S02 Atch B Drawings - 31 pages.pdf
PDF 22 MB Posted
- Solicitation number
- 36C26326B0007
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6M
7M
1W
T
H S
T R
E E
T
T H
S T
R E
E T
DOUGLAS AVE
LOWERBEAVER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CD SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
DESIGNER OF RECORD
BUILDING LOCATION:
C U s e rs
\j tu c h te n h a g e n \D o c u m e n ts
\1
-A
-R jt u c h te n h a g e n a e -m n .c o m
.r v t
/1
/2
:2
:4
A
M
GI000
COVER SHEET REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
4/24/2025 CM PC
REPLACE BOILER PLANT BRINE TANK
3600 30TH ST, DES MOINES, IA 50310
636A6-22-104
17987
VA COR:
CONTACT:
ADDRESS:
PHONE:
TODD HAGEN
VA CENTRAL IOWA HEALTH CARE SYSTEM
3600 30TH STREET
DES MOINES, IA 50310
515-699-5999 X25740
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
CHRISTINA MCDANIEL
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT: ADAM ADAMS
PHONE:
FIRE ENGINEER:
NAME:
ADDRESS:
CONTACT:
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
ERIC REED
PHONE: 913-829-8650
PROJECT SITE
A/E PROJECT MANAGER, MECH/PLUMB ENGINEER:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
KEITH HOMSTAD
PHONE:
ELEC ENGINEER:
NAME:
ADDRESS:
CONTACT: WILLIAM HAAS
PHONE:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
763-412-4000
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
763-412-4000
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
763-412-4000
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE
GI000 COVER SHEET
GI002 ABBREVIATIONS
GC101 BASEMENT LEVEL INFECTION CONTROL PLAN
GC111 BASEMENT AND FIRST LEVEL PHASING PLAN
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE
AS101 ARCHITECTURAL SITE AND LOGISTICS PLAN
AE101 BASEMENT LEVEL CODE SUMMARY AND FLOOR PLAN - OVERALL
AE102 BASEMENT LEVEL - ENLARGED FLOOR AND DEMO PLAN
AE111 FIRST LEVEL - FLOOR PLAN AND PARTIAL DEMO PLAN
BUILDING 11
SHEET INDEX - SURVEY
SHEET NO. SHEET TITLE
CS101 EXISTING CONDITIONS
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE
S001 NOTE SHEET
S101 FOOTING & FOUNDATION PLAN
S201 FIRST FLOOR FRAMING PLAN
S301 FOUNDATION & FRAMING DETAILS
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE
P001 PLUMBING SYMBOLS, ABBREVIATIONS, GENERAL NOTES
PD101 PARTIAL BASEMENT LEVEL - PLUMBING DEMOLITION (PHASE 2)
PL101 TEMPORARY BRINE TANK LOCATION PLAN (PHASE 1)
PL102 PARTIAL BASEMENT LEVEL - TEMPORARY BRINE TANK PIPING (PHASE 1)
PL103 PARTIAL BASEMENT LEVEL - PLUMBING PLAN (PHASES 4 & 5)
P501 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
P701 TEMPORARY FLOW DIAGRAM
P702 TEMPORARY FLOW DIAGRAM DEMO
P703 FINAL FLOW DIAGRAM
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS, GENERAL NOTES
ED101 BASEMENT LEVEL ELECTRICAL DEMOLITION - PHASE 2
EL101 BASEMENT LEVEL LIGHTING PLAN - PHASE 4
EP101 TEMP BRINE TANK POWER PLAN - PHASE 1
EP102 POWER PLAN - PHASES 4 & 5
E601 ELECTRICAL DETAILS AND SCHEDULES
SHEET INDEX - FIRE PROTECTION
SHEET NO. SHEET TITLE
FX101 FIRE SUPPRESSION FLOOR PLAN
SHEET INDEX - HAZARDOUS MATERIALS
SHEET NO. SHEET TITLE
HA101 BASEMENT LEVEL - HAZARDOUS MATERIALS PLAN - LEAD PAINT REMOVAL
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I
AM A DULY LICENSED ARCHITECT UNDER THE LAWS OF THE
STATE OF IOWA.
DATESIGNATURE
4/24/2025
PAGES OR SHEETS COVERED BY THIS SEAL:
PRINTED OR TYPED NAME:
LICENSE NUMBER:
MY LICENSE RENEWAL DATE IS:
Thomas Olesak
ARC07582
06/30/2025
SHEETS GI000, GI002, GC101, GC111, AS101, AE101, AE102, AND
AE111
Revisions: Date:
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CD SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\j tu c h te n h a g e n \D o c u m e n ts
\1
-A
-R jt u c h te n h a g e n a e -m n .c o m
.r v t
/1
/2
:4
:5
P
M
GI002
ABBREVIATIONS REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
4/24/2025 CM PC
17987
UP
EXISTING
BOILER
PLANT
SHOP
003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
EXISTING
CHILLER
ROOM
006A
EXISTING
EMERGENCY
GENERATOR
EXISTING
CONDENSATE
COLLECTION
EXISTING
TANK ROOM
EXISTING
LOCKER
ROOM
021A
EXISTING
TOILET
020A
EXISTING
CONTROL
ROOM
EXISTING
BOILER
ROOM
LIMITS OF CONSTRUCTION
BRINE TANK BRINE TANK
TB3b
TB3b
TB3b
TB3b
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 1: LOW RISK
CONTROL PROCEDURE CLASS - III
INFECTION CONTROL RISK ASSESSMENT (ICRA)
BY PROJECT AREA USE AND PHASE
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT
NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL
INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET,
PAINTING BUT NOT SANDING WALL COVERING, ELECTRICAL
TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO
NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE
MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION
OF TELEPHONE AND COMPUTER CABLING, ACCESS TO CHASE
SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION
CAN BE CONTROLLED. FLOOR COVERING REMOVAL (WITHOUT
SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST
OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT
IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE
COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION
ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN
THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING
HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
INFECTION CONTROL & CONSTRUCTION
BARRIER GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS
AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE
OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR
EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR
TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,
OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC
BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. INFECTION CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
EXISTING STRUCTURE ABOVE
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH SIDE.
FINISH OCCUPIED SIDE WITH GLOSS
PAINT. SEE SPECIFICATIONS.
3 5/8" STEEL STUDS @ 16" OC WITH SOUND
ATTENUATING INSULATION FULL HEIGHT
CLOSE OPEN DUCTS WITH 6 MIL
POLYETHYLENE BARRIER. SEAL EDGES WITH
CONTINUOUS DUCT TAPE
CONSTRUCTION SIDE OF BARRIER OCCUPIED SIDE
OF BARRIER
COMPRESSIBLE INSULATION
REMOVE PORTION OF CEILING OR
ENTIRE CEILING AS REQUIRED ON
CONSTRUCTION SIDE OF BARRIER
TO INSTALL CONSTRUCTION /ICRA
BARRIER.
REMOVE PORTION OF CEILING AS
REQUIRED TO INSTALL
CONSTRUCTION/ICRA BARRIER.
MODIFY CEILING AT BARRIER ON
OCCUPIED SIDE
6 MIL POLY OVER
CEILING PENETRATION
NOTES:
1. ALL CORNERS TO FORM 90 ANGLE WITH NO RADIUS
2. SEAL ALL SIDES OF POLY WITH DUCT TAPE
3. SEAL ALL CRACKS WITH DUCT TAPE.
6 MIL POLY OVER
EQUIPMENT OR
FURNISHING
6 MIL POLY OVER
WALL PROTRUSION
FLOOR
DOOR
BEYOND
WINDOW
BEYOND
CEILING
6 MIL POLY OVER
WALL OPENINGS
6 MIL POLY OVER
DOORS & WINDOWS
CEILING
1 HOUR FIRE RATED ICRA / CONSTRUCTION BARRIER LOCATION, AND
DOOR, WHERE SHOWN
INFECTION CONTROL RISK ASSESSMENT (ICRA) LEGEND
LIMITS OF CONSTRUCTION
TEMPORARY NON-RATED (PLASTIC SHEETING) CONSTRUCTION BARRIER
LOCATION, WHERE APPROVED BY THE VA FOR USE IN RISK TYPE B.
UPGRADE TO 1 HOUR RATED PARTITION WHEN DIRECTED BY THE VA
DOOR
TB3b
(1 ) LAYER 5/8" TYPE "X"
GYPSUM BOARD EACH SIDE
3 5/8" METAL STUD
FRAMING, SPACED MAX
16" OC
3" SOUND ATTENUATING
INSULATION
UP TO 1 HR FIRE RATING
UL DESIGN U419
STC 49
4 7/8"
NOTE: AT THE VA'S DISCRETION, PREFABRICATED ONE-HOUR FIRE
RATED NEGATIVE AIR MONITORING PANELS MAY BE PERMITTED IN
LIEU OF PARTITION TYPE 'TB3b'. REFER TO SPECIFICATION 01 35 26
SAFETY REQUIREMENTS FOR MORE INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CD SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY MAP
1W
C U s e rs
\j tu c h te n h a g e n \D o c u m e n ts
\1
-A
-R jt u c h te n h a g e n a e -m n .c o m
.r v t
/1
/2
:4
:5
P
M
GC101
BASEMENT LEVEL INFECTION
CONTROL PLAN
REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
4/24/2025 CM PC
17987
1/8" = 1'-0"
BASEMENT LEVEL ICRA, CONSTRUCTION BARRIER & PHASING PLAN
0 8' 16'4'
1/2" = 1'-0"
CONSTRUCTION /ICRA BARRIER (TYP)
12" = 1'-0"
CRITICAL BARRIER PREP
NOT TO SCALE
LEGEND - TEMORARY PARTITION - ICRA
PIT
PIT
PIT
CONSTRUCTION PHASING GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE CAN
INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00 1.6.G
PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING WITH
ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE A WRITTEN
NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE PLANS, VALIDATING AND
ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO WORK MAY
BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR DELAYING WORK UNDER
THIS CONTRACT, OR OTHER CONTRACTS ON THE PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL FOR ALL
PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION PHASING
DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH THE VA
INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND THE CONTRACTOR
PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON COMPLETION OF A PARTICULAR
PHASE, THE ENTIRE AREA COVERED BY THAT PHASE CAN BE OCCUPIED BY THE VA
PERSONNEL WITH ALL SYSTEMS FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL CONTRACTOR
SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL THE
COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED AREAS IN
SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL
OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND ELECTRICAL SYSTEMS
SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S)
AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS FOR
ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF
EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN PHASES TO
ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND VACATE THE FOLLOW-ON
PHASES. THE VA WILL ACCELERATE THIS TIME WHEN POSSIBLE AND WILL NOTIFY THE
CONTRACTOR IF THIS OCCURS.
14. COORDINATE WITH VA REPRESENTATIVE ON ALL CONSTRUCTION FENCING.
15. CONSTRUCTION FENCE SECURITY KEYS TO BE GIVEN TO COR.
16. COORDINATE HAZARDOUS MATERIAL ABATEMENT WITH THE PHASING OF THE PROJECT.
BEAM
BELOW
CL
BEAM
BELOW
CL
BEAM
BELOW
CL
BEAM
BELOW
CL
WALL
BELOW
CL
PHASE 1
PHASE 2
PHASING AREAS
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
EXISTING
BOILER
PLANT
SHOP
003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
TB3b
PHASE 3
002B
BRINE TANK
002C
BRINE TANK
003A
EXISTING
NATURAL
GAS
EXISTING
BOILER
PLANT
SHOP
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
PHASE 2
PHASE 4
EXISTING
BOILER
PLANT
SHOP
003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
BRINE TANK BRINE TANK
PHASE 4
003A
NATURAL GAS
EXISTING
PUMP ROOM
EXISTING
PLANT SHOP
EXISTING BOILER
002B
BRINE TANK
002C
BRINE TANK
PHASE 1
PHASING
PHASE 1
INSTALL A TEMPORARY BRINE TANK (ST-3), AND CONTROLLERS ON THE EXTERIOR OF THE BUILDING
(LOCATION TO BE PLAN NORTH/WEST CORNER OF BOILER HOUSE, LEAVING ENOUGH ROOM TO
PLUG THE VA CAMPUS SHUTTLE IN. DEMO CONCRETE UNDER THE LOADING DOCK DOOR, CORE
HOLES INTO THE BASEMENT AND TAP AND TIE THE NEW SYSTEM INTO EXISTING, RUN HARD WATER AND ELECTRICAL TO THE TEMPORARY TANK, INSULATE AND INSTALL HEAT TAPE ON ALL EXTERIOR PIPING COMPONENTS, EXTENDING 10FT INTO THE BUILDING. RUN BRINE LINE BACK TO EXISTING
SYSTEM. VERIFY OPERATION OF CONTROLS AND THE TEMPORARY TANK’S ABILITY TO SUPPLY
BRINE TO THE EXISTING (E) DAY BRINE TANK. THIS WORK WILL INCLUDE INSTALLATION OF
TEMPORARY ELECTRICAL, FOR CONTROLLER AND HEAT TRACE, THE BRINE WILL BE GRAVITY FED
INTO THE DAY TANK AND LEVEL CONTROLLED.
PHASE 2
ONCE THE TEMPORARY BRINE (ST-3) TANK HAS BEEN PLACED INTO OPERATION THE STRUCTURAL DEMOLITION CAN BEGIN BY INSTALLING SHORING AND BRACING ALL REQUIRED LOCATIONS PRIOR
TO DEMO OF EXISTING CONCRETE SLAB LOCATED ABOVE THE BRINE TANKS. ERECT TEMPORARY
WALLS TO CONTROL ACCESS AND DUST. DEMOLISH SELECT WALLS AND CEILING/PARKING LOT AS
REQUIRED FOR REPLACEMENT DUE TO STRUCTURAL CONCERNS OR FOR INSTALLATION OF NEW
BRINE STORAGE TANKS (ST-1, ST-2). DEMOLISH AND REMOVE (2) EXISTING BRINE TANKS (EXISTING SALT BASIN), PUMPS AND ANCILLARY EQUIPMENT. THE DAY TANK ((E) DAY BRINE TANK) AND CONTROLS WILL REMAIN IN PLACE, SUPPLYING BRINE TO THE RESIN BEAD SET UNTIL PHASE 5 OF
CONSTRUCTION. DEMO AND REMOVE ALL UN-USED NATURAL GAS PIPE, SPIRE AND GUARDRAIL
SURROUNDING SPIRE.
PHASE 3
INSPECT AND CORRECT ANY STRUCTURAL CONCRETE THAT HAS BEEN COMPROMISED BY OXIDE
JACKING. PREPARE AREA FOR NEW EQUIPMENT AND TANKS (ST-1, ST-2) BY INSTALLING
HOUSEKEEPING PAD. INSTALL HIGH PERFORMANCE COATINGS TO THE FLOOR, WALL AND
CEILING/ROOF WITHIN THE BRINE TANK ENCLOSURE AND ANY OTHER AREAS AS REQUIRED PER
ARCH DRAWINGS. INSPECT AND REPLACE ALL FIRE SPRINKLER HEADS AND ANY FIRE PROTECTION PIPING THAT HAS BEEN DAMAGED BY CORROSION PER FIRE PROTECTION ENGINEER’S DRAWINGS.
PHASE 4
INSTALL TWO NEW POLY BRINE TANKS (ST-1, ST-2), INSTALL TWO REDUNDANT BRINE PUMPS (BP-1, BP-2), INSTALL PUMP CONTROLLER(S), ANCILLARY FILL EQUIPMENT AND TIE SYSTEM INTO EXISTING
DAY TANK. ONCE THE SYSTEM HAS BEEN SHOWN TO OPERATE CORRECTLY AND SUPPLY THE
EXISTING DAY TANK AS DESIGNED. BOTH RESIN BEAD SETS WILL BE REGENERATED, AND THE
EXISTING DAY TANK WILL BE REPLACED WITH A NEW DAY TANK (DT-1). ONCE EQUIPMENT IS IN AND
OPERATING REPLACE STRUCTURAL WALLS AND CEILING PER ARCH AND STRUCTURAL DRAWINGS.
PHASE 5
INSTALL VOLUMETRIC FLOW METER(S) AND CONTROLLER ON RESIN BEAD SYSTEM ALONG WITH (2) NEW CONTROL VALVES. THIS WILL CONTROL THE DURATION AND REGEN CYCLES FOR THE RESIN BEAD SYSTEMS. THE BRINE SYSTEM WILL OPERATE INDEPENDENTLY OF THE RESIN BEAD SET AND ONLY CONTROL BASED ON THE LEVEL IN THE DAY TANK. ONCE THE SYSTEM IS OPERATING AND
SUPPLYING BRINE AS DEMAND REQUIRES. DEMO TEMPORARY BRINE TANK (ST-3), DEMO
TEMPORARY CONTROLLERS ON THE EXTERIOR OF THE BUILDING. REPAIR CORE HOLES INTO THE BASEMENT AND DEMO HARD WATER PIPE AND BRINE PIPE BACK TO EXISTING SYSTEM TIE POINTS, DEMO INSULATION AND HEAT TAPE ON PIPING COMPONENTS. BACKFILL AND REPLACE CONCRETE
UNDER THE LOADING DOCK DOOR.
PHASE 6
COMMISSION NEW BRINE SYSTEM AND ENSURE RESIN BEAD SYSTEM IS RECEIVING APPROPRIATE
FLOW AND SALINITY AND PROVIDE REPORT TO THE VA. REMOVE ALL TEMPORARY SHORING AND
DUST CAPTURE WALLS, DEMOBILIZE AND REMOVE ALL EQUIPMENT, TOOLS AND GARBAGE FROM
SITE. COMPLETE PUNCH LIST AND RETURN THE SITE AND SYSTEM TO THE VA.
EXISTING
BOILER
PLANT
SHOP
003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
BRINE TANK BRINE TANK
PHASE 6
EXISTING
BOILER
PLANT
SHOP
003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
STEAM
TUNNEL
BRINE TANK BRINE TANK
PHASE 5
PHASE 4
PHASE 5
PHASE 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% CD SUBMISSION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEY MAP
1W
C U s e rs
\j tu c h te n h a g e n \D o c u m e n ts
\1
-A
-R jt u c h te n h a g e n a e -m n .c o m
.r v t
/1
/2
:5
:0
P
M
GC111
BASEMENT AND FIRST LEVEL PHASING
PLAN
REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
4/24/2025 CM JT
17987
1/8" = 1'-0"
FIRST LEVEL PHASING PLAN - PHASE 1 AND PHASE 2
0 8' 16'4'
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 3
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 2
1/8" = 1'-0"
FIRST LEVEL PHASING PLAN - PHASE 4
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 4
0 8' 16'4'
0 8' 16'4'0 8' 16'4'
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 1
0 8' 16'4'
0 8' 16'4'
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 6
1/8" = 1'-0"
BASEMENT LEVEL PHASING PLAN - PHASE 5
1/8" = 1'-0"
FIRST LEVEL PHASING PLAN - PHASE 5
0 8' 16'4'
0 8' 16'4'0 8' 16'4'
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL, PLUMBING AND
OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS CONTRACT.
INSPECT THESE AREAS TO ASCERTAIN WORK REQUIRED AND PERFORM THE WORK
IN ACCORDANCE OF CONTRACT REQUIREMENTS.
2. PROVIDE FIREPROOFING TO THE RATING REQUIRED AS INDICATED IN THE PLANS
AND/OR AS NOTED IN THE CODE SUMMARY AND PER NFPA ON STRUCTURAL STEEL
ELEMENTS.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. PATCH OPENINGS CUT THOUGH RATED CONSTRUCTION WITH MATERIALS
COMPATIBLE WITH EXISTING ASSEMBLY TO RESTORE INTEGRITY OF THE RATING.
RESTORE FINISHES OF DISTURBED AREAS TO LIKE NEW CONDITION.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. AT LOCATIONS WHERE EXISTING FIRESTOPPING IS REQUIRED TO BE ALTERED,
REMOVE EXISTING FIRESTOPPING SYSTEM IN ITS ENTIRETY AND REPLACE FIRE
STOPPING SYSTEM WITH NEW FIRESTOPPING MATERIALS THAT MEET THE RATING
REQUIREMENTS OF THE PENETRATION.
7. DIMENSIONS OF EQUIPMENT ARE THOSE OF THE BASIS-OF-DESIGN EQUIPMENT.
VERIFY DIMENSIONS OF ACTUAL EQUIPMENT BEING PROVIDED TO COORDINATE
SPACE REQUIREMENTS.
8. VERIFY DIMENSIONS OF MECHANICAL OR ELECTRICAL EQUIPMENT PRIOR TO
FABRICATING SUPPORTS FOR THE EQUIPMENT.
9. PATCH AREAS DISTURBED OR MODIFIED BY THIS WORK WITH MATERIALS TO MATCH
EXISTING ADJACENT SURFACES OR SCHEDULED FINISHES AND TO A LIKE NEW
CONDITION.
10. PROVIDE ACCESS PANELS WHERE INDICATED ON DRAWINGS AND WHERE
DESCRIBED IN SPECIFICATIONS SECTION 08 31 13. COORDINATE LOCATIONS AND
SIZES REQUIRED (24" X 24" MINIMUM) WITH MECHANICAL, PLUMBING, ELECTRICAL
AND TECHNOLOGY SUBCONTRACTORS.
11. ABBREVIATIONS AND SYMBOLS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL,
AND ELECTRICAL MAY VARY BY DISCIPLINE. SEE RESPECTIVE DISCIPLINE SECTIONS
AND/OR DRAWINGS FOR DEFINITIONS.
12. PROVIDE 3/4" FIRE RETARDANT TREATED (FRT) PLYWOOD SURFACE FOR SURFACE
MOUNTED MECHANICAL AND ELECTRICAL FIXTURES AND EQUIPMENT, UNLESS
NOTED OTHERWISE. DO NOT PAINT OVER FRT LABEL.
13. EVALUATE INTEGRITY OF EXISTING LIFE SAFETY RATED PARTITION ASSEMBLIES
INDICATED BY SYMBOLS ON THE PLAN(S) OR IN THE CODE SUMMARY WITHIN THE
PROJECT SCOPE INCLUDING PENETRATIONS THOUGH ASSEMBLY AND BASE AND
HEAD OF ASSEMBLY. WHERE GAPS OR DEFICIENCIES ARE FOUND, RESTORE
INTEGRITY OF EXISTING ASSEMBLIES WITH MATERIAL NECESSARY TO MEET
REQUIRED RATING OF THE ASSEMBLIES.
15. DEFINITIONS OF COMMON TERMS.
• FURNISH: TO SUPPLY AND DELIVER TO THE SITE, READY FOR INSTALLATION
• INSTALL: TO PLACE INTO POSITION SERVICE OR USE
• PROVIDE: TO FURNISH AND INSTALL
APPLICABLE REGULATIONS
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2022 FGI GUIDELINES
2024 NFPA 101 LIFE SAFETY CODE (LSC)
ABA STANDARDS (2015) (ABAAS)
2021 IBC
PROJECT DESCRIPTION
CODE SUMMARY
THIS RENOVATION PROJECT REPLACES (2) TWO EXISTING BRINE
GENERATION TANKS AND ASSOCIATED PLUMBING IN BUILDING 11;
REMOVES, REPAIRS AND REPLACES PORTIONS OF SELECT WALLS
AND CEILING/ROOF STRUCTURE, AND OTHER SYSTEMS IMPACTED
BY THE REPLACMENT OF THE EXISTING LEAKING BRINE TANKS.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
TESTRATING (HRS)
EXISTING/UNCHANGED
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
ACTUAL AREA PER FLOOR
CONSTRUCTION TYPE(S)
SEE OVERALL FLOOR PLAN
SEE OVERALL FLOOR PLAN
OCCUPANT LOAD OF BUILDING
ACTUAL AREAUSER DEFINED, ASSUMED LESS THAN 20 OCCUPANTS
2 ASTM E119
0 N/A
0 N/A
(NFPA 220 TABLE 4.1.1)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
OCCUPANT LOAD AND MEANS OF EGRESS REMAIN UNCHANGED
WITH THIS PROJECT'S SCOPE OF WORK
EGRESS
NO
(LSC SECTION 8.3)
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE PLANS
OCCUPANCY CLASSIFICATION(S)
EXISTING OCCUPANCY (UNCHANGED) :
INDUSTRIAL OCCUPANCY -
SPECIAL-PURPOSE INDUSTRIAL OCCUPANY
(LSC TABLE 6.1.14.4.1)
(LSC CH 40.1.2.1.2)
MISCELLANEOUS INTERIOR FINISHES CLASSIFICATION
I OR II
A-C (IN ACCORD W/ FLAMESPREAD)WALL/CEILING
VA PHYSICAL SECURITY AND RESILIENCE DESIGN MANUAL (PSRDM)
II (222)
EXISTING/UNCHANGED
BASEMENT
FIRST LEVEL
2 ASTM E119
2 ASTM E119
2 ASTM E119
2 ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
ASTM E119
(NFPA 220 TABLE 4.1.1)
FLOORS
LIFE SAFETY SYMBOLS
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
1 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EDEXIT EXIT EXIT DISCHARGE
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPARATION
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
101A
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATION
WALL TAG
OFFICE
ROOM NAME AND
NUMBER
AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01 REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
DESIGN DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
DESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
KEY MAP
1W
C U s e rs
\j tu c h te n h a g e n \D o c u m e n ts
\1
-A
-R jt u c h te n h a g e n a e -m n .c o m
.r v t
/9 /2
:0
:5
A
M
AE101
BASEMENT LEVEL CODE SUMMARY
AND FLOOR PLAN - OVERALL
REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
12/10/2024 CM PC
17987
0 8' 16'4' 1/8" = 1'-0"
BASEMENT LEVEL FLOOR PLAN - OVERALL
Revisions: Date:
UP
W P
/G F
I J
G F
I
J 003A
EXISTING
NATURAL
GAS
EXISTING
PUMP
ROOM
EXISTING
CHILLER
ROOM
EXISTING
CONDENSATE
COLLECTION
006A
EXISTING
EMERGENCY
GENERATOR
EXISTING
TANK ROOM
E X
IS
T
IN
G
S T
E A
M T
U N
N E
L
021A
EXISTING
TOILET
EXISTING
LOCKER
ROOM
EXISTING
BOILER
ROOM
020A
EXISTING
CONTROL
ROOM
FLOOR PLAN
DEMO
EXIT
E X
IT
R A
M P
FE
E X
IT
EXIT
EXIT
FE
FE
TIE-IN LOCATION AT TWO EXISTING
ELECTRICAL PANELS FOR NEW
CIRCUITS TO THE TEMPORARY
BRINE TANK PUMP LOCATION AND
THE NEW REDUNDANT BRINE TANK
PUMP AND CONTROLS
- SEE DESIGN NARRATIVE FOR
FURTHER DETAIL
AE102
AE102
EXISTING
BOILER
PLANT
SHOP
LIMITS OF CONSTRUCTION
BRINE TANK BRINE TANK
HA101
02/19/2025 MM
BASEMENT LEVEL - HAZARDOUS
MATERIALS PLAN - LEAD PAINT
REMOVAL
ABATEMENT GENERAL NOTES
1. All abatement work shall be conducted according to the specification and all federal, state, and local regulations.
2. Abatement shall be conducted during normal business hours, excluding federal holidays.
3. Work schedules and abatement limits shall be coordinated with, and approved by the COR and VPIH.
4. The abatement contractor shall submit a detailed abatement plan and abatement schedule with the required submittals.
Any changes to the abatement plan or schedule shall be submitted to the COR and VPIH for approval prior to any work.
6. The locations and quantities of all lead abatement shall be field verified by the abatement contractor and the general contractor prior to the start of the project. The limits of removal and extent of the containments shall be verified with the COR and VPIH.
7. All loadout procedures shall be coordinated with the COR and VPIH.
8. A decontamination room in accordance with the specification for this project, and applicable local, state and federal regulations shall be used for this project. The location of the decontamination room shall be approved by the COR and VPIH at the start of the project.
9. 3rd party monitoring reports shall be submitted to the COR and VPIH.
HAZARDOUS PLAN NOTES
1.Refer to specification 028333-13 for lead paint removal and abatement requirements and procedures.
2.Refer to the asbestos inspection report dated 9/6/2024 and the lead inspection report dated 9/6/2024 for current asbestos and lead findings.
ABATEMENT KEYNOTES
Construct a lockable, impermeable enclosure around the decontamination room. Provide temporary heat and water as required.
Remove lead based paint according to the specification and local, state and federal regulations.
L1
L2
L2
L2
L2
L2
L1
SA
100% CD SUBMISSION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
95% CD SUBMISSION
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
NOT FOR CONSTRUCTION
C :\U se rs
\p ch oi \D oc um en ts
\1
-A
-R
_Y eu ny ou ng .rv t 9/
/2
1:
:1
PM
CS101
EXISTING CONDITIONS REPLACE BOILER PLANT
BRINE TANK
DES MOINES, IA
636A6-22-104
2/19/25 NH JL
17987
100% CD SUBMISSION
PHASE 1:
• DEMO CONCRETE UNDER THE LOADING DOCK DOOR, CORE HOLES INTO THE BASEMENT AND PROVIDE
LINTELS.
PHASE 2:
• STRUCTURAL DEMOLITION CAN BEGIN BY INSTALLING SHORING AND BRACING ALL REQUIRED LOCATIONS
PRIOR TO DEMO OF EXISTING CONCRETE SLAB LOCATED ABOVE THE BRINE TANKS.
• DEMOLISH SELECT WALLS AND CEILING/PARKING LOT AS REQUIRED FOR REPLACEMENT DUE TO
STRUCTURAL CONCERNS OR FOR INSTALLATION OF NEW BRINE STORAGE TANKS.
PHASE 3:
• INSPECT AND CORRECT ANY STRUCTURAL CONCRETE THAT HAS BEEN COMPROMISED BY OXIDE JACKING.
• PREPARE AREA FOR NEW EQUIPMENT AND TANKS (ST-1, ST-2) BY INSTALLING HOUSEKEEPING PAD.
• INSTALL HIGH PERFORMANCE COATINGS TO THE FLOOR, WALL AND CEILING/ROOF WITHIN THE BRINE TANK
ENCLOSURE AND ANY OTHER AREAS AS REQUIRED PER ARCH DRAWINGS.
PHASE 4:
• ONCE EQUIPMENT IS IN AND OPERATING REPLACE STRUCTURAL WALLS AND CEILING PER ARCHITECTURE
AND STRUCTURAL DRAWINGS.
PHASE 5:
• RETURN TEMPORARY BRINE TANK TO STEP SAVER INC. DEMOLISH TEMPORARY COLD HARD WATER AND
BRINE WATER PIPING, ALL ASSOCIATED ACCESSORIES AND CONTROLLERS TO TEMPORARY BRINE TANK, ST-3. REPAIR CORE HOLES IN THE BASEMENT WALL. BACKFILL AND REPLACE CONCRETE UNDER THE
LOADING DOCK DOOR.
PHASE 6:
• REMOVE ALL TEMPORARY SHORING AND DUST CAPTURE WALLS, DEMOBILIZE AND REMOVE ALL
EQUIPMENT, TOOLS AND GARBAGE FROM SITE.
• COMPLETE PUNCH LIST AND RETURN THE SITE AND SYSTEM TO THE VA.
PHASING GENERAL NOTES
REFER TO SHEET GC111 FOR MORE INFORMATION
GENERAL CONSTRUCTION NOTES:
1. ALL WORK SHALL COMPLY WITH THE 2021 INTERNATIONAL BUILDING CODE, AS
APPROVED BY THE STATE OF IOWA / CITY OF DES MOINES.
2. REFERENCE STANDARDS: UNLESS OTHERWISE NOTED (U.O.N.), ALL
STANDARDS SHALL BE CURRENT EDITION, WITH LATEST ADDENDA, IF
APPLICABLE.
3. THE CONTRACTOR SHALL VERIFY ALL CONTRACT DOCUMENTS, SITE
ELEVATIONS, DIMENSIONS AND CONDITIONS PRIOR TO STARTING WORK AND
SHALL NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES OR
INCONSISTENCIES.
4. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES.
5. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT
THE FINISHED STRUCTURE. UNLESS OTHERWISE INDICATED, THEY DO NOT
INDICATE THE MEANS OR METHOD OF CONSTRUCTION. TEMPORARY
BRACING AND SHORING AGAINST WIND AND ERECTION CONDITIONS DURING
CONSTRUCTION OF THE BUILDING, SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
PROTECTION OF THE STRUCTURE DURING ALL PHASES OF DEMOLITION,
CONSTRUCTION, AND INSTALLATION.
6. NO AREA OF THE STRUCTURE SHALL BE LOADED WITH CONSTRUCTION
MATERIALS OR EQUIPMENT THAT EXCEEDS FINAL DESIGN CRITERIA.
7. VERIFY LOCATION OF BOX OUTS AND OPENINGS WITH MECHANICAL
CONTRACTORS. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS
ETC. ARE FOR GENERAL INFORMATION ONLY AND SHALL BE VERIFIED WITH
THE MECHANICAL CONTRACTOR BEFORE COMMENCING THE WORK.
8. IF MECHANICAL AND ELECTRICAL EQUIPMENT SIZES, WEIGHTS, OR
LOCATIONS DO NOT COINCIDE WITH EQUIPMENT SHOWN ON PLANS,
COORDINATE ADJUSTMENTS WITH THE STRUCTURAL ENGINEER.
9. HOLES, PIPES, SLEEVES, ETC. NOT SHOWN ON THE DRAWINGS MUST BE
APPROVED BY THE STRUCTURAL ENGINEER BEFORE PLACEMENT THROUGH
STRUCTURAL MEMBERS.
10. CONTRACTOR SHALL PROVIDE A CAST-IN SLEEVE FOR ALL HORIZONTAL
ELEMENTS THAT EXTEND THROUGH FOOTING. IE: DRAIN TILE, ELECTRICAL
CONDUIT, MECHANICAL PIPING, ETC. ALL SLEEVES SHALL BE COORDINATED
WITH ARCHITECT/ENGINEER.
11. SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC., SHALL
BE DIMENSIONED, REVIEWED, COORDINATED, AND SIGNED/ STAMPED BY THE
GENERAL CONTRACTOR PRIOR TO SUBMITTING TO THE STRUCTURAL
ENGINEER.
12. FABRICATOR SHALL CLEARLY NOTE CHANGES MADE IN THE SHOP DRAWINGS
WHICH DO NOT COMPLY WITH THE CONTRACT DOCUMENTS. REVIEWED
APPROVAL SHOP DRAWINGS SHOWING ENGINEERS COMMENTS
ACCOMPANIED WITH RECORD SET SHOP SHOP DRAWINGS, SHALL BE
AVAILABLE FOR REFERENCE AT THE CONSTRUCTION SITE.
13. CONCRETE ANCHORS SHALL BE SIMPSON 'TITEN HD" SCREW ANCHORS OR
EQUIVALENT (U.O.N.). INSTALL ANCHORS USING THE MANUFACTURER'S
RECOMMENDATIONS.
FOUNDATION NOTES:
1. FOOTING ELEVATIONS ARE TO TOP OF FOOTING (T.O. FTG.), UNLESS
OTHERWISE NOTED.
2. FOOTINGS ARE DESIGNED FOR A MINIMUM NET ALLOWABLE SOIL BEARING
PRESSURE OF1500 psf FOR CONTINUOUS AND 1500 psf FOR PAD FOOTINGS.
FOUNDATION DESIGN COMPLIES W/ GEOTECHNICAL REPORT
DATED:SEPTEMBER 12, 2024 BY TERRACON
3. FOOTINGS SHALL BEAR ON NATURAL UNDISTURBED SOIL OR ENGINEERED FILL.
SOILS SHALL BE OBSERVED AND APPROVED BY A GEOTECHNICAL ENGINEER
PRIOR TO PLACEMENT OF FOOTING CONCRETE. IF NATURAL UNDISTURBED
SOILS ARE NOT ENCOUNTERED AND/OR INADEQUATE SOILS ARE NOTED AT
FOOTING BEARING LEVEL, ARCHITECT/ENGINEER SHALL BE NOTIFIED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .