This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide Remotely Piloted Aircraft (RPA) organizational-level maintenance and operations support under an Indefinite Delivery, Indefinite Quantity (IDIQ) contract. The primary objectives are to provide a high level of MQ-9 maintenance, sustain combat and training capabilities, and accomplish all associated tasks at the specified CENTCOM 2 location. The contractor is required to follow applicable technical orders, publications, and local directives, and be prepared to support 24/7 operations. Unique requirements include accomplishing planned sortie production, performing SATCOM Launch and Recovery operations, adhering to munitions loading/arm/de-arm procedures, and providing Maintenance Recovery Team support. The contract has a 5-year ordering period with an anticipated award date of April 2025.

View the file

Other files

File Type Posted
DRAFT Contract Section L.pdf PDF
DRAFT Section M.pdf PDF
Combined RFI_Synopsis_DRFP Contractor Submitted Questions_Amend 2.pdf PDF
Combined RFI_Synopsis_DRFP Contractor Submitted Questions.pdf PDF
Appendix I - Certifications Trainings and Qualifications - Final Draft.pdf PDF
Appendix D - Publications Forms and Websites - Final Draft.pdf PDF
DRAFT Solicitation - FA489024R0012.pdf PDF
Appendix G - Special Requirement for Deployment Support - Final Draft.pdf PDF
RPA Mx PWS_Re-compete (22Apr24)-Final Draft.pdf PDF
RPA Task Order 3 - PWS (Ellsworth-Shaw-Whiteman) - Final Draft.pdf PDF
Appendix J - Contractor Identified Key Personnel - Quals_Template - Final Draft.pdf PDF
Appendix B - DD Form 1423 - Contract Data Requirements List (CDRL) - Final Draft.pdf PDF
Appendix F - Performance Incentive_Award Fee Plan - Final Draft.pdf PDF
Appendix H - C5ISR Demarcation Points - Final Draft.pdf PDF
RPA Task Order 4 - PWS (ANGB) - Final Draft.pdf PDF
RPA Task Order 5 - PWS (CENTCOM 1) - Final Draft.pdf PDF
RPA Task Order 2 - PWS (26 WPN Nellis) - Final Draft.pdf PDF
Appendix K - PWS Addendum (Proprietary Data) - Final Draft.pdf PDF
Appendix A - Definitions Abbreviations and Acronyms - Final Draft.pdf PDF
Appendix L - Manning Matrix (Proprietary Data) - Final Draft.pdf PDF
RPA Task Order 8 - PWS (Transition) - Final Draft.pdf PDF
Appendix E - Government Property Inventory (15OCT23) - Final Draft.xlsx XLSX spreadsheet
Appendix C - DAFI 21-101 Compliance Matrix - Final Draft.pdf PDF
RPA Task Order 7 - PWS (EUCOM 1) - Final Draft.pdf PDF
fa489024R0012 RPA 254 PKG FOR DRFP.pdf PDF
RPA Task Order 0 - PWS (AFRB) - Final Draft.pdf PDF
RPA Task Order 1 - PWS (Creech AFB) - Final Draft.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters Air Combat Command (HQ ACC)

ACC AMIC PMAU

PERFORMANCE WORK STATEMENT

(PWS)

FOR

Remotely Piloted Aircraft (RPA)

Operations & Maintenance (O&M) Support

Task Order – 6

Contract Number: FA4890-24-X-00XX

Date: 29 Mar 2024

REMOTELY PILOTED AIRCRAFT (RPA) Mx – Task Order 6 PWS

Task Order 6 PWS Page | 2

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Task Order Scope

1.2 Locations

1.3 References

1.4 Period of Performance (PoP)

2.0 UNIQUE REQUIREMENTS

2.1 Unique Task Requirements

2.2 Unique Security Requirements

2.3 Unique Travel and Transportation Requirements

2.4 Unique Personnel Requirements

3.0 POINTS OF CONTACT

Table 1. Unique Requirements Level of Effort

Task Order 6 PWS Page | 3

1.0 INTRODUCTION

The Contractor shall provide qualified Organizational-level (O-level) maintenance IAW the Indefinite Delivery, Indefinite Quantity (IDIQ) Task Order performance work statement (PWS).

This PWS provides unique Remotely Piloted Aircraft (RPA) O-level support requirements as specified below. All other requirements are outlined in the IDIQ PWS.

1.1 Task Order Scope

The primary objectives of this contract are to provide a high-level of MQ-9 organizational-level (O-level) maintenance for the MQ-9 Reaper Remotely Piloted Aircraft (RPA) weapon system and to sustain the combat and training capability at the tasked locations specified in this task order performance work statement (PWS) in accordance with (IAW) the IDIQ PWS and appendices.

Support shall be accomplished IAW Department of the Air Force Instruction (DAFI) 21-101 and as supplemented by Air Combat Command (ACC) and applicable host unit regulations. The Contractor is expected to generate innovative approaches to accomplish contract tasks, functions, and requirements efficiently and effectively in a quality manner, at appropriate costs, and in a way which fosters pride and ownership in work performed.

The contract objective shall be fulfilled by providing qualified personnel necessary to accomplish the primary contract requirements. Support shall include aircraft maintenance management, Aerospace Ground Equipment (AGE) and Ground Support Equipment (GSE) maintenance, supply support, Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4ISR) Systems O&M support, Quality Assurance, Quality Control, and ancillary support programs.

1.2 Locations

Locations included in this PWS are as follows:

• CENTCOM 2

1.3 References

References include:

• RPA IDIQ PWS

• IDIQ PWS Appendices A-L

• IDIQ Attachment 3 – Manpower, Labor Rates, and Pricing Tables

1.4 Period of Performance (PoP)

The PoP for the Base Year is twelve months: 1 Jul 2025 – 30 Jun 2026 followed by four 12-month options.

2.0 UNIQUE REQUIREMENTS

2.1 Unique Task Requirements

2.1.1 The Contractor shall accomplish planned sortie production and maintenance actions to ensure the local flying schedule and Air Tasking Orders (ATO) are supported.

2.1.2 The Contractor shall perform all flying operations and maintenance IAW applicable

Task Order 6 PWS Page | 4 technical orders (T.O.s), publications, and local directives identified within the IDIQ PWS.

2.1.3 The Contractor shall provide the ability to perform SATCOM Launch and Recovery (SLR) operations during sortie generation to include Commander Directed Lines (CDLs) as directed by the Combatant Commander or delegated authority.

2.1.4 The Contractor shall be prepared to support operations 24 hours per day, 7 days per week.

2.1.5 The Contractor shall follow DAFMAN 21-201 for Munitions loading/arm/de- arm, unless local procedures are more restrictive, then follow the local procedures.

2.1.6 The Contractor shall conduct Minimum Proficiency Requirement Load (MRPL) evaluations, to include initial monthly proficiency reviews, bi-monthly, semi-annual, and flightline evaluations when supporting OCONUS forward deployed MQ-9 munitions load operations.

2.1.7 The Contractor shall follow the TCTO guidance.

2.1.8 The Contractor shall provide Maintenance Recovery Team (MRT) support as coordinated with AMIC Program Management Office (PMO) for a period of up to 90 days.

2.1.9 The Contractor shall support as provided in the Level of Effort table below.

RPA Mx Site UTC CL / CT AC GCS

CENTCOM 2 2 8 16 4

Total 2 8 16 4

Table 1. Unique Requirements Level of Effort

2.1.10 The Contractor shall maintain a facility for battery charging adjacent to MQ-9 hangar.

2.1.11 The Contractor shall adhere to local procedures / requirements for transiting through controlled movement area.

2.1.12 The Contractor shall ensure approximately 1200’ from aircraft parking area to GCS with no active runway between them.

2.1.13 The Contractor shall ensure approximately 1200’ from aircraft parking area to Ground

Data Terminal (GDT) tower.

NOTES:

• In accordance with SLR implementation, GCS support is expected to become obsolete.

• Two projected assigned MQ-9 hangars are on the ramp with MQ-9 parking area approximately

300’ away with adequate space to support 8 combat lines. Aircraft ramp parking and hangar space for additional aircraft may be physically separate from the projected 2 assigned hangars.

2.2 Unique Security Requirements

2.2.1 Security clearance level and access badges required are detailed in Table 2 below.

Location Security Clearance Level Required Access Badges Required

CENTCOM 2 SECRET Comon Access Card (CAC) & Restricted Area Badge

Table 2. Security Clearance & Access Badge Requirements

2.2.2 Visitor Group Security Agreement (VGSA). AFMAN 16-1406 does not require the

Task Order 6 PWS Page | 5 contractor to sign a VGSA. Contractors who operate as an independent visitor group are subject to AFMAN 16-1404 and must identify an on-site security point of contact (POC) to the local Information Protection Office. Upon notification of the presence of the visitor group, the Information Protection office will contact the FSO and provide them with the local security policies when classified performance will occur to the contractor in writing (e.g., email, electronic media, or paper).

2.2.3 Long-Term VGSA. The contractor shall enter a long-term visitor group security agreement if contract performance is on base for 90 days or more. This agreement shall outline how the contractor integrates security requirements for contract operations with the Air Force to ensure effective and economical operation on the installation. The agreement shall address:

2.2.3.1 Security support provided by Air Force. Security support provided by the Air Force to the Contractor, including storage containers for classified information/material, use of base destruction facilities, classified reproduction facilities, use of base classified mail services, security badges, base visitor control, investigation of security incidents, base traffic regulations, the use of security forms, and conducting inspections required by DOD 5220.22-R and AFMAN 16-1406.

2.2.3.2 Security support requiring joint Air Force and Contractor coordination.

Includes packaging classified information, mailing and receiving classified materials, implementing emergency procedures for protection of classified information, security checks, and internal security controls for protection of classified material and high value pilferable property.

NOTE: On base, the long-term visitor group security agreement may take the place of a Standard Practice Procedure (SPP).

2.3 Unique Travel and Transportation Requirements

2.3.1 The Contractor shall travel via Commercial or MilAir travel from CONUS to ETDC and on to tasked location, or commercial travel from CONUS directly to host country as directed by COCOM.

2.3.2 The Contractor is responsible for providing vehicles to move personnel between duty location and billeting.

2.3.3 The Government is responsible for providing general-purpose flightline, MRT and special-purpose vehicles.

NOTE: The Contractor may also use the Government provided shuttle for moving people around the base.

2.4 Unique Personnel Requirements

2.4.1 The Contractor personnel shall be billeted on base.

2.4.2 The Contractor shall have access to the designated on-site dining facility and will utilize a ‘pay-as-you-go’ strategy.

3.0 POINTS OF CONTACT

• Anne Renn, PMAU Program Manager (PM), 757-764-9427, annette.renn@us.af.mil

• Carlos D. Thomas, PMAU Deputy PM, 757-528-3972, carlos.thomas.8@us.af.mil

• MSgt Kurtis Hoar, PMAU Maintenance SME, DSN: 757-225-9718, kurtis.hoar@us.af.mil

• S. Leeann Ori, PKC Contracting Officer, 757-255-4713, sherri.ori@us.af.mil

• Emma Elmore, PKCA, emma.elmore@us.af.mil mailto:carlos.thomas.8@us.af.mil mailto:emma.elmore@us.af.mil

Task Order 6 PWS Page | 6

• Anthony Mills, DRQ/Contracting Officer Representative (COR) Lead, 702-468-2511, anthony.mills.7@us.af.mil

• Site COR(s), pending appointment prior to award mailto:anthony.mills.7@us.af.mil

1.0 INTRODUCTION
1.1 Task Order Scope
1.2 Locations
1.3 References
1.4 Period of Performance (PoP)
2.0 UNIQUE REQUIREMENTS
2.1 Unique Task Requirements
2.2 Unique Security Requirements
2.3 Unique Travel and Transportation Requirements
2.4 Unique Personnel Requirements
3.0 POINTS OF CONTACT

File details come from the government source that posted it. Updated .