S02 657A4-21-800-ATTACHMENT 6 Price Estimate Template V1.2.xlsx

XLSX spreadsheet 157 KB Posted

Attached to
Z2DA--657A4-21-800, TF - FCA - Remove and Replace End-of-Life HVAC Infrastructure Building 1
Solicitation number
36C25525R0106
Issued by

About this file

This is a Price Estimate Template for a federal contract opportunity related to HVAC infrastructure replacement at a Department of Veterans Affairs facility. The Excel spreadsheet provides a comprehensive cost breakdown template organized by CSI (Construction Specifications Institute) divisions, including sections for labor, material, and equipment costs across 48 different construction categories ranging from general requirements to electrical power generation.

The template is designed for contractors to detail project costs with specific provisions for overhead (not to exceed 25%), profit (not to exceed 10%), and bonds (not to exceed 5%). While the current document contains no actual cost entries, it is structured to support precise cost estimation for the solicitation (36C25525R0106) involving removal and replacement of end-of-life HVAC infrastructure in Building 1 at a Veterans Health Administration facility within Veterans Integrated Service Network 15. The template allows for granular cost tracking across multiple construction disciplines, enabling detailed and transparent project pricing.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Estimate Summary

Project Name:Preparer Name:Date:
Company Name:
Enter Overhead (Not to Exceed 25%), Profit (Not to Exceed 10%) and Percentages of Bonds (Not to Exceed 5%) Below:
OverheadProfitBonds
25.00%10.00%5.00%
Division Summary (MF04)
LaborMaterialEquipmentTotalLaborMaterialEquipmentTotal
01General Requirements$ - 0$ - 0$ - 0$ - 027Communications$ - 0$ - 0$ - 0$ - 0
02Existing Conditions$ - 0$ - 0$ - 0$ - 028Electronic Safety and Security$ - 0$ - 0$ - 0$ - 0
03Concrete$ - 0$ - 0$ - 0$ - 029
04Masonry$ - 0$ - 0$ - 0$ - 030
05Metals$ - 0$ - 0$ - 0$ - 031Earthwork$ - 0$ - 0$ - 0$ - 0
06Wood, Plastic, and Composites$ - 0$ - 0$ - 0$ - 032Exterior Improvements$ - 0$ - 0$ - 0$ - 0
07Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 033Utilities$ - 0$ - 0$ - 0$ - 0
08Openings - Doors and Windows$ - 0$ - 0$ - 0$ - 034Transportation$ - 0$ - 0$ - 0$ - 0
09Finishes$ - 0$ - 0$ - 0$ - 035
10Specialties$ - 0$ - 0$ - 0$ - 036
11Equipment$ - 0$ - 0$ - 0$ - 037
12Furnishings$ - 0$ - 0$ - 0$ - 038
13Special Construction$ - 0$ - 0$ - 0$ - 039
14Conveying Equipment$ - 0$ - 0$ - 0$ - 040
1541
1642
1743
1844
1945
2046
21Fire Suppression$ - 0$ - 0$ - 0$ - 047
22Plumbing$ - 0$ - 0$ - 0$ - 048Electric Power Generation$ - 0$ - 0$ - 0$ - 0
23HVAC$ - 0$ - 0$ - 0$ - 0
24
25Integrated Automation$ - 0$ - 0$ - 0$ - 0
26Electrical$ - 0$ - 0$ - 0$ - 0
Material, Labor, and Equipment TotalsMF04 Bare Total$ - 0$ - 0$ - 0$ - 0
(No Totaling Components )
Material$ - 0
Labor$ - 0
Equipment$ - 0
Subtotal$ - 0
Overhead$ - 0
Profit$ - 0
Bonds$ - 0

GRAND TOTAL $ - 0

01 - General Requirements

Project Name:Preparer Name:Date:
Company Name:
01 - General Requirements
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

01 - General Requirements - Totals $ - 0 $ - 0 $ - 0 $ - 0

02 - Existing Conditions

Project Name:Preparer Name:Date:
Company Name:
02 - Existing Conditions
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

02 - Existing Conditions - Totals $ - 0 $ - 0 $ - 0 $ - 0

03 - Concrete

Project Name:Preparer Name:Date:
Company Name:
03 - Concrete
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

03 - Concrete - Totals $ - 0 $ - 0 $ - 0 $ - 0

04 - Masonry

Project Name:Preparer Name:Date:
Company Name:
04 - Masonry
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

04 - Masonry - Totals $ - 0 $ - 0 $ - 0 $ - 0

05 - Metals

Project Name:Preparer Name:Date:
Company Name:
05 - Metals
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

05 - Metals - Totals $ - 0 $ - 0 $ - 0 $ - 0

06 - Wood, Plastics & Composite

Project Name:Preparer Name:Date:
Company Name:
06 - Wood, Plastics & Composite
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

06 - Wood, Plastics & Composite - Totals $ - 0 $ - 0 $ - 0 $ - 0

07 - Thermal & Moisture Protect

Project Name:Preparer Name:Date:
Company Name:
07 - Thermal & Moisture Protection
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

07 - Thermal & Moisture Protection - Totals $ - 0 $ - 0 $ - 0 $ - 0

08 - Doors and Windows

Project Name:Preparer Name:Date:
Company Name:
08 - Openings - Doors and Windows
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

08 - Openings - Doors and Windows - Totals $ - 0 $ - 0 $ - 0 $ - 0

09 - Finishes

Project Name:Preparer Name:Date:
Company Name:
09 - Finishes
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

09 - Finishes - Totals $ - 0 $ - 0 $ - 0 $ - 0

10 - Specialties

Project Name:Preparer Name:Date:
Company Name:
10 - Specialties
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

10 - Specialties - Totals $ - 0 $ - 0 $ - 0 $ - 0

11 - Equipment

Project Name:Preparer Name:Date:
Company Name:
11 - Equipment
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

11 - Equipment - Totals $ - 0 $ - 0 $ - 0 $ - 0

12 - Furnishings

Project Name:Preparer Name:Date:
Company Name:
12 - Furnishings
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

12 - Furnishings - Totals $ - 0 $ - 0 $ - 0 $ - 0

13 - Special Construction

Project Name:Preparer Name:Date:
Company Name:
13 - Special Construction
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

13 - Special Construction - Totals $ - 0 $ - 0 $ - 0 $ - 0

14 - Conveying Equipment

Project Name:Preparer Name:Date:
Company Name:
14 - Conveying Equipment
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

14 - Conveying Equipment - Totals $ - 0 $ - 0 $ - 0 $ - 0

21 - Fire Suppression

Project Name:Preparer Name:Date:
Company Name:
21 - Fire Suppression
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

21 - Fire Suppression - Totals $ - 0 $ - 0 $ - 0 $ - 0

22 - Plumbing

Project Name:Preparer Name:Date:
Company Name:
22 - Plumbing
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

22 - Plumbing - Totals $ - 0 $ - 0 $ - 0 $ - 0

23 - HVAC

Project Name:Preparer Name:Date:
Company Name:
23 - Heating, Ventilation and Air Conditioning
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

23 - HVAC - Totals $ - 0 $ - 0 $ - 0 $ - 0

25 - Integrated Automation

Project Name:Preparer Name:Date:
Company Name:
25 - Integrated Automation
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

25 - Integrated Automation - Totals $ - 0 $ - 0 $ - 0 $ - 0

26 - Electrical

Project Name:Preparer Name:Date:
Company Name:
26 - Electrical
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

26 - Electrical - Totals $ - 0 $ - 0 $ - 0 $ - 0

27 - Communications

Project Name:Preparer Name:Date:
Company Name:
27 - Communications
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

27 - Communications - Totals $ - 0 $ - 0 $ - 0 $ - 0

28 - Electronic Safety and Secu

Project Name:Preparer Name:Date:
Company Name:
28 - Electronic Safety and Security
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

28 - Electronic Safety and Security - Totals $ - 0 $ - 0 $ - 0 $ - 0

31 - Earthwork

Project Name:Preparer Name:Date:
Company Name:
31 - Earthwork
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

31 - Earthwork - Totals $ - 0 $ - 0 $ - 0 $ - 0

32 - Exterior Improvements

Project Name:Preparer Name:Date:
Company Name:
32 - Exterior Improvements
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

32 - Exterior Improvements - Totals $ - 0 $ - 0 $ - 0 $ - 0

33 - Utilities

Project Name:Preparer Name:Date:
Company Name:
33 - Utilities
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

33 - Utilities - Totals $ - 0 $ - 0 $ - 0 $ - 0

34 - Transportation

Project Name:Preparer Name:Date:
Company Name:
34 - Transportation
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

34 - Transportation - Totals $ - 0 $ - 0 $ - 0 $ - 0

48- Electrical Power Generation

Project Name:Preparer Name:Date:
Company Name:
48 - Electrical Power Generation
LaborMaterialEquipment
ItemSpec NumberDescriptionUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalUnitQuantityUnit CostTotalItem Totals
01$ - 0$ - 0$ - 0$ - 0
02$ - 0$ - 0$ - 0$ - 0
03$ - 0$ - 0$ - 0$ - 0
04$ - 0$ - 0$ - 0$ - 0
05$ - 0$ - 0$ - 0$ - 0
06$ - 0$ - 0$ - 0$ - 0
07$ - 0$ - 0$ - 0$ - 0
08$ - 0$ - 0$ - 0$ - 0
09$ - 0$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0$ - 0
16$ - 0$ - 0$ - 0$ - 0
17$ - 0$ - 0$ - 0$ - 0
18$ - 0$ - 0$ - 0$ - 0
19$ - 0$ - 0$ - 0$ - 0
20$ - 0$ - 0$ - 0$ - 0
21$ - 0$ - 0$ - 0$ - 0
22$ - 0$ - 0$ - 0$ - 0
23$ - 0$ - 0$ - 0$ - 0
24$ - 0$ - 0$ - 0$ - 0
25$ - 0$ - 0$ - 0$ - 0
26$ - 0$ - 0$ - 0$ - 0
27$ - 0$ - 0$ - 0$ - 0
28$ - 0$ - 0$ - 0$ - 0

48 - Electrical Power Generation - Totals $ - 0 $ - 0 $ - 0 $ - 0

File details come from the government source that posted it. Updated .