGE,ADJUSTABLE PRESSURE RELIEF VALVE.
3. GFU TO BE PROVIDED WITH ELECTRICAL OUTLET FOR PLUG-IN BY DIV 26.
4. CONTROL PANEL: NEMA 4X, 115V POWER CORD, POWER ON/OFF SWITCH AND INDICATION, H-O-A PUMP SWITCH AND INDICATION, LOW LEVEL INDICATION, AUXILIARY LOW LEVEL OUTPUT
5. CONTROLS CONTRACTOR SHALL INTERFACE WITH LOW LEVEL ALARM TO COMMUNICATE TO THE BUILDING AUTOMATION SYSTEM IN EVENT OF TANK LOW LEVEL.
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
REGISTER, DIFFUSER & GRILLE SCHEDULE
TAG MAX CFM NECK SIZE TYPE DP MAX NC BLOW PRICE MODEL NO. NOTES
S-1 175 6" Ø
PLAQUE
DIFFUSER
0.05 <20
SPD 24"x24", TYPE 31
T-BAR MOUNT
1-6
S-2 280 8" Ø
PLAQUE
DIFFUSER
0.07 20
SPD 24"x24", TYPE 31
T-BAR MOUNT
1-6
S-3 385 10" Ø
PLAQUE
DIFFUSER
0.09 <20
SPD 24"x24", TYPE 31
T-BAR MOUNT
1-6
S-4 480 14"x8"
LOUVERED
SUPPLY
0.03 21
SDG SPIRAL
DUCT-MOUNTED
2,6,7
S-5 275 12"x6"
LOUVERED
SUPPLY
0.03 19
610/ TB / L
DUCT MOUNTED GRILLE
2,4,6,7
S-6 940 22"x10"
LOUVERED
SUPPLY
0.03 24
610/ TB / L
DUCT MOUNTED GRILLE
2,4,6,7
R-1 195 8"x8"
LOUVERED
RETURN
0.10 22
535 / TBP / L 12"x12" LAY IN
MODULE
1-6
R-2 450 12"x12"
LOUVERED
RETURN
0.10 25
535 / TB / L
24"x24" LAY IN
1-6
R-3 650 16"x16"
LOUVERED
RETURN
0.06 23
535/ TB / L
24"x24" LAY IN
1-6
R-4 1620 20"x14"
LOUVERED
RETURN
0.22 42
630/ TB / L
DUCT MOUNTED GRILLE
2,4,6,7
E-1 195 8"x8"
LOUVERED
EXHAUST
0.10 22
535 / TBP / L
12"x12" LAY IN MODULE
1-6
E-2 450 12"x12"
LOUVERED
EXHAUST
0.10 25
535 / TB / L
24"x24" LAY IN
1-6
E-3 650 16"x16"
LOUVERED
EXHAUST
0.06 23
535/ TB / L
24"x24" LAY IN
1-6
E-4 1000 20"x18"
LOUVERED
EXHAUST
0.06 24
535/ TB / L
24"x24" LAY IN
1-6
GENERAL NOTES:
1. ALL REGISTERS, DIFFUSERS AND GRILLES SHALL HAVE WHITE FINISH UNLESS OTHERWISE INDICATED.
2. PROVIDE FACE OPERABLE DAMPERS IN RGD'S WHERE DUCT MOUNTED BALANCE DAMPERS ARE NOT ACCESSIBLE (I.E. GYPSUM CEILINGS)
KEYED NOTES:
1. PROVIDE MOUNTING FRAME FOR 24"x24" LAY-IN CEILING GRID
2. ALUMINUM CONSTRUCTION.
3. PROVIDE CROSS NOTCH FOR STRADDLING T-BAR
4. OPPOSED BLADE DAMPER
5. PROVIDE INTEGRAL PLENUM; S-16 TO HAVE CUSTOM MADE 2' HIGH PLENUM
6. PROVIDE INTEGRAL AIR SCOOP WHERE VOLUME DAMPER IS NOT SHOWN ON PLANS.
7. DUCT MOUNTED DIFFUSER. SEE PLANS FOR DUCT SIZES.
VARIABLE AIR VOLUME (VAV) TERMINAL SCHEDULE
TAG SERVES
INLET SIZE
(IN)
OUTLET SIZE
(IN)
SET POINT RANGE
INLET STATIC
PRESSURE-MI
N.
MAX. APD
(IN. WG.)
HOT WATER HEATING COIL
DIV. 26 PROVIDE
STANDBY POWER
(Y/N)
TYPICAL UNIT MFG
& MODEL NO.
NOTES:
CFM
MAX.
CFM
MIN.
CFM HEAT MAX MBH ROWS
EWT/LWT
(°F)
EAT/LAT
(°F)
MAX GPM @
140°F EWT
MAX WPD
(FT-HD)
PIPING
RUNOUT SIZE
(IN.)
VAV-1 CLEAN 5 195 150 150 0.75 0.06 4.88 1 140/120.4 55/85.0 0.5 0.65 3/4" Y TRANE VCWF SEE BELOW
VAV-2 CONFERENCE 6 285 225 225 0.75 0.15 6.1 1 140/120.4 55/80 0.62 0.95 3/4" Y TRANE VCWF SEE BELOW
VAV-3
CLINIC ENTRY &
LACTATION
5 175 140 140 0.75 0.05 4.75 1 140/121.0 55/86.3 0.5 0.64 3/4" Y TRANE VCWF SEE BELOW
VAV-4 WAITING AREA 8 630 625 625 0.75 0.41 16.95 2 140/116.6 55/80 1.45 0.22 3/4" Y TRANE VCWF SEE BELOW
VAV-5 PROCEDURE 10 910 620 620 0.75 0.35 16.81 2 140/101.0 55/80 0.86 0.17 3/4" Y TRANE VCWF SEE BELOW
VAV-6 TEAM A 6 270 230 230 0.75 0.14 6.24 1 140/121.0 55/80 0.66 1.04 3/4" Y TRANE VCWF SEE BELOW
VAV-7 EXAM 1&2 6 360 360 360 0.75 0.36 9.76 2 140/103.0 55/80 0.53 0.25 3/4" Y TRANE VCWF SEE BELOW
VAV-8
EXAM 3,4,5
10 810 810 810 0.75 0.29 21.96 2 140/103.6 55/80 1.21 0.32 3/4" Y TRANE VCWF SEE BELOW
VAV-9 TEAM B 6 260 210 210 0.75 0.13 5.69 1 140/118.6 55/80 0.53 0.73 3/4" Y TRANE VCWF SEE BELOW
VAV-10
PATIENT
CORRIDOR
10 650 380 380 0.75 0.11 10.3 1 140/106.3 55/80 0.61 1.7 3/4" Y TRANE VCWF SEE BELOW
VAV-11 CONSULT ROOMS 10 735 735 735 0.75 0.25 19.93 2 140/102.4 55/80 1.06 0.25 3/4" Y TRANE VCWF SEE BELOW
VAV-12
BREAK,STOR,
STAFF ENTRY
10 695 595 595 0.75 0.23 16.13 2 140/100.5 55/80 0.82 0.16 3/4" Y TRANE VCWF SEE BELOW
VAV-13
OFFICES (X2)
8 520 520 520 0.75 0.3 14.1 2 140/114.7 55/80 1.12 0.14 3/4" Y TRANE VCWF SEE BELOW
VAV-14 CAFETERIA 14 1620 1195 1195 0.75 0.28 32.4 2 140/103.6 55/80 1.78 0.18 3/4" Y TRANE VCWF SEE BELOW
VAV-15 BASEMENT MECH 10 850 740 740 0.75 0.31 16.95 2 140/100.8 55/80 0.87 0.17 3/4" Y TRANE VCWF SEE BELOW
VAV-16
ELECTRICAL
ROOM
6 250 250 250 0.75 0.12 6.78 1 140/123.2 55/80 0.81 1.48 3/4" Y TRANE VCWF SEE BELOW
NOTES: 1. RUNOUTS TO VAV BOXES SHALL BE THE SAME SIZE AS THE INLET UNLESS OTHERWISE NOTED ON THE PLANS.
2. VERIFY VAV UNIT CONFIGURATIONS (CONTROLS ENCLOSURE AND HOT WATER COIL CONNECTIONS) WITH PLANS. INSTALL MAINTAINING MANUFACTURER REQUIRED CLEARANCES.
3. PROVIDE MANUFACTURER RECOMMENDED MINIMUM LENGTH OF STRAIGHT DUCTWORK BEFORE INLET CONNECTION.
4. PROVIDE UNITS WITH FACTORY MOUNTED AIRFLOW MEASURING STATION, VAV ACTUATOR AND CONTROLS ENCLOSURE.
5. PROVIDE WITH 1" DOUBLE WALL INSULATION WITH SOLID 26 GAUGE GALVANIZED STEEL LINER.
6. PROVIDE WITH MANUFACTURERS DISCONNECT SWITCH.
AIR SEPARATOR SCHEDULE
TAG LOCATION SERVED GPM
PD (FT)
SIZE
(IN)
DIA.
(IN)
LNG.
(IN)
TYPICAL UNIT MFG & MODEL NO. NOTES:
AS-1 MECH ROOM HEATING HOT WATER 72.5 0.6 2-1/2 5 15.75 BELL & GOSSETT CRS-2-1/2F 1,2,3
AS-2 MECH ROOM HEATING 40% LOOP 40 0.4 2 4 15.25 BELL & GOSSETT CRS-2F
1,2,3
NOTES:
1. 150 PSI WORKING PRESSURE, ASME RATED
2. ASME RATED
3. COALESCING TYPE, REMOVABLE HEAD
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
CS CSCS
FL
CS
CS
FL FL
B1
NTS
HEATING HOT WATER SYSTEM - SEQUENCE OF OPERATION
CS
CS
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
FL
HSFSMD
MD
MD
H
MD
F1
NTS
AIR HANDLING UNIT (AHU-1) - VARIABLE AIR VOLUME SEQUENCE OF OPERATION
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
GENERAL
1. EXHAUST FAN SHALL BE CONTROLLED VIA DDC CONTROLLER
(PROVIDED BY THE ATC CONTRACTOR). ALL SETPOINTS SHALL BE
ADJUSTABLE.
2. MOTORIZED DAMPERS SHALL HAVE END SWITCHES TO PROVE DAMPER
OPEN PRIOR TO THE FAN STARTING.
3. TOILET ROOMS, JANITOR ROOMS, LOCKER ROOMS AND SIMILAR
SPACES: EXHAUST FANS SHALL BE STARTED AND STOPPED VIA THE
SAME OCCUPANCY SCHEDULE AS THE ASSOCIATED AIR HANDLING
SYSTEM.
4. COORDINATE OCCUPIED/UNOCCUPIED WITH OWNER.
FAN CONTROL
1. WHILE IN UNOCCUPIED MODE, THE EXHAUST FAN SHALL BE OFF WITH
THE ASSOCIATED EXHAUST AIR DAMPER CLOSED.
2. WHEN STARTED IN OCCUPIED MODE, THE SHALL BE OPEN AND THE
EXHAUST FAN SHALL START.
ALARMS
1. IF THE EXHAUST FAN FAILS, THE DDC CONTROLLER SHALL SEND AN
ALARM SIGNAL TO THE BMS.
2. FAN STATUS: CURRENT SENSORS AND STATIC PRESSURE SENSORS ON
THE FAN SUCTION SHALL ALARM UPON FAN FAILURE. STATIC
PRESSURE SET POINT SHALL BE ADJUSTABLE. FANS WITH VFDS SHALL
USE VFD RUN CONTACTS FOR FAN STATUS.
MD
BMS
CONTROLLER
B1
NTS
EXHAUST FAN - SEQUENCE OF OPERATION
B4
NTS
RADIANT CEILING PANEL - SEQUENCE OF OPERATION
D1
NTS
VAV UNIT W/ REHEAT - SEQUENCE OF OPERATION
D4
NTS
VAV UNIT W/ REHEAT & RADIANT CEILING PANEL - SEQUENCE OF OPERATION
RADIANT PANEL CONTROL SEQUENCE
1. RADIANT PANELS WILL ACT AS A PARALLEL HEAT SOURCE FOR THE SELECT
ROOMS.
RADIANT PANEL (OCCUPIED MODE) CONTROL
1.
2.
3.
4.
UPON THE LOCAL ZONE SWITCH BEING POSITIONED TO AUTO: WHEN THE
VAVBOX DISCHARGE TEMPERATURE IS ABOVE ROOM SETPOINT THE RADIANT
HEAT2-WAY CONTROL VAVLE CV-1 SHALL MODULATE IN PARALLEL WITH TEH BOX
CONTROL VALVE.
UPON THE LOCAL ZONE SWITCH BEING POSITIONED TO ON, 2-WAY CONTROL
VALVE CV-1 SHALL MODULATE FULLY OPEN.
UPON THE LOCAL ZONE SWITCH BEING POSITIONED TO OFF, 2-WAY CONTROL
VALVE CV-2 SHALL MODULATE FULLY CLOSED.
VALVE STATUS SHALL BE DISPLAYED AT THE USER WORKSTATION.
2-WAY MODULATING
CONTROL VALVE
ALARMS
1. IF THE ROOM TEMPERATURE FALLS BELOW 5 DEG F (ADJ) OF SETPOINT FOR
10MINUTES (ADJ) OR LONGER, SEND A DETAILED ALARM TO THE FRONT END.
HWR
CV-1
HWS
RADRAD
LOCAL ZONE CONTROL
SWITCH LOCATED IN
INFUSION BAYS AND
EXAM ROOM
D7
NTS
VAV UNIT COOLING ONLY - SEQUENCE OF OPERATION
Approved: Project Director
Approved: Assoc Project Director
Approved: Chief Engineer
Approved: Safety Manager
Approved: NAL
Approved: PCC/Service Director
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10 JUNE 2022Revisions: Date:
608-317
718 SMYTH RD, MANCHESTER, NH
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
STORM WATER, BELOW GRADE
STORM WATER
SANITARY SEWER, BELOW GRADE
DRAIN
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
SOIL, WASTE, OR SANITARY SEWER
SOFTEN COLD WATER
FILTERED COLD WATER
VENT (SANITARY)
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
CLEAN OUT
HOSE BIB
DRAWING SYMBOLS
PL105
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
PLUMBING VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
PLUMBING ABBREVIATIONS
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
E,EX EXISTING
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT