S02-36C77625B0026_1.pdf

PDF 795 KB Posted

Attached to
Construct 12 bed CLC at the Trinka Davis Veterans Village
Solicitation number
36C77625B0026
Issued by

About this file

This is a Department of Veterans Affairs (VA) Solicitation for Invitation for Bid (IFB) for constructing a 12-bed Community Living Center (CLC) at the Trinka Davis Veterans Village in Carrollton, Georgia. The project is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a contract value between $10,000,000 and $20,000,000, specifically NAICS code 236220. The new facility will include 10 standard CLC rooms and 2 bariatric rooms capable of accommodating patients up to 1,000 lbs, designed to integrate seamlessly with the existing facility to allow shared spaces for staff, patients, and visitors.

Key solicitation details include a site visit scheduled for July 23, 2025, at 9:00am EST, with bids due by 12:00pm EST on August 27, 2025. Bidders must be verified SDVOSB at the time of bid and award, and the contract has a performance period of 10 calendar days for mobilization and 730 calendar days for total project completion. The solicitation includes multiple bid alternates that allow the VA to adjust the project scope based on available funding, such as options to eliminate secondary electrical feed, landscaping, clerestory areas, and bariatric rooms. Bidders must submit comprehensive documentation, including a bid guarantee, representations and certifications, and comply with various federal acquisition regulations.

View the file

Other files

File Type Posted
S06-36C77625B0026-Amendment 0004.pdf PDF
S06-Wage Rates-Carroll County-August update.pdf PDF
S06-36C77625B0026-Amendment 0003.pdf PDF
S06-S2.05.pdf PDF
S06-S2.04.pdf PDF
S06-S2.01.pdf PDF
S06-Summary of Changes.pdf PDF
S06-A5.10.pdf PDF
S06-A5.12.pdf PDF
S06-A3.20.pdf PDF
S06- Addendum 2 Specs - Vol 3.pdf PDF
S06- Addendum 2 Specs - Vol 2.pdf PDF
S06-36C77625B0026-Amendment 0002.pdf PDF
S06-S2.02.pdf PDF
S06-Q15-5.jpg JPG image
S06-Q15-2.jpg JPG image
S06-Complete Set - TDVV_Part6.pdf PDF
S06-Complete Set - TDVV_Part5.pdf PDF
S06-Q15-4.jpg JPG image
S06-Complete Set - TDVV_Part3.pdf PDF
S06-A5.14.pdf PDF
S06-A5.11.pdf PDF
S06-22.9003_A_v22 - Sheet - AE202 - BUILDING ELEVATIONS.pdf PDF
S06-22.9003_A_v22 - Sheet - AE402 - ENLARGED ARCHITECTURAL PLANS.pdf PDF
S06- Addendum 2 Specs - Vol 1.pdf PDF
S06-Q15-3.jpg JPG image
S06-Q15-1.jpg JPG image
S06-Complete Set - TDVV_Part4.pdf PDF
S06-Complete Set - TDVV_Part2.pdf PDF
S06-A5.13.pdf PDF
S06-22.9003_A_v22 - Sheet - AE201 - BUILDING ELEVATIONS.pdf PDF
S06-S2.06.pdf PDF
S06-QC-11032301 Va Trinka Davis Veteran Village -Rev 2.pdf PDF
S06-Complete Set - TDVV_Part1.pdf PDF
S06 - Tech Questions and Responses.pdf PDF
S06-Site Visit Sign-In Sheet-ATL.pdf PDF
S06 - Site Visit Agenda -ATL.pdf PDF
Amendment 0001-36C77625B0026 0001.pdf PDF
S06- 36C77625B0026_1.pdf PDF
S06-Bid Opening Information.pdf PDF
Attachment 4-Specs Vol 2-ATL.pdf PDF
Attachment 8-Basis of Design-ATL.pdf PDF
Attachment 10-Site Visit Details and Directions- ATL.pdf PDF
Attachment 2-Drawings.pdf PDF
Attachment 7-Wage Rates-Carroll County.pdf PDF
Attachment 9-Campus Map.pdf PDF
Attachment 1-Statement of Work.pdf PDF
Attachment 3-Specs Vol 1-ATL.pdf PDF
Attachment 5-Specs Vol 3-ATL.pdf PDF
Attachment 6-Limitations on Subcontracting-ATL.docx DOCX document
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C77625B0026 X

07-14-2025

TBD

508-349

36C776

Department of Veterans Affairs Program Contracting Activity Central

(PCAC)

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

Department of Veterans Affairs Program Contract Activity Central

(PCAC)

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

Doniver G. Hamilton (216) 791-3800 ext 11379

Project 508-349: Construct 12 Bed CLC at the Trinka Davis Veterans Village in Carrollton, GA.

This solicitation is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) Set Aside in accordance with 38 U.S.C. § 8127 (Public Law 109-461). Bidders shall be verified as an SDVOSB at the time of bid and award.

The Contractor shall provide all labor, materials, and equipment to accomplish the Trinka Davis 12 Bed CLC project per construction drawings and specifications. The project shall be accomplished per contract drawings numbered 508-349, specification number 508-349 and SOW attached to this solicitation.

The project intent is to add 12 beds to the Trinka Davis Veteran’s Village. These 12 private rooms will have private bathrooms and will have room for co-sleeper space. The rooms will consist of 10 “standard” CLC style rooms and 2 Bariatric rooms capable of patients up to 1000 lbs. This new CLC shall be integrated into the existing facility such that staff, patients, and visitors will be able to share spaces; this will be achieved through proximity to the to the existing facility, physical connection, and maintaining the unique style and aesthetics of the existing facility.

Place of Performance:

Trinka Davis Veterans Village at the Atlanta VA Medical Center 180 Martin Dr.

Carrollton, GA 30117

NAICS code: 236220

PSC: Y1DZ

VAAR Magnitude of Construction: $10,000,000 to $20,000,000

A site visit has been scheduled, please review site visit information within this solicitation.

PLEASE NOTE: The bidder is required to fill in Unique Identifier in block No. 14 Standard Form (SF) 1442.

The bidder agrees to attend any post award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation (FAR) 42.5.

Any reference in the specifications to guarantee period services or warranties outside of the one year warranty period in accordance with FAR 52.246-21 Warranty of Construction shall be omitted and not considered for development of the bid.

Updated specifications will be provided in a forthcoming amendment.

10 730 x x 52.211-10

X 10

0 12:00pm EST

08-27-2025

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

PLEASE SEE PRICE SCHEDULE

36C776

Department of Veterans Affairs Program Contracting Activity Central

(PCAC)

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

VAFSC

Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically https://www.fsc.va.gov/einvoice.asp e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429

Joelle M. Mascarenas

VA-VHA-RPOC-2024-0009

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 BID MATERIAL:

1.2 BID GUARANTEE:

1.3 PAYMENT & PERFORMANCE BONDS:

1.4 TAXES:

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

2.2 INVITATION FOR BID:

2.3 SDVOSB SET-ASIDE:

2.4 TECHNICAL QUESTIONS:

2.5 AMENDMENTS:

2.6 PRE-BID SITE VISIT:

2.7 PREPARATION OF BIDS:

2.8 BID SUBMISSION:

2.9 DETERMINATION OF NON-RESPONSIVE:

2.10 DETERMINATION OF RESPONSIBILITY:

2.11 VETS 4212:

2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):

2.13 CONTRACT AWARD:

2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

PERFORMANCE ASSESSMENT SYSTEM (CPARS):

2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:

2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT

MANAGER:

2.17 52.216-1 TYPE OF CONTRACT (APR 1984)

2.18 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014)

2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

2.20 52.228-1 BID GUARANTEE (SEP 1996)

2.21 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

2.22 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.23 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995)

2.24 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

2.25 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.26 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.27 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE

ITEMS (APR 2019)

REPRESENTATIONS AND CERTIFICATIONS

3.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN

2025)(DEVIATION FEB 2025)

3.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.4 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

3.5 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.6 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.7 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND

REPRESENTATION (JUN 2020)

GENERAL CONDITIONS

4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)

4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(JAN 2025)

4.4 52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2024)(DEVIATION FEB 2025)

4.5 52.223-20 AEROSOLS (MAY 2024)

4.6 52.223-21 FOAMS (MAY 2024)

4.7 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024)(DEVIATION

FEB 2025)

4.8 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE

AGREEMENTS (NOV 2023) ALTERNATE I (NOV 2023)

4.9 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.11 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:

4.12 52.236-4 PHYSICAL DATA (APR 1984)

4.13 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997) ALTERNATE II (APR 1984)

4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.15 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

4.16 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.17 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.18 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.19 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.20 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)

(DEVIATION)

4.21 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899

(DEVIATION)(APR 2025)

4.22 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)

4.23 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.24 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

4.25 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

4.26 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.27 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.28 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.29 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.30 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.31 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ..71

4.32 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.33 MANDATORY WRITTEN DISCLOSURES

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVI

CES

QUANTI

TY

UNI

T UNIT PRICE AMOUNT

1.00 JB _______________

BID ITEM #1, BASE BID: Work includes general construction, alterations, roads, walks, grading, drainage, necessary removal of existing structures and construction and all other items as required by drawings, specification, and the statement of work for project 508-349.

PLEASE NOTE: The Contractor shall complete the entire project no later than 730 calendar days after the Contractor receives the Notice to Proceed.

Contract Period: Base POP Begin:

POP End:

BID ITEM #2 - ALTERNATE A – ELIMINATE SECONDARY

ELECTRICAL FEED:

All work in BASE BID except electrical work shown on electrical drawings.

PLEASE NOTE: THIS DOES NOT IMPACT THE PERIOD

OF PERFORMANCE.

BID ITEM #3 – ALTERNATE B – ELIMINATE

LANDSCAPING:

Includes all work in the BASE BID but REMOVES ALTERNATE A AND eliminates the tree and shrub planting areas along the turnaround. Eliminate the tree, shrub, and flower bed areas in between the new building and existing building on both the east and south side of the new building.

The new trees and shrubs to be installed within the 10' and 20' buffer zone along the property limits to the west and north of the building are to remain; they are not to be eliminated if this alternate is accepted.

BID ITEM #4 – ALTERNATE C – ELIMINATE

CLERESTORY AREAS: Includes all work in the BASE BID but REMOVES ALTERNATE A & ALTERNATE B and eliminates the clerestory areas above the back vestibule and bathing room. Structure shall continue over these areas to match adjacent single story wall section including roof overhang.

BID ITEM #5 – ALTERNATE D – ELIMINATE

CLERESTORY AREAS: Includes all work in the BASE BID but REMOVES ALTERNATE A, ALTERNATE B & ALTERNATE C and eliminates the clerestory area above the living room. Structure shall continue over these areas to match adjacent single story wall section including roof overhang.

BID ITEM #6 – ALTERNATE E – ELIMINATE BARIATRIC

ROOMS: Includes all the work in the BASE BID but removes

ALTERNATE A, ALTERNATE B, ALTERNATE C &

ALTERNATE D and eliminates 2 bariatric rooms and back patio including all structural items, walls, doors, roof, lighting plumbing, etc. Corridor wall shall become an exterior wall matching EXT-1. See DEDUCT FLOOR PLAN for configuration if alternate is accepted.

GRAND TOTAL _______________

NOTICE

1. Line Item 0001, Base Bid (General Construction) contains all the work for this project. Each Line Item (Alternate) removes a portion of the work.

2. All bid alternates are cumulative in nature. The intent is to award Line Item 0001, Base Bid (General Construction). However, if the bid price exceeds the funds available for Line Item 0001, Base Bid (General Construction), then Line Item 0002 (BID ALTERNATE A) will be applied. If the bid price exceeds the funds available for Line Item 0002 (BID ALTERNATE A, then Line Item 0003 (BID ALTERNATE B) will be applied. If the bid price exceeds the funds available for Line Item 0003 (BID ALTERNATE B), then Line Item 0004 (BID ALTERNATE C) will be applied. If the bid price exceeds the funds available for Line Item 0004 (BID ALTERNATE C) then Line Item 0005 (BID ALTERNATE D) will be applied. If the bid price exceed the funds available for Line Item 0005 (BID ALTERNATE D), then Line Item 0006 (BID ALTERNATE E) will be applied.

3. Please reference VAAR 852.236-92 Notice to Bidders–Additive or Deductive Bid Line Items in the solicitation for additional details.

4. Bidders must provide a lump sum price for each of the Line Items. Failure to do so shall render their bid as nonresponsive.

5. Pricing should be submitted in whole dollar values. Please do NOT include pricing in cents.

6. Bidder is required to fill in their Unique Entity Identifier number associate with SAM.gov in

Block No. 14 on Standard Form (SF) 1442.

7. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE

AND BONDS

1.1 BID MATERIAL:

Bid materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Invitation for Bid (IFB). The VA will not provide printed copies of drawings or specifications. It is the responsibility of the bidder to obtain the bid materials in a time and manner sufficient to respond to this solicitation by the specified due date.

1.2 BID GUARANTEE:

A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for receipt of bids, will result in the rejection of the bid. Copies of the SF 24 may be obtained from https://www.gsa.gov/forms.

In accordance with Class Deviation from the Federal Acquisition Regulation to Eliminate Hard Copy Original Documents, Signatures, Notarization, Seals on Bonds, and Other Seals for Certain Contract Requirements issued by the VA Executive Director, Office of Acquisition and Logistics and the Senior Procurement Executive on May 11, 2020, the requirement for a hard copy original bond, with the original signatures, notarization and seals has been eliminated. The bid bond must be submitted electronically as part of the bid package.

1.3 PAYMENT & PERFORMANCE BONDS:

The bidder to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25). Both bonds must be submitted in accordance with FAR 52.228-15 Performance and Payment Bonds – Construction (DEVIATION). Copies of SFs 25A and 25 may be obtained from https://www.gsa.gov/forms.

1.4 TAXES:

Contractor must take into account FAR 52.229-3; “Federal, State and Local Taxes” and its Special Note in their pricing. The FAR clause and its Special Note provide guidance on taxes being applied to pricing.

Bidders are hereby notified that all state and local sales or use taxes for construction materials must be included in their bid price. It is solely the responsibility of the bidder to include all other applicable taxes in their bid price as well. The Government has determined that for this acquisition it cannot take advantage of any sales or use tax exemptions that may be available to it under applicable state law. Under no circumstances will any Contractor be designated as an agent of the Government for purposes of any tax exemption, nor will the Government authorize any Contractor’s use of any tax exemption directly applicable to the Government under this procurement.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gsa.gov%2Fforms&data=05%7C02%7C%7C7197924ab06b4510c2cb08dd1867cd0b%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638693556286629207%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=MT5QogE1p45j8KY7G3NL%2BRIn0UgyKEY8mmn8Lp5c5oQ%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.gsa.gov%2Fforms&data=05%7C02%7C%7C7197924ab06b4510c2cb08dd1867cd0b%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638693556286629207%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=MT5QogE1p45j8KY7G3NL%2BRIn0UgyKEY8mmn8Lp5c5oQ%3D&reserved=0

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:

All solicitation related documents will be published to Contract Opportunities https://Sam.gov.

2.2 INVITATION FOR BID:

This solicitation is being issued as an Invitation for Bid (IFB) in accordance with FAR Part 14.

2.3 SDVOSB SET-ASIDE:

This procurement is a 100% set-aside for SDVOSB concerns. Bids received from other than SDVOSBs will not be considered. All SDVOSBs will be verified in the Dynamic Small Business Index (DSBS) and/or the SBA’s VetCert Database at the time of bid submission and the time of award. All SDVOSBs must be listed as “certified” in the SBA’s VetCert database (Veteran Small Business Certification (sba.gov)) at the time of bid submission and at time of award. Failure to be certified from the time of bid submission through the time of award will result in the bidder’s bid being non-responsive.

2.4 TECHNICAL QUESTIONS:

Questions of a technical nature must be provided in writing and must be submitted by the prospective bidders only via e-mail to: Joelle Mascarenas (Joelle.Mascarenas@va.gov ) and Doniver Hamilton (Doniver.Hamilton@va.gov ). The subject line must read: Construct 12 Bed CLC-Carrollton, GA-Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS July 30, 2025 at 12:00pm EST.

2.5 AMENDMENTS:

Amendments to this solicitation will be posted at https://Sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential bidders are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment shall result in your bid being considered non-responsive.

2.6 PRE-BID SITE VISIT:

A formal site visit has been scheduled for this project. This will be the only opportunity for potential bidders to visit the site. See FAR Clause 52.236-27 of this solicitation for further information.

All potential bidders, subcontractors and suppliers are strongly encouraged to attend this site visit.

2.7 PREPARATION OF BIDS:

The Government will not pay for any costs incurred in preparation and submission of bids.

https://sam.gov/ mailto:Joelle.Mascarenas@va.gov mailto:Doniver.Hamilton@va.gov https://sam.gov/

2.8 BID SUBMISSION:

A. GENERAL:

(a) Bidders must submit their bids via email to: Joelle Mascarenas (Joelle.Mascarenas@va.gov) and Doniver Hamilton (Doniver.Hamilton@va.gov).

(b) Only emailed bids will be accepted. Bids submitted by any method other than email are not allowed and will be deemed non-responsive and therefore ineligible for award.

(c) The bid opening will be conducted via teleconference. An in person bid opening will not be facilitated.

(d) Failure to provide electronic bids and the electronic copy of the bid bond on the date and time set for bid opening, will deem the bid non-responsive.

B. BID PACKAGE CONTENTS:

(a) Standard Form (SF) 1442 Solicitation, Offer and Award:

The bidder must complete & sign the “OFFER” section of the SF 1442. Please include your company’s Unique Entity Identifier number associate with SAM.gov in Block 14.

(b) Acknowledgement of All Amendments:

The bidder must acknowledge all amendments by either 1.) Completing block 19 of the SF 1442, or 2.) Returning the signed amendment form(s) with the submission.

(c) Price Schedule:

The bidder must complete the Price Schedule contained in the solicitation. The bidder must submit separate pricing for all items listed in the price schedule. Bidders not submitting the Price Schedule will be deemed non-responsive and therefore ineligible for award.

(d) Bid Guarantee:

The bidder must furnish a bid guarantee (see FAR 52.228-1). The bid guarantee must be provided on Standard Form 24.

(e) Representations & Certifications:

The bidder must provide their Representations and Certifications or their response to FAR 52.204-8 (b)(2) (i) or (ii) Annual Representations and Certifications.

(f) Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment:

Bidder must provide their response to FAR 52.204-24 (d) Representation.

(g) Information Regarding Responsibility Matters:

Bidder must provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.

(h) Violation of Arms Controls Treaties or Agreements:

Bidder must provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.

(i) Tax on Certain Foreign Procurements:

Bidder must provide their response to FAR 52.229-11 (d).

(j) Post Award Small Business Program Representations:

Bidder must provide their response to FAR 52.219-28 (h), if applicable.

(k) Limitations on Subcontracting:

In accordance with VAAR 852.219-75, bidder must complete ATTACHMENT 6- Limitations on Subcontracting-ATL and return with their bid submission. Completed form will become part of the official award documentation. Failure to submit the signed certification with the bidder’s bid will deem the bid non-responsive.

(l) Notice to SDVOSB Joint Venture/Mentor Protegee:

Any bidder submitting a bid as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint mailto:Joelle.Mascarenas@va.gov mailto:Doniver.Hamilton@va.gov venture, stating that the parties to the joint venture (1) have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402 and (2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the bidder’s bid will deem the bid non-responsive.

C. BID OPENING:

(a) Bids will be publicly read aloud. A conference line will be announced via an amendment to the solicitation approximately seven (7) calendar days prior to the receipt date for bids.

(b) In the event there are any concerns with the bids, in accordance with FAR 14.402-1 (c), Microsoft Teams will be used to assist in the examination of the bid(s).

2.9 DETERMINATION OF NON-RESPONSIVE:

Bids received pertaining to this solicitation will be reviewed for responsiveness. Failure to provide documentation as outlined in the Bid Submission section of the solicitation, at the date and time set for bid opening shall deem the bid non-responsive.

2.10 DETERMINATION OF RESPONSIBILITY:

A Determination of Responsibility will be conducted for the apparent “low bidder/awardee” prior to award of the project. The above information, along with other information obtained from Government systems, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. The Government reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all bidders after receipt of bids. These requests for information do not constitute discussion. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the bidder ineligible for award.

2.11 VETS 4212:

Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at:

http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all bidders are encouraged to file every year. The Contracting Officer will request a copy of the email confirmation of receipt notification, prior to awarding the project. Failure to comply with this section will result in removal from award consideration.

2.12 SYSTEM FOR AWARD MANAGEMENT (SAM):

The FAR requires that federal contractors register in the SAM database at https://sam.gov/ and enter all mandatory information into the system. FAR 52.204-7(b)(1): An Offeror is required to be registered in SAM when submitting an offer or quotation and at time of award (see FAR clause 52.204-13, System for Award Management Maintenance, for the requirement to maintain SAM registration during performance and through final payment).

http://www.dol.gov/vets/vets4212.htm https://sam.gov/

2.13 CONTRACT AWARD:

Award may only be made with the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the government, considering only price (see FAR 52.214-19).

Award will be made based on the Deduct line items in the order expressed that provide the most features within the funds determined to be available. The low price will be evaluated by the Contracting Officer prior to award to confirm that it is “a fair and reasonable price that is most advantageous to the Government.”

2.14 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR

PERFORMANCE ASSESSMENT SYSTEM (CPARS):

As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $750,000 and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS is available to all Federal agencies and is the system used to collect and retrieve performance assessment reports used in source selection determinations. CPARS also includes access to the federal awardee performance and integrity information system (FAPIIS). FAPIIS is a web-enabled application accessed via CPARS for contractor responsibility determination information.

Each contractor whose contract award is estimated to exceed $750,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438- 1690. Registration should occur no later than thirty days after contract award and must be kept current should there be any change to the contractor’s registered representative.

For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report will be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.

Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.

2.15 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT

CHECKS:

All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information. The level of background investigation is commensurate with the level of access needed to perform all work as identified in the solicitation documents. This requirement is applicable to all subcontractor personnel requiring the same access. As per VA Directive 0710, costs of background investigations will be borne by the contractor. Please be advised that the awardee will need to coordinate with the VA Medical Center concerning badging requirements. If the site requires an investigation, the contractor must follow VA Directive 0710.

2.16 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT

MANAGER:

Any reference contained within the solicitation/contract specifications and/or drawings to the “VA Engineer,” “Resident Engineer,” or “Project Manager” or their abbreviations must be replaced with “Contracting Officer’s Representative (COR).”

2.17 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.18 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.19 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the

Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.20 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.21 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID

GUARANTEE) (FEB 2021)

(a) Offerors shall obtain from each person acting as an individual surety on a bid guarantee—

(1) A pledge of assets that meets the eligibility, valuation, and security requirements described in the Federal Acquisition Regulation (FAR) 28.203–1; and

(2) Standard Form 28, Affidavit of Individual Surety.

(b) The Offeror shall include with its offer the information required at paragraph (a) of this provision within the timeframe specified in the provision at FAR 52.228–1, Bid Guarantee, or as otherwise established by the Contracting Officer.

(c) The Contracting Officer may release the security interest on the individual surety’s assets in support of a bid guarantee based upon evidence that the offer supported by the individual surety will not result in contract award.

2.22 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Joelle M. Mascarenas

VHA PCAC Contracting Officer Hand-Carried Address:

Joelle Mascarenas

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131 Mailing Address:

Joelle Mascarenas

Department of Veterans Affairs Program Contracting Activity Central 6100 Oak Tree Blvd, Suite 490 Independence OH 44131

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.23 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I

(FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Wednesday, July 23, 2025 at 9:00am EST.

(c) Participants will meet at—

The waiting area in front of the CBOC . See campus map.

2.24 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING

AUG 2020

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS DEC 2016

52.214-4 FALSE STATEMENTS IN BIDS APR 1984

52.214-5 SUBMISSION OF BIDS DEC 2016

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND

WITHDRAWALS OF BIDS

NOV 1999

52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984

52.214-19 CONTRACT AWARD—SEALED BIDDING—

CONSTRUCTION

AUG 1996

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE APR 1991

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991

2.25 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

(a) Any protest filed by an interested party shall—

(1) Include the name, address, fax number, email and telephone number of the protester;

(2) Identify the solicitation and/or contract number;

(3) Include an original signed by the protester or the protester’s representative and at least one copy;

(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;

(5) Specifically request a ruling of the individual upon whom the protest is served;

(6) State the form of relief requested; and

(7) Provide all information establishing the timeliness of the protest.

(b) Failure to comply with the above may result in dismissal of the protest without further consideration.

(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.

(End of Provision)

2.26 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics, Risk Management Team, Department of Veterans Affairs 810 Vermont Avenue, N.W.

Washington, DC 20420 Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management 811 Vermont Avenue, N.W.

Washington, DC 20420

2.27 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE

BID LINE ITEMS (APR 2019)

(a) Additive or deductive line items in the bid schedule shall be evaluated to determine the low offeror and the items to be awarded. The evaluation shall be made as follows—

(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.

(2) The low bid shall be the Bidder that—

(i) Is otherwise eligible for award; and

(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.

(3) All bids shall be evaluated on the basis of the same additive or deductive line items.

(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and

(ii) Add that next item if an award may be made that includes that line item and is within the available funds.

(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if—

(1) It is in the best interest of the Government;

(2) Funds are available at the time of award; and

(3) The low offeror’s price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.

(c) Example: ‘‘The amount available is $100,000. Offeror A’s base bid and four additives (in the order stated in the list of priorities in the bid schedule) are $85,000, $10,000, $8,000, $6,000, and $4,000. Offeror B’s base bid and four additives are $80,000, $16,000, $9,000, $7,000, and $4,000. Offeror A is the low offeror. The aggregate amount of offeror A’s bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.’’

(End of Clause)

REPRESENTATIONS AND CERTIFICATIONS

3.1 DEVIATION NOTICE (FEB 2025)

Please Note: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services and including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications— Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

3.2 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN

2025)(DEVIATION FEB 2025)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $45 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .