These are architectural and civil engineering drawings for a modular building complex project at the John J. Pershing Veterans Administration Medical Center in Poplar Bluff, Missouri. The project involves removing and replacing end-of-life heating, ventilation, and air conditioning (HVAC) infrastructure in Building 1, with a comprehensive four-phase approach using a temporary modular building complex as swing space.

The phased plan includes: Phase 1 relocating blood labs, Phase 2 moving Environmental Management Services and Laundry, Phase 3 transferring Pain Clinic and Veterans Service Offices, and Phase 4 accommodating Dental Clinic operations. The modular building complex will be a 4-plex of units with dedicated spaces for restrooms, telecommunications, utilities, and department-specific functions. The drawings detail site layout, utility connections, civil engineering specifications, erosion control, and comprehensive architectural plans for the temporary modular structures, including floor plans, elevations, and specific design requirements for each project phase.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GI001

MODULAR BUILDING - COVER AND

INDEX OF DRAWINGS

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

REMOVE AND REPLACE END OF LIFE HEATING, VENTILATION,

AND AIR CONDITIONING/ 657A4-21-305

TEMPORARY MODULAR BUILDING SWING SPACE

PROJECT NUMBER 657A4-21-800

JOHN J. PERSHING VETERANS ADMINISTRATION MEDICAL CENTER

1500 NORTH WESTWOOD BOULEVARD

POPLAR BLUFF, MO 63901-3318

LOCATION MAP - POPLAR BLUFF

NTS

LOCATION MAP - STATE OF MISSOURI

NTS

MODULAR BLDG.

COMPLEX LOCATION

AERIAL VIEW

NTS

CAMPUS PLAN - JOHN J. PERSHING VA MEDICAL CENTER

NTS

RELOCATE 14

HC STALLS

FROM WEST

SIDE TO THIS

LOT NEAR EAST

ENTRANCE

Mark Revisions: Date:

1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GI002

MODULAR BUILDING - INDEX OF

DRAWINGS

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

INDEX OF DRAWINGS

GENERAL INFORMATION

GI001 MODULAR BUILDING - COVER AND INDEX OF DRAWINGS

GI002 MODULAR BUILDING - INDEX OF DRAWINGS

GC101 MODULAR BLDG. - CONNECTING LINK FLOOR PLAN - PHASE 1

GC102 MODULAR BLDG. - CONNECTING LINK FLOOR PLAN - PHASE 2

GC103 MODULAR BLDG. - CONNECTING LINK FLOOR PLAN - PHASE 3

GC104 MODULAR BLDG. - CONNECTING LINK FLOOR PLAN - PHASE 4

CIVIL

CJ100 CIVIL NOTES AND LEGEND

CD100 EXISTING CONDITIONS AND DEMO PLAN

CD101 FUTURE CONDITIONS REMOVAL PLAN

CS100 SITE LAYOUT

CS101 TYPICAL SECTION PLAN AND PROFILES

CS102 FUTURE LAYOUT AND RESTORATION PLAN

CG100 GRADING AND EROSION CONTROL PLAN

CU100 UTILITY PLAN

CU101 PLAN AND PROFILE - SANITARY SEWER

CK100 CIVIL DETAILS

CK101 CIVIL DETAILS

CK102 CIVIL DETAILS

STRUCTURAL

SG001 STRUCTURAL GENERAL NOTES

SF101 PHASE 1 - FOUNDATION PLAN

SF102 PHASE 1 - FRAMING PLAN

SD101 PHASE 4 - DEMO PLAN

SF501 DETAILS

ARCHITECTURAL

AG001 ARCHITECTURAL ABBREVIATIONS, LEGENDS

AG002 ARCHITECTURAL GENERAL NOTES

A-101 CONNECTING LINK - FIRST FLOOR PLAN & REFLECTED CEILING PLAN

A-102 CONNECTING LINK ROOF PLAN

A-103 CONNECTING LINK - MOD. BLDG. - 1ST FLR - DEMO+RENO - PH. 3-4

A-104 CONNECTING LINK - MODULAR BLDG - DEMOLITION - PH 4 (END)

A-200 EXTERIOR ELEVATIONS

A-300 BLDG. SECTIONS - CONNECTING LINK-MODULAR BLDG. COMPLEX

A-301 CONNECTING LINK WALL SECTIONS

A-501 CONNECTING LINK DETAILS

A-701 DOOR AND FRAME TYPES, DETAILS AND DOOR SCHEDULE

A-801 PARTITION TYPES AND DETAILS

EQUIPMENT

QH101 FIRST FLOOR - EQUIPMENT PLAN - PHASE 1

QH601 LAB EQUIPMENT LIST - MODULAR BLDG

FIRE PROTECTION

FX000 FIRE PROTECTION COVERSHEET

FD101 LEVEL 01 DEMOLITION PLAN - FIRE PROTECTION

FX101 LEVEL 01 PLAN - FIRE PROTECTION

FX500 FIRE PROTECTION DETAILS

VENTILATION

MH000 MECHANICAL COVERSHEET

MH101 LEVEL 01 PLAN - VENTILATION

MH601 VENTILATION DIAGRAMS

MH603 VENTILATION SCHEDULES

ELECTRICAL

E-000 ELECTRICAL COVERSHEET

E-101 LEVEL 01 PLAN - ELECTRICAL

TECHNOLOGY

T000 TECHNOLOGY COVERSHEET

T201.0 LEVEL 01 PLAN - TECHNOLOGY FIBER ROUTE

T201.1 LEVEL 01 PLAN - TECHNOLOGY

T500 TECHNOLOGY DETAILS

T600 TECHNOLOGY DIAGRAMS AND ROOM ENLARGEMENTS

T601 TECHNOLOGY SCHEDULES

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

EXIT MARKER

S-1 S-2 S-3

4 3

D

E

C1

A-300

A-501

C1

A-200

A-200

D1

B6

EXISTING CONCRETE

AREAWAY RETAINING WALL

EXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVE

EXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVE

6' -0

'-0

6' -0

B

A

L-A

L-B

L-C

CC

L-1 L-2 L-3

A-501

C4

IN901x

C2

2" EXP. JOINT

A-200

B1

12'-0" 12'-0" 12'-0" 6'-5" 12'-0" 12'-0" 12'-0" 12'-0"

28 7 6 5

C

'-0

'-0

'-0

7' -2

7'

-2

'-0

'-0

'-0

'-0

AA

BB

RAMP

RISE

RAMP

RISE

DELEGATED DESIGN FOR TRAILER PROVIDER/GC

DELEGATED DESIGN FOR

COVERED WALKWAY BY MODULAR

BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

LANDING

END PLATFORM

PLATFORM

F4

A-301

C4

A-301

F.O. MOD - F.O. RETAINING WALL

20'-0" MIN.

DELEGATED DESIGN FOR

RAMPS/COVERED WALKWAY BY

MODULAR BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

5' -1

1/

2"

1/ 4"

6' -0

3' -0

3'

-0

PLATFORM

F .O

. F

IR

E W

A

LL

F

.O . M

O D

B

LD

G

'-0

M

IN

PLATFORM

FIREWALL (BY GC

- PART OF CONSTRUCTION

CONTRACT)

GC RESPONSIBLE FOR DESIGN, CONSTRUCTION

& REMOVAL OF ENCLOSED, TEMPERATURE-

CONTROLLED CONNECTORS/RAMPS TO NORTH

OF FIREWALL

7'-8 3/4"

6'-0"

36'-0"

6' -0

'-0

6' -0

HVAC HVAC HVAC HVAC

6'-0"

GC - RESPONSIBLE FOR DESIGN, CONSTRUCTION &

REMOVAL OF ENCLOSED, TEMPERATURE-CONTROLLED

CONNECTORS/RAMPS TO NORTH OF FIREWALL

A-200

F1

'-0

HVAC HVAC HVAC

WEST

ENTRY

CONNECTING

LINK

1A-C05B

2" EXP. JOINT

1A-C05A

1A -C

B

1A -C

B

EXTENTS OF GC-PROVIDED

DELEGATED DESIGN

EXTENTS OF CONNECTING

LINK CONSTRUCTION

DEDUCT ALTERNATE LIST

DEDUCT ALTERNATE – INCLUDES THE

FOLLOWING:

A. DELETE NEW AHU-9/AC9 AND ALL RELATED

AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

B. DELETE NEW DENTAL AHU AND ALL

RELATED AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

C. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

D. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

E. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

F. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

G. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

H. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

I. DELETE ALL MECHANICAL PIPING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

J. DELETE ALL MECHANICAL PIPING

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED AHU SERVING

MAIL ROOM 1A-173)

K. DELETE ALL MECHANICAL VENTILATION

WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

L. DELETE ALL MECHANICAL VENTILATION

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED RTU-MAIL

SERVING MAIL ROOM 1A-173)

M. DELETE ALL WORK RELATED TO THE NEW

TEMPORARY AHU, SHOWN ON FIRST FLOOR

VENTILATION WEST OF BUILDING 1

N. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

O. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

P. DELETE ALL TEMPORARY MODULAR

BUILDINGS AND/OR TRAILERS SHOWN FOR

PHASES 2, 3, & 4. ONLY PHASE 1

TEMPORARY BUILDINGS AND CONNECTING

LINK ARE TO REMAIN.

ARCH. GENERAL NOTES

1. DASHED BOLD LINES INDICATE EXTENTS OF

DEMOLITION UNLESS NOTED OTHERWISE.

2. ALL INTERIOR WALLS WILL BE TYPE "A"

CONSTRUCTION UNLESS OTHERWISE

INDICATED. REFER TO SHEET A801.

3. ALL METAL STUD AND GYPSUM WALLBOARD

PARTITIONS ARE DIMENSIONED TO THE

OUTSIDE FACE AND TO COLUMN GRID

UNLESS OTHERWISE NOTED.

4. WHEN WALL PARTITIONS OF DIFFERENT FIRE

RATING INTERSECT, THE HIGHEST RATED

PARTITION TAKES PRECEDENT. MAINTAIN

RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

5. REFER TO SHEET A-801 FOR FIRE

EXTINGUISHER CABINET DETAILS.

6. CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

7. REFER TO SPECIFICATION SECTION 10 28 00

FOR ADDITIONAL TOILET ACCESSORIES

LOCATIONS AND MOUNTING HEIGHTS.

8. REFER TO Q-SERIES DRAWINGS FOR

EQUIPMENT NUMBERS.

9. REFER TO SHEET A-801 FOR TYPICAL

BACKING DETAIL WITHIN INTERIOR WALL

PARTITION, HANDRAILS, CORNER GUARDS

ETC.

10. ALL EXISTING TO REMAIN CEILING AND WALL

GRILLES, DIFFUSERS AND LIGHTS, ETC., ARE

TO BE CLEANED PRIOR TO REINSTALLATION..

11. VERIFY THAT EXISTING AND NEW WALLS

REQUIRING FIRE RATINGS ARE MAINTAINED,

REPAIRED AND EXTENDED TO STRUCTURE.

12. ALL CORRIDOR WALLS ARE REQUIRED TO BE

SMOKE TIGHT, WHETHER THEY ARE FIRE

RATED OR NOT. REPAIR AND EXTEND AT

LEAST THE CORRIDOR SIDE OF NON-FIRE

RATED CORRIDOR WALLS TO STRUCTURE,

UNLESS NOTED OTHERWISE NOTED. SEE

PARTITION TYPES SHEET.

13. REFER TO ARCHITECTURAL FLOOR PLANS

FOR LOCATION OF REQUIRED FIRE WALLS.

14. REFER TO SPECIFICATION SECTIONS 07 60

00 & 07 95 13 FOR EXPANSION JOINT

ASSEMBLIES. PROVIDE FIRE RATED

EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO ARCHITECTURAL FLOOR

PLAN FOR FOR FIRE RATINGS.

15. ALL FURNITURE SHOWN HALFTONED WILL

BE OWNER FURNISHED AND OWNER

INSTALLED UNLESS NOTED OTHERWISE.

PHASE 1 - BLOOD LABS-DEPT. (FROM BLDG. 1-2ND

FLR WINGS 2C-1A-East) - HEMATOLOGY, CHEMISTRY, BLOOD BANK, MICROBIOLOGY

PHASE 1 THRU PHASE 4 - COVERED WALKWAY-RAMP

MODULAR BUILDING

COMPLEX LEGEND

WEST

ENTRY

EMPLOYEE

ENTRANCE

VESTIBULE

1A-C05A

1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER DEDUCT ALTERNATE

SEE SECTION 01 00 00 - GENERAL

REQUIREMENTS FOR FULL DESCRIPTION OF

DEDUCT ALTERNATE. REFER TO DRAWINGS FOR

ADDITIONAL NOTES AND DIRECTIONS RELATED

TO DEDUCT ALTERNATE.

PHASE 0 & 1 DESCRIPTIONS:

PHASE 0:

A. DESIGN AND SUBMIT FOR VA APPROVAL LAYOUTS AND

PHASING PLANS FOR WORK IN BUILDING 1 AND

CONSTRUCTION OF THE TEMPORARY MODULAR

BUILDING COMPLEX (MBC), ALONG WITH PRODUCT

SUBMITTALS FOR ITEMS TO BE PART OF THE PROJECT.

B. PREPARE SITE WEST OF BUILDING 1 AND CONSTRUCT

TEMPORARY MODULAR BUILDING COMPLEX (MBC) –

PHASE 1. INCLUDING COVERED WALKWAYS, FIREWALL

AND CONNECTING LINK TO HOSPITAL AND ALL

NECESSARY UTILITY CONNECTIONS TO THE SITE AND

THE HOSPITAL, BUILDING 1.

C. THE MBC SHALL COMPRISE OF A 4-PLEX OF UNITS TO

REMAIN ON-SITE FOR THE DURATION OF THIS PROJECT

WITH DEDICATED UNITS FOR RESTROOMS,

TELECOMMUNICATIONS AND UTILITY FUNCTIONS, WITH

A CONNECTING CORRIDOR AND AN ADDITIONAL 3-PLEX

OF BUILDING MODULES TO HOUSE PHASE 1 LAB

FUNCTIONS.

D. THE CONTRACTOR HAS THE OPTION OF

1. OBTAINING SPECIALTY MODULES DEDICATED

FOR USE WITH LABORATORIES, OR

2. PROVIDING A SERIES OF CONVENTIONAL

BUILDING MODULES WHICH CAN BE OUTFITTED

FOR LAB FUNCTIONS IN PHASE 1 AND

CONVERTED FOR OTHER FUNCTIONS AS

REQUIRED FOR PHASES 2 AND 3.

PHASE 1:

A. RELOCATE EXISTING LABORATORY OPERATIONS AND

EQUIPMENT FROM SECOND FLOOR LABS IN WINGS ‘A’-

EAST AND ‘C’ TO THE TEMPORARY MODULAR BUILDING

COMPLEX.

B. COMPLETE ASBESTOS REMEDIATION IN SAME SECOND

FLOOR LAB AREAS.

C. RENOVATE SECOND FLOOR LAB AREAS, REPLACE LAB-

AHU AND RELATED EQUIPMENT AND STRUCTURAL

IMPROVEMENTS AT SECOND, THIRD AND FOURTH

FLOORS, AND MAKE ALL NECESSARY UTILITY

CONNECTIONS DOWN TO PIPE BASEMENT LEVEL.

D. CONDUCT WORK IN PIPE BASMENT RELATED TO LAB

AHU WORK.

E. INSTALLATION OF RTU-MAIL AND RENOVATION OF MAIL

ROOM 1A-173. PROVIDE HVAC RENOVATION OF MAIL

ROOM 1A-173 ON FIRST FLOOR, INCLUDING NEW RTU-

MAIL ON ROOFTOP OF THE SOUTH ENTRY LOBBY AT

SECOND FLOOR, AND NEW DUCTWORK THROUGH

CORRIDOR 1A-C04 AND MEDICAL RECORDS 1A-101.

• THIS INCLUDES STRUCTURAL

REINFORCEMENT OF EXISTING LOBBY

ROOF STRUCTURE,

• REMOVAL AND REINSTALLATION OF

LOBBY, MAIL ROOM, CORRIDOR AND

MEDICAL RECORDS CEILINGS.

F. AT THE BEGINNING OF PHASE 1:

1. THE SEPARATE 3-PLEX OF MODULES FOR LAB

FUNCTIONS SHALL BE OPERATIONAL AND

READY TO ACCEPT EQUIPMENT FROM THE LABS.

2. DESIGNATED EQUIPMENT FROM THE LAB WILL

NEED TO REMAIN IN BUILDING 1 WHILE NEW

EQUIPMENT IS INSTALLED IN THE MBC LABS. A

PERIOD OF 4-5 WEEKS IS REQUIRED FOR

TESTING AND CALIBRATION OF NEW

EQUIPMENT, WITH DESIGNATED EXISTING

EQUIPMENT TO REMAIN IN OPERATION UNTIL

THE NEW EQUIPMENT IS CERTIFIED TO BE

AVAILABLE FOR USE.

3. AFTER LAB-TESTING EQUIPMENT IS SET UP AND

READY FOR OPERATION, DESIGNATED

EQUIPMENT IN BUILDING 1 CAN BE REMOVED

AND DEMOLITION MAY COMMENCE IN BUILDING

1.

4. WORK IN PIPE BASEMENT MAY TAKE PLACE

AFTER RELOCATION OF 2ND FLOOR LABS TO

THE MBC.

5. THE MAIL ROOM WILL BE RELOCATED TO THE

MBC 4-PLEX. THE MAIL ROOM WILL BE MOVED

BACK INTO BUILDING 1 UPON COMPLETION OF

WORK RELATED TO THE MAIL ROOM RTU AND

REFINISHING OF THE MAIL ROOM.

G. AT END OF PHASE 1:

1. RELOCATE ALL LAB OPERATIONS AND

EQUIPMENT FROM THE TEMPORARY MODULAR

BUILDING BACK INTO THE SECOND FLOOR LAB

SPACE.

2. REFURBISH THE MBC IN PREPARATION FOR

PHASE 2 AND PREPARE IT TO RECEIVE

FUNCTIONS BEING DISLOCATED OUT OF THE

HOSPITAL AS PART OF PHASE 2.

a. IF SPECIALTY LAB MODULES WERE USED, REMOVE FROM MBC AND REPLACE WITH

GENERAL-PURPOSE MODULES

PREPARED FOR PHASES 2 AND 3 USES.

b. IF GENERAL-PURPOSE MODULES WERE

MODIFIED TO SERVE LABS, RENOVATE

MODULES FOR PHASES 2 AND 3 USES.

PHASING GENERAL NOTES

SEE AG002 FOR GENERAL PHASING NOTES

1. THE GENERAL CONTRACTOR SHALL

PROVIDE DELEGATED DESIGN SERVICES

FOR THE TEMPORARY MODULAR BUILDING

COMPLEX (MBC) AND COVERED WALKWAYS-

RAMPS BETWEEN THE MBC AND THE 2-

HOUR FIREWALL SEPARATING THE

COVERED WALKWAY FROM THE

CONNECTING LINK TO THE WEST ENTRY OF

BUILDING 1.

2. DRAWINGS FOR THE MBC PRESENTED IN

THE CONSTRUCTION DOCUMETNS ARE

CONCEPTUAL AND SHOW LAYOUTS USED

FOR INITIAL PLANNING AND PHASING FOR

WORK RELATED TO TEMPORARY

RELOCATION OF DEPARTMENTS FROM

BUILDING 1 TO THE MBC DURING

CONSTRUCTION.

3. IT IS THE RESPONSIBILITY OF THE

CONTRACTOR TO COMPLETE DESIGN FOR

THE MBC AND COVERED WALKWAYS WITHIN

THE REQUIREMENTS PROVIDED IN THE

CONTRACT DOCUMENTS.

4. THE COR AND MEDICAL CENTER SHALL BE

INCLUDED IN THE DESIGN PROCESS.

COORDINATION BETWEEN THE

CONTRACTOR AND THE VA WILL REQUIRE

THAT THE CONTRACTOR CONDUCT

MEETINGS WITH THE VA AND MEDICAL

CENTER STAFF FOR PLANNING, DESIGN

REVIEWS AND APPROVALS.

5. WORK ON CONSTRUCTION OF THE MBC AND

COVERED WALKWAYS-RAMPS MAY NOT

COMMENCE UNTIL FINAL APPROVALS HAVE

BEEN PROVIDED BY THE VA.

DELEGATED DESIGN

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

E

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

Aw

F

D

Ac Ae

B

KEY PLAN

E

F

D

B

TT

Aw Ac Ae

CC

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GC101

MODULAR BLDG. - CONNECTING

LINK FLOOR PLAN - PHASE 1

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

3/16" = 1'-0"1

FIRST FLOOR - FLOOR PLAN - PHASE 1

DEDUCT ALTERNATE - SEE AG002 & TEMPORARY

MODULAR BUILDING COMPLEX DRAWINGS

4 3

D

E

B

A

L-A

L-B

L-C

CC

L-1 L-2 L-3

28 7 6 5

C

AA

BB

LANDING

END PLATFORM

PLATFORM

5'-10"

5' -1

1/

2"

1/ 4"

6' -0

3' -0

3'

-0

PLATFORM

F .O

. F

IR

E W

A

LL

F

.O . M

O D

B

LD

G

'-0

M

IN

6' -0

PLATFORM

12'-0" 12'-0" 12'-0" 6'-5" 12'-0" 12'-0" 12'-0" 12'-0"

F.O. MOD - F.O. RETAINING WALL

20'-0" MIN.

7'-8 3/4" 36'-0"

RAMP

RISE

RAMP

RISE

DELEGATED DESIGN FOR

COVERED WALKWAY BY MODULAR

BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

DELEGATED DESIGN FOR

RAMPS/COVERED WALKWAY BY

MODULAR BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

GC - RESPONSIBLE FOR DESIGN, CONSTRUCTION &

REMOVAL OF ENCLOSED, TEMPERATURE-CONTROLLED

CONNECTORS/RAMPS TO NORTH OF FIREWALL

EXISTING CONCRETE

AREAWAY RETAINING WALL

EXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVEEXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVE

DELEGATED DESIGN FOR TRAILER PROVIDER/GC

GC RESPONSIBLE FOR DESIGN, CONSTRUCTION

& REMOVAL OF ENCLOSED, TEMPERATURE-

CONTROLLED CONNECTORS/RAMPS TO NORTH

OF FIREWALL

HVAC HVAC HVAC HVAC HVAC HVAC HVAC

'-0

'-0

'-0

7' -2

7'

-2

'-0

'-0

'-0

'-0

EXTENTS OF GC-PROVIDED

DELEGATED DESIGN

EXTENTS OF CONNECTING

LINK CONSTRUCTION

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

EXIT MARKER

S-1 S-2 S-3

DEDUCT ALTERNATE LIST

DEDUCT ALTERNATE – INCLUDES THE

FOLLOWING:

A. DELETE NEW AHU-9/AC9 AND ALL RELATED

AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

B. DELETE NEW DENTAL AHU AND ALL

RELATED AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

C. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

D. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

E. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

F. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

G. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

H. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

I. DELETE ALL MECHANICAL PIPING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

J. DELETE ALL MECHANICAL PIPING

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED AHU SERVING

MAIL ROOM 1A-173)

K. DELETE ALL MECHANICAL VENTILATION

WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

L. DELETE ALL MECHANICAL VENTILATION

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED RTU-MAIL

SERVING MAIL ROOM 1A-173)

M. DELETE ALL WORK RELATED TO THE NEW

TEMPORARY AHU, SHOWN ON FIRST FLOOR

VENTILATION WEST OF BUILDING 1

N. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

O. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

P. DELETE ALL TEMPORARY MODULAR

BUILDINGS AND/OR TRAILERS SHOWN FOR

PHASES 2, 3, & 4. ONLY PHASE 1

TEMPORARY BUILDINGS AND CONNECTING

LINK ARE TO REMAIN.

ARCH. GENERAL NOTES

1. DASHED BOLD LINES INDICATE EXTENTS OF

DEMOLITION UNLESS NOTED OTHERWISE.

2. ALL INTERIOR WALLS WILL BE TYPE "A"

CONSTRUCTION UNLESS OTHERWISE

INDICATED. REFER TO SHEET A801.

3. ALL METAL STUD AND GYPSUM WALLBOARD

PARTITIONS ARE DIMENSIONED TO THE

OUTSIDE FACE AND TO COLUMN GRID

UNLESS OTHERWISE NOTED.

4. WHEN WALL PARTITIONS OF DIFFERENT FIRE

RATING INTERSECT, THE HIGHEST RATED

PARTITION TAKES PRECEDENT. MAINTAIN

RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

5. REFER TO SHEET A-801 FOR FIRE

EXTINGUISHER CABINET DETAILS.

6. CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

7. REFER TO SPECIFICATION SECTION 10 28 00

FOR ADDITIONAL TOILET ACCESSORIES

LOCATIONS AND MOUNTING HEIGHTS.

8. REFER TO Q-SERIES DRAWINGS FOR

EQUIPMENT NUMBERS.

9. REFER TO SHEET A-801 FOR TYPICAL

BACKING DETAIL WITHIN INTERIOR WALL

PARTITION, HANDRAILS, CORNER GUARDS

ETC.

10. ALL EXISTING TO REMAIN CEILING AND WALL

GRILLES, DIFFUSERS AND LIGHTS, ETC., ARE

TO BE CLEANED PRIOR TO REINSTALLATION..

11. VERIFY THAT EXISTING AND NEW WALLS

REQUIRING FIRE RATINGS ARE MAINTAINED,

REPAIRED AND EXTENDED TO STRUCTURE.

12. ALL CORRIDOR WALLS ARE REQUIRED TO BE

SMOKE TIGHT, WHETHER THEY ARE FIRE

RATED OR NOT. REPAIR AND EXTEND AT

LEAST THE CORRIDOR SIDE OF NON-FIRE

RATED CORRIDOR WALLS TO STRUCTURE,

UNLESS NOTED OTHERWISE NOTED. SEE

PARTITION TYPES SHEET.

13. REFER TO ARCHITECTURAL FLOOR PLANS

FOR LOCATION OF REQUIRED FIRE WALLS.

14. REFER TO SPECIFICATION SECTIONS 07 60

00 & 07 95 13 FOR EXPANSION JOINT

ASSEMBLIES. PROVIDE FIRE RATED

EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO ARCHITECTURAL FLOOR

PLAN FOR FOR FIRE RATINGS.

15. ALL FURNITURE SHOWN HALFTONED WILL

BE OWNER FURNISHED AND OWNER

INSTALLED UNLESS NOTED OTHERWISE.

WEST

ENTRY

EMPLOYEE

ENTRANCE

VESTIBULE

1A-C05A

WEST

ENTRY

CONNECTING

LINK

1A-C05B

PHASE 2 - ENVIRONMENTAL MANAGEMENT

SERVICES (EMS), LAUNDRY

PHASE 1 THRU PHASE 4 - COVERED WALKWAY-RAMP

MODULAR BUILDING

COMPLEX LEGEND1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER DEDUCT ALTERNATE

SEE SECTION 01 00 00 - GENERAL

REQUIREMENTS FOR FULL DESCRIPTION OF

DEDUCT ALTERNATE. REFER TO DRAWINGS FOR

ADDITIONAL NOTES AND DIRECTIONS RELATED

TO DEDUCT ALTERNATE.

PHASE 2 DESCRIPTION

PHASE 2:

A. PHASE 2 INCLUDES:

1. REMOVAL AND REPLACEMENT OF AHU-AC9

AND ASSOCIATED DUCTWORK.

2. PLATFORM FOR NEW AHU-AC9 AND

AHU_DENTAL (TO BE INSTALLED IN PHASE

4).

3. CONNECTION TO REPLACED AHU-AC9.

4. RENOVATE GROUND FLOOR WEST AREAS,

WHERE IDENTIFIED, ALONG WITH REMOVAL

AND REPLACEMENT OF RELATED

EQUIPMENT AND INTERIOR CEILINGS, AND

MAKING ALL NECESSARY UTILITY

CONNECTIONS.

5. A TEMPORARY AHU IS TO BE INSTALLED ON

THE GROUND WEST OF THE HOSPITAL AND

NORTH OF THE MBC TO SERVE AREAS

CURRENTLY BEING SERVED BY EXISTING

AHU-AC9 ON GROUND FLOORS AS PART OF

PHASE 2, AND FIRST FLOORS AS PART OF

PHASES 3 AND 4.

6. REPLACE AHU-AC9 ON ROOF AT FIRST

FLOOR (NEW AHU-DENTAL ON SAME ROOF

TO INSTALL AS PART OF PHASE 4).

7. REPLACE ROOF AS SHOWN AT FIRST

FLOOR ALONG WITH ROOFTOP AHU

REPLACEMENT.

8. RENOVATE GROUND FLOOR WEST AREAS,

WHERE IDENTIFIED, AND RELATED

EQUIPMENT AND INTERIOR CEILINGS, AND

MAKE ALL NECESSARY UTILITY

CONNECTIONS.

B. AT THE BEGINNING OF PHASE 2:

1. ENVIRONMENTAL MANAGEMENT SERVICES

(EMS), INCLUDING (BUT NOT LIMITED TO)

LAUNDRY WILL BE RELOCATED TO THE

MODULAR BUILDING COMPLEX PRIOR TO

START OF DEMOLITION AND RENOVATION

WORK. PROVISION FOR LAUNDRY IS TO BE

MADE AS DIRECTED BY THE COR.

2. AFTER DESIGNATED DEPARTMENTS ARE

RELOCATED TO THE MBC, WORK MAY

BEGIN INSIDE BLDG. 1.

a. AT END OF PHASE 2:

1. ALL FUNCTIONS WILL BE MOVED BACK INTO

RENOVATED SPACES.

2. THE MBC IS TO BE PREPARED FOR PHASE 3

ACTIVITIES.

PHASING GENERAL NOTES

SEE AG002 FOR GENERAL PHASING NOTES

1. SEE SHEET AG002 FOR DELEGATED DESIGN

NOTES FOR THE TEMPORARY MODULAR

BUILIDING COMPLEX (MBC) AND COVERED

WALKWAYS-RAMPS.

DELEGATED DESIGN

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

E

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

Aw

F

D

Ac Ae

B

KEY PLAN

E

F

D

B

TT

Aw Ac Ae

CC

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GC102

MODULAR BLDG. - CONNECTING

LINK FLOOR PLAN - PHASE 2

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

3/16" = 1'-0"1

FIRST FLOOR - FLOOR PLAN - PHASE 2

DEDUCT ALTERNATE -

SEE AG002 & BUILDING 1

DRAWINGS

DEDUCT ALTERNATE - SEE AG002 & TEMPORARY

4 3

D

E

B

A

L-A

L-B

L-C

CC

L-1 L-2 L-3

28 7 6 5

C

AA

BB

LANDING

END PLATFORM

PLATFORM

5'-10"

5' -1

1/

2"

1/ 4"

6' -0

3' -0

3'

-0

PLATFORM

F .O

. F

IR

E W

A

LL

F

.O . M

O D

B

LD

G

'-0

M

IN

6' -0

PLATFORM

HVAC

12'-0" 12'-0" 12'-0" 6'-5" 12'-0" 12'-0" 12'-0" 12'-0"

F.O. MOD - F.O. RETAINING WALL

20'-0" MIN.

7'-8 3/4"36'-0"

UNISEX

TOILET

UNISEX

TOILET

HAC

UNISEX

TOILET

UNISEX

TOILET

IT /

TELECOM

ROOM

RAMP

RISE

RAMP

RISE

DELEGATED DESIGN FOR

COVERED WALKWAY BY MODULAR

BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

DELEGATED DESIGN FOR

RAMPS/COVERED WALKWAY BY

MODULAR BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

EXISTING CONCRETE

AREAWAY RETAINING WALL

EXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVEEXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVE

DELEGATED DESIGN FOR TRAILER PROVIDER/GC

GC RESPONSIBLE FOR DESIGN, CONSTRUCTION

& REMOVAL OF ENCLOSED, TEMPERATURE-

CONTROLLED CONNECTORS/RAMPS TO NORTH

OF FIREWALL

GC - RESPONSIBLE FOR DESIGN, CONSTRUCTION &

REMOVAL OF ENCLOSED, TEMPERATURE-CONTROLLED

CONNECTORS/RAMPS TO NORTH OF FIREWALL

HVAC HVAC HVAC HVAC HVAC HVAC

CLOSET

CLOSET

EXAM ROOM

EXAM ROOM

WOMEN'S

CLINIC

SPACE

HVAC

'-0

'-0

'-0

7' -2

7'

-2

'-0

'-0

'-0

'-0

EXTENTS OF GC-PROVIDED

DELEGATED DESIGN

EXTENTS OF CONNECTING

LINK CONSTRUCTION

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

EXIT MARKER

S-1 S-2 S-3

DEDUCT ALTERNATE LIST

DEDUCT ALTERNATE – INCLUDES THE

FOLLOWING:

A. DELETE NEW AHU-9/AC9 AND ALL RELATED

AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

B. DELETE NEW DENTAL AHU AND ALL

RELATED AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

C. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

D. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

E. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

F. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

G. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

H. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

I. DELETE ALL MECHANICAL PIPING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

J. DELETE ALL MECHANICAL PIPING

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED AHU SERVING

MAIL ROOM 1A-173)

K. DELETE ALL MECHANICAL VENTILATION

WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

L. DELETE ALL MECHANICAL VENTILATION

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED RTU-MAIL

SERVING MAIL ROOM 1A-173)

M. DELETE ALL WORK RELATED TO THE NEW

TEMPORARY AHU, SHOWN ON FIRST FLOOR

VENTILATION WEST OF BUILDING 1

N. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

O. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

P. DELETE ALL TEMPORARY MODULAR

BUILDINGS AND/OR TRAILERS SHOWN FOR

PHASES 2, 3, & 4. ONLY PHASE 1

TEMPORARY BUILDINGS AND CONNECTING

LINK ARE TO REMAIN.

ARCH. GENERAL NOTES

1. DASHED BOLD LINES INDICATE EXTENTS OF

DEMOLITION UNLESS NOTED OTHERWISE.

2. ALL INTERIOR WALLS WILL BE TYPE "A"

CONSTRUCTION UNLESS OTHERWISE

INDICATED. REFER TO SHEET A801.

3. ALL METAL STUD AND GYPSUM WALLBOARD

PARTITIONS ARE DIMENSIONED TO THE

OUTSIDE FACE AND TO COLUMN GRID

UNLESS OTHERWISE NOTED.

4. WHEN WALL PARTITIONS OF DIFFERENT FIRE

RATING INTERSECT, THE HIGHEST RATED

PARTITION TAKES PRECEDENT. MAINTAIN

RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

5. REFER TO SHEET A-801 FOR FIRE

EXTINGUISHER CABINET DETAILS.

6. CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

7. REFER TO SPECIFICATION SECTION 10 28 00

FOR ADDITIONAL TOILET ACCESSORIES

LOCATIONS AND MOUNTING HEIGHTS.

8. REFER TO Q-SERIES DRAWINGS FOR

EQUIPMENT NUMBERS.

9. REFER TO SHEET A-801 FOR TYPICAL

BACKING DETAIL WITHIN INTERIOR WALL

PARTITION, HANDRAILS, CORNER GUARDS

ETC.

10. ALL EXISTING TO REMAIN CEILING AND WALL

GRILLES, DIFFUSERS AND LIGHTS, ETC., ARE

TO BE CLEANED PRIOR TO REINSTALLATION..

11. VERIFY THAT EXISTING AND NEW WALLS

REQUIRING FIRE RATINGS ARE MAINTAINED,

REPAIRED AND EXTENDED TO STRUCTURE.

12. ALL CORRIDOR WALLS ARE REQUIRED TO BE

SMOKE TIGHT, WHETHER THEY ARE FIRE

RATED OR NOT. REPAIR AND EXTEND AT

LEAST THE CORRIDOR SIDE OF NON-FIRE

RATED CORRIDOR WALLS TO STRUCTURE,

UNLESS NOTED OTHERWISE NOTED. SEE

PARTITION TYPES SHEET.

13. REFER TO ARCHITECTURAL FLOOR PLANS

FOR LOCATION OF REQUIRED FIRE WALLS.

14. REFER TO SPECIFICATION SECTIONS 07 60

00 & 07 95 13 FOR EXPANSION JOINT

ASSEMBLIES. PROVIDE FIRE RATED

EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO ARCHITECTURAL FLOOR

PLAN FOR FOR FIRE RATINGS.

15. ALL FURNITURE SHOWN HALFTONED WILL

BE OWNER FURNISHED AND OWNER

INSTALLED UNLESS NOTED OTHERWISE.

WEST

ENTRY

EMPLOYEE

ENTRANCE

VESTIBULE

1A-C05A

WEST

ENTRY

CONNECTING

LINK

1A-C05B

PHASE 3 - PAIN CLINIC, WOMEN'S

CLINIC, VETERANS SERVICE

OFFICES (VSOs)

PHASE 1 THRU PHASE 4 -

COVERED WALKWAY-RAMP

MODULAR BUILDING

COMPLEX LEGEND1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER DEDUCT ALTERNATE

SEE SECTION 01 00 00 - GENERAL

REQUIREMENTS FOR FULL DESCRIPTION OF

DEDUCT ALTERNATE. REFER TO DRAWINGS FOR

ADDITIONAL NOTES AND DIRECTIONS RELATED

TO DEDUCT ALTERNATE.

PHASE 3 DESCRIPTION

PHASE 3:

A. PHASE 3 INCLUDES:

1. REMOVAL, REPLACEMENT AND

CONNECTION OF NEW DUCTWORK TO

REPLACED AHU-AC9 AT FIRST FLOOR.

2. RELATED WORK ON FIRST FLOOR, WEST

PLAN AREAS. INCLUDING REMOVAL AND

REPLACEMENT OF INTERIOR CEILINGS.

3. RENOVATE FIRST FLOOR WEST AREAS,

WHERE IDENTIFIED, AND RELATED

EQUIPMENT, AND MAKE ALL NECESSARY

UTILITY CONNECTIONS.

B. AT THE BEGINNING OF PHASE 3:

1. DEPARTMENTS, INCLUDING VETERANS

SERVICE OFFICES (VSOS), PAIN CLINIC

AND WOMEN’S CLINIC, IN WINGS 'A'-WEST

AND 'F' WILL BE RELOCATED TO THE MBC

PRIOR TO START OF DEMOLITION AND

RENOVATION WORK.

2. AFTER DEPARTMENTS ARE RELOCATED

TO MBC, WORK MAY BEGIN INSIDE BLDG.

1.

C. AT THE END OF PHASE 3:

1. ALL DEPARTMENTS WILL BE MOVED

BACK INTO RENOVATED SPACES.

2. THE MBC IS TO BE PREPARED FOR

PHASE 4 ACTIVITIES.

A. THE MODULAR BUILDING 3-PLEX

WILL BE DISCONNECTED FROM

THE MBC AND REMOVED FROM

THE SITE.

B. THE CONNECTING CORRIDOR-

COVERED WALKWAY BETWEEN

THE 3-PLEX AND 4-PLEX IS TO BE

REBUILT TO ACCOMMODATE

SPECIALTY DENTAL TRAILERS,

WHICH ARE TO BE PLACED AT

THE BEGINNING OF PHASE 4.

PHASING GENERAL NOTES

SEE AG002 FOR GENERAL PHASING NOTES

1. SEE SHEET AG002 FOR DELEGATED DESIGN

NOTES FOR THE TEMPORARY MODULAR

BUILIDING COMPLEX (MBC) AND COVERED

WALKWAYS-RAMPS.

DELEGATED DESIGN

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

E

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

Aw

F

D

Ac Ae

B

KEY PLAN

E

F

D

B

TT

Aw Ac Ae

CC

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GC103

MODULAR BLDG. - CONNECTING

LINK FLOOR PLAN - PHASE 3

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

3/16" = 1'-0"1

FIRST FLOOR - FLOOR PLAN - PHASE 3

DEDUCT ALTERNATE -

SEE AG002 & BUILDING 1

DRAWINGS

DEDUCT ALTERNATE - SEE AG002 & TEMPORARY

9 4 3

D

E

B

A

L-A

L-B

L-C

CC

L-1 L-2 L-3

28 7 6 5

C

AA

BB

LANDING

END PLATFORM

PLATFORM

5'-10"

5' -1

1/

2"

1/ 4"

6' -0

3' -0

3'

-0

PLATFORM

F .O

. F

IR

E W

A

LL

F

.O . M

O D

B

LD

G

'-0

M

IN

6' -0

PLATFORM

24'-0" 12'-0" 6'-5" 12'-0" 12'-0" 12'-0" 12'-0"

F.O. MOD - F.O. RETAINING WALL

20'-0" MIN.

7'-8 3/4" 36'-0"

RAMP

RISE

RAMP

RISE

DELEGATED DESIGN FOR

COVERED WALKWAY BY MODULAR

BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

DELEGATED DESIGN FOR

RAMPS/COVERED WALKWAY BY

MODULAR BLDG. PROVIDER / GC

- WILL REQUIRE COORDINATION W/

STRUCT & CIVIL FOR SUPPORT

PIERS & FOUNDATIONS

EXISTING CONCRETE

AREAWAY RETAINING WALL

EXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVEEXISTING BRICK COLUMN

SUPPORTING CANOPY ABOVE

DELEGATED DESIGN FOR TRAILER PROVIDER/GC

GC RESPONSIBLE FOR DESIGN, CONSTRUCTION

& REMOVAL OF ENCLOSED, TEMPERATURE-

CONTROLLED CONNECTORS/RAMPS TO NORTH

OF FIREWALL

UNISEX

TOILET

UNISEX

TOILET

IT /

TELECOM

ROOM

HAC

UNISEX

TOILET

UNISEX

TOILET

PHASE 4 -

DENTAIL TRAILERS

(2) 8'-6" x 48'

CLOSET

CLOSET

DENTAL LAB

HVAC HVAC HVAC HVAC

1A -C

B

1A

-C

B

'-0

'-0

'-0

7' -2

7'

-2

'-0

'-0

'-0

'-0

EXTENTS OF GC-PROVIDED

DELEGATED DESIGN

EXTENTS OF CONNECTING

LINK CONSTRUCTION

GC - RESPONSIBLE FOR DESIGN, CONSTRUCTION &

REMOVAL OF ENCLOSED, TEMPERATURE-CONTROLLED

CONNECTORS/RAMPS TO NORTH OF FIREWALL

SMOKE PARTITION

SYMBOL

LIFE SAFETY PLAN LEGEND:

DESCRIPTION

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

EGRESS PATH

STARTING

LOCATION

TRAVEL

DISTANCE

100'

TRAVEL PATH

EXIT MARKER

S-1 S-2 S-3

PHASE 4 - 8'x12"

ENCLOSED PLATFORM

BETWEEN DENTAL

TRAILERS (BY GC)

ARCH. GENERAL NOTES

1. DASHED BOLD LINES INDICATE EXTENTS OF

DEMOLITION UNLESS NOTED OTHERWISE.

2. ALL INTERIOR WALLS WILL BE TYPE "A"

CONSTRUCTION UNLESS OTHERWISE

INDICATED. REFER TO SHEET A801.

3. ALL METAL STUD AND GYPSUM WALLBOARD

PARTITIONS ARE DIMENSIONED TO THE

OUTSIDE FACE AND TO COLUMN GRID

UNLESS OTHERWISE NOTED.

4. WHEN WALL PARTITIONS OF DIFFERENT FIRE

RATING INTERSECT, THE HIGHEST RATED

PARTITION TAKES PRECEDENT. MAINTAIN

RATING BEHIND FIRE EXTINGUISHER

CABINETS, ETC.

5. REFER TO SHEET A-801 FOR FIRE

EXTINGUISHER CABINET DETAILS.

6. CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS PRIOR TO

CONSTRUCTION.

7. REFER TO SPECIFICATION SECTION 10 28 00

FOR ADDITIONAL TOILET ACCESSORIES

LOCATIONS AND MOUNTING HEIGHTS.

8. REFER TO Q-SERIES DRAWINGS FOR

EQUIPMENT NUMBERS.

9. REFER TO SHEET A-801 FOR TYPICAL

BACKING DETAIL WITHIN INTERIOR WALL

PARTITION, HANDRAILS, CORNER GUARDS

ETC.

10. ALL EXISTING TO REMAIN CEILING AND WALL

GRILLES, DIFFUSERS AND LIGHTS, ETC., ARE

TO BE CLEANED PRIOR TO REINSTALLATION..

11. VERIFY THAT EXISTING AND NEW WALLS

REQUIRING FIRE RATINGS ARE MAINTAINED,

REPAIRED AND EXTENDED TO STRUCTURE.

12. ALL CORRIDOR WALLS ARE REQUIRED TO BE

SMOKE TIGHT, WHETHER THEY ARE FIRE

RATED OR NOT. REPAIR AND EXTEND AT

LEAST THE CORRIDOR SIDE OF NON-FIRE

RATED CORRIDOR WALLS TO STRUCTURE,

UNLESS NOTED OTHERWISE NOTED. SEE

PARTITION TYPES SHEET.

13. REFER TO ARCHITECTURAL FLOOR PLANS

FOR LOCATION OF REQUIRED FIRE WALLS.

14. REFER TO SPECIFICATION SECTIONS 07 60

00 & 07 95 13 FOR EXPANSION JOINT

ASSEMBLIES. PROVIDE FIRE RATED

EXPANSION JOINTS IN RATED FIRE RATED

WALLS; REFER TO ARCHITECTURAL FLOOR

PLAN FOR FOR FIRE RATINGS.

15. ALL FURNITURE SHOWN HALFTONED WILL

BE OWNER FURNISHED AND OWNER

INSTALLED UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE LIST

DEDUCT ALTERNATE – INCLUDES THE

FOLLOWING:

A. DELETE NEW AHU-9/AC9 AND ALL RELATED

AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

B. DELETE NEW DENTAL AHU AND ALL

RELATED AND/OR CONNECTED SYSTEMS

(DUCTWORK, PIPING, STRUCTURAL

PLATFORM, REROOFING, CEILING

REPLACEMENT, TEMPERATURE CONTROL,

ELECTRICAL, DEMOLITION, ETC.)

C. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

D. DELETE ALL ARCHITECTURAL & INTERIOR

DESIGN WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

E. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

F. DELETE ALL FIRE PROTECTION WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

G. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

H. DELETE ALL PLUMBING WORK

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F

I. DELETE ALL MECHANICAL PIPING WORK

(DEMOLITION, AND NEW) ON GROUND

FLOOR, AREAS Aw & E

J. DELETE ALL MECHANICAL PIPING

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED AHU SERVING

MAIL ROOM 1A-173)

K. DELETE ALL MECHANICAL VENTILATION

WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

L. DELETE ALL MECHANICAL VENTILATION

(DEMOLITION, AND NEW) ON FIRST FLOOR,

AREAS Aw, E & F (EXCEPT FOR WORK

RELATED TO DEDICATED RTU-MAIL

SERVING MAIL ROOM 1A-173)

M. DELETE ALL WORK RELATED TO THE NEW

TEMPORARY AHU, SHOWN ON FIRST FLOOR

VENTILATION WEST OF BUILDING 1

N. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

GROUND FLOOR, AREAS Aw & E

O. DELETE ALL ELECTRICAL LIGHTING &

POWER WORK (DEMOLITION, AND NEW) ON

FIRST FLOOR, AREAS Aw, E & F (EXCEPT

FOR WORK RELATED TO DEDICATED AHU

SERVING MAIL ROOM 1A-173)

P. DELETE ALL TEMPORARY MODULAR

BUILDINGS AND/OR TRAILERS SHOWN FOR

PHASES 2, 3, & 4. ONLY PHASE 1

TEMPORARY BUILDINGS AND CONNECTING

LINK ARE TO REMAIN.

WEST

ENTRY

EMPLOYEE

ENTRANCE

VESTIBULE

1A-C05A

WEST

ENTRY

CONNECTING

LINK

1A-C05B

PHASE 4 - DENTAL CLINIC

PHASE 4 - DENTAIL SPECIALTY

MODULES-CONNECTORS

PHASE 1 THRU PHASE 4 -

COVERED WALKWAY-RAMP

MODULAR BUILDING

COMPLEX LEGEND1. LAYOUT FOR MODULAR BUILDINGS BEYOND THE FIREWALL SHALL BE

THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AS PART OF A

DELEGATED DESIGN DELIVERY SYSTEM, WITH INPUT FROM THE

MEDICAL CENTER.

2. ITEMS SHOWN ARE CONCEPTUAL AND FOR INFORMATIONAL

PURPOSES ONLY (NOT FOR CONSTRUCTION). THE CONTRACTOR

SHALL PROVIDE, AS PART OF DELEGATED DESIGN, LAYOUTS FOR

MODULAR BUILDING UNITS, RELOCATED DEPARTMENTS AND

EQUIPMENT, ALONG WITH PHASING DOCUMENTS FOR

COORDINATION WITH, REVIEW AND APPROVAL BY THE VA PRIOR TO

AUTHORIZATION OF WORK BY THE VA.

MODULAR BLDG COMPLEX DISCLAIMER DEDUCT ALTERNATE

SEE SECTION 01 00 00 - GENERAL

REQUIREMENTS FOR FULL DESCRIPTION OF

DEDUCT ALTERNATE. REFER TO DRAWINGS FOR

ADDITIONAL NOTES AND DIRECTIONS RELATED

TO DEDUCT ALTERNATE.

PHASING GENERAL NOTES

SEE AG002 FOR GENERAL PHASING NOTES

PHASE 4 DESCRIPTION

PHASE 4:

A. PHASE 4 INCLUDES:

a. REPLACEMENT AND CONNECTION TO

NEW AHU_DENTAL AND RELATED WORK

ON FIRST FLOOR, WEST PLAN AREAS IN

WING ‘E’,

b. INSTALLATION OF RTU-MAIL AND

RENOVATION OF MAIL ROOM 1A-173.

PROVIDE HVAC RENOVATION OF MAIL

ROOM 1A-173 ON FIRST FLOOR,

INCLUDING NEW RTU-MAIL ON ROOFTOP

OF THE SOUTH ENTRY LOBBY AT

SECOND FLOOR.

• THIS INCLUDES STRUCTURAL

REINFORCEMENT OF EXISTING

LOBBY ROOF STRUCTURE,

• REMOVAL AND REINSTALLATION

OF LOBBY AND MAIL ROOM

CEILINGS.

c. RENOVATE FIRST FLOOR WEST AREAS, WHERE IDENTIFIED, AND RELATED

EQUIPMENT AND INTERIOR CEILINGS,

AND MAKE ALL NECESSARY UTILITY

CONNECTIONS.

B. AT THE BEGINNING OF PHASE 4:

1. TWO SPECIALTY DENTAL TRAILERS ARE

TO BE PLACED AT THE WEST END OF

THE MBC, WITH TEMPORARY WALKWAY

STRUCTURES MODIFIED AND ADDED TO

CONNECT THE DENTAL TRAILERS TO

THE MBC.

2. THE DENTAL DEPARTMENT WILL BE

RELOCATED TO THE DENTAL TRAILERS

AND WITHIN THE MBC 4-PLEX PRIOR TO

START OF WORK INSIDE BUILDING 1.

3. THE MAIL ROOM WILL BE RELOCATED TO

THE MBC 4-PLEX. THE MAIL ROOM WILL

BE MOVED BACK INTO BUILDING 1 UPON

COMPLETION OF WORK RELATED TO THE

MAIL ROOM RTU AND REFINISHING OF

THE MAIL ROOM.

4. UPON COMPLETION OF HVAC WORK IN

BUILDING 1, REMOVE THE TEMPORARY

GROUND MOUNTED AHU. RELOCATE THE

DENTAL DEPARTMENT TO BUILDING 1

UPON COMPLETION AND ACCEPTANCE

OF RENOVATION WORK.

C. END OF PHASE 4:

1. DEMOLISH TEMPORARY MODULAR

BUILDING COMPLEX – PHASE 4 OF

THOSE DRAWINGS. INCLUDING COVERED

WALKWAYS, FIREWALL AND

CONNECTING WALKWAY TO HOSPITAL.

2. REMOVE ALL MBC UTILITY

CONNECTIONS TO THE SITE AND THE

HOSPITAL, BUILDING 1.

3. RETURN SITE TO CURRENT STATE AS

SHOWN ON CIVIL DRAWINGS

1. SEE SHEET AG002 FOR DELEGATED DESIGN

NOTES FOR THE TEMPORARY MODULAR

BUILIDING COMPLEX (MBC) AND COVERED

WALKWAYS-RAMPS.

DELEGATED DESIGN

JIM

H.

HAGEMAN

A-2205

A

R C H I T E

C

T

S T

A T

E

O F N E B

R A

S K

A

8/30/2024

PLAN

NORTH

TRUE

NORTH

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

E

ARCHITECT/ENGINEER OF RECORD

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

Shaffer, Stevens & Schaap 1070 Howard Street Omaha, Nebraska 68102 Phone: (402) 455-7698

AMI Environmental Inc 8802 S 135th Street Omaha, NE 68138 Phone: (402) 397-5001

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143 Phone: (314) 645-1132

CC

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

Aw

F

D

Ac Ae

B

KEY PLAN

E

F

D

B

TT

Aw Ac Ae

CC

A u to d e s k D o c s

/2

-1

A

-2

-3

V

A P o p la r

B lu ff

R e m o v e a n d

R e p la c e

L a b A

H U a n d

A H

U

/6

A

-2

-3

.B T

T .A rc h

R

-1

-M o d u la r B ld g

.r v t

/1

/2

:0

:3

A

M

GC104

MODULAR BLDG. - CONNECTING

LINK FLOOR PLAN - PHASE 4

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION, AND

AIR CONDITIONING

657A4-21-800

MODULAR BLDG.

8/30/2024 JHH ALESIA

3/16" = 1'-0"1

FIRST FLOOR - FLOOR PLAN - PHASE 4

DEDUCT ALTERNATE -

SEE AG002 & BUILDING 1

DRAWINGS

DEDUCT ALTERNATE - SEE AG002 & TEMPORARY

C

I

E

A

D

G

H

F

South Campus Road Entrance

South Building Entrance

Main Entrance

Urgent Care

North Building Entrance

Main Campus Road Entrance

Bldg. 2 Entrance

North Campus Road Entrance

Westwood Blvd./Hwy 67

John J. Pershing VA Medical Center Poplar Bluff, Missouri

LEGEND:

Employee Parking

Parking Removed

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMP

321 4 5 6 7 8 9 10

ALESIA ARCHITECTURE P.C.

3705 NORTH 200TH STREET

ELKHORN, NEBRASKA 68022

PHONE: (402) 291-6941

SHAFFER , STEVENS & SCHAAP

9910 NORTH 48TH STREET

OMAHA, NEBRASKA68152

PHONE: (402) 455-7698

IMEG Corp.

15 SUNNEN DR. STE. 104

MAPLEWOOD, MO 63143

PHONE: (314) 645-1774

AMI ENVIRONMENTAL INC

8802 S 135TH STREET

OMAHA, NE 68138

PHONE: (402) 397-5001

C :\U se rs

\a ar on .c

.m ey er \D ow nl oa ds

\R

_2

1-

_V A_

7A

4-

-3

\R

_2

1-

_V A_

7A

4-

-3

.rv t

7/ 8/

1:

:2

AM

REMOVE AND REPLACE END OF

LIFE HEATING, VENTILATION,

AND AIR CONDITIONING

657A4-21-800

CEM MDM

MODULAR BLDG.

08/30/2024

CIVIL NOTES AND LEGEND

RAILROAD SPIKE, FOUND

SURVEY BOUNDARY

HANDHOLE

POWER POLE

STORM MANHOLE

HYDRANT

WATER VALVE

GAS VALVE

STORM INLET

LIGHT POLE

SIGN

STORM DOUBLE INLET

SPOT ELEVATION

MEASURED DIMENSION

L E G E N D

RECORDED DIMENSION

R.O.W. MARKER, FOUND

ELECTRIC PEDESTAL/TRANSFORMER

TELEPHONE PEDESTAL

TELEPHONE POLE

SOIL BORING HOLE

FLARED END SECTION

SECTION LINE

EASEMENT LINE

CHAIN LINK FENCE

OVERHEAD ELECTRIC

GAS LINE

UNDERGROUND ELECTRIC

GUARD RAIL

SANITARY/STORM CLEANOUT

TELEPHONE LINE

R.O.W. LINE

ELECTRIC MANHOLE

TELEPHONE MANHOLE

UTILITY MANHOLE

LIGHT JUNCTION BOX

CONIFER TREE

DECIDUOUS TREE

TREE STUMP

BUSH/SHRUB

VAPOR LIGHT

CONTROL POINT

UNKNOWN MANHOLE

WELL

GUY WIRE

FLAGPOLE

POST/BOLLARD

TREE LINE

HISTORICAL LINE - AS NOTED

PROPERTY LINE

DOWNSPOUT

BENCHMARK

ELECTRIC METER

WATER METER

FORCE MAIN

SANITARY SEWER

STORM SEWER

PIPE UNDERDRAIN

WATER LINE

SETBACK LINE

UTILITY LINE

GUY POLE

GRADE LABEL

POWER POLE W/ LIGHT

POWER POLE W/ METER

DRAINAGE SLOPE

LINE CONTINUATION

CONTOUR

CENTERLINE

SANITARY MANHOLE

FLOOD PLAIN

FLOODWAY

PROPOSED EXISTING

SILT FENCE

CONCRETE MONUMENT, FOUND

CONSTRUCTION LIMITS

PIPE, FOUND

STORM INLET

SPRINKLER BOX

WATER SERVICE

EDGE OF WATER LINE/DITCH FLOWLINE

GENERAL NOTES

1. ALL IMPROVEMENTS SHOWN ON THESE ENGINEERING PLANS SHALL COMPLY

WITH THE POPLAR BLUFF DESIGN AND SPECIFICATIONS, LATEST EDITION, AND

THE STANDARDS OF THE MISSOURI DEPARTMENT OF NATURAL RESOURCES,

LATEST EDITION.

2. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED

FROM AVAILABLE SURVEYS, RECORDS, AND FIELD INVESTIGATION. THEIR

LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE

MAY BE OTHERS, THE EXISTENCE OF WHICH PRESENTLY NOT KNOWN OR

SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR

EXISTENCE AND EXACT LOCATION AND TO AVOID DAMAGE THERETO.

3. ALL DEBRIS RESULTING FROM CONSTRUCTION OPERATIONS SHALL BE

PROPERLY DISPOSED OF OFF-SITE UNLESS NOTED.

4. THE CONTRACTOR SHALL EXERCISE PROPER CAUTION TO PROTECT THE

EXISTING IMPROVEMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

REPAIRING ANY DAMAGE.

5. PORTLAND CEMENT CONCRETE. CONCRETE SHALL HAVE THE FOLLOWING

PROPERTIES. COMPRESSING STRENGTH SHALL BE 4000PSI IN 28 DAYS, AIR

ENTRAINMENT SHALL BE BETWEEN 5 % AND 8% AND SLUMP SHALL BE 4 INCHES

OR LESS ALL AS MEASURED BY THE APPROPRIATE ASTM METHODS.

REINFORCING STEEL SHALL BE ASTM CERTIFIED 60KSI TENSILE STRENGTH.

REINFORCING STEEL SHALL BE #4 SIZE UNLESS OTHERWISE SPECIFIED.

HANDRAILS, BOLLARDS, AND OTHER APPURTENANCES SHALL BE INSTALLED PER

PLAN AND MEET JURISDICTIONAL REQUIREMENTS.

6. CLEANUP AND FINAL INSPECTION. WORK BROKEN OR DAMAGED BY CONTRACTOR

ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.

ALL WASTE MATERIAL, CONCRETE WASHOUT, LANDSCAPE WASTE AND BUILDING

MATERIAL SHALL BE REMOVED. SOIL SHALL BE REMOVED FROM PAVED AREAS

AND THE PROJECT SHALL BE LEFT IN A CLEAN AND WORKMANLIKE MANNER.

GRADING NOTES

1. ALL…