This document is a draft Performance Work Statement (PWS) Appendix H for a federal contract opportunity, Solicitation FA4890-24-R-0012, for Remotely Piloted Aircraft (RPA) Operations and Maintenance (O&M) services.

The appendix establishes demarcation points that define the contractor's O&M responsibilities for various RPA communications systems and equipment, including the Mobile Ground Control Station (MGCS), Long Range-Ground Control Station (LR-GCS), and Fixed Ground Control Station (FGCS). The demarcation points designate where the contractor's responsibilities transition to other organizational entities. The contractor is responsible for O&M up to the established communications demarcation points and must coordinate with local providers for diagnostic and repair efforts beyond those boundaries.

View the file

Other files

File Type Posted
DRAFT Contract Section L.pdf PDF
DRAFT Section M.pdf PDF
Combined RFI_Synopsis_DRFP Contractor Submitted Questions_Amend 2.pdf PDF
Combined RFI_Synopsis_DRFP Contractor Submitted Questions.pdf PDF
Appendix I - Certifications Trainings and Qualifications - Final Draft.pdf PDF
Appendix D - Publications Forms and Websites - Final Draft.pdf PDF
DRAFT Solicitation - FA489024R0012.pdf PDF
Appendix G - Special Requirement for Deployment Support - Final Draft.pdf PDF
RPA Mx PWS_Re-compete (22Apr24)-Final Draft.pdf PDF
RPA Task Order 3 - PWS (Ellsworth-Shaw-Whiteman) - Final Draft.pdf PDF
Appendix J - Contractor Identified Key Personnel - Quals_Template - Final Draft.pdf PDF
Appendix B - DD Form 1423 - Contract Data Requirements List (CDRL) - Final Draft.pdf PDF
Appendix F - Performance Incentive_Award Fee Plan - Final Draft.pdf PDF
RPA Task Order 6 - PWS (CENTCOM 2) - Final Draft.pdf PDF
RPA Task Order 4 - PWS (ANGB) - Final Draft.pdf PDF
RPA Task Order 5 - PWS (CENTCOM 1) - Final Draft.pdf PDF
RPA Task Order 2 - PWS (26 WPN Nellis) - Final Draft.pdf PDF
Appendix K - PWS Addendum (Proprietary Data) - Final Draft.pdf PDF
Appendix A - Definitions Abbreviations and Acronyms - Final Draft.pdf PDF
Appendix L - Manning Matrix (Proprietary Data) - Final Draft.pdf PDF
RPA Task Order 8 - PWS (Transition) - Final Draft.pdf PDF
Appendix E - Government Property Inventory (15OCT23) - Final Draft.xlsx XLSX spreadsheet
Appendix C - DAFI 21-101 Compliance Matrix - Final Draft.pdf PDF
RPA Task Order 7 - PWS (EUCOM 1) - Final Draft.pdf PDF
fa489024R0012 RPA 254 PKG FOR DRFP.pdf PDF
RPA Task Order 0 - PWS (AFRB) - Final Draft.pdf PDF
RPA Task Order 1 - PWS (Creech AFB) - Final Draft.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMOTELY PILOTED AIRCRAFT (RPA) Mx – PWS Appendix H Solicitation: FA4890-24-R-0012

Date: 1 Mar 2024

Appendix H Page | 1

APPENDIX H: C5ISR DEMARCATION POINTS

MQ-9 Equipment/System Established Demarcation Points

Demarcation points (DEMARC) are established to designate where O&M responsibilities for communications facilities or equipment changes from one organizational entity to another. The contractor is responsible for the O&M of RPA systems and equipment up to the established communications DEMARC. The contractor shall coordinate/support diagnostic and repair efforts that cross contractor responsible DEMARC boundaries with local communications providers, as required to meet mission requirements, or as directed by the government.

System Established DEMARC Point

MGCS w/legacy cables (CONUS/OCONUS) GCS signal I/O panel for external signals such as video distribution

LR-GCS w/legacy cables (CONUS/OCONUS) LR-GCS signal I/O panel for external signals such as video distribution

MGCS w/fiber interface kit (CONUS/OCONUS) GCS fiber interface box and GDT/SETSS fiber interface box

LR-GCS w/fiber interface kit (CONUS/OCONUS) LR-GCS fiber interface box and GDT/SETSS interface box

FGCS (CONUS) FGCS I/O and power distribution panels and GDT/SETSS fiber interface box

GDT w/fiber interface kit (CONUS/OCONUS) GDT Fiber converter/interface box

SETSS w/fiber interface kit (CONUS) SETSS fiber converter/interface box (if installed)

REMOTELY PILOTED AIRCRAFT (RPA) Mx – PWS Appendix H Solicitation: FA4890-24-R-0012

Date: 1 Mar 2024

Appendix H Page | 2

Scenario: MGCS or LRGCS on Outdoor Pad, Legacy Cables

MGCS

or

LRGC

Legacy GDT/SETSS Cable (up to 300') GDT or

SETSS

Scenario: MGCS or LRGCS on Outdoor Pad, Fiber Cable

MGCS

or

LRGC

Legacy Cable Base Fiber

Legacy Cable

MGCS

Fiber

Interface

MGCS Pad Fiber Panel

MGCS Pad Fiber Panel

GDT/SETSS

Fiber

Interface

GDT

or

SETSS

Scenario: Fixed GCS

Building Fiber/Copper Legacy

Cable

FGCS

FGCS FF

I/O Panel I/O Panel Comm Closet

GDT/SETSS GDT/SETSS

Pad Fiber Fiber

Panel Interface

GDT

or

SETSS

Areas of Responsibility

DEMARC

MQ-9 DEMARC