This file is a pre-bid response document containing questions and answers for IFB 36C25225B0015, a cooling tower fan replacement project at Captain James A. Lovell Federal Health Care Center in North Chicago, IL. The responses, posted on July 31, 2025 as Amendment 0003, address nine questions from Blue Yonder regarding project requirements and logistics.

Key clarifications include: the VA will provide reference documents for the custom-made cooling towers but contractors must comply with current solicitation requirements; the superintendent may serve as Site Safety & Health Officer (SSHO) if qualified by the VA, but Quality Control Manager must be a separate role; laydown/storage areas and dumpster locations will be coordinated between contractor and Contracting Officer's Representative at mobilization; photographic documentation is required with daily production reports but can be performed in-house (no third-party service required), with strict prohibitions on including patients, visitors, or employees in photos; the existing Building Management System uses Automated Logic; CAD files are available at VA's discretion; and VA will provide Submittal Exchange for electronic submittals. The project falls under NAICS code 238220 for plumbing, heating, and air-conditioning contractors with a 197 calendar day performance period.

View the file

Other files

File Type Posted
S06_Att2G Bldg.188 Chiller Plant S3 Sections and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2R Bldg.188 Chiller Plant E-4 Roof Plan and Motor Contr. Ctr Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2E Bldg.188 Chiller Plant S1 Foundation Plan and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2Q Bldg.188 Chiller Plant E-3 Switchboard Details and Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2L Bldg.188 Chiller Plant H-4 Water Flow Diagram and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2M Bldg.188 Chiller Plant H-5 Equipment Schedules in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2D Bldg.188 Chiller Plant Bldg. Plans section and Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2H Bldg.188 Chiller Plant S4 Column Schedule and Steel Details in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2N Bldg.188 Chiller Plant H-6 Chilled water Distribution Diagram in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2J Bldg.188 Chiller Plant H-2 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2K Bldg.188 Chiller Plant H-3 Partial Plans and Secs. in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2A Bldg.188 Chiller Plans in Response to RFI Question 1 IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2F Bldg.188 Chiller Plant S2 Roof Framing Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2S Bldg.188 Chiller Plant E-5 Single Line and Fire Alarm Diagrams in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2I Bldg.188 Chiller Plant H-1 Partial Plant in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2P Bldg.188 Chiller Plant E-2 Power and Signal Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0003.docx DOCX document
S06_Att2O Bldg.188 Chiller Plant E-1 Lighting Plan in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att1 SF30 Continuation Page IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2B Bldg.188 Chiller Plant Elev. Bldgs Details and Sections in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
S06_Att2C Bldg.188 Chiller Plant Roof Plans in Response to RFI Question 1 Solicitation 36C25225B0015_08062025.pdf PDF
36C25225B0015 0002.docx DOCX document
S06 - Updated Bid Schedule_36C25225B0015 Amend 0002.pdf PDF
36C25225B0015 0001.docx DOCX document
S06 - 556-24-107 cooling tower fans pre bid site visit 18Jul25.pdf PDF
S02 - Attachment 1_VAAR 852.219-75_REQUIRED.pdf PDF
S02 - Wage Determination_eff 7.4.25.pdf PDF
S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Specification.pdf PDF
36C25225B0015_1.docx DOCX document
S02 - 556-24-107 Replace Cooling Tower Fans_100prtCD 20241202_Combined Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

556-24-107 IFB Replace Cooling Tower Fans for Pre -Bid Solicitation Questions - 07/25/2025
Captain James A Lovell Federal Health Care Center (FHCC) Solicitation for Bidders
This IFB Pre-Bid response is intended to clarify the scope, not conflict with it.
If a response appears to conflict with the scope, please contact the VA COR.
NO.RFI FROMQUESTION OR COMMENTVA RESPONSE 07/31/2025RESPONSE POSTED IN AMENDMENT NO.
1Blue YonderThe existing cooling towers are custom made. Please provide the original design plans to determine the tower fill media size and capacity, fan CFMs and HP, temperatures, basin sizes, etc.VA has attached some documents for reference. These in no way detract from the requirements from the current solicitation. (SEE ATTACHMENT: S06_Att2A Bldg.188 Chiller Plant Portfolio in Response to RFI Question 1 IFB Amendment 0003 556-24-107 Solicitation 36C25225B0015_080620250003
2Blue YonderCan the Superintendent fulfill the Quality Control Manager (QCM) role?Review and comply with the contract documents. Superintendent may act as SSHO if qualified (see RFI 3) QA/QC can not be superintendent or SSHO.0003
3Blue YonderCan the Superintendent fulfill the Site Safety & Health (SSHO) role?See RFI 2. Review and comply with 01 35 26 - 1.7 "Site Safety and Health Officer" (SSHO) and "Competent Person". The superintendent can act as the SSHO if VA determines them to have the proper qualifications and competency. The SSHO must remain on-site at all times during construction. There is no case in which the SSHO can attend to multiple projects at the same time.0003
4Blue YonderWill the VA provide laydown/storage areas? If so, where will they be located?The Contractor and COR will coordinate laydown/storage area at the time of mobilization. Consideration will be made to get this area close to the job site but locations are subject to change depending on facility needs.0003
5Blue YonderWill the VA provide an area for a dumpster? If so, where will that be located?The Contractor and COR will coordinate laydown/storage area at the time of mobilization. Consideration will be made to get this area close to the job site but locations are subject to change depending on facility needs.0003
6Blue YonderAre there any requirements regarding photographic documentation?Review and comply with the contract documents. GC is required to prepare and submit photographic documentation of all projects with their submitted daily production reports.

SOW: "In no case shall the GC allow any team member to take photographs with patients, visitors, or employees in the picture." PHI and PII is also not allowed in photographs.

Photographic documentation falls under daily logs. This is not required to be a 3rd party service.0003
Please confirm if this will be required as part of this project?Yes photographic documentation is required.
If required, must this be a 3rd party service?
Or can it be performed inhouse by general contractor?
7Blue YonderPlease confirm the current BAS vendor/system for the building?The existing BMS is by Automated Logic. Refer to specification 230923.0003
8Blue YonderAre CAD files available for all of the issued drawings? Or will they be available after award is made?The A&E provided CAD files to the VA, and they are at the discretion of the VA to provide.0003
9Blue YonderWill the VA be providing an electronic submittal program, or is it expected that the general contractor provides this?VA will provide Submittal Exchange.0003
Are there programs or software that are acceptable?

NO. RFI FROM QUESTION OR COMMENT VA RESPONSE 07/31/2025 RESPONSE POSTED IN AMENDMENT NO.