S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Combined Drawings.pdf

PDF 4 MB Posted

Attached to
Z1DA--556-24-107 Replace Cooling Tower Fans (VA-25-00066976)
Solicitation number
36C25225B0015
Issued by

About this file

This document is a set of 100% Construction Documents for replacing cooling tower fans at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The project involves removing and replacing six existing cooling tower fans, associated power systems, controls, and related components in Building 188. The base bid includes upgrading the cooling towers to enable complete and compliant removal and replacement of fans, with the goal of reestablishing long-term reliability of the facility's cooling infrastructure.

The technical documentation includes detailed mechanical and electrical plans spanning multiple sheets, covering demolition and new installation aspects. Key specifications include installing new Hudson Products TUF-LITE III fans with 40 HP direct drive motors, variable frequency drives (VFDs), new basin seal coatings, spray nozzles, drift eliminators, and fill materials. The electrical work involves replacing existing breaker buckets, providing new feeders, and connecting the fans to the existing 480V motor control centers (MCCs). The contract is associated with VA Solicitation 36C25225B0015 and has a contract number of 36C252-23-D-0061 with task order 36C25224N0366.

View the file

Other files

File Type Posted
S06_Att2G Bldg.188 Chiller Plant S3 Sections and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2R Bldg.188 Chiller Plant E-4 Roof Plan and Motor Contr. Ctr Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2E Bldg.188 Chiller Plant S1 Foundation Plan and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2Q Bldg.188 Chiller Plant E-3 Switchboard Details and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2L Bldg.188 Chiller Plant H-4 Water Flow Diagram and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2M Bldg.188 Chiller Plant H-5 Equipment Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2D Bldg.188 Chiller Plant Bldg. Plans section and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2H Bldg.188 Chiller Plant S4 Column Schedule and Steel Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2N Bldg.188 Chiller Plant H-6 Chilled water Distribution Diagram in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2J Bldg.188 Chiller Plant H-2 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2K Bldg.188 Chiller Plant H-3 Partial Plans and Secs. in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2A Bldg.188 Chiller Plans in Response to RFI Question 1 IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2F Bldg.188 Chiller Plant S2 Roof Framing Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2S Bldg.188 Chiller Plant E-5 Single Line and Fire Alarm Diagrams in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2I Bldg.188 Chiller Plant H-1 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2P Bldg.188 Chiller Plant E-2 Power and Signal Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0003.docx DOCX document
S06_Att2O Bldg.188 Chiller Plant E-1 Lighting Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att1 SF30 Continuation Page IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2 RFI Pre-Bid Responses IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.xlsx XLSX spreadsheet
S06_Att2B Bldg.188 Chiller Plant Elev. Bldgs Details and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2C Bldg.188 Chiller Plant Roof Plans in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0002.docx DOCX document
S06 - Updated Bid Schedule_36C25225B0015 Amend 0002.pdf PDF
36C25225B0015 0001.docx DOCX document
S06 - 556-24-107 cooling tower fans pre bid site visit 18Jul25.pdf PDF
S02 - Attachment 1_VAAR 852.219-75_REQUIRED.pdf PDF
S02 - Wage Determination_eff 7.4.25.pdf PDF
S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Specification.pdf PDF
36C25225B0015_1.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:1

P M

A u to d e s k D o c s

/2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

- 1

.G R

.r v t

G000

COVER SHEET REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT AEA

23022.013

100% CONSTRUCTION

DOCUMENTS

Captain James A. Lovell Federal Health Care Center (FHCC)

REPLACE COOLING TOWER FANS

3001 N GREEN BAY RD,

NORTH CHICAGO, IL 60064

N

SHEET NUMBER SHEET NAME

G000 COVER SHEET

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD101 FIRST FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

MD102 ROOF FLOOR PLAN -OVERALL -MECHANICAL -DEMOLITION

MD103 COOLING TOWER -SECTION -DEMOLITION

M101 FIRST FLOOR PLAN -OVERALL -MECHANICAL

M102 ROOF FLOOR PLAN -OVERALL -MECHANICAL

M103 COOLING TOWER -SECTION

M400 ENLARGED ROOM CHILLER ENCLOSURE 109 - MECHANICAL

M501 MECHANICAL SCHEDULES

E000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED101 FIRST FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

ED102 ROOF FLOOR PLAN -OVERALL -ELECTRICAL -DEMOLITION

E101 FIRST FLOOR PLAN -OVERALL -ELECTRICAL

E102 ROOF FLOOR PLAN -OVERALL -ELECTRICAL

E500 ONE-LINE DIAGRAM

E700 ELECTRICAL SCHEDULES

VA CONTRACT #: 36C252-23-D-0061

TASK ORDER #: 36C25224N0366

BASE BID: INCLUDES UPGRADING THE SIX COOLING TOWERS IN THE CHILLER PLANT BUILDING 188 AT VETERANS AFFAIRS(VA) CAPTAIN JAMES A. LOVELL FEDERAL HEALTH CARE CENTER(FHCC) TO ENABLE COMPLETE AND COMPLIANT REMOVAL AND REPLACEMENT OF SIX EXISTING COOLING TOWER FANS AND ASSOCIATED POWER, CONTROLS, AND ASSOCIATED MATERIALS AND SYSTEMS NECESSARY TO REESTABLISH LONG-TERM RELIABILITY.

Revisions: Date:

ACCOMPANYING SOLICITATION 36C25225B0015

ABBREVIATION

GENERAL ABBREVIATIONS

DESCRIPTION ABBREVIATION DESCRIPTION

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

AD ACCESS DOOR/PANEL

AFF ABOVE FINISHED FLOOR

AMB AMBIENT

DIA DIAMETER

DN DOWN

E EXISTING

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

GC GENERAL CONTRACTOR

FPM FEET PER MINUTE

FPS FEET PER SECOND

L LENGTH

LF LINEAR FEET

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MFR MANUFACTURER

MIN MINIMUM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

PC PLUMBING CONTRACTOR

PSIG POUNDS PER SQUARE INCH GAUGE

RPM REVOLUTIONS PER MINUTE

SHT SHEET

TOB TOP OF BEAM

GPM GALLONS PER MINUTE

TOS TOP OF STEEL

BOB BOTTOM OF BEAM

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

UNION

Y STRAINER WITH BLOWDOWN

ELBOW UP

ELBOW DOWN

TEE UP

PIPING

- SOLID LINE INDICATES SYSTEM SUPPLY

-- DASHED LINE INDICATES SYSTEM RETURN

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

GENERAL MECHANICAL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

# SHEET NOTE

DENOTES SPECIFIC REQUIREMENT FOR THE SHEET ON WHICH THE NOTE APPEARS

AND IS USED TO DESCRIBE WORK THAT IS TOO LENGTHY TO PLACE ON PLAN.

DIAMETER

DENOTES CONNECTION OF NEW WORK TO

EXISTING SYSTEM

PROTECT EXISTING SYSTEM FROM ENTRANCE OF FOREIGN DEBRIS DURING WORK.

ARROW INDICATES DOWNWARD PIPE SLOPE

#/# INDICATES SLOPE IN INCHES PER FOOT

WHERE PIPING IS NOT MARKED, REFER TO SPECIFICATIONS FOR REQUIREMENTS

ARROW INDICATES DIRECTION OF FLOW IN PIPING

ISOLATION VALVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CHECK VALVE

ARROW INDICATES DIRECTION OF NORMAL FLOW

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PIPE IN SLEEVE REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

CIRCUIT SETTER, AUTOFLOW, ETC.

REFER TO SPECIFICATIONS FOR TYPE BASED ON SIZE AND SYSTEM

PRESSURE GAUGE

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIESTHERMOMETER - HORIZONTAL PIPE

TEE DOWN

TEE HORIZONTAL

PIPE REDUCER

INDICATES POINT WHERE PIPING CHANGES FROM ONE SIZE TO ANOTHER.

SMALL POINT OF ARROW INDICATES SMALLER SIZE SIDE OF TRANSITION.

REQUIRED SERVICE CLEARANCE FOR EQUIPMENT

CONTINUATION FIRST SYMBOL APPLIES TO ROUND DUCT AND PIPING.

PLUMBING SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

AIR VENT

AUTOMATIC FLOW CONTROL VALVE

# INDICATES FLOW TO BE BALANCED IN GPM

BACKFLOW PREVENTER

CALIBRATED BALANCING VALVE

VALVE - THROTTLING SERVICE

VALVE - SHUTOFF SERVICE

P/T PORT

PIPE CAP

PIPE CONTINUATION

PRESSURE GAUGE STEAM REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

PRESSURE REDUCING VALVE

PUMP

RELIEF VALVE

S SENSOR

SUCTION DIFFUSER

THERMOMETER - VERTICAL PIPE REFER TO SPECIFICATIONS FOR TYPE AND ACCESSORIES

VACUUM BREAKER

Y STRAINER

STEAM TRAP

CC CONTROLS CONTRACTOR

PIPING

- SINGLE DASH INDICATES DOMESTIC COLD WATER

- DOUBLE DASH INDICATES DOMESTIC HOT WATER

- TRIPLE DASH INDICATES HOT WATER

CIRCULATING

- SOLID INDICATES SANITARY ABOVE FLOOR

- CONTINUOUS DASHED INDICATES VENT

- LONG DASHED LINES INDICATE SANITARY BELOW

FLOOR

NUMBER INDICATES NOMINAL DIAMETER IN INCHES,

LETTER(S) INDICATES SYSTEM.

REFER TO ABBREVIATIONS FOR SYSTEM TYPE.

C.O.

C.O.

ROOF DRAIN

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"RD

# SF

WALL DISCHARGE (DOWNSPOUT NOZZLE)

TAG INDICATES DRAIN SIZE IN INCHES AND AREA

OF ROOF DRAINED IN SQUARE FEET

REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

#"DSN

# SF

FD-# FLOOR DRAIN REFER TO PLUMBING FIXTURE SCHEDULE FOR TYPE.

CLEANOUT

CIRCLE INDICATES UP TO FLOOR OR WALL CLEANOUT.

LINE INDICATES END OF PIPE CLEANOUT LOCATED ABOVE A CEILING.

DOUBLE GRADE CLEANOUT REFER TO DETAILS FOR ADDITIONAL REQUIREMENTS.

ABBREVIATION

PLUMBING ABBREVIATIONS

DESCRIPTION

CHEMICAL VENTCV

CHEMICAL WASTECW

BOTTLE/GLASS FILLERBF

ABBREVIATION DESCRIPTION

DOMESTIC HOT WATERDHW

DOMESTIC HOT WATER CIRCULATIONDHWC

LAVATORYL

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BACK FLOW PREVENTERBFP

BATH TUBBT

COMPRESSED AIR (NON-MEDICAL)CA

PROPANELPG

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

CONDENSATE DRAINCD

CLEANOUTCO

CONDENSATE PUMPCP

MOP SINKMS

NORMALLY CLOSEDNC

NORMALLY OPENNO

CLINICAL SINKCS

DOMESTIC COLD WATERDCW

DRINKING FOUNTAINDF

NON-POTABLE WATERNPW

POST INDICATOR VALVEPIV

PRESSURE REDUCING VALVEPRVDOUBLE GRADE CLEANOUTDGCO

DEIONIZED WATERDI

DEIONIZED WATER CIRCULATINGDIC

ROOF DRAINRD

REVERSE OSMOSIS WATERRO

DEIONIZED HOT WATERDIH

RPZ

S

REDUCED PRESSURE ZONE (BACK FLOW PREVENTER)

SINK

DEIONIZED HOT WATER CIRCULATINGDIHC

DISTILLED WATERDIS

DISTILLED WATER CIRCULATINGDISC

SANITARY SEWERSAN

DOMESTIC SOFT COLD WATERSCW

DOMESTIC SOFT HOT WATERSHW

DIALYSIS WATER RETURNDR

DIALYSIS WATER SUPPLYDS

DRAIN TILEDT

DOMESTIC SOFT HOT WATER CIRCULATINGSHWC

SEWAGE EJECTORSE

SHOWERSH

EMERGENCY EYE WASHEEW

EMERGENCY SHOWERES

EMERGENCY SHOWER AND EYE WASH COMBOESEW

STORM OVERFLOWSO

SUMP PUMPSP

SERVICE SINKSS

EXPANSION TANKET

ELECTRIC WATER COOLEREWC

ENTERING WATER TEMPERATUREEWT

STORM SEWERST

TEMPERATURETEMP

URINALUR

FILTERF

FLOOR CLEANOUTFCO

FLOOR DRAINFD

VENTV

VENT THROUGH ROOFVTR

FLOOR SINKFS

WB

WC

WALL BOX

WATER CLOSET

NATURAL GASG

WALL CLEANOUTWCO

GRADE CLEANOUTGCO

HUB DRAINHD

WATER HEATERWH

WATER SOFTENERWS

HORSEPOWERHP

WPD

YCO

WATER PRESSURE DROP

YARD CLEANOUTGREASE VENTGV

HOSE BIBHB

GREASE WASTEGW

DOWN SPOUT NOZZLEDSN

SYMBOL

FIRE PROTECTION SYMBOLS

DESCRIPTION ADDITIONAL REMARKS

FLOW SWITCH COORDINATE INTERFACE WITH FIRE ALARM SYSTEM CONTRACTOR

FIRE DEPARTMENT CONNECTION MOUNT BETWEEN 18" AND 48" ABOVE FINISHED GRADE

REFER TO SPECIFICATIONS FOR TYPES AND FINISHES.

PENDANT REFERS TO FULL, SEMI-RECESSED AND RECESSED TYPES. LOCATIONS

FOR EACH ARE INDICATED IN THE SPECIFICATIONS OR ON THE PLANS.

SIDEWALL SPRINKLER -

EXISTING SIDEWALL SPRINKLER

SPRINKLER

EXISTING SPRINKLER

EXISTING SPRINKLER TO BE REMOVED

FIRE PIPEF

O.S. & Y. VALVE

SHUT-OFF VALVE WITH TAMPER SWITCHTS

F

ABBREVIATION

FIRE PROTECTION ABBREVIATIONS

DESCRIPTION

BACK FLOW PREVENTERBFP

FIRE PROTECTIONF

FIRE DEPARTMENT CONNECTIONFDC

ABBREVIATION DESCRIPTION

FLOW SWITCHFS

POST INDICATOR VALVEPIV

SPRINKLERSPR

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

RECTANGULAR DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

ROUND DUCTWORK

D = DUCT DIAMETER

TURNING VANES

FLEXIBLE PIPING

WxH

D"Ø

HVAC SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

W/H

FLAT OVAL DUCTWORK

W = DIMENSION IN VIEW (INCHES)

H = DIMENSION PERPENDICULAR TO VIEW (INCHES)

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO DUCT CONSTRUCTION SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

DUCT CROSS SECTION - SUPPLY

DUCT CROSS SECTION - RETURN

DUCT CROSS SECTION - EXHAUST

CROSS SECTION INDICATES DUCT EXTENDING PERPENDICULAR TO THE PAGE. IN

PLAN VIEW THIS INDICATES A DUCT RISE OR DROP TO ANOTHER LEVEL. SOLID

INTERIOR LINE INDICATES EXTENSION UP. DASHED INTERIOR LINE INDICATES

EXTENSION DOWN.

MANUAL BALANCE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE MANUAL BALANCE DAMPERS IN AN

ACCESSIBLE LOCATION AND AS CLOSE TO THE MAIN DUCT AS POSSIBLE.

CONTROL DAMPER

FIRE/SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

DIFFUSER

REFER TO SPECIFICATIONS FOR TYPE.

FLEXIBLE DUCT

REFER TO SPECIFICATIONS FOR TYPE. REFER TO DETAILS FOR INSTALLATION

REQUIREMENTS. MAXIMUM LENGTH SHALL BE 48 INCHES UNLESS NOTED OTHERWISE

ON THE PLANS OR IN THE SPECIFICATIONS.

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - NO COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - HOT WATER COIL

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - ELECTRIC COIL

VB-#

### CFM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

### = AIRFLOW IN CFM

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

VB-#

#.# GPM

VAV BOX TAG

# = REFERENCE NUMBER IN SCHEDULE

#.# = WATER FLOW RATE IN GPM

REFER TO SCHEDULE, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION

AND INSTALLATION REQUIREMENTS.

VARIABLE AIR VOLUME BOX - DUAL DUCT

D#

DIFFUSER TAG

D = TYPE # = TYPE NUMBER

### = AIRFLOW IN CFM

REFER TO DIFFUSER SCHEDULE FOR TYPE DESCRIPTIONS AND SIZING. BALANCE TO

AIRFLOW LISTED. WHEN TYPE IS NOT GIVEN AND ONLY CFM IS DESIGNATED, PROVIDE

D1 FOR SUPPLY OR G1 FOR RETURN/EXHAUST.

FLOW ARROW ARROW INDICATES DIRECTION OF AIRFLOW FROM DIFFUSERS WITH ADJUSTABLE

THROWS.

DIFFUSER BLANK OFF SHADED AREA INDICATES QUADRANT OF DIFFUSER TO BE PROVIDED WITH BLANK OFF

PANEL.

RETURN GRILLE

EXHAUST GRILLE

WALL REGISTER / GRILLE

DUCT MOUNTED REGISTER / GRILLE

LINEAR SLOT

REFER TO VARIABLE VOLUME BOX SCHEDULE FOR TYPES AND SIZING. AIRFLOW

LISTED IS NOMINAL DESIGN CFM AND GPM. FINAL VALUES ARE TO BE DETERMINED BY

TESTING AND BALANCING CONTRACTOR AND PROGRAMMED BY CONTROLS

CONTRACTOR.

SMOKE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

ABBREVIATION

HVAC ABBREVIATIONS

DESCRIPTION

AIR BLENDERAB

AIR CONDITIONING UNIT (SPLIT SYSTEM INDOOR UNIT)AC

AIR HANDLING UNITAHU

NOT ALL ABBREVIATIONS APPLY TO THIS SET OF DOCUMENTS

BOILER FEED UNITBFU

BOILERBLR

CONSTANT AIR VOLUME BOXCAV

COOLING COILCC

CONDENSATE DRAINCD

CUBIC FEET PER MINUTECFM

CHILLERCH

CONDENSATE PUMPCP

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

COOLING TOWERCT

CONDENSING UNITCU

CABINET UNIT HEATERCUH

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

DIFFUSERD

DUAL DUCTDD

DIRECT EXPANSIONDX

EXHAUST AIREA

ENTERING AIR TEMPERATUREEAT

EXHAUST FANEF

EFFICIENCYEFF

ENERGY RECOVERY COILERC

ENERGY RECOVERY WHEELERW

EXPANSION TANKET

ENTERING WATER TEMPERATUREEWT

FILTER BANK (CONSISTING OF ONE OR MORE FILTERS)FB

FAN COIL UNITFCU

FLOW MEASURING STATIONFMS

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

FUEL OIL VENTFOV

FIRE DAMPERFRD

FIRE SMOKE DAMPERFSD

FINNED TUBE RADIATORFTR

GRILLEG

GLYCOL CHILLED WATER RETURNGCWR

GLYCOL CHILLED WATER SUPPLYGCWS

GRAVITY EXHAUSTGE

GLYCOL HEATING HOT WATER RETURNGHWR

GLYCOL HEATING HOT WATER SUPPLYGHWS

GRAVITY INTAKEGI

HEATING COILHC

PRESSURE/TEMPERATURE TEST PORT

TEMPERATURE CONTROL SYMBOLS

SYMBOL DESCRIPTION ADDITIONAL REMARKS

WALL MOUNTED CONTROL DEVICE

# INDICATES TYPE

REFER TO MOUNTING HEIGHTS DETAIL FOR MOUNTING ELEVATION.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON MONOXIDE, ETC.)

OCCUPANCY SENSOR

REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. WHEN SENSOR IS

NOT SHOWN ON ELECTRICAL DRAWINGS IT SHALL BE PROVIDED AND INSTALLED BY

THE TEMPERATURE CONTROLS CONTRACTOR.

DUCT, PIPE, OR CEILING MOUNTED CONTROL

SENSOR

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

T = THERMOSTAT H = HUMIDISTAT S = SENSOR (CARBON DIOXIDE, ETC.)

CONTROL VALVE (3-WAY)

CONTROL VALVE (2-WAY)

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

F/S FLOW MEASURING STATION REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FIRE DAMPER

REFER TO SPECIFICATIONS FOR TYPE. LOCATE DAMPERS IN AN ACCESSIBLE

LOCATION AND PROVIDE ACCESS DOORS/PANELS IN DUCT AND CEILING/WALL.

CD

FD

SD

FS

DAMPER SHALL BE SAME SIZE AS DUCT UNLESS NOTED OTHERWISE. REFER TO

SEQUENCES, SCHEMATICS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

REFER TO SPECIFICATIONS FOR TYPE. REFER TO SEQUENCES AND SCHEMATICS FOR

ADDITIONAL INFORMATION AND REQUIREMENTS.

FLOW SWITCHF

ABBREVIATION DESCRIPTION

HORSEPOWERHP

HIGH PRESSURE STEAM CONDENSATEHPC

HIGH PRESSURE STEAM SUPPLY (86 PSIG AND ABOVE)HPS

HEAT RECOVERY CHILLERHRC

HUMIDIFIERHUM

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

LOW PRESSURE STEAM CONDENSATELPC

LOW PRESSURE STEAM SUPPLY (0-12 PSIG)LPS

LOUVERLV

LEAVING WATER TEMPERATURELWT

BTU (1000'S)MBH

MANUAL DAMPERMD

MOTOR OPERATED DAMPERMOD

MEDIUM PRESSURE STEAM CONDENSATEMPC

MEDIUM PRESSURE STEAM SUPPLY (13-85 PSIG)MPS

NORMALLY CLOSED, NOISE CRITERIANC

NORMALLY OPEN, NUMBERNO

OUTDOOR AIROA

PUMPP

PUMPED CONDENSATEPC

PRESSURE REDUCING VALVEPRV

PUMPED STEAM CONDENSATEPSC

REGISTERR

RETURN AIRRA

RELIEF AIRREA

REFRIGERANT DX LIQUIDREFL

REFRIGERANT DX SUCTION GASREFS

RETURN FANRF

RELATIVE HUMIDITYRH

ROOF TOP UNITRTU

SUPPLY AIRSA

SMOKE DAMPERSD

SUPPLY FANSF

STATIC PRESSURESP

STEAMSTM

TEMPERATURETEMP

TRANSFERTR

UNIT HEATERUH

VARIABLE AIR VOLUME BOXVAV

VENT THROUGH ROOFVTR

WET BULB TEMPERATUREWB

WATER COLUMNWC

WATER PRESSURE DROPWPD

WATER SOURCE HEAT PUMP RETURNWSHPR

WATER SOURCE HEAT PUMP SUPPLYWSHPS

CONTRACTOR REQUIREMENTS FOR THE

DEMOLITION OF, OR ADDITION TO, ANY PORTION

OF AIR, PLUMBING OR HYDRONIC SYSTEMS.

COVER SHEET NOTES:

THE FOLLOWING SHALL APPLY TO ALL MECHANICAL SYSTEMS AFFECTED BY CONSTRUCTION ACTIVITIES. SYSTEMS INCLUDED BUT ARE NOT LIMITED TO HVAC, EXHAUST, EQUIPMENT, DUCTWORK, DUCTWORK ACCESSORIES, HYDRONICS, COILS, FILTERS, PLUMBING, TEMPERATURE CONTROLS, LIFE

SAFETY CONTROLS AND PRESSURIZATION CONTROLS.

1. COMPLY WITH THE FACILITY'S INFECTIOUS CONTROL RISK ASSESSMENT (ICRA) REQUIREMENTS.

2. DETERMINE AND VERIFY THE AREAS SERVED BY THE AFFECTED SYSTEMS.

MECHANICAL GENERAL NOTES:

A. THESE NOTES APPLY TO ALL SHEETS CONTAINING HVAC, PIPING, PLUMBING, MEDICAL GAS, TEMPERATURE CONTROLS, AND FIRE PROTECTION WORK. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. WHERE A DISCREPANCY EXISTS BETWEEN THESE PLANS AND THE PROJECT SPECIFICATIONS, THE SPECIFICATION REQUIREMENTS SHALL TAKE PRECEDENCE OVER THE DRAWINGS.

B. VERIFY THE EXISTING CONDITIONS AT THE PROJECT SITE BEFORE SUBMITTING COST PROPOSAL. BE ADVISED THAT LOCATIONS SHOWN ARE APPROXIMATE. AN ATTEMPT HAS BEEN MADE TO SHOW ALL PIPING, FIXTURES, DUCTWORK, AND OUTLETS. CONTRACTOR SHALL VISIT THE SITE TO VERIFY COMPONENTS, LOCATIONS AND SIZES SHOWN OR NOT SHOWN. ALL COMPONENTS NEED TO BE REMOVED IN THE DEMOLITION AREA UNLESS NOTED ON THE DRAWINGS. IF DEVIATION BETWEEN EXISTING CONDITIONS AND NEW WORK IS FOUND, CONTRACTOR SHALL NOTIFY ENGINEER.

C. REFER TO THE SPECIFICATIONS AND ARCHITECTURAL PLANS FOR PHASING REQUIREMENTS. DURING EACH PHASE THE CONTRACTOR SHALL COMPLETE ALL WORK LOCATED WITHIN THE BOUNDARY OF THAT PHASE. ANY WORK AND THAT MUST BE COMPLETED IN THE AREA AFTER THAT AREA HAS BEEN TURNED OVER TO THE OWNER SHALL BE IDENTIFIED AT THE BEGINNING OF THE PHASE FOR EVALUATION AND ACCEPTANCE OF THE OWNER.

D. CONTRACTOR SHALL BE RESPONSIBLE FOR THEIR OWN DEMOLITION, REMOVAL, CAPPING, STORING, ABANDONING, DISCONNECTING, RELOCATING AND RECONNECTION OF EXISTING EQUIPMENT AND MATERIAL. ALL CUTTING, PATCHING, REPAIRING, REPLACEMENT AND REFINISHING SHALL MATCH THE EXISTING

CONSTRUCTION AS NEARLY AS POSSIBLE.

E. ALL EXISTING EQUIPMENT BEING REMOVED WILL BE HANDED OVER TO OWNER FOR FIRST RIGHT OF SALVAGE. IF OWNER REFUSES SALVAGE ITEMS, REMOVING

CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL.

F. CONTRACTOR SHALL REFER TO THE DRAWINGS OF ALL TRADES TO FAMILIARIZE THEMSELVES WITH EXTENT OF WORK INCLUDING BUT NOT LIMITED TO WHERE NEW PARTITIONING IS BEING INSTALLED, WHERE EXISTING PARTITIONING IS BEING REMOVED, WHERE CEILINGS ARE BEING REMOVED AND/OR REPLACED, ETC.

G. THESE DRAWINGS ARE NECESSARILY DIAGRAMMATIC IN NATURE. NOT ALL FITTINGS, OFFSETS, VENTS OR DRAINS ARE SHOWN. THE CONTRACTOR SHALL INCLUDE ALL FITTINGS, OFFSETS, VENTS, DRAINS, AND DEVICES REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM.

H. SUPPORT ALL DUCTWORK, PIPING AND EQUIPMENT FROM BUILDING STRUCTURE MEMBERS. ROUTE DUCT MAINS TIGHT TO STRUCTURE UNLESS NOTED OTHERWISE. HOLD PIPING TIGHT TO BOTTOM OF STRUCTURAL MEMBERS OR RUN THROUGH JOIST WEBS IF POSSIBLE. DO NOT USE WIRE OR PERFORATED METAL TO SUPPORT PIPING. DO NOT SUPPORT PIPING FROM OTHER PIPING, DUCTWORK, AND/OR ELECTRICAL CONDUITS. DO NOT SUPPORT FROM WOOD TONGUE AND GROOVE ROOF DECK. SUPPORT FROM BOTTOM CHORD OF BAR JOISTS ONLY AT PANEL POINTS. ALL COMPONENTS REQUIRING MAINTENANCE SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE READILY ACCESSIBLE WITHOUT REMOVAL OF THE CEILING SYSTEM AND TO ALLOW FOR REMOVAL FROM

THE SYSTEM WHEN SUCH REMOVAL IS REQUIRED FOR MAINTENANCE.

I. AT THE COMPLETION OF WORK, CLEAN ALL STRAINERS PROVIDED AS A PART OF THE WORK AS WELL AS PRIMARY SYSTEM STRAINERS LOCATED AT PUMPS

WHERE SYSTEMS WERE EXTENDED. ON EXISTING EQUIPMENT, COORDINATE WORK WITH OWNER.

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M000

MECHANICAL SYMBOLS AND

ABBREVIATIONS

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:4

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

MD101

FIRST FLOOR PLAN - OVERALL -

MECHANICAL - DEMOLITION

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

FIRST FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

GENERAL NOTES:

1. REMOVE BUTTERFLY VALVE, ACTUATOR EXTENTION, AND HANDWHEEL.

2. REMOVE EXISTING SEALANT FROM BASIN WALLS AND FLOOR PER NEW MATERIAL MANUFACTURERS

RECOMMENDATIONS TO ALLOW FOR NEW MATERIAL ADHERSION TO COOLING TOWER BASIN AND WALLS, TYPICAL.

3. CONTRACTOR TO PREVENT ALL COOLING TOWER DEMOLITION DEBRIS BEING INTRODUCED INTO THE CONDENSER

WATER PUMPS AND CHILLER.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

XF-1

XF-2

XF-3

XF-4

XF-5

XF-6

COOLING

TOWER #1

COOLING

TOWER #2

COOLING

TOWER #3

COOLING

TOWER #4

COOLING

TOWER #5

COOLING

TOWER #6

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:4

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

MD102

ROOF FLOOR PLAN - OVERALL -

MECHANICAL - DEMOLITION

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

ROOF FLOOR PLAN - OVERALL - MECHANICAL - DEMOLITION

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

GENERAL NOTES:

1. REMOVE FAN, DRIVE SHAFT, AND ASSOCIATED CONTROLS.

2. COOLING TOWER ACCESS DOOR.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

6 6 6 6 6 6

COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3 COOLING TOWER #4 COOLING TOWER #5 COOLING TOWER #6

XF-1 XF-2 XF-3 XF-4 XF-5 XF-6

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:4

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

MD103

COOLING TOWER - SECTION -

DEMOLITION

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

NO SCALE

ALL COOLING TOWERS SECTION CUT - DEMOLITION

SHEET NOTES:

GENERAL NOTES:

1. REMOVE DRIFT ELIMINATOR.

2. CONTRACTOR TO INSPECT EXISTING PVC PIPING FOR BREAKS, CRACKS, OR OTHER

DEFICIENCIES. IF ANY PIPING DEFICIENCIES ARE FOUND REMOVE EXISTING PIPING AND PREPARE

FOR NEW PIPING INSTALLATION.

3. REMOVE ALL SPRAY NOZZLES AND GROMMETS FROM PVC PIPING.

4. REMOVE ALL COOLING TOWER FILL MATERIAL.

5. REMOVE EXISTING SEALANT FROM BASIN WALLS AND FLOOR PER MANUFACTURERS

RECOMMENDATIONS, TYPICAL.

6. REMOVE FAN, SHAFT, GEAR BOX, AND CONTROLS.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

LOCKERS

ELECTRICAL

Space

B105

CLEAN UP

JAN

Space

B109

CORRIDOR

C101

STORAGE

CHILLERS

COOLING TOWER

M400

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M101

FIRST FLOOR PLAN - OVERALL -

MECHANICAL

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

FIRST FLOOR PLAN - OVERALL - MECHANICAL

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

GENERAL NOTES:

1. PROVIDE NEW BUTTERFLY VALVE, ACTUATOR EXTENTION, AND HANDWEEL.

2. PROVIDE NEW ASPHALT-EXTENDED POLYURETHANE SEALANT ON WALLS AND BASE OF COOLING TOWER

BASIN EQUAL TO "CIM 1000" INDUSTRIAL COATING. INSTALL THE NEW COVERAGE TO MATCH THE HEIGHTS

AND EXTENTS OF THE ORIGINAL COATING.

3. WHEN THE COOLING TOWER WORK HAS BEEN COMPLETED AND OPERATIONAL CONTRACTOR TO CLEAN

AND INSPECT PUMP STRAINERS AFTER THREE DAYS OF OPERATION.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

SF-1

SF-2

SF-3

SF-4

SF-5

SF-6

COOLING

TOWER #1

COOLING

TOWER #2

COOLING

TOWER #3

COOLING

TOWER #4

COOLING

TOWER #5

COOLING

TOWER #6

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M102

ROOF FLOOR PLAN - OVERALL -

MECHANICAL

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

ROOF FLOOR PLAN - OVERALL - MECHANICAL

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

GENERAL NOTES:

1. PROVIDE NEW FAN, SHAFT, AND DIRECT DRIVE MOTOR. INSTALL PER MANUFACTURERS INSTRUCTIONS.

2. CONTRACTOR TO REPAIR HINGE ON COOLING TOWER HATCH. PRIME AND PAINT TO MATCH EXISTING FINISH.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

6 6 6 6 6 6

COOLING TOWER #1 COOLING TOWER #2 COOLING TOWER #3 COOLING TOWER #4 COOLING TOWER #5 COOLING TOWER #6

SF-1 SF-2 SF-3 SF-4 SF-5 SF-6

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M103

COOLING TOWER - SECTION REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

NO SCALE

ALL COOLING TOWERS SECTION CUT

SHEET NOTES:

GENERAL NOTES:

1. PROVIDE NESTED SEAM DRIFT ELIMINATOR, TYPICAL. EQUAL TO ACCU-PAC CFULTRA BY

BRENTWOOD. CONTRACTOR TO FIELD VERIFY DIMENSIONS.

2. REPLACE DAMAGED OR BROKEN PVC PIPING AS REQUIRED.

3. PROVIDE NEW SPRAY NOZZLES AND GROMMETS IN ALL PVC PIPING, TYPICAL. EQUAL TO UTP

#SN180-IMC BY BRENTWOOD. CONTRACTOR TO PROVIDE 25 SPARE NOZZLES TO OWNER FOR

FUTURE MAINTENENCE.

4. PROVIDE COOLING TOWER FILL, TYPICAL. EQUAL TO ACCU-PAC OF21MA BY BRENTWOOD.

CONTRACTOR TO FIELD VERIFY DIMENSIONS.

5. PROVIDE NEW BASIN SEAL COATING MEMBRANE EQUAL TO "CIM 1000" INDUSTRIAL COATING TO

COVER CONCRETE FLOOR AND ALL WALLS OF COOLING TOWER. SEAL COATING TO BE

INSTALLED TO PREVIOUS COATING LIMITS.

6. FAN, SHAFT, AND DIRECT DRIVE MOTOR. MOUNT PER MANUFACTURERS RECOMMENDATIONS.

1. MECHANICAL SYMBOLS AND ABBREVIATIONS SHEET GENERAL NOTES APPLY TO ALL SHEETS.

2. ON DEMOLITION PLANS; EXISTING MECHANICAL SYSTEMS TO BE REMOVED ARE SHOWN HATCHED AND/OR

DASHED, EXISTING MECHANICAL SYSTEMS TO REMAIN ARE SHOWN LIGHT LINE WEIGHT. ON ALL OTHER

PLANS, NEW MECHANICAL SYSTEMS ARE INDICATED WITH HEAVY LINE WEIGHTS.

3. UNLESS NOTED OTHERWISE, DETAILS SHOWN WITHIN THESE DOCUMENTS ARE APPLICABLE FOR ALL

PIPING, EQUIPMENT AND DUCTWORK INSTALLATIONS WHETHER OR NOT SPECIFICALLY NOTED.

4. THE OWNER AND ENGINEER ARE NOT RESPONSIBLE FOR THE CONTRACTOR'S SAFETY PRECAUTIONS OR FOR THE MEANS, METHODS, TECHNIQUES, CONSTRUCTION SEQUENCES, OR PROCEDURES REQUIRED TO

PERFORM THIS WORK.

CHILLERS

COOLING TOWER

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:4

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M400

ENLARGED ROOM CHILLER

ENCLOSURE 109 - MECHANICAL

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024

23022.013

100% CONSTRUCTION

DOCUMENTS

3/16" = 1'-0"

B188_ENLARGED ROOM CHILLER ENCLOSURE 109 MECHANICAL

N

2 2 4 6 8 10 12 14

3/16" = 1'-0"

FEETSCALE

REMARKS:

1. PROVIDE VFD WITH INTEGRAL DISCONNECT.

2. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE

CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING

EQUIPMENT.

3. PROVIDE LOW NOISE OPTION. FANS TO HAVE AN NC RATING OF 66.4 dBA OR LESS, WHEN MEASURES AT 50 FEET FROM AIR INTAKE AND A FAN TIP SPEED OF

11,988 FPM.

4. PROVDE WITH A SHOCK AND VIBRATION SWITCH SIMILAR TO FW MURPHY VS2 SERIES, PROVIDE WITH REMOTE RESET OPERATION.

5. MINIMUM FAN SPEED TO BE 20%.

6. REPORT FAN SPEED BY PERCENTAGE.

REMARKS:

1. IF NO CC IN CONTRACT, MC TO WIRE CONTROLS AND EC TO PIPE CONDUIT.

2. ALL LOW VOLTAGE WIRING OF PANELS TO BE COVERED IN MC BID, WIRING CONTRACTOR TO BE SUBCONTRACTOR TO MC.

3. INSTALLING CONTRACTOR IS RESPONSIBLE FOR FIELD ALIGNMENT SERVICES WHEN REQUIRED BY COMMON MOTOR

REQUIREMENTS SPECIFICATION OR BY INDIVIDUAL EQUIPMENT SPECIFICATIONS.

4. ALL HARDWARE, SOFTWARE, EQUIPMENT, ACCESSORIES, WIRING (POWER AND SENSOR), PIPING, RELAYS, SENSORS, POWER SUPPLIES, TRANSFORMERS, AND INSTRUMENTATION REQUIRED FOR A COMPLETE AND OPERATIONAL DDC SYSTEM, BUT NOT SHOWN ON THE ELECTRICAL DRAWINGS, ARE THE RESPONSIBILITY OF THE CC. COOLING TOWER FAN CONTROL:

• THE BMS SHALL ENABLE THE COOLING TOWER FAN. EXISTING BMS ALGORITHM AND SEQUENCING FOR ENABLING COOLING

TOWER FANS SHALL REMAIN AS CURRENTLY PROGRAMMED.

• CONTROL CONTRACTOR TO UPDATE BMS GRAPHICS.

• CONTROL CONTRACTOR TO BE CONTRACTED UNDER GENERAL CONTRACTOR.

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:4

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

M501

MECHANICAL SCHEDULES REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 AKE AJF

23022.013

100% CONSTRUCTION

DOCUMENTS

FAN SCHEDULE

MARK TYPE

WEIGHT

[LBS]

MAX FAN

RPM

ELECTRICAL DATA

MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE

DISCONNECT

TYPE

MIN

SCCR

SF-1 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6

SF-2 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6

SF-3 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6

SF-4 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6

SF-5 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6

SF-6 AXIAL 900 318 40 480 V 3 VFD 42 HUDSON PRODUCTS TUF-LITE III 4000 KW 1, 2, 3, 4, 5, 6 REMARKS:

1. E = ELECTRIC P = PNEUMATIC BO = BY OTHERS S = REFERENCED POINT FROM HARDWIRE ELSEWHERE ON DDC NETWORK

2. A = ANALOG B = BINARY

3. I = INPUT O = OUTPUT

4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE

5. T = TRENDING EH = EVENT HISTORY AR = ARCHIVE TT = TOTALIZATION GP = GRAPHICAL POINT

POINT ID

COOLING TOWER FAN VFD STATUS

POINT DESCRIPTION

COOLING TOWER FAN VFD START/STOP

COOLING TOWER VFD SPEED CONTROL

DIRECT DIGITAL CONTROL POINTS LIST - COOLING TOWER FANS

E

E

E

E

B

B

A

B

I

O

O

I

TYPE (2) I/O (3) UNITSSOURCE (1)

COOLING TOWER CURRENT STATUS SWITCH

ON/OFF

ENABLED/DISABLED

COORDINATION OF WORK SCHEDULE

ITEM SUPPLIER INSTALLER POWER CONTROL (4)

MOTORS MC MC (3) EC CC

EQUIPMENT MOUNTED ELECTRICAL COMPONENTS MC MC EC CC

LOOSE MOUNTED ELECTRICAL COMPONENTS EC EC EC CC

CONTROL RELAYS, TRANSFORMERS, POWER MC EC EC (4) CC

TEMPERATURE CONTROL SENSORS MC MC CC CC

TEMPERATURE CONTROL PANELS MC CC EC (4) CC

VARIABLE SPEED DRIVES MC MC EC CC

PE/EP SWITCHES, SOLENOID VALVES, ACTUATORS CC CC EC (4) CC

PUSHBUTTON STATIONS EC EC EC (4) EC

NO SCALEM501

COOLING TOWER FAN CONTROL1

5 E B ICOOLING TOWER VIBRATION STATUS SWITCH ON/OFF

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CEILING

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WALL PHONE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

D. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES.

E. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

F. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING FOR BAS SYSTEM REQUIREMENTS. COORDINATE WITH MECHANICAL.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

E000

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

ELECTRICAL FIXTURE

SYMBOLS

PLAN SYMBOL NAME

RECEPTACLE - DOUBLE DUPLEX

- CONV

RECEPTACLE - DUPLEX - CONV

RECEPTACLE - DUPLEX - CONV -

GFCI

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

SWITCHED RECEPTACLE

FHCC CONDUIT COLOR SCHEME

Red- Fire Alarm Blue- Controls, HVAC, BAS Orange- Fiber optic, communications Green- Normal power Yellow- Emergency Power, Critical Power Black- Security Purple- Medical Systems, Nurse Call

ONE LINE SYMBOL

PLAN SYMBOL NAME

CONTINUATION

DISCONNECT SWITCH

GROUND BAR

GROUNDING ELECTRODE

MOTOR STARTER

SWITCHBOARD/SWITCHGEAR -

DOUBLE TUB

TRANSFORMER

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

ENCLOSED DISCONNECT

SWITCH - NON-FUSED

PANELBOARD - SURFACE

SWITCHBOARD

TRANSFORMER - DRY TYPE

TRANSFORMER - OIL FILLED

VARIABLE FREQUENCY DRIVE

(D)

(D)

(D)

(D)

(D)

MV MOTOR

CONTROL CH-2 (E)

EMD-188

SUBSTATION

USS2 (E)

SUBSTATION

USS1 (E)

MV MOTOR

CONTROL CH-3 (E)

(E)

MCC-CP-C (E)

P N

L

LP

-C P

-A

E

P N

L A

E

XFMR (E)

XFMR (E)

ATS (E)

(E)

MAIN SWGR #3 (E)

MAIN SWGR #2 (E)

MAIN SWGR #1 (E)

MCC-CP-A (E)

MCC-CP-D (E)

MCC-CP-B (E)

VFD-CTF-1 (D)

VFD-CTF-2 (D)

VFD-CTF-3 (D)

(E)

(E)

(E)

V F

D -C

T F-

(D

V

F D

-C T

F-

(D

V F

D -C

T F-

(D

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

ED101

FIRST FLOOR PLAN - OVERALL -

ELECTRICAL - DEMOLITION

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

FIRST FLOOR PLAN - OVERALL - ELECTRICAL - DEMOLITION

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

1. EXISTING COOLING TOWER FANS TO BE REMOVED.

DISCONNECT CONDUIT AND FEEDERS. REMOVE FEEDERS

BACK TO SOURCE. RETAIN CONDUIT FOR REUSE WITH NEW

REEDER CONDUCTORS.

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

(D)

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

ED102

ROOF FLOOR PLAN - OVERALL -

ELECTRICAL - DEMOLITION

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

ROOF FLOOR PLAN - OVERALL - ELECTRICAL - DEMOLITION

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

1. DISCONNECT EXISTING COOLING TOWER FAN. REMOVE

DISCONNECTS IN THEIR ENTIRIEY.

2. COOLING TOWER FAN MOTOR #4 HAS BEEN REMOVED

PREVIOUSLY. CONTRACTOR SHALL REMOVE EXISTING

FEEDERS BACK TO THE POINT OF ORIGIN.

LOCKERS

ELECTRICAL

Space

B105

CLEAN UP

JAN

Space

B109

CORRIDOR

C101

STORAGE

102 CHILLERS

COOLING TOWER

MV MOTOR

CONTROL CH-2 (E)

EMD-188

SUBSTATION

USS2 (E)

SUBSTATION

USS1 (E)

MV MOTOR

CONTROL CH-3 (E)

MCC-CP-C (E)

MAIN SWGR #3 (E)

MAIN SWGR #2 (E)

MAIN SWGR #1 (E)

MCC-CP-A (E)

MCC-CP-B (E)

MCC-CP-D (E)

(E)

(E)

(E)

XFMR (E)

XFMR (E)

P N

L A

E

P N

L

LP

-C P

-A

E

ATS (E)

(E)

(E)

V F

D -C

T F-

V

F D

-C T

F-

V F

D -C

T F-

VFD-CTF-1

VFD-CTF-2

VFD-CTF-3

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

E101

FIRST FLOOR PLAN - OVERALL -

ELECTRICAL

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

FIRST FLOOR PLAN - OVERALL - ELECTRICAL

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

N

SHEET NOTES:

1. PROVIDE NEW VFD FOR COOLING TOWER FAN. REFER TO SHEET E102 FOR

CONNECTION TO FAN DISCONNECT. VFD SHALL BE STRUT MOUNTED.

SF-1

SF-2

SF-3

SF-4

SF-5

SF-6

SF-1

SF-2

SF-3

SF-4

SF-5

SF-6

PNL A-13

WR

WR

WR

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

E102

ROOF FLOOR PLAN - OVERALL -

ELECTRICAL

REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

3/32" = 1'-0"

ROOF FLOOR PLAN - OVERALL - ELECTRICAL

N

5 5 10 15 20 25 30

3/32" = 1'-0"

FEETSCALE

SHEET NOTES:

1. REFER T0 ONE-LINE DIAGRAM FOR WIRING AND CONNECTION INFORMATION.

2. EXISTING CONDUIT TO DISCONNECT TO REMAIN. CONTRACTOR SHALL REMOVE

EXISTING FEEDERS AND PROVIDE NEW PER EQUIPMENT CONNECTION SCHEDULE.

A. MECHANICAL EQUIPMENT NOT SHOWN ON ONE-LINE. REFER TO PANEL SCHEDULES FOR COMPLETE LIST

OF CIRCUIT BREAKER SIZES AND QUANTITIES REQUIRED.

B. THE CONTRACTOR SHALL REQUEST THE MOST RECENT SET OF THE CURRENT POWER SYSTEMS STUDY

PROJECT TO COORDINATE THE AIC RATINGS FROM THE COR.

(GENERAL NOTES SHALL APPLY TO ALL ONE-LINE SHEETS)

ONE-LINE GENERAL NOTES:

SW SWGR #3 BLD 188

600A/3

300/3

2000A/3

MCC-CP-D

480V

MTR CT-4

40HP

MTR CT-5

40HP

USS#2 BLD-188

480V

T-188-2

4160/480

SWGR #3 BLD 188

4160V

1600A/3

MTR CT-1

40HP

MTR CT-2

40HP

MTR CT-3

40HP

MCC-CP-C

480V

MTR CT-6

40HP

1 1 1

1 1 1

VFD VFD VFD

VFD VFD VFD

EXISTING LOAD:

CT-1: 40HP - 52A

CT-2: 40HP - 52A

CT-3: 40HP - 52A

EXISTING LOAD:

CT-4: 40HP - 52A

CT-5: 40HP - 52A

CT-6: 40HP - 52A

SW SWGR #3 BLD 188

600A/3

300/3

2000A/3

MCC-CP-D

480V

MTR CT-4

40 HP

MTR CT-5

40 HP

USS#2 BLD-188

480V

T-188-2

4160/480

SWGR #3 BLD 188

4160V

1600A/3

MTR CT-1

40 HP

MTR CT-2

40 HP

MTR CT-3

40 HP

MCC-CP-C

480V

MTR CT-6

40 HP

70/3 70/3 70/3

70/3 70/3 70/3

PROVIDE NEW CIRCUIT BREAKER BUCKET IN MCC

PROVIDE NEW CIRCUIT BREAKER BUCKET IN MCC

100/3 NF 100/3 NF 100/3 NF

100/3 NF100/3 NF100/3 NF

MEC MEC MEC

MEC MEC MEC

VFD VFD VFD

VFD VFD VFD

1 1 1

1 1 1

EXISTING LOAD:

CT-4: 40HP - 52A

CT-5: 40HP - 52A

CT-6: 40HP - 52A

NEW LOAD:

CT-4: 40HP - 52A

CT-5: 40HP - 52A

CT-6: 40HP - 52A

FINAL CHANGE - NO NET CHANGE

EXISTING LOAD:

CT-1: 40HP - 52A

CT-2: 40HP - 52A

CT-3: 40HP - 52A

NEW LOAD:

CT-1: 40HP - 52A

CT-2: 40HP - 52A

CT-3: 40HP - 52A

FINAL CHANGE - NO NET CHANGE

8910 Purdue Road, Suite 320 Indianapolis, IN 46268 Phone: 317.931.9800

INSTALL GREEN INSULATED

GROUND WIRE WITH

LIGHTING, RECEPTACLE AND

EQUIPMENT BRANCH CIRCUITS.

INSTALL INDIVIDUAL (DEDICATED)

NEUTRAL CONDUCTORS FOR

EACH 120V OR 277V PHASE

CONDUCTOR SERVED FROM A

SINGLE POLE CIRCUIT BREAKER

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

100% Construction Documents 12/02/2024

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

FULLY SPRINKLERED

Office of Construction and Facilities Management

Phase

STAMP

www.specializedeng.com SES Project :

DESIGNER OF RECORDCONSULTANT

U.S. Department of Veterans Affairs

12/02/2024

/3 /2

:5

:3

P M

A u to d e s k D o c s /2

.0

V

A L o v e ll R e p la c e C o o lin g T o w e r

F a n s /5

.R e p la c e C o o lin g

T o w e r

F a n s . E

R

.r v t

E500

ONE-LINE DIAGRAM REPLACE COOLING TOWER FANS

Captain James A., Lovell FHCC, 3001 Green Bay Rd, North Chicago, IL 60064

556-24-107

B188

12/02/2024 NMT SSK

23022.013

100% CONSTRUCTION

DOCUMENTS

FEEDER SCHEDULE - COPPER

FEEDER NOMINAL SIZE WIRE AND CONDUIT

MEC -- REFER TO EQUIPMENT CONNECTION SCHEDULE

NO SCALE

EXISTING ELECTRICAL ONE-LINE

NO SCALE

NEW WORK ELECTRICAL ONE-LINE

SHEET NOTES:

1. REMOVE EXISTING BREAKER AND PROVIDE NEW BREAKER BUCKET IN MCC PER NEW WORK.

2. EXISTING CONDUIT TO REMAIN. CONTRACTOR TO REMOVE FEEDERS BACK TO POINT OF ORIGIN AND

PROVIDE NEW PER EQUIPMENT CONNECTION SCHEDULE.

2 2 2

2 2 2

REMARKS: (EQUIPMENT CONNECTION SCHEDULE)

1. N/A

GENERAL NOTES: (EQUIPMENT CONNECTION SCHEDULE)

A. EQUIPMENT LISTED MAY NOT BE UNIQUE, VERIFY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .