S06 Building 11 Brine Tank Project - Lead Survey Report - 7 pages.pdf

PDF 2 MB Posted

Attached to
Z1DA--PN: 636A6-22-104, Replace Boiler Plant Brine Tank (DM) 2237: 636-26-2-9801-00013
Solicitation number
36C26326B0007
Issued by

View the file

Other files

File Type Posted
S06 Additional Late Questions and Responses - 2 pages.pdf PDF
36C26326B0007 0007.docx DOCX document
36C26326B0007 0006.docx DOCX document
S06 Additional Late Question and Response -1 page.pdf PDF
36C26326B0007 0005.docx DOCX document
S06 Additional Late Questions and Responses -3 pages.pdf PDF
36C26326B0007 0004.docx DOCX document
S06 Atch F Wage Determination IA20260071 01.02.26 -6 pages.pdf PDF
S06 Additional Late Questions and Responses -1 page.pdf PDF
36C26326B0007 0003.docx DOCX document
36C26326B0007 0002.docx DOCX document
S06 Building 11 Brine Tank Project - Pre-Renovation Asbestos Survey Report -22 pages.pdf PDF
36C26326B0007 0001.docx DOCX document
S06 Questions and Responses - Solicitation 36C26326B0007 -3 pages.pdf PDF
S06 Pre-Bid Sign In Sheet 12.8.25 -1 page.pdf PDF
S06 Late Questions and Responses - Solicitation 36C26326B0007 -1 page.pdf PDF
S06 Pre-Bid Site Visit Agenda -2 pages.pdf PDF
S06 Atch F Wage Determination IA20240071 12.12.25 -7 pages.pdf PDF
S02 Atch A SOW - 4 pages.pdf PDF
S02 Atch D VAAR 852.219-75 Limitations on Subcontracting Certificate of Compliance - 2 pages.pdf PDF
S02 Atch B Drawings - 31 pages.pdf PDF
S02 Atch E Safety or Environmental Violations and EMR Information - 2 pages.pdf PDF
36C26326B0007_1.docx DOCX document
S02 Atch F Wage Determination IA20240071 11.21.25 -7 pages.pdf PDF
S02 Atch C Specifications - 608 pages.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Landmark Environmental, LLC

9555 James Avenue South – Suite 262

Bloomington, MN 55431

Phone: 952-295-9400 www.landmarkenv.com

Client: Anderson Engineering of Minnesota, LLC Project Number: 23178.02

Date of Testing: August 21, 2021 Date of Report: September 6, 2024

Project: Lead Paint Testing at the Des Moines VA Central Iowa Health Care System

Landmark Environmental, LLC (Landmark) was retained by Anderson Engineering of Minnesota, LLC (the Client) to perform lead-based paint (LBP) testing (Testing) as part of a renovation project at the Veterans Affairs (VA) Central Iowa Health Care System located in Des Moines, Iowa (the Property). The Testing was conducted as part of the planning for a remodel project titled “636A6-22-104 Building 11 Replace Boiler Plant Brine Tank” (the Project). Only locations and materials that will be impacted during the Project were included in the Testing.

Landmark conducted the Testing on August 21, 2024. All test results are included in the attached sheets. Results that exceeded the OSHA Standards have been transferred to the following table:

Testing Conducted by Landmark Environmental on August 21, 2024

Sample Number

Location Description Result (mg/cm2)

4 Natural Gas Room Blue on Concrete Wall 0.1

5 Natural Gas Room Blue on Concrete Wall 0.1

10 Natural Gas Room Yellow on Metal Gas Pipe 1.9

11 Natural Gas Room Yellow on Metal Gas Pipe 1.9

16 Natural Gas Room White on Concrete Ceiling 0.1

18 Natural Gas Room Black on Metal Door Trim 0.1

19 Pump Room Blue on Concrete Wall 0.1

20 Pump Room Blue on Concrete Wall 0.1

22 Pump Room White on Concrete Ceiling 0.1

23 Pump Room Yellow on Metal Gas Pipe 5.2

25 Pump Room Blue on Concrete Wall 0.1

26 Room 002 White on Concrete Wall 3.5

27 Room 002 White on Concrete Wall 0.1

28 Room 002 White on Concrete Wall 0.1

29 Room 002 Green on Concrete Wall 0.2

30 Room 002 White on Concrete Wall 2.0

31 Room 002 White on Concrete Wall 2.5 https://protect.checkpoint.com/v2/r01/___http://www.landmarkenv.com/___.YXAzOmFlbW46YzpvOjg3YTZkNDg0NzI5MzM4ZTRjYWFkZGI1YzY3ZWY0MjE0Ojc6MzlmOTphZTQ2NmZkNzZkNzMzNTBkMGMxNDkxZTlhOWVmM2VhOTQ0ZjQxODVhNjRhNjI3NzdkMzAzNTE4Mjg4MDIyN2VkOnA6VDpG

September 6, 2024

Sample Number

Location Description Result (mg/cm2)

35 Room 002 White on Concrete Column 0.1

36 Room 002 Black on Metal Ladder 5.9

38 Room 002 White on Concrete Wall 2.3

39 Room 002 White on Concrete Wall 2.9

41 Room 002 White on Concrete Ceiling 0.1

42 Room 002 White on Concrete Beam 0.1

45 Room 002 White on Concrete Ceiling 0.1

46 Room 002 White on Concrete Wall 1.4

60 Room 002 White on Metal Hatch 0.7

61 Pump Room White on Metal Hatch 0.2

INTERPRETING PAINT SAMPLING RESULTS

Iowa Occupational Safety and Health Administration (IOSHA) has adopted the federal

Occupational Safety and Health Administration (OSHA) standards and operates as an OSHA approved state plan. Because IOAHA has adopted federal OSHA standards, the results of the

Testing are compared to federal OSHA standards.

Testing surfaces for lead and establishing "safe" levels of lead content is difficult. The OSHA standard does not identify a lower level of lead content in paint that will eliminate the initial monitoring requirement.

Landmark tested a total of forty-seven (47) painted surfaces for lead. Twenty-seven (27) of these surfaces tested above the Occupational Safety and Health Administration (OSHA) guideline of 0.0 milligrams per square centimeter (mg/cm2). Nine (9) of these surfaces also tested above the Environmental Protection Agency (EPA)/ and the Housing and Hurban

Development (HUD) lead paint level of 1.0 mg/cm2. Additionally, five (5) quality control tests were performed during the Testing. If these results are used by a contractor to comply with the OSHA interim lead in construction standard (29 CFR 1926.62), the contractor must evaluate the potential for lead dust or fume generation from all activities which will disturb paint containing any detectable quantity of lead.

OSHA Standards apply to any employee disturbing (creating dust or fumes) materials covered with LBP. OSHA regulates lead as an airborne contaminant. Airborne concentrations during disturbance will vary with both the concentration of lead paint and with the operation (manual demolition, sanding, etc.). OSHA requires the contractor to show proof that the operations disturbing LBP in any concentration will not exceed the action level of 30 micrograms per cubic meter (µg/m3) or the permissible exposure limit of 50 µg/m3.

This information is provided as a general approach to compliance with OSHA 29CFR

1926.62. It is not the intent of Landmark that this information applies to all situations involving the standard. The standard should be consulted in all cases, and interpretations verified with OSHA prior to construction.

September 6, 2024

A SciAps X-Ray Fluorescence field portable analyzer (XRF) was used to conduct lead paint testing in the Project work area where painted surfaces was observed. The Performance

Characteristic Sheet for this instrument is included in the Appendix. The following information details information on the specific XRF used in this inspection.

XRF Manufacturer SciAps

XRF Model Number X550-Pb

XRF Serial Number 02480

CONDITIONS

Landmark conducted the Testing and the Report in a manner consistent with the care and skill ordinarily exercised by members of the environmental profession in the community under similar budget and time constraints.

If you have any questions or comments, please contact me at mmeier@landmarkenv.com or at 952-295-9400. Thank you for the opportunity to assist you.

If reproduced, this report must be copied in its entirety.

Mark Meier, Senior Environmental Scientist Landmark Environmental, LLC

Attachments

Lead Paint Test Results

Building 11 Boiler Plant Brine Tank Project

Central Iowa Health Care System - Des Moines, Iowa

Date Test # Site Floor Room Component Side Substrate Condition Color Pb Unit type Notes

8/21/2024 9:12 1 Calibration 1 mg/cm2

8/21/2024 9:12 2 Calibration 1.1 mg/cm2

8/21/2024 9:12 3 Calibration 1.1 mg/cm2

8/21/2024 9:20 4 Building 11 Bsmt Natural Gas Room Wall B Concrete Peeling Blue 0.1 mg/cm2

8/21/2024 9:20 5 Building 11 Bsmt Natural Gas Room Wall B Concrete Peeling Blue 0.1 mg/cm2

8/21/2024 9:20 6 Building 11 Bsmt Natural Gas Room Wall C Concrete Peeling Blue 0 mg/cm2

8/21/2024 9:21 7 Building 11 Bsmt Natural Gas Room Wall D Concrete Peeling Blue 0 mg/cm2

8/21/2024 9:21 8 Building 11 Bsmt Natural Gas Room Wall A Concrete Peeling Blue 0 mg/cm2

8/21/2024 9:21 9 Building 11 Bsmt Natural Gas Room Wall A Concrete Peeling Blue 0 mg/cm2 QC

8/21/2024 9:22 10 Building 11 Bsmt Natural Gas Room Gas Line Metal Solid Yellow 1.9 mg/cm2 Abandoned

8/21/2024 9:22 11 Building 11 Bsmt Natural Gas Room Gas Line Metal Solid Yellow 1.9 mg/cm2 Live

8/21/2024 9:23 12 Building 11 Bsmt Natural Gas Room Gas Line Metal Solid Gray 0 mg/cm2

8/21/2024 9:23 13 Building 11 Bsmt Natural Gas Room Support Stand Metal Peeling Gray 0 mg/cm2

8/21/2024 9:24 14 Building 11 Bsmt Natural Gas Room Ceiling Concrete Peeling White 0 mg/cm2

8/21/2024 9:24 15 Building 11 Bsmt Natural Gas Room Floor Concrete Peeling Red 0 mg/cm2

8/21/2024 9:24 16 Building 11 Bsmt Natural Gas Room Ceiling Concrete Peeling White 0.1 mg/cm2

8/21/2024 9:25 17 Building 11 Bsmt Natural Gas Room Door Metal Peeling White 0 mg/cm2

8/21/2024 9:25 18 Building 11 Bsmt Natural Gas Room Door Trim Metal Peeling Black 0.1 mg/cm2

8/21/2024 9:26 19 Building 11 Bsmt Pump Room Wall B Concrete Peeling Blue 0.1 mg/cm2

8/21/2024 9:26 20 Building 11 Bsmt Pump Room Wall C Concrete Peeling Blue 0.1 mg/cm2

8/21/2024 9:27 21 Building 11 Bsmt Pump Room Ceiling Concrete Peeling White 0 mg/cm2

8/21/2024 9:27 22 Building 11 Bsmt Pump Room Ceiling Concrete Peeling White 0.1 mg/cm2

8/21/2024 9:28 23 Building 11 Bsmt Pump Room Gas Line Metal Solid Yellow 5.2 mg/cm2

8/21/2024 9:29 24 Building 11 Bsmt Pump Room Wall A Concrete Peeling Blue 0 mg/cm2

8/21/2024 9:29 25 Building 11 Bsmt Pump Room Wall A Concrete Peeling Blue 0.1 mg/cm2

8/21/2024 9:30 26 Building 11 Bsmt Room 002 Wall D Concrete Solid White 3.5 mg/cm2 by Tank

8/21/2024 9:31 27 Building 11 Bsmt Room 002 Wall D Concrete Solid White 0.1 mg/cm2

8/21/2024 9:32 28 Building 11 Bsmt Room 002 Wall D Concrete Solid White 0.1 mg/cm2

8/21/2024 9:32 29 Building 11 Bsmt Room 002 Wall D Concrete Solid Green 0.2 mg/cm2 Under White

8/21/2024 9:33 30 Building 11 Bsmt Room 002 Wall D Concrete Solid White 2 mg/cm2

8/21/2024 9:33 31 Building 11 Bsmt Room 002 Wall D Concrete Solid White 2.5 mg/cm2

8/21/2024 9:33 32 Building 11 Bsmt Room 002 Wall C Concrete Solid White 0 mg/cm2

Lead Paint Test Results

Building 11 Boiler Plant Brine Tank Project

Central Iowa Health Care System - Des Moines, Iowa

Date Test # Site Floor Room Component Side Substrate Condition Color Pb Unit type Notes

8/21/2024 9:33 33 Building 11 Bsmt Room 002 Wall C Concrete Solid White 0 mg/cm2

8/21/2024 9:42 34 Building 11 Bsmt Room 002 Floor Concrete Peeling Gray 0 mg/cm2

8/21/2024 9:42 35 Building 11 Bsmt Room 002 Column Concrete Solid White 0.1 mg/cm2

8/21/2024 9:43 36 Building 11 Bsmt Room 002 Ladder Metal Peeling Black 5.9 mg/cm2

8/21/2024 9:44 37 Building 11 Bsmt Room 002 Wall D Concrete Solid White 0 mg/cm2

8/21/2024 9:44 38 Building 11 Bsmt Room 002 Wall C Concrete Solid White 2.3 mg/cm2

8/21/2024 9:44 39 Building 11 Bsmt Room 002 Wall C Concrete Solid White 2.9 mg/cm2

8/21/2024 9:45 40 Building 11 Bsmt Room 002 Floor Concrete Solid Brown 0 mg/cm2

8/21/2024 9:45 41 Building 11 Bsmt Room 002 Ceiling Concrete Solid White 0.1 mg/cm2

8/21/2024 9:46 42 Building 11 Bsmt Room 002 Beam Concrete Solid White 0.1 mg/cm2

8/21/2024 9:46 43 Building 11 Bsmt Room 002 Brine Tank Plastic Solid Green 0 mg/cm2

8/21/2024 9:46 44 Building 11 Bsmt Room 002 Brine Tank Plastic Solid Green 0 mg/cm2 QC

8/21/2024 9:49 45 Building 11 Bsmt Room 002 Ceiling Concrete Solid White 0.1 mg/cm2

8/21/2024 9:49 46 Building 11 Bsmt Room 002 Wall B Concrete Solid White 1.4 mg/cm2

8/21/2024 9:50 47 Building 11 Bsmt Room 002 Floor Concrete Solid Brown 0 mg/cm2

8/21/2024 9:50 48 Building 11 Bsmt Room 002 Floor Concrete Solid Brown 0 mg/cm2 QC

8/21/2024 9:50 49 Building 11 Bsmt Room 002 Pipe Plastic Solid White 0 mg/cm2

8/21/2024 9:50 50 Building 11 Bsmt Room 002 Pipe Plastic Solid White 0 mg/cm2 QC

8/21/2024 9:52 51 Building 11 Bsmt Room 002 Pipe Metal Solid Silver 0 mg/cm2

8/21/2024 9:52 52 Building 11 Bsmt Room 002 Pipe Metal Solid Silver 0 mg/cm2 QC

8/21/2024 9:52 53 Building 11 Bsmt Room 002 Pipe Metal Solid Blue 0 mg/cm2

8/21/2024 9:53 54 Calibration 1.1 mg/cm2

8/21/2024 9:53 55 Calibration 1.1 mg/cm2

8/21/2024 9:53 56 Calibration 1 mg/cm2

8/21/2024 11:02 57 Calibration 1.1 mg/cm2

8/21/2024 11:02 58 Calibration 1.1 mg/cm2

8/21/2024 11:02 59 Calibration 1 mg/cm2

8/21/2024 11:03 60 Building 11 Bsmt Room 002 Hatch Metal Peeling White 0.7 mg/cm2

8/21/2024 11:04 61 Building 11 Bsmt Pump Room Hatch Metal Peeling White 0.2 mg/cm2

8/21/2024 11:05 62 Calibration 1.1 mg/cm2

8/21/2024 11:05 63 Calibration 1.1 mg/cm2

8/21/2024 11:05 64 Calibration 1.1 mg/cm2

KEY

- Lead Paint Test LocationXX4, 5

7 8, 9

11, 12, 13

17, 18

14, 15, 16

21-23

24, 25

263233

27-31

41, 43, 49, 50, 51, 52, 53

47,