RPA Task Order 8 - PWS (Transition) - Final Draft.pdf
PDF 223 KB Posted
- Solicitation number
- DRAFT-FA4890-24-R-0012
About this file
This document is a Performance Work Statement (PWS) for a task order under an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide Organizational-level (O-level) maintenance support for the MQ-9 Reaper Remotely Piloted Aircraft (RPA) weapon system at various CONUS and OCONUS locations.
The PWS outlines the scope of work, locations, references, period of performance, and unique requirements for the transition period. Key objectives include providing qualified personnel to accomplish aircraft maintenance management, Aerospace Ground Equipment (AGE) and Ground Support Equipment (GSE) maintenance, supply support, C4ISR Systems O&M support, Quality Assurance, and other ancillary support programs. Unique requirements address the transition plan execution, security clearance and access badge requirements, and inventory of government-furnished property. The period of performance for the transition is 91 calendar days/63 working days from April 1, 2025 to June 30, 2025.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headquarters Air Combat Command (HQ ACC)
ACC AMIC PMAU
PERFORMANCE WORK STATEMENT
(PWS)
FOR
Remotely Piloted Aircraft (RPA)
Operations & Maintenance (O&M) Support
Task Order – 8
Contract Number: FA4890-24-X-00XX
Date: 11 Apr 2024
REMOTELY PILOTED AIRCRAFT (RPA) Mx – Task Order 8 PWS
Task Order 7 PWS Page | 2
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Task Order Scope
1.2 Locations
1.3 References
1.4 Period of Performance (PoP)
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.2 Unique Security Requirements
2.3 Unique Travel and Transportation Requirements ........................ Error! Bookmark not defined.
2.4 Unique Personnel Requirements .................................................. Error! Bookmark not defined.
3.0 POINTS OF CONTACT
Table 1. Unique Requirements Level of Effort .......................................... Error! Bookmark not defined.
Table 2. Security Clearance & Access Badge Requirements ..................... Error! Bookmark not defined.
Task Order 7 PWS Page | 3
1.0 INTRODUCTION
The Contractor shall provide qualified Organizational-level (O-level) maintenance IAW the Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order performance work statement (PWS).
This PWS provides for transition of the unique Remotely Piloted Aircraft (RPA) O-level support requirements as specified below. All other requirements are outlined in the IDIQ PWS.
1.1 Task Order Scope
The primary objectives of this contract are to provide a high-level of MQ-9 organizational-level (O-level) maintenance for the MQ-9 Reaper Remotely Piloted Aircraft (RPA) weapon system and to sustain the combat and training capability at the tasked locations specified in this task order performance work statement (PWS) in accordance with (IAW) the IDIQ PWS and appendices.
Support shall be accomplished IAW Department of the Air Force Instruction (DAFI) 21-101 and as supplemented by Air Combat Command (ACC) and applicable host units. The Contractor is expected to generate innovative approaches to accomplish contract tasks, functions, and requirements efficiently and effectively in a quality manner, at appropriate costs, and in a way which fosters pride and ownership in work performed.
The contract objective shall be fulfilled by providing qualified personnel necessary to accomplish the primary contract requirements. Support shall include aircraft maintenance management, Aerospace Ground Equipment (AGE) and Ground Support Equipment (GSE) maintenance, supply support, Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Systems O&M support, Quality Assurance, Quality Control, and ancillary support programs.
1.2 Locations
Locations included in this PWS are as follows:
• 432 MXG, Creech AFB, NV
• 57th Wing, 26 Weapons (WPS) Schoolhouse, Nellis AFB, NV, Building 119
• 53rd Wing, 556 Test & Evaluation Squadron (TES), Operating Location Alpha, Nellis AFB, NV
• 432 MXG, 25 ATKG, Shaw AFB, SC
• 432 MXG, 89 ATKS, Ellsworth AFB, SD
• 432 MXG, 20 ATKS, Whiteman AFB, MO
• 110th Wing, Battle Creek ANG, Battle Creek, MI
• 118th Wing, Tennessee ANG, Joint Base Berry Field, TN
• 132d Wing, Iowa ANG, Des Moines, IA
• 188th Wing, Ebbing ANG, Fort Smith, AR
• 111th Attack Wing, Horsham ANG, Horsham, PA
• 107th Attack Wing, New York ANG, Niagara Falls, NY
• 178th Wing, Ohio ANG, Springfield, OH
• CENTCOM 1
• CENTCOM 2
1.3 References
References include:
• RPA IDIQ PWS
Task Order 7 PWS Page | 4
• IDIQ PWS Attachments A-L
• IDIQ Attachment 3 – Manpower, Labor Rates, and Pricing Tables
• Task Order 1 – PWS (Creech AFB)
• Task Order 2 – PWS (26 WPN Nellis)
• Task Order 3 – PWS (Ellsworth-Shaw-Whiteman AFBs)
• Task Order 4 – PWS (ANGB)
• Task Order 5 – PWS (CENTCOM 1)
• Task Order 6 – PWS (CENTCOM 2)
1.4 Period of Performance (PoP)
The PoP for the Transition is 1 Apr 2025 – 30 Jun 2025 (91 calendar days / 63 working days).
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.1.1 The Contractor shall execute the approved phase-In plan as submitted to ensure full task order performance within 120 days of task order award.
2.1.2 The Contractor shall update Government Program Management Office (PMO) a minimum of weekly on Phase-In status.
2.1.3 The Contractor shall notify Government PMO within one duty day of any situation that will or has the potential to delay full contract performance.
2.1.4 The Contractor shall coordinate transition planning and execution with site the current
Contractor and site leadership as required to ensure a smooth hand-over and minimal mission impact.
2.1.5 The Contractor shall ensure key personnel (Appendix J) are in place within 30 days Transition Start.
2.1.6 The Contractor shall obtain data and be prepared to fully populate the Program Management Information System (PMIS) within 30 calendar days after Contract Start (NLT 5 Aug 2025).
2.1.7 The Contractor shall perform a complete physical inventory during contract transition for all GFP and annually IAW FAR Part 52.245-1.
2.2 Unique Security Requirements
2.2.1 The Contractor shall ensure personnel have required security clearance level and access badges to facilitate transition actions.
3.0 POINTS OF CONTACT
• Anne Renn, PMAU Program Manager (PM), 757-764-9427, annette.renn@us.af.mil
• Carlos D. Thomas, PMAU Deputy PM, 757-528-3972, carlos.thomas.8@us.af.mil
• MSgt Kurtis Hoar, PMAU Maintenance SME, DSN: 757-225-9718, kurtis.hoar@us.af.mil
• S. Leeann Ori, PKC Contracting Officer, 757-255-4713, sherri.ori@us.af.mil
• Emma Elmore, PKCA, emma.elmore@us.af.mil
• Anthony Mills, DRQ/Contracting Officer Representative (COR) Lead, 702-468-2511, anthony.mills.7@us.af.mil
• Site COR(s), pending appointment prior to award mailto:carlos.thomas.8@us.af.mil mailto:emma.elmore@us.af.mil mailto:anthony.mills.7@us.af.mil
| 1.0 INTRODUCTION |
| 1.1 Task Order Scope |
| 1.2 Locations |
| 1.3 References |
| 1.4 Period of Performance (PoP) |
| 2.0 UNIQUE REQUIREMENTS |
| 2.1 Unique Task Requirements |
| 2.2 Unique Security Requirements |
| 3.0 POINTS OF CONTACT |
File details come from the government source that posted it. Updated .