S06_Att2S Bldg.188 Chiller Plant E-5 Single Line and Fire Alarm Diagrams in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf

PDF 685 KB Posted

Attached to
Z1DA--556-24-107 Replace Cooling Tower Fans (VA-25-00066976)
Solicitation number
36C25225B0015
Issued by

About this file

This is a technical engineering drawing or schematic diagram from Perkins & Will architectural/engineering firm. The document appears to be a detailed electrical or mechanical systems diagram showing various components, wiring configurations, and technical specifications.

The drawing includes multiple detailed schematics with electrical panels, connection diagrams, and what appears to be a comprehensive data table or schedule in the lower right portion. The diagrams show various electrical components, control panels, and interconnection details with technical annotations and specifications. The document includes standard architectural drawing elements such as title blocks, revision information, and professional seals, indicating this is part of a formal construction or engineering project documentation set rather than a federal contracting document.

View the file

Other files

File Type Posted
S06_Att2G Bldg.188 Chiller Plant S3 Sections and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2R Bldg.188 Chiller Plant E-4 Roof Plan and Motor Contr. Ctr Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2E Bldg.188 Chiller Plant S1 Foundation Plan and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2Q Bldg.188 Chiller Plant E-3 Switchboard Details and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2L Bldg.188 Chiller Plant H-4 Water Flow Diagram and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2M Bldg.188 Chiller Plant H-5 Equipment Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2D Bldg.188 Chiller Plant Bldg. Plans section and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2H Bldg.188 Chiller Plant S4 Column Schedule and Steel Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2N Bldg.188 Chiller Plant H-6 Chilled water Distribution Diagram in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2J Bldg.188 Chiller Plant H-2 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2K Bldg.188 Chiller Plant H-3 Partial Plans and Secs. in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2A Bldg.188 Chiller Plans in Response to RFI Question 1 IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2F Bldg.188 Chiller Plant S2 Roof Framing Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2I Bldg.188 Chiller Plant H-1 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2P Bldg.188 Chiller Plant E-2 Power and Signal Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0003.docx DOCX document
S06_Att2O Bldg.188 Chiller Plant E-1 Lighting Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att1 SF30 Continuation Page IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2 RFI Pre-Bid Responses IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.xlsx XLSX spreadsheet
S06_Att2B Bldg.188 Chiller Plant Elev. Bldgs Details and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2C Bldg.188 Chiller Plant Roof Plans in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0002.docx DOCX document
S06 - Updated Bid Schedule_36C25225B0015 Amend 0002.pdf PDF
36C25225B0015 0001.docx DOCX document
S06 - 556-24-107 cooling tower fans pre bid site visit 18Jul25.pdf PDF
S02 - Attachment 1_VAAR 852.219-75_REQUIRED.pdf PDF
S02 - Wage Determination_eff 7.4.25.pdf PDF
S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Specification.pdf PDF
36C25225B0015_1.docx DOCX document
S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Combined Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .