This amendment modifies a solicitation for construction services. The solicitation seeks to renovate a women's health clinic at the Manchester VA Medical Center. The amendment extends the response deadline from July 18th to August 1st at 2:00 PM Eastern time. It also announces a second optional site visit on July 13th at 11:00 AM to view the pharmacy/temporary lab area. The amendment provides answers to questions about the scope of work shown on conceptual design drawings for this area. While these drawings convey the current layout for full demolition and renovation, they lack details needed for accurate bidding. The responses clarify that the drawings are for demolition purposes only and that all new elements shown will be removed.

View the file

Other files

File Type Posted
085113 Aluminum Windows for amendment 0008.pdf PDF
36C77623R0050 0008.docx DOCX document
36C77623R0050 0007.docx DOCX document
RBM Survey Report Manchester VAMC - Womens Clinic-Final.pdf PDF
36C77623R0050 0006.docx DOCX document
6670-AQ201 EQUIPMENT SCHEDULE-6670-AQ201 EQUIPMENT SCHEDULE.pdf PDF
6670-AS801 DOOR _ WINDOW SCHEDULES mca-DOOR _ WINDOW SCHEDULES.pdf PDF
Specs 01-13 Combined.pdf PDF
36C77623R0050 0005.docx DOCX document
6670-AS301 EXTERIOR ELEVATIONS-EXTERIOR ELEVATIONS.pdf PDF
36C77623R0050 0004_1.docx DOCX document
0004 Attachment 13 - Manchester RFIs 1 of 2 -SMRT.pdf PDF
0004 Attachment 14 - Manchester RFIS - 2 of 2 - SMRt reponses.pdf PDF
36C77623R0050 0004.pdf PDF
36C77623R0050 0002.docx DOCX document
36C77623R0050 0001.docx DOCX document
0001 Attachment 1- Site Visit Sign-in Sheet - Manchester.pdf PDF
0001 Attachment 2 - 608-317 VA WHC-updated pharmacy area-W110 redesign - phase 3 - r3 6-22-23.pdf PDF
S02 ATT 5 608-317 WHC DRAWINGS-Part3.pdf PDF
36C77623R0050_1.docx DOCX document
S02 ATT 3 608-317 WHC DRAWINGS-Part1.pdf PDF
S02 ATT 7 JA - WHC-Redacted.pdf PDF
S02 ATT 10 Contractor Safety-Enviro Form.pdf PDF
S02 ATT 8 Wage Rates Hillsborough Cnty.pdf PDF
S02 ATT 6 SITE VISIT INSTRUCTIONS.pdf PDF
S02 ATT 4 608-317 WHC DRAWINGS-Part2.pdf PDF
S02-ATT 1 Combined ARCH Specs.pdf PDF
S02 ATT 9 - PPQ.pdf PDF
S02 ATT 11 Limitations on SubContracting.pdf PDF
S02-ATT 2 Combined MEP Specs.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 608-317 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 36C776 Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 To all Offerors/Bidders

36C77623R0050 06-14-2023

X x x August 1, 2023 at 2:00 PM ET See continuation page for details of amendment 0003 to solicitation 36C77623R0050.

William Henkel Contracting Officer

CONTINUATION PAGE

The purpose of amendment 0003 to RFP 36C77623R0050 is the following:

To Extend the suspense date for proposals to 36C77623R0050 from July 18, 2023 at 2:00 PM Eastern to August 1, 2023 at 2:00 Eastern time.

To provide information regarding a second site visit taking place: Thursday July 13th at 11am. Meet outside at Mountain Entrance Canopy

Provide an update on unanswered RFIs. An additional amendment will be posted with remaining RFI’s to be answered by the designer of record.

To provide the below answers to below questions

Please reference the 11x17 “Pharmacy”/Temp Lab sketches (12 pages) provided in Amendment 0001. These drawings are conceptual sketches, provided by the Facilities Department, and are not biddable in their present form, due to missing information, details, spec references, interior elevations, etc., that are needed in a hard-bid environment. These documents were created inhouse as a temp fit up of vacant space. They have been provided as a means of conveying updated layout information for demolition/ full gut renovation to this space. All new items shown in these addendum drawings compared to original drawings shall be considered for demolition.

0. Explanation for the intent of phasing/timing for the scope shown on the updated pharmacy W110 area, and coordination with the new construction shown on the bid documents. (or possibly coordination with another construction project by others, in another area of the building). Area was shown as current space layout suited for full demolition. Phasing does not change from original drawings and specifications. Drawings reflect current layout of space for full gut renovation/demolition purposes. For W110 all walls, doors, windows, flooring shall be demolished consistent with the remainder of the area per original drawings.

0. Missing interior elevations and details showing architectural interface of relocated, new and existing construction. Not needed for full gut renovation/demolition

0. Missing door and hardware spec. Not needed for full gut renovation/demolition

0. The sketches presumably show new counters (since not shown on the demo drawings), base cabinets, supports, counter type not indicated. Drawings provided showing current layout for full gut renovation/demolition. All counters, base cabinets, supports etc. are slated for demolition

0. Missing specs for plumbing fixtures. Not needed for full gut renovation/demolition

0. Missing sewer/drain diameters for new and diameters of existing. Not needed for full gut renovation/demolition. See original drawings

0. Missing domestic water line sizes and routing. Not needed for full gut renovation/demolition. See original drawings

0. Etc.

0. This is a partial list to convey that critical information is missing for subcontractors to accurately bid the scope shown on these sketches. These documents were created inhouse as a temp fit up of vacant space. They have been provided as a means of conveying updated current layout of space slated for demolition/ full gut renovation. All new items shown in these addendum drawings compared to original drawings shall be considered for demolition

0. Please provide a complete set of bid drawings and specs for the work in this area, fully designed by the Architect of Record (with a PE stamp). These documents were created inhouse as a temp fit up of vacant space. They have been provided as a means of conveying updated current layout for demolition/ full gut renovation to this space.

0. We would suggest another option would be for the VAMC to establish a place holder allowance for the scope shown on these sketches, for all bidding CM/GC’s to include in their bids, which would provide a level pricing environment for all bidders and also allow more time for fully designed drawings and specs to be prepared. These documents were created inhouse as a temp fit up of vacant space. They have been provided as a means of conveying updated current layout for demolition/ full gut renovation to this space.

1. We are also requesting a second site walk to re-examine this temp lab area, since the scope on these sketches were not part of the project at the time of the first site walk. The Lab area toured during the first walk through reflected the layout of the sketches provided and conveyed onsite as full gut renovation.

1. We would like to respectfully reiterate our request for a 2-week extension to the bid date to allow for a second site visit and to facilitate better subcontractor participation. Due to the July 4th Holiday weeks, subcontractor participation is very limited. We believe an extension to the bid date will provide for much better subcontractor coverage and provide for more competitive pricing.

2nd walkthrough will be conducted Thursday July 13th at 11am. Meet outside at Mountain Entrance Canopy

End of Document Amendment 0003 to 36C77623R0050