S06 Building 11 Brine Tank Project - Pre-Renovation Asbestos Survey Report -22 pages.pdf

PDF 3 MB Posted

Attached to
Z1DA--PN: 636A6-22-104, Replace Boiler Plant Brine Tank (DM) 2237: 636-26-2-9801-00013
Solicitation number
36C26326B0007
Issued by

View the file

Other files

File Type Posted
S06 Additional Late Questions and Responses - 2 pages.pdf PDF
36C26326B0007 0007.docx DOCX document
36C26326B0007 0006.docx DOCX document
S06 Additional Late Question and Response -1 page.pdf PDF
36C26326B0007 0005.docx DOCX document
S06 Additional Late Questions and Responses -3 pages.pdf PDF
36C26326B0007 0004.docx DOCX document
S06 Atch F Wage Determination IA20260071 01.02.26 -6 pages.pdf PDF
S06 Additional Late Questions and Responses -1 page.pdf PDF
36C26326B0007 0003.docx DOCX document
36C26326B0007 0002.docx DOCX document
36C26326B0007 0001.docx DOCX document
S06 Building 11 Brine Tank Project - Lead Survey Report - 7 pages.pdf PDF
S06 Questions and Responses - Solicitation 36C26326B0007 -3 pages.pdf PDF
S06 Pre-Bid Sign In Sheet 12.8.25 -1 page.pdf PDF
S06 Late Questions and Responses - Solicitation 36C26326B0007 -1 page.pdf PDF
S06 Pre-Bid Site Visit Agenda -2 pages.pdf PDF
S06 Atch F Wage Determination IA20240071 12.12.25 -7 pages.pdf PDF
S02 Atch A SOW - 4 pages.pdf PDF
S02 Atch D VAAR 852.219-75 Limitations on Subcontracting Certificate of Compliance - 2 pages.pdf PDF
S02 Atch B Drawings - 31 pages.pdf PDF
S02 Atch E Safety or Environmental Violations and EMR Information - 2 pages.pdf PDF
36C26326B0007_1.docx DOCX document
S02 Atch F Wage Determination IA20240071 11.21.25 -7 pages.pdf PDF
S02 Atch C Specifications - 608 pages.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared for:

ANDERSON ENGINEERING

13605 1ST AVENUE NORTH

PLYMOUTH, MN

September 6, 2024

Asbestos Survey 636A6-22-104 Building 11 Replace Boiler Plant Brine Tank VA Central Iowa Health Care System Des Moines, Iowa

Landmark Environmental, LLC 9555 James Avenue South | Bloomington, MN 55431 | Phone: 952-295-9400 | www.landmarkenv.com

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

Asbestos Survey Report

636A6-22-104 Building 11 Replace Boiler Plant Brine Tank

VA Central Iowa Health Care System

Des Moines, Iowa

1.0 Executive Summary

2.0 Introduction

3.0 Sampling Methods and Analysis

4.0 Asbestos-Containing Material Assessment

5.0 Findings

6.0 Recommendations

Appendices

Appendix A Certificates

Appendix B Building Diagram with Sample Locations and Asbestos Laboratory Report

Appendix C Asbestos-Containing Materials Physical Assessment

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

1.0 Executive Summary

Landmark Environmental, LLC (Landmark) was retained by Anderson Engineering (Client) to conduct a pre-renovation asbestos survey (Survey) as part of a renovation project at the Veterans Affairs (VA) Central Iowa Health Care System, located in Des Moines, Iowa

(the Property). The Client intends to conduct a remodel project titled “636A6-22-104

Building 11 Replace Boiler Plant Brine Tank” (Project). Only locations and materials to be impacted during this Project were included in the Survey. The Survey was conducted on August 21, 2024.

A summary of the Survey results are as follows:

Landmark collected 13 bulk asbestos samples as part of the inspection. The contracted laboratory, EMSL Analytical, Inc. (EMSL) separated these 13 samples into 14 individual layer samples and all 14 individual layer samples were analyzed.

Based on the laboratory report, no suspect building materials were found to contain asbestos.

No building materials were assumed to contain asbestos during the Survey.

Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.

Since the building and brine generation tank system was operating, a complete destructive survey could not be conducted. No attempt was made to locate materials inside walls, doors, tanks and other areas that would require destructive entry. The possibility exists that materials may be present in these locations. Materials observed, or suspected in these areas, are assumed to be ACM. The possibility exists that as these locations are opened up during renovation, suspect material will be found. If suspect materials are encountered during renovation, work should stop immediately and the materials should be sampled for asbestos content or assumed to contain asbestos and properly removed by a licensed asbestos abatement contractor.

This Survey identifies asbestos as they existed on the day of the survey at the Property.

Conditions may change over time.

This Survey should not be used as a bidding document. The ACM quantities provided are estimates and must be verified by the bidding contractors.

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

2.0 Introduction

Landmark completed this asbestos Survey report (Report) at the Property. The procedures used for this Survey and assessment comply with the EPA, Occupational

Safety and Health Administration (OSHA), Iowa Division of Labor (IDL), and Iowa

Department of Natural Resources (IDNR) asbestos standards.

2.1 Purpose

Landmark was retained by the Client to complete the Survey and Report for the purposes of understanding asbestos-containing material (ACM) and quantities of ACM at the Property for the upcoming Project.

2.2 Survey Approach

The Survey, consisting of identifying, sampling, assessing, and quantifying suspect ACM within the survey area, was conducted on August 21, 2024.

2.3 Assumptions, Limitations and Exceptions

The findings and recommendations in this Report are subject to the following assumptions, limitations, and/or exceptions:

• Since the building and brine generation tank system was operating, a complete destructive survey could not be conducted. No attempt was made to locate materials inside walls, doors, tanks, and other areas that would require destructive entry. The possibility exists that materials may be present in these locations. The possibility exists that as these locations are opened during renovation, suspect material will be found. If suspect materials are encountered during renovation, work should stop immediately and the materials should be sampled for asbestos content or assumed to contain asbestos and properly removed by a licensed asbestos abatement contractor.

• Electrical wiring and panels were not sampled. Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.

• This Survey identifies materials as they existed on the day of the survey. Conditions may change over time.

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

2.4 Qualifications

The Survey was conducted by Mark Meier, an accredited asbestos building inspector with Landmark. A photocopy of the inspector’s IDL certification is included in Appendix A.

Asbestos sample analysis for this project was conducted by EMSL. EMSL is accredited by the National Voluntary Accreditation Program (NVLAP lab code 200019-0).

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

3.0 Sampling Methods and Analysis

3.1 Bulk Asbestos Sampling

Building diagrams were utilized to divide the Property building into functional spaces for the purposes of describing sampling locations. The building diagram with sample locations has been included in Appendix B.

Similar systems and materials were grouped into “homogeneous areas of building materials” (homogeneous materials). Homogeneous materials often exist in more than one functional space within the Property building. Each homogeneous material was assigned a discrete number; the homogeneous material number is indicated in the first number of the sample name. Multiple samples of each homogeneous material were taken in accordance with the EPA-Asbestos Hazard Emergency Response Act (AHERA) guidelines using a random sampling procedure. These multiple samples were designated “A, B, C,” etc. for each homogenous material, as indicated in the sample name. The sample locations and sample descriptions are shown on the building diagram and the asbestos laboratory report in Appendix B.

Samples were collected by carefully removing a small representative sample of the suspect material and sealing it in a plastic bag.

3.2 Bulk Asbestos Analysis

Landmark collected 13 bulk asbestos samples as part of the inspection. The contracted laboratory, EMSL separated these 13 samples into 14 individual layer samples and all 14 individual layer samples were analyzed. The results are presented in the attached laboratory report in Appendix B.

The bulk samples were analyzed by polarized light microscopy (PLM) with dispersion staining, EPA method 600/R-93/116 and EPA method 600/M4-82-020. Quantity determinations are made by visual estimation. For each homogeneous material, once a positive sample was identified, the remaining samples were not analyzed.

EPA National Emission Standards for Hazardous Air Pollutants (NESHAP)-Rule 40 CFR

Part 61 states that samples found to contain less than 10% asbestos by visual estimation may be further quantified by point count analysis.

The Asbestos rule states that all multi-layer systems, except for wall systems where joint compound was used only at the joints and nail holes, must be analyzed as separate materials. If any layer contains greater than one percent asbestos, that layer must be treated as asbestos-containing. This requires all layers in a multi-layered system to be

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx treated as asbestos-containing if the layers cannot be separated without disturbing the asbestos-containing layer.

Asbestos samples will be held for 30 days after the date of this report.

3.3 Chain of Custody Procedures

To ensure that samples collected in the field are neither lost nor their identity mis-identified, all samples, from the point of collection to receipt in the laboratory, proceeds as follows. Each sample is first assigned a unique and distinct sampling number. After a sample is placed into a plastic bag, that unique number is assigned to that bag. This same number is documented on the laboratory’s chain of custody. The inspector signs each chain of custody before delivering to the lab. Upon receipt of the samples, the lab analyst verifies that each sample matches the corresponding chain of custody number and signs and dates the chain of custody. After analysis, the analyst generates a report that includes the sample results and the project chain of custody forms.

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

4.0 Asbestos-Containing Material Assessment

In each functional space, each homogeneous material was quantified and assessed for friability (i.e. material can be crumbled, pulverized, or reduced to powder by hand pressure when dry). Suspect ACM was then assessed as to their condition and potential for disturbance. This information was recorded on the asbestos physical assessment shown in Appendix C. The model for this system is described in the EPA Draft

Curriculum for Training Building Inspectors.

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

5.0 Findings

5.1 Summary of Asbestos-Containing Materials

Suspect homogeneous material found to contain asbestos and their sample numbers include:

Thermal Insulation – None Observed

Surfacing Material – None Observed

Miscellaneous Materials – None Observed

Assumed Materials – None Observed

5.2 Summary of Non-Asbestos-Containing Materials

Suspect ACM is considered negative for asbestos when all samples of the material are found to contain one percent or less asbestos. Suspect homogeneous material found to be negative includes:

1. Hard pipe fitting insulation on hard pipe insulation - small line (Sample 1).

2. Hard pipe insulation - small line (Sample 2).

3. Hard pipe insulation - large line (Sample 3).

4. Clay block mortar (Sample 4).

5. Black tar on wall (Sample 5).

6. White caulk (Sample 6).

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

6.0 Recommendations

Based on the Survey and assessment results, as well as the proposed future use of the

Property building, the following recommendations for each ACM are summarized below.

Description Total Estimated Recommendation

Thermal System Insulation None observed

Surfacing Material None observed

Miscellaneous Materials None observed

Assumed Materials None observed

Electrical wiring and panels were not sampled and were assumed to contain asbestos.

Landmark does not perform bulk sampling of electrical equipment unless it has been shut down and tagged by a licensed electrician.

Since the building and brine generation tank system was operating, a complete destructive survey could not be conducted. No attempt was made to locate materials inside walls, doors, tanks and other areas that would require destructive entry. The possibility exists that materials may be present in these locations. Materials observed, or suspected in these areas, are assumed to be ACM. The possibility exists that as these locations are opened up during renovation, suspect material will be found. If suspect materials are encountered during renovation, work should stop immediately and the materials should be sampled for asbestos content or assumed to contain asbestos and properly removed by a licensed asbestos abatement contractor.

F:\PROJECTS\AND-Anderson Engineering\Des Moines Brine Tank 636A6-22-104\Asbestos Survey\Building 11 Brine Tank Project

- Pre-Renovation Asbestos Survey Report.docx

7.0 Signatures of Environmental Professional(s)

We declare that, to the best of our professional knowledge and belief, the Survey referenced by this report, and the report itself, were conducted in accordance with intent of the EPA, IDNR, IDL, AHERA regulations to the best of my ability and knowledge.

Mark Meier

Asbestos Building Inspector (24-12078)

Eric Gabrielson

Vice President

Appendices

Appendix A

Appendix B

EMSL Analytical, Inc.

3410 Winnetka Avenue North New Hope, MN 55427

Tel/Fax: (763) 449-4922 / (763) 449-4924 http://www.EMSL.com / minneapolislab@emsl.com

352407997EMSL Order:

Customer ID: LMEN42

Customer PO:

Project ID:

Attention: Phone:Mark Meier (952) 666-2422

Fax:Landmark Environmental, LLC (952) 887-9605

Received Date:9555 James Avenue South – Suite 262 08/22/2024 3:40 PM

Analysis Date:Bloomington, MN 55431 08/28/2024 - 08/29/2024

Collected Date: 08/21/2024

Project: 23128.02/ DMVA Brine Tank

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

1A

352407997-0001

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Gray/Blue

Fibrous

Homogeneous

Hard fitting on Small

Line/ Rm 002

1B

352407997-0002

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Gray/Blue

Fibrous

Homogeneous

Hard fitting on Small

Line/ Rm 002

1C

352407997-0003

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Gray/Blue

Fibrous

Homogeneous

Hard fitting on Small

Line/ Rm 002

2A

352407997-0004

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard Pipe insulation on Small Line/002

2B

352407997-0005

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard Pipe insulation on Small Line/002

2C

352407997-0006

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard Pipe insulation on Small Line/002

3A

352407997-0007

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard pipe insulation on Larger Line/ 002

3B

352407997-0008

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard pipe insulation on Larger Line/ 002

3C

352407997-0009

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard pipe insulation on Larger Line/ 002

3D

352407997-0010

None DetectedNon-fibrous (Other)80%Synthetic

Glass

10%

10%

Blue

Fibrous

Homogeneous

Hard pipe insulation on Larger Line/ 002

4 Mortar

352407997-0011

None DetectedNon-fibrous (Other)100%Gray/Various/Black

Non-Fibrous

Homogeneous

Clay Block

Mortar/Rump Rm

4 Brown Material

352407997-0011A

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Clay Block

Mortar/Rump Rm

352407997-0012

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Black Tar

Coating/Pump Rm

352407997-0013

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

White Caulk/ Exterior

Initial report from: 08/29/2024 10:44:10

Page 1 of 2ASB_PLM_0008_0002 - 2.31 Printed: 8/29/2024 9:44 AM

EMSL Analytical, Inc.

3410 Winnetka Avenue North New Hope, MN 55427

Tel/Fax: (763) 449-4922 / (763) 449-4924 http://www.EMSL.com / minneapolislab@emsl.com

352407997EMSL Order:

Customer ID: LMEN42

Customer PO:

Project ID:

Analyst(s)

Michael Craigmile (14) Rachel Travis, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non- friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis . Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New Hope, MN NVLAP Lab Code 200019-0; Colorado AL-24478

Initial report from: 08/29/2024 10:44:10

Page 2 of 2ASB_PLM_0008_0002 - 2.31 Printed: 8/29/2024 9:44 AM

OrderID: 352407997

OrderID: 352407997

KEY

- Asbestos Sample LocationXX

3C

3B 3A2C 2B 2A1C 1B 1A

6 - exterior

Appendix C

9/6/2024 BUILDING 11 REPLACE BOILER PLANT BRINE TANK

VA CENTRAL IOWA HEALTH CARE SYSTEM, DES MOINES, IOWA

ASBESTOS-CONTAINING MATERIAL ASSESSMENT DATABASE

Floor Location Type Description Quantity

Height

(Feet) Condition

Disturbance

Potential

Homog.

Material

Bsmt Natural Gas Room No ACM Observed

Bsmt Pump Room No ACM Observed

Bsmt Room 002 No ACM Observed

Bsmt Brine Tanks No ACM Observed

Exterior Top of Brine

Tanks No ACM Observed

Type: TSI=Thermal System Insulation SURF=Surfacing Materials MISC=Misc.