About this file

This document contains questions and responses related to solicitation 36C77623R0050 for the construction of a new Women's Health Clinic at the Manchester VA Medical Center. The solicitation involves constructing a 4,000 square foot addition and renovating 4,500 square feet of existing space. Key areas addressed include the structural independence of the addition, insulation and emergency power requirements, rainwater collection and HVAC details, temporary electrical power needs, plumbing requirements including water supply and fire protection, and fire suppression room ratings. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files

File Type Posted
085113 Aluminum Windows for amendment 0008.pdf PDF
36C77623R0050 0008.docx DOCX document
36C77623R0050 0007.docx DOCX document
RBM Survey Report Manchester VAMC - Womens Clinic-Final.pdf PDF
36C77623R0050 0006.docx DOCX document
6670-AQ201 EQUIPMENT SCHEDULE-6670-AQ201 EQUIPMENT SCHEDULE.pdf PDF
6670-AS801 DOOR _ WINDOW SCHEDULES mca-DOOR _ WINDOW SCHEDULES.pdf PDF
Specs 01-13 Combined.pdf PDF
36C77623R0050 0005.docx DOCX document
6670-AS301 EXTERIOR ELEVATIONS-EXTERIOR ELEVATIONS.pdf PDF
36C77623R0050 0004_1.docx DOCX document
0004 Attachment 13 - Manchester RFIs 1 of 2 -SMRT.pdf PDF
36C77623R0050 0004.pdf PDF
36C77623R0050 0003.docx DOCX document
36C77623R0050 0002.docx DOCX document
36C77623R0050 0001.docx DOCX document
0001 Attachment 1- Site Visit Sign-in Sheet - Manchester.pdf PDF
0001 Attachment 2 - 608-317 VA WHC-updated pharmacy area-W110 redesign - phase 3 - r3 6-22-23.pdf PDF
S02 ATT 5 608-317 WHC DRAWINGS-Part3.pdf PDF
36C77623R0050_1.docx DOCX document
S02 ATT 3 608-317 WHC DRAWINGS-Part1.pdf PDF
S02 ATT 7 JA - WHC-Redacted.pdf PDF
S02 ATT 10 Contractor Safety-Enviro Form.pdf PDF
S02 ATT 8 Wage Rates Hillsborough Cnty.pdf PDF
S02 ATT 6 SITE VISIT INSTRUCTIONS.pdf PDF
S02 ATT 4 608-317 WHC DRAWINGS-Part2.pdf PDF
S02-ATT 1 Combined ARCH Specs.pdf PDF
S02 ATT 9 - PPQ.pdf PDF
S02 ATT 11 Limitations on SubContracting.pdf PDF
S02-ATT 2 Combined MEP Specs.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

151 Broad St. Middletown CT 06457 O.860.215.8972 F.860.215.8973

Solicitation 36C77623R0050

GENERAL

The construction of a new 8,500sf Women’s Health Clinic that will be attached to the South-West end of the Main Medical Center (Building #1). The construction of the new Women’s Health Clinic includes 4,000sf of existing space to be renovated plus an approx. 4,500 sf 2-story addition consisting of a partial basement.

Will does two building require to be one main building or two separate building?

Will A/E design team require to use the same material previous used on site

What type of insulation will be required to install on the new roof?

How many inches will be used?

Will there be emergency power require on site?

HVAC SYSTEM

Where will rainwater be collected?

How will client require it tied into the existing irrigation system?

Is there any special Details of how heat is recovered will be require in space?

Is there a special types of HVAC equipment will require?

What other kinds of mechanical equipment will be used:

Brian Steele Typewriter The addition is structurally independent of the existing building as shown on the structural drawings.

Brian Steele Typewriter The same fill material? See the geotechnical report.

Brian Steele Typewriter Emergency power should be maintained for existing systems

Brian Steele Typewriter question unclear

Brian Steele Typewriter see Mechanical Drawings

Brian Steele Typewriter question unclear

Brian Steele Typewriter see site and plumbing Drawings

VHAMANBOLDUS

Text Box See Architectural drawing and specs for roof info

VHAMANBOLDUS

Text Box VA Manchester does not have irrigation

VHAMANBOLDUS

Text Box General Comment from VA:

Some of these questions below are out of the ordinary and do not seem pertinent to this specific project.

VHAMANBOLDUS

Cloud

LIGHTING/ELECTRICAL

Will site require temp power provide by the contractor?

What is the incoming power will to be 480V for all large equipment? 277 lights, and 120/208v for branch panel loads?

Is client looking to have temp UPS power on site?

Running time agreed on is 6-8hrs max. Assumes UPS will feed PC, DATA loads only

Will GC require to supply its own temp electrical power for workflow?

Is there a survey of the site and utilities? Will this be provide if we are the winning team?

Will there be any electrical needs outside of the 8500 sq. ft. or outdoor?

see electrical drawings

Brian Steele Typewriter See site drawings

Brian Steele Typewriter All electrical work is provided on the electrical drawings and specs

Brian Steele Typewriter VA to answer

Brian Steele Typewriter VA to answer

Brian Steele Typewriter VA to answer

VHAMANBOLDUS

Text Box 208V Power is available on site. If available power not sufficient contractor shall use portable generator

VHAMANBOLDUS

Text Box No

VHAMANBOLDUS

Text Box see previous response

Will electrical design require energy monitoring of the loads in the building on site and/or remotely? If not, would you like us to?

Is client looking to have roof lightening protection, due to the essential equipment on site?

Does Client looking for any solar or any other types of renewable energy to support normal building?

PLUMBING

How much water client need on site to support new building?

Is there a test the water?

Is there a fuel source- or can one be provided on top of the hill?

What is the plan for water for fire protection/sprinklers?

Does this come from existing system or design team will need to create one?

Has there been a survey of site and utilities completed in front?

Sewer pipe sizes and locations? Are there any restrictions from the utility on the quality of the waste water that can be processed? How the waste water is needs to be pre-treated before leaving the facility?

Is there sufficient space below the warehouse floor to run the new water piping to the rooms or will it need to be run overhead?

What are the usage requirements, continuous or periodic?

What is the daily consumption projected for each room?

FIRE PROTECTION

For fire protection, can client confirm from the water utility whether or not they have had any reports of MIC (microbial induced corrosion) from facilities in the vicinity?

Has there been flow test fire sprinklers?

Does the Client understand the fire suppression room has to Be hour rated?

Brian Steele Typewriter Yes, this is covered on the electrical drawings.

Brian Steele Typewriter this is not in the scope

Brian Steele Typewriter all electrical scope is covered in the electrical drawings and specs

Brian Steele Typewriter question unclear

Brian Steele Typewriter question unclear

Brian Steele Typewriter Fuel for what?

Brian Steele Typewriter Fire protection scope is covered on FP drawings.

Brian Steele Typewriter see site drawings

Brian Steele Typewriter see site and plumbing drawings.

waste water is tying into existing sewer system.

Brian Steele Typewriter warehouse? see plumbing drawings for items below the slabs

Brian Steele Typewriter questions are unclear

Brian Steele Typewriter VA to answer

Brian Steele Typewriter See specifications

Brian Steele Typewriter see drawings for ratings

VHAMANBOLDUS

Text Box VA will not provide fuel

VHAMANBOLDUS

Text Box VA can not confirm