S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Combined Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- 36C25225B0015
About this file
This document is a set of 100% Construction Documents for replacing cooling tower fans at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves removing and replacing six existing cooling tower fans, associated power systems, controls, and related components in Building 188. The base bid includes upgrading the cooling towers to enable complete and compliant removal and replacement of fans, with the goal of reestablishing long-term reliability of the facility's cooling infrastructure.
The technical documentation includes detailed mechanical and electrical plans spanning multiple sheets, covering demolition and new installation aspects. Key specifications include installing new Hudson Products TUF-LITE III fans with 40 HP direct drive motors, variable frequency drives (VFDs), new basin seal coatings, spray nozzles, drift eliminators, and fill materials. The electrical work involves replacing existing breaker buckets, providing new feeders, and connecting the fans to the existing 480V motor control centers (MCCs). The contract is associated with VA Solicitation 36C25225B0015 and has a contract number of 36C252-23-D-0061 with task order 36C25224N0366.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:1
P M
A u to d e s k D o c s
/2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
- 1
.G R
.r v t
G000
COVER SHEET REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT AEA
23022.013
100% CONSTRUCTION
DOCUMENTS
Captain James A. Lovell Federal Health Care Center (FHCC)
REPLACE COOLING TOWER FANS
3001 N GREEN BAY RD,
NORTH CHICAGO, IL 60064
N
SHEET NUMBER SHEET NAME
G000 COVER SHEET
M000 MECHANICAL SYMBOLS AND ABBREVIATIONS
MD101 FIRST FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
MD102 ROOF FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION
MD103 COOLING TOWER -SECTION -DEMOLITION
M101 FIRST FLOOR PLAN -OVERALL -MECHANICAL
M102 ROOF FLOOR PLAN -OVERALL -MECHANICAL
M103 COOLING TOWER -SECTION
M400 ENLARGED ROOM CHILLER ENCLOSURE 109 - MECHANICAL
M501 MECHANICAL SCHEDULES
E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
ED101 FIRST FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
ED102 ROOF FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION
E101 FIRST FLOOR PLAN -OVERALL -ELECTRICAL
E102 ROOF FLOOR PLAN -OVERALL -ELECTRICAL
E500 ONE-LINE DIAGRAM
E700 ELECTRICAL SCHEDULES
VA CONTRACT #: 36C252-23-D-0061
TASK ORDER #: 36C25224N0366
BASE BID: INCLUDES UPGRADING THE SIX COOLING TOWERS IN THE CHILLER PLANT BUILDING 188 AT VETERANS AFFAIRS(VA) CAPTAIN JAMES A. LOVELL FEDERAL HEALTH CARE CENTER(FHCC) TO ENABLE COMPLETE AND COMPLIANT REMOVAL AND REPLACEMENT OF SIX EXISTING COOLING TOWER FANS AND ASSOCIATED POWER, CONTROLS, AND ASSOCIATED MATERIALS AND SYSTEMS NECESSARY TO REESTABLISH LONG-TERM RELIABILITY.
Revisions: Date:
ACCOMPANYING SOLICITATION 36C25225B0015
ABBREVIATION
GENERAL ABBREVIATIONS
DESCRIPTION ABBREVIATION DESCRIPTION
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
AD ACCESS DOOR/PANEL
AFF ABOVE FINISHED FLOOR
AMB AMBIENT
DIA DIAMETER
DN DOWN
E EXISTING
EC ELECTRICAL CONTRACTOR
EFF EFFICIENCY
GC GENERAL CONTRACTOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
L LENGTH
LF LINEAR FEET
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MFR MANUFACTURER
MIN MINIMUM
NIC NOT IN CONTRACT
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PSIG POUNDS PER SQUARE INCH GAUGE
RPM REVOLUTIONS PER MINUTE
SHT SHEET
TOB TOP OF BEAM
GPM GALLONS PER MINUTE
TOS TOP OF STEEL
BOB BOTTOM OF BEAM
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
UNION
Y STRAINER WITH BLOWDOWN
ELBOW UP
ELBOW DOWN
TEE UP
PIPING
- SOLID LINE INDICATES SYSTEM SUPPLY
-- DASHED LINE INDICATES SYSTEM RETURN
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
GENERAL MECHANICAL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
# SHEET NOTE
DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS
AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.
DIAMETER
DENOTES CONNECTION OF NEW WORK TO
EXISTING SYSTEM
PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.
ARROW INDICATES DOWNWARD PIPE SLOPE
#/# INDICATES SLOPE IN INCHES PER FOOT
WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS
ARROW INDICATES DIRECTION OF FLOW IN PIPING
ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CHECK VALVE
ARROW INDICATES DIRECTION OF NORMAL FLOW
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
CIRCUIT SETTER, AUTOFLOW, ETC.
REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM
PRESSURE GAUGE
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE
TEE DOWN
TEE HORIZONTAL
PIPE REDUCER
INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.
SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.
REQUIRED SERVICE CLEARANCE FOR EQUIPMENT
CONTINUATION FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.
PLUMBING SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
AIR VENT
AUTOMATIC FLOW CONTROL VALVE
# INDICATES FLOW TO BE BALANCED IN GPM
BACKFLOW PREVENTER
CALIBRATED BALANCING VALVE
VALVE - THROTTLING SERVICE
VALVE - SHUTOFF SERVICE
P/T PORT
PIPE CAP
PIPE CONTINUATION
PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
PRESSURE REDUCING VALVE
PUMP
RELIEF VALVE
S SENSOR
SUCTION DIFFUSER
THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES
VACUUM BREAKER
Y STRAINER
STEAM TRAP
CC CONTROLS CONTRACTOR
PIPING
- SINGLE DASH INDICATES DOMESTIC COLD WATER
- DOUBLE DASH INDICATES DOMESTIC HOT WATER
- TRIPLE DASH INDICATES HOT WATER
CIRCULATING
- SOLID INDICATES SANITARY ABOVE FLOOR
- CONTINUOUS DASHED INDICATES VENT
- LONG DASHED LINES INDICATE SANITARY BELOW
FLOOR
NUMBER INDICATES NOMINAL DIAMETER IN INCHES,
LETTER(S) INDICATES SYSTEM.
REFER TO ABBREVIATIONS FOR SYSTEM TYPE.
C.O.
C.O.
ROOF DRAIN
TAG INDICATES DRAIN SIZE IN INCHES AND AREA
OF ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"RD
# SF
WALL DISCHARGE (DOWNSPOUT NOZZLE)
TAG INDICATES DRAIN SIZE IN INCHES AND AREA
OF ROOF DRAINED IN SQUARE FEET
REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
#"DSN
# SF
FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.
CLEANOUT
CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.
LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.
DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.
ABBREVIATION
PLUMBING ABBREVIATIONS
DESCRIPTION
CHEMICAL VENTCV
CHEMICAL WASTECW
BOTTLE/GLASS FILLERBF
ABBREVIATION DESCRIPTION
DOMESTIC HOT WATERDHW
DOMESTIC HOT WATER CIRCULATIONDHWC
LAVATORYL
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BACK FLOW PREVENTERBFP
BATH TUBBT
COMPRESSED AIR (NON-MEDICAL)CA
PROPANELPG
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
CONDENSATE DRAINCD
CLEANOUTCO
CONDENSATE PUMPCP
MOP SINKMS
NORMALLY CLOSEDNC
NORMALLY OPENNO
CLINICAL SINKCS
DOMESTIC COLD WATERDCW
DRINKING FOUNTAINDF
NON-POTABLE WATERNPW
POST INDICATOR VALVEPIV
PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO
DEIONIZED WATERDI
DEIONIZED WATER CIRCULATINGDIC
ROOF DRAINRD
REVERSE OSMOSIS WATERRO
DEIONIZED HOT WATERDIH
RPZ
S
REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)
SINK
DEIONIZED HOT WATER CIRCULATINGDIHC
DISTILLED WATERDIS
DISTILLED WATER CIRCULATINGDISC
SANITARY SEWERSAN
DOMESTIC SOFT COLD WATERSCW
DOMESTIC SOFT HOT WATERSHW
DIALYSIS WATER RETURNDR
DIALYSIS WATER SUPPLYDS
DRAIN TILEDT
DOMESTIC SOFT HOT WATER CIRCULATINGSHWC
SEWAGE EJECTORSE
SHOWERSH
EMERGENCY EYE WASHEEW
EMERGENCY SHOWERES
EMERGENCY SHOWER AND EYE WASH COMBOESEW
STORM OVERFLOWSO
SUMP PUMPSP
SERVICE SINKSS
EXPANSION TANKET
ELECTRIC WATER COOLEREWC
ENTERING WATER TEMPERATUREEWT
STORM SEWERST
TEMPERATURETEMP
URINALUR
FILTERF
FLOOR CLEANOUTFCO
FLOOR DRAINFD
VENTV
VENT THROUGH ROOFVTR
FLOOR SINKFS
WB
WC
WALL BOX
WATER CLOSET
NATURAL GASG
WALL CLEANOUTWCO
GRADE CLEANOUTGCO
HUB DRAINHD
WATER HEATERWH
WATER SOFTENERWS
HORSEPOWERHP
WPD
YCO
WATER PRESSURE DROP
YARD CLEANOUTGREASE VENTGV
HOSE BIBHB
GREASE WASTEGW
DOWN SPOUT NOZZLEDSN
SYMBOL
FIRE PROTECTION SYMBOLS
DESCRIPTION ADDITIONAL REMARKS
FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR
FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE
REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.
PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS
FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.
SIDEWALL SPRINKLER -
EXISTING SIDEWALL SPRINKLER
SPRINKLER
EXISTING SPRINKLER
EXISTING SPRINKLER TO BE REMOVED
FIRE PIPEF
O.S. & Y. VALVE
SHUT-OFF VALVE WITH TAMPER SWITCHTS
F
ABBREVIATION
FIRE PROTECTION ABBREVIATIONS
DESCRIPTION
BACK FLOW PREVENTERBFP
FIRE PROTECTIONF
FIRE DEPARTMENT CONNECTIONFDC
ABBREVIATION DESCRIPTION
FLOW SWITCHFS
POST INDICATOR VALVEPIV
SPRINKLERSPR
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
RECTANGULAR DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
ROUND DUCTWORK
D = DUCT DIAMETER
TURNING VANES
FLEXIBLE PIPING
WxH
D"Ø
HVAC SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
W/H
FLAT OVAL DUCTWORK
W = DIMENSION IN VIEW (INCHES)
H = DIMENSION PERPENDICULAR TO VIEW (INCHES)
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
DUCT CROSS SECTION - SUPPLY
DUCT CROSS SECTION - RETURN
DUCT CROSS SECTION - EXHAUST
CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN
PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID
INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES
EXTENSION DOWN.
MANUAL BALANCE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN
ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.
CONTROL DAMPER
FIRE/SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
DIFFUSER
REFER TO SPECIFICATIONS FOR TYPE.
FLEXIBLE DUCT
REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION
REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE
ON THE PLANS OR IN THE SPECIFICATIONS.
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - NO COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - HOT WATER COIL
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - ELECTRIC COIL
VB-#
### CFM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
### = AIRFLOW IN CFM
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY
TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
VB-#
#.# GPM
VAV BOX TAG
# = REFERENCE NUMBER IN SCHEDULE
#.# = WATER FLOW RATE IN GPM
REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND INSTALLATION REQUIREMENTS.
VARIABLE AIR VOLUME BOX - DUAL DUCT
D#
DIFFUSER TAG
D = TYPE # = TYPE NUMBER
### = AIRFLOW IN CFM
REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO
AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE
D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.
FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE
THROWS.
DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF
PANEL.
RETURN GRILLE
EXHAUST GRILLE
WALL REGISTER / GRILLE
DUCT MOUNTED REGISTER / GRILLE
LINEAR SLOT
REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW
LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY
TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS
CONTRACTOR.
SMOKE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
ABBREVIATION
HVAC ABBREVIATIONS
DESCRIPTION
AIR BLENDERAB
AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC
AIR HANDLING UNITAHU
NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS
BOILER FEED UNITBFU
BOILERBLR
CONSTANT AIR VOLUME BOXCAV
COOLING COILCC
CONDENSATE DRAINCD
CUBIC FEET PER MINUTECFM
CHILLERCH
CONDENSATE PUMPCP
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
COOLING TOWERCT
CONDENSING UNITCU
CABINET UNIT HEATERCUH
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
DIFFUSERD
DUAL DUCTDD
DIRECT EXPANSIONDX
EXHAUST AIREA
ENTERING AIR TEMPERATUREEAT
EXHAUST FANEF
EFFICIENCYEFF
ENERGY RECOVERY COILERC
ENERGY RECOVERY WHEELERW
EXPANSION TANKET
ENTERING WATER TEMPERATUREEWT
FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB
FAN COIL UNITFCU
FLOW MEASURING STATIONFMS
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
FUEL OIL VENTFOV
FIRE DAMPERFRD
FIRE SMOKE DAMPERFSD
FINNED TUBE RADIATORFTR
GRILLEG
GLYCOL CHILLED WATER RETURNGCWR
GLYCOL CHILLED WATER SUPPLYGCWS
GRAVITY EXHAUSTGE
GLYCOL HEATING HOT WATER RETURNGHWR
GLYCOL HEATING HOT WATER SUPPLYGHWS
GRAVITY INTAKEGI
HEATING COILHC
PRESSURE/TEMPERATURE TEST PORT
TEMPERATURE CONTROL SYMBOLS
SYMBOL DESCRIPTION ADDITIONAL REMARKS
WALL MOUNTED CONTROL DEVICE
# INDICATES TYPE
REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)
OCCUPANCY SENSOR
REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS
NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY
THE TEMPERATURE CONTROLS CONTRACTOR.
DUCT, PIPE, OR CEILING MOUNTED CONTROL
SENSOR
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)
CONTROL VALVE (3-WAY)
CONTROL VALVE (2-WAY)
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
F/S FLOW MEASURING STATION REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
FIRE DAMPER
REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE
LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.
CD
FD
SD
FS
DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO
SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR
ADDITIONAL INFORMATION AND REQUIREMENTS.
FLOW SWITCHF
ABBREVIATION DESCRIPTION
HORSEPOWERHP
HIGH PRESSURE STEAM CONDENSATEHPC
HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS
HEAT RECOVERY CHILLERHRC
HUMIDIFIERHUM
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
LOW PRESSURE STEAM CONDENSATELPC
LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS
LOUVERLV
LEAVING WATER TEMPERATURELWT
BTU (1000'S)MBH
MANUAL DAMPERMD
MOTOR OPERATED DAMPERMOD
MEDIUM PRESSURE STEAM CONDENSATEMPC
MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS
NORMALLY CLOSED, NOISE CRITERIANC
NORMALLY OPEN, NUMBERNO
OUTDOOR AIROA
PUMPP
PUMPED CONDENSATEPC
PRESSURE REDUCING VALVEPRV
PUMPED STEAM CONDENSATEPSC
REGISTERR
RETURN AIRRA
RELIEF AIRREA
REFRIGERANT DX LIQUIDREFL
REFRIGERANT DX SUCTION GASREFS
RETURN FANRF
RELATIVE HUMIDITYRH
ROOF TOP UNITRTU
SUPPLY AIRSA
SMOKE DAMPERSD
SUPPLY FANSF
STATIC PRESSURESP
STEAMSTM
TEMPERATURETEMP
TRANSFERTR
UNIT HEATERUH
VARIABLE AIR VOLUME BOXVAV
VENT THROUGH ROOFVTR
WET BULB TEMPERATUREWB
WATER COLUMNWC
WATER PRESSURE DROPWPD
WATER SOURCE HEAT PUMP RETURNWSHPR
WATER SOURCE HEAT PUMP SUPPLYWSHPS
CONTRACTOR REQUIREMENTS FOR THE
DEMOLITION OF, OR ADDITION TO, ANY PORTION
OF AIR, PLUMBING OR HYDRONIC SYSTEMS.
COVER SHEET NOTES:
THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, PLUMBING, TEMPERATURE CONTROLS, LIFE
SAFETY CONTROLS AND PRESSURIZATION CONTROLS.
1. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.
2. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.
MECHANICAL GENERAL NOTES:
A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, MEDICAL GAS, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.
B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.
C. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF THE OWNER.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND REFINISHING SHALL MATCH THE EXISTING
CONSTRUCTION AS NEARLY AS POSSIBLE.
E. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE ITEMS, REMOVING
CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.
F. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING REMOVED AND/OR REPLACED, ETC.
G. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.
H. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL FROM
THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.
I. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS
WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M000
MECHANICAL SYMBOLS AND
ABBREVIATIONS
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:4
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
MD101
FIRST FLOOR PLAN - OVERALL -
MECHANICAL - DEMOLITION
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
FIRST FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
GENERAL NOTES:
1. REMOVE BUTTERFLY VALVE, ACTUATOR EXTENTION, AND HANDWHEEL.
2. REMOVE EXISTING SEALANT FROM BASIN WALLS AND FLOOR PER NEW MATERIAL MANUFACTURERS
RECOMMENDATIONS TO ALLOW FOR NEW MATERIAL ADHERSION TO COOLING TOWER BASIN AND WALLS, TYPICAL.
3. CONTRACTOR TO PREVENT ALL COOLING TOWER DEMOLITION DEBRIS BEING INTRODUCED INTO THE CONDENSER
WATER PUMPS AND CHILLER.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
XF-1
XF-2
XF-3
XF-4
XF-5
XF-6
COOLING
TOWER #1
COOLING
TOWER #2
COOLING
TOWER #3
COOLING
TOWER #4
COOLING
TOWER #5
COOLING
TOWER #6
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:4
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
MD102
ROOF FLOOR PLAN - OVERALL -
MECHANICAL - DEMOLITION
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
ROOF FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
GENERAL NOTES:
1. REMOVE FAN, DRIVE SHAFT, AND ASSOCIATED CONTROLS.
2. COOLING TOWER ACCESS DOOR.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
6 6 6 6 6 6
COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3 COOLING TOWER #4 COOLING TOWER #5 COOLING TOWER #6
XF-1 XF-2 XF-3 XF-4 XF-5 XF-6
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:4
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
MD103
COOLING TOWER - SECTION -
DEMOLITION
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
NO SCALE
ALL COOLING TOWERS SECTION CUT - DEMOLITION
SHEET NOTES:
GENERAL NOTES:
1. REMOVE DRIFT ELIMINATOR.
2. CONTRACTOR TO INSPECT EXISTING PVC PIPING FOR BREAKS, CRACKS, OR OTHER
DEFICIENCIES. IF ANY PIPING DEFICIENCIES ARE FOUND REMOVE EXISTING PIPING AND PREPARE
FOR NEW PIPING INSTALLATION.
3. REMOVE ALL SPRAY NOZZLES AND GROMMETS FROM PVC PIPING.
4. REMOVE ALL COOLING TOWER FILL MATERIAL.
5. REMOVE EXISTING SEALANT FROM BASIN WALLS AND FLOOR PER MANUFACTURERS
RECOMMENDATIONS, TYPICAL.
6. REMOVE FAN, SHAFT, GEAR BOX, AND CONTROLS.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
LOCKERS
ELECTRICAL
Space
B105
CLEAN UP
JAN
Space
B109
CORRIDOR
C101
STORAGE
CHILLERS
COOLING TOWER
M400
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M101
FIRST FLOOR PLAN - OVERALL -
MECHANICAL
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
FIRST FLOOR PLAN - OVERALL - MECHANICAL
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
GENERAL NOTES:
1. PROVIDE NEW BUTTERFLY VALVE, ACTUATOR EXTENTION, AND HANDWEEL.
2. PROVIDE NEW ASPHALT-EXTENDED POLYURETHANE SEALANT ON WALLS AND BASE OF COOLING TOWER
BASIN EQUAL TO "CIM 1000" INDUSTRIAL COATING. INSTALL THE NEW COVERAGE TO MATCH THE HEIGHTS
AND EXTENTS OF THE ORIGINAL COATING.
3. WHEN THE COOLING TOWER WORK HAS BEEN COMPLETED AND OPERATIONAL CONTRACTOR TO CLEAN
AND INSPECT PUMP STRAINERS AFTER THREE DAYS OF OPERATION.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
SF-1
SF-2
SF-3
SF-4
SF-5
SF-6
COOLING
TOWER #1
COOLING
TOWER #2
COOLING
TOWER #3
COOLING
TOWER #4
COOLING
TOWER #5
COOLING
TOWER #6
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M102
ROOF FLOOR PLAN - OVERALL -
MECHANICAL
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
ROOF FLOOR PLAN - OVERALL - MECHANICAL
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
GENERAL NOTES:
1. PROVIDE NEW FAN, SHAFT, AND DIRECT DRIVE MOTOR. INSTALL PER MANUFACTURERS INSTRUCTIONS.
2. CONTRACTOR TO REPAIR HINGE ON COOLING TOWER HATCH. PRIME AND PAINT TO MATCH EXISTING FINISH.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
6 6 6 6 6 6
COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3 COOLING TOWER #4 COOLING TOWER #5 COOLING TOWER #6
SF-1 SF-2 SF-3 SF-4 SF-5 SF-6
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M103
COOLING TOWER - SECTION REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
NO SCALE
ALL COOLING TOWERS SECTION CUT
SHEET NOTES:
GENERAL NOTES:
1. PROVIDE NESTED SEAM DRIFT ELIMINATOR, TYPICAL. EQUAL TO ACCU-PAC CFULTRA BY
BRENTWOOD. CONTRACTOR TO FIELD VERIFY DIMENSIONS.
2. REPLACE DAMAGED OR BROKEN PVC PIPING AS REQUIRED.
3. PROVIDE NEW SPRAY NOZZLES AND GROMMETS IN ALL PVC PIPING, TYPICAL. EQUAL TO UTP
#SN180-IMC BY BRENTWOOD. CONTRACTOR TO PROVIDE 25 SPARE NOZZLES TO OWNER FOR
FUTURE MAINTENENCE.
4. PROVIDE COOLING TOWER FILL, TYPICAL. EQUAL TO ACCU-PAC OF21MA BY BRENTWOOD.
CONTRACTOR TO FIELD VERIFY DIMENSIONS.
5. PROVIDE NEW BASIN SEAL COATING MEMBRANE EQUAL TO "CIM 1000" INDUSTRIAL COATING TO
COVER CONCRETE FLOOR AND ALL WALLS OF COOLING TOWER. SEAL COATING TO BE
INSTALLED TO PREVIOUS COATING LIMITS.
6. FAN, SHAFT, AND DIRECT DRIVE MOTOR. MOUNT PER MANUFACTURERS RECOMMENDATIONS.
1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.
2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR
DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER
PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.
3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL
PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.
4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO
PERFORM THIS WORK.
CHILLERS
COOLING TOWER
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:4
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M400
ENLARGED ROOM CHILLER
ENCLOSURE 109 - MECHANICAL
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024
23022.013
100% CONSTRUCTION
DOCUMENTS
3/16" = 1'-0"
B188_ENLARGED ROOM CHILLER ENCLOSURE 109 MECHANICAL
N
2 2 4 6 8 10 12 14
3/16" = 1'-0"
FEETSCALE
REMARKS:
1. PROVIDE VFD WITH INTEGRAL DISCONNECT.
2. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE
CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING
EQUIPMENT.
3. PROVIDE LOW NOISE OPTION. FANS TO HAVE AN NC RATING OF 66.4 dBA OR LESS, WHEN MEASURES AT 50 FEET FROM AIR INTAKE AND A FAN TIP SPEED OF
11,988 FPM.
4. PROVDE WITH A SHOCK AND VIBRATION SWITCH SIMILAR TO FW MURPHY VS2 SERIES, PROVIDE WITH REMOTE RESET OPERATION.
5. MINIMUM FAN SPEED TO BE 20%.
6. REPORT FAN SPEED BY PERCENTAGE.
REMARKS:
1. IF NO CC IN CONTRACT, MC TO WIRE CONTROLS AND EC TO PIPE CONDUIT.
2. ALL LOW VOLTAGE WIRING OF PANELS TO BE COVERED IN MC BID, WIRING CONTRACTOR TO BE SUBCONTRACTOR TO MC.
3. INSTALLING CONTRACTOR IS RESPONSIBLE FOR FIELD ALIGNMENT SERVICES WHEN REQUIRED BY COMMON MOTOR
REQUIREMENTS SPECIFICATION OR BY INDIVIDUAL EQUIPMENT SPECIFICATIONS.
4. ALL HARDWARE, SOFTWARE, EQUIPMENT, ACCESSORIES, WIRING (POWER AND SENSOR), PIPING, RELAYS, SENSORS, POWER SUPPLIES, TRANSFORMERS, AND INSTRUMENTATION REQUIRED FOR A COMPLETE AND OPERATIONAL DDC SYSTEM, BUT NOT SHOWN ON THE ELECTRICAL DRAWINGS, ARE THE RESPONSIBILITY OF THE CC. COOLING TOWER FAN CONTROL:
• THE BMS SHALL ENABLE THE COOLING TOWER FAN. EXISTING BMS ALGORITHM AND SEQUENCING FOR ENABLING COOLING
TOWER FANS SHALL REMAIN AS CURRENTLY PROGRAMMED.
• CONTROL CONTRACTOR TO UPDATE BMS GRAPHICS.
• CONTROL CONTRACTOR TO BE CONTRACTED UNDER GENERAL CONTRACTOR.
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:4
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
M501
MECHANICAL SCHEDULES REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 AKE AJF
23022.013
100% CONSTRUCTION
DOCUMENTS
FAN SCHEDULE
MARK TYPE
WEIGHT
[LBS]
MAX FAN
RPM
ELECTRICAL DATA
MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE
DISCONNECT
TYPE
MIN
SCCR
SF-1 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6
SF-2 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6
SF-3 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6
SF-4 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6
SF-5 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6
SF-6 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6 REMARKS:
1. E = ELECTRIC P = PNEUMATIC BO = BY OTHERS S = REFERENCED POINT FROM HARDWIRE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING EH = EVENT HISTORY AR = ARCHIVE TT = TOTALIZATION GP = GRAPHICAL POINT
POINT ID
COOLING TOWER FAN VFD STATUS
POINT DESCRIPTION
COOLING TOWER FAN VFD START/STOP
COOLING TOWER VFD SPEED CONTROL
DIRECT DIGITAL CONTROL POINTS LIST - COOLING TOWER FANS
E
E
E
E
B
B
A
B
I
O
O
I
TYPE (2) I/O (3) UNITSSOURCE (1)
COOLING TOWER CURRENT STATUS SWITCH
ON/OFF
ENABLED/DISABLED
COORDINATION OF WORK SCHEDULE
ITEM SUPPLIER INSTALLER POWER CONTROL (4)
MOTORS MC MC (3) EC CC
EQUIPMENT MOUNTED ELECTRICAL COMPONENTS MC MC EC CC
LOOSE MOUNTED ELECTRICAL COMPONENTS EC EC EC CC
CONTROL RELAYS, TRANSFORMERS, POWER MC EC EC (4) CC
TEMPERATURE CONTROL SENSORS MC MC CC CC
TEMPERATURE CONTROL PANELS MC CC EC (4) CC
VARIABLE SPEED DRIVES MC MC EC CC
PE/EP SWITCHES, SOLENOID VALVES, ACTUATORS CC CC EC (4) CC
PUSHBUTTON STATIONS EC EC EC (4) EC
NO SCALEM501
COOLING TOWER FAN CONTROL1
5 E B ICOOLING TOWER VIBRATION STATUS SWITCH ON/OFF
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CEILING
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WALL PHONE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES.
E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
F. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING FOR BAS SYSTEM REQUIREMENTS. COORDINATE WITH MECHANICAL.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
E000
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
ELECTRICAL FIXTURE
SYMBOLS
PLAN SYMBOL NAME
RECEPTACLE - DOUBLE DUPLEX
- CONV
RECEPTACLE - DUPLEX - CONV
RECEPTACLE - DUPLEX - CONV -
GFCI
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
SWITCHED RECEPTACLE
FHCC CONDUIT COLOR SCHEME
Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call
ONE LINE SYMBOL
PLAN SYMBOL NAME
CONTINUATION
DISCONNECT SWITCH
GROUND BAR
GROUNDING ELECTRODE
MOTOR STARTER
SWITCHBOARD/SWITCHGEAR -
DOUBLE TUB
TRANSFORMER
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
ENCLOSED DISCONNECT
SWITCH - NON-FUSED
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
TRANSFORMER - OIL FILLED
VARIABLE FREQUENCY DRIVE
(D)
(D)
(D)
(D)
(D)
MV MOTOR
CONTROL CH-2 (E)
EMD-188
SUBSTATION
USS2 (E)
SUBSTATION
USS1 (E)
MV MOTOR
CONTROL CH-3 (E)
(E)
MCC-CP-C (E)
P N
L
LP
-C P
-A
E
P N
L A
E
XFMR (E)
XFMR (E)
ATS (E)
(E)
MAIN SWGR #3 (E)
MAIN SWGR #2 (E)
MAIN SWGR #1 (E)
MCC-CP-A (E)
MCC-CP-D (E)
MCC-CP-B (E)
VFD-CTF-1 (D)
VFD-CTF-2 (D)
VFD-CTF-3 (D)
(E)
(E)
(E)
V F
D -C
T F-
(D
V
F D
-C T
F-
(D
V F
D -C
T F-
(D
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
ED101
FIRST FLOOR PLAN - OVERALL -
ELECTRICAL - DEMOLITION
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
FIRST FLOOR PLAN - OVERALL - ELECTRICAL - DEMOLITION
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
1. EXISTING COOLING TOWER FANS TO BE REMOVED.
DISCONNECT CONDUIT AND FEEDERS. REMOVE FEEDERS
BACK TO SOURCE. RETAIN CONDUIT FOR REUSE WITH NEW
REEDER CONDUCTORS.
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
(D)
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
ED102
ROOF FLOOR PLAN - OVERALL -
ELECTRICAL - DEMOLITION
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
ROOF FLOOR PLAN - OVERALL - ELECTRICAL - DEMOLITION
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
1. DISCONNECT EXISTING COOLING TOWER FAN. REMOVE
DISCONNECTS IN THEIR ENTIRIEY.
2. COOLING TOWER FAN MOTOR #4 HAS BEEN REMOVED
PREVIOUSLY. CONTRACTOR SHALL REMOVE EXISTING
FEEDERS BACK TO THE POINT OF ORIGIN.
LOCKERS
ELECTRICAL
Space
B105
CLEAN UP
JAN
Space
B109
CORRIDOR
C101
STORAGE
102 CHILLERS
COOLING TOWER
MV MOTOR
CONTROL CH-2 (E)
EMD-188
SUBSTATION
USS2 (E)
SUBSTATION
USS1 (E)
MV MOTOR
CONTROL CH-3 (E)
MCC-CP-C (E)
MAIN SWGR #3 (E)
MAIN SWGR #2 (E)
MAIN SWGR #1 (E)
MCC-CP-A (E)
MCC-CP-B (E)
MCC-CP-D (E)
(E)
(E)
(E)
XFMR (E)
XFMR (E)
P N
L A
E
P N
L
LP
-C P
-A
E
ATS (E)
(E)
(E)
V F
D -C
T F-
V
F D
-C T
F-
V F
D -C
T F-
VFD-CTF-1
VFD-CTF-2
VFD-CTF-3
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
E101
FIRST FLOOR PLAN - OVERALL -
ELECTRICAL
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
FIRST FLOOR PLAN - OVERALL - ELECTRICAL
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
SHEET NOTES:
1. PROVIDE NEW VFD FOR COOLING TOWER FAN. REFER TO SHEET E102 FOR
CONNECTION TO FAN DISCONNECT. VFD SHALL BE STRUT MOUNTED.
SF-1
SF-2
SF-3
SF-4
SF-5
SF-6
SF-1
SF-2
SF-3
SF-4
SF-5
SF-6
PNL A-13
WR
WR
WR
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
E102
ROOF FLOOR PLAN - OVERALL -
ELECTRICAL
REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
3/32" = 1'-0"
ROOF FLOOR PLAN - OVERALL - ELECTRICAL
N
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
SHEET NOTES:
1. REFER T0 ONE-LINE DIAGRAM FOR WIRING AND CONNECTION INFORMATION.
2. EXISTING CONDUIT TO DISCONNECT TO REMAIN. CONTRACTOR SHALL REMOVE
EXISTING FEEDERS AND PROVIDE NEW PER EQUIPMENT CONNECTION SCHEDULE.
A. MECHANICAL EQUIPMENT NOT SHOWN ON ONE-LINE. REFER TO PANEL SCHEDULES FOR COMPLETE LIST
OF CIRCUIT BREAKER SIZES AND QUANTITIES REQUIRED.
B. THE CONTRACTOR SHALL REQUEST THE MOST RECENT SET OF THE CURRENT POWER SYSTEMS STUDY
PROJECT TO COORDINATE THE AIC RATINGS FROM THE COR.
(GENERAL NOTES SHALL APPLY TO ALL ONE-LINE SHEETS)
ONE-LINE GENERAL NOTES:
SW SWGR #3 BLD 188
600A/3
300/3
2000A/3
MCC-CP-D
480V
MTR CT-4
40HP
MTR CT-5
40HP
USS#2 BLD-188
480V
T-188-2
4160/480
SWGR #3 BLD 188
4160V
1600A/3
MTR CT-1
40HP
MTR CT-2
40HP
MTR CT-3
40HP
MCC-CP-C
480V
MTR CT-6
40HP
1 1 1
1 1 1
VFD VFD VFD
VFD VFD VFD
EXISTING LOAD:
CT-1: 40HP - 52A
CT-2: 40HP - 52A
CT-3: 40HP - 52A
EXISTING LOAD:
CT-4: 40HP - 52A
CT-5: 40HP - 52A
CT-6: 40HP - 52A
SW SWGR #3 BLD 188
600A/3
300/3
2000A/3
MCC-CP-D
480V
MTR CT-4
40 HP
MTR CT-5
40 HP
USS#2 BLD-188
480V
T-188-2
4160/480
SWGR #3 BLD 188
4160V
1600A/3
MTR CT-1
40 HP
MTR CT-2
40 HP
MTR CT-3
40 HP
MCC-CP-C
480V
MTR CT-6
40 HP
70/3 70/3 70/3
70/3 70/3 70/3
PROVIDE NEW CIRCUIT BREAKER BUCKET IN MCC
PROVIDE NEW CIRCUIT BREAKER BUCKET IN MCC
100/3 NF 100/3 NF 100/3 NF
100/3 NF100/3 NF100/3 NF
MEC MEC MEC
MEC MEC MEC
VFD VFD VFD
VFD VFD VFD
1 1 1
1 1 1
EXISTING LOAD:
CT-4: 40HP - 52A
CT-5: 40HP - 52A
CT-6: 40HP - 52A
NEW LOAD:
CT-4: 40HP - 52A
CT-5: 40HP - 52A
CT-6: 40HP - 52A
FINAL CHANGE - NO NET CHANGE
EXISTING LOAD:
CT-1: 40HP - 52A
CT-2: 40HP - 52A
CT-3: 40HP - 52A
NEW LOAD:
CT-1: 40HP - 52A
CT-2: 40HP - 52A
CT-3: 40HP - 52A
FINAL CHANGE - NO NET CHANGE
8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800
INSTALL GREEN INSULATED
GROUND WIRE WITH
LIGHTING, RECEPTACLE AND
EQUIPMENT BRANCH CIRCUITS.
INSTALL INDIVIDUAL (DEDICATED)
NEUTRAL CONDUCTORS FOR
EACH 120V OR 277V PHASE
CONDUCTOR SERVED FROM A
SINGLE POLE CIRCUIT BREAKER
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
100% Construction Documents 12/02/2024
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
FULLY SPRINKLERED
Office of Construction and Facilities Management
Phase
STAMP
www.specializedeng.com SES Project :
DESIGNER OF RECORDCONSULTANT
U.S. Department of Veterans Affairs
12/02/2024
/3 /2
:5
:3
P M
A u to d e s k D o c s /2
.0
V
A L o v e ll R e p la c e C o o lin g T o w e r
F a n s /5
.R e p la c e C o o lin g
T o w e r
F a n s . E
R
.r v t
E500
ONE-LINE DIAGRAM REPLACE COOLING TOWER FANS
Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064
556-24-107
B188
12/02/2024 NMT SSK
23022.013
100% CONSTRUCTION
DOCUMENTS
FEEDER SCHEDULE - COPPER
FEEDER NOMINAL SIZE WIRE AND CONDUIT
MEC -- REFER TO EQUIPMENT CONNECTION SCHEDULE
NO SCALE
EXISTING ELECTRICAL ONE-LINE
NO SCALE
NEW WORK ELECTRICAL ONE-LINE
SHEET NOTES:
1. REMOVE EXISTING BREAKER AND PROVIDE NEW BREAKER BUCKET IN MCC PER NEW WORK.
2. EXISTING CONDUIT TO REMAIN. CONTRACTOR TO REMOVE FEEDERS BACK TO POINT OF ORIGIN AND
PROVIDE NEW PER EQUIPMENT CONNECTION SCHEDULE.
2 2 2
2 2 2
REMARKS: (EQUIPMENT CONNECTION SCHEDULE)
1. N/A
GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)
A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY…
This is the start of the file's text. The full file is on GovTribe.