This is a Bid Schedule document for Pave the Way Package 3, a roadway repair and resurfacing project for Macon-Bibb County. The project encompasses approximately 6.85 miles of Main Streets requiring comprehensive pavement work. The scope of services includes milling, bituminous tack application, roadway patching, asphalt overlay with 12.5 mm and 9.5 mm Superpave materials, installation and adjustment of sewer and storm manholes, installation and adjustment of water valve risers, traffic signal loop installation, and complete striping and marking work including center lines, edge lines, lane lines, painted arrows, crosswalks, stop bars, and hatching. The contract period is 120 days, commencing upon the successful bidder's receipt of the Notice to Proceed from the Procurement Office. Prior to commencing work, the successful bidder must coordinate with the Macon Water Authority to locate and mark existing sanitary and storm water infrastructure.
The bid schedule itemizes specific quantities for all work elements, with major components including 8,124 tons of milling, 5,908.35 gallons of bituminous tack, 9,847.24 square yards of roadway patching, 113 sewer and storm manhole installations with adjustments, 79 water valve riser installations with adjustments, 9 traffic signal loop installations, and 92,948 linear feet of striping work. Bidders must provide unit prices for each line item and submit a total bid price for the entire Package 3 contract, which will serve as the basis for award determination.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pave the Way Package 3 for Macon-Bibb County
(Roadway Repair and Resurfacing)
Bid Schedule – Pave the Way Package 3
The quantities listed are an approximate estimate of the materials required to complete the roadway repair and resurfacing projects, for the Main Streets list. The “Total Bid Price” is the bid amount which shall be used to award Pave the Way Package 3 paving contract to the successful bidder.
Prior to beginning contract paving work on the main streets, the successful bidder shall be required to contact Mike Beard with the Macon Water Authority, at (478) 256-9382, regarding coordination with
MWA on locating /marking paved over sanitary manholes. Contact Willie Sidney with the Macon Water
Authority, at (478) 256-9400, to locate / mark paved over water valves.
Also, the successful bidder shall contact Monte Tolleson with the Macon Water Authority Storm Water
Office, at (478) 738-6520, regarding locating / marking paved over storm manholes.
The 120-day contract period shall proceed upon the successful bidder receiving the “Notice to Proceed” from our Procurement Office.
Road Name From To Miles
Goodall Mill Rd Jones Rd Sardis Church Road 1.01 Guy Paine Rd Pio Nono Ave MLK 0.52 Allied Industrial End of Rd Mead Rd 0.65
Old Gaull City Rd Allied Industrial To a Point 212 Ft South of the RR Crossing 0.28
Allen Rd Houston Rd Hawkinsville Rd 1.09 Allen Rd Hawkinsville Rd Eastof 2104 Allen Rd 0.33 General Winship Pinecrest Rd General Winship Dr S 0.29 General Winship South General Winship Ingleside Ave. 0.14 Pinecrest Rd Old Holton Rd Elmridge Dr 0.41 Rogers Dr End of Drive Kingsley Dr 0.22 Corbin Ave Riverside Dr Old Holton Rd 0.48 Old Holton Rd Pierce Ave Corbin Ave 0.44 Thurmond Dr Nancelon Cir N Old Holton Rd 0.26 Newton Pl End of Rd Thurmond Dr 0.04 Kingsley Dr Walton Pl Rockbridge Rd 0.09 Rockbridge Rd Adrian Pl Kingsley Dr 0.10 Adrian Pl Motes Pl End of Rd 0.25 Walton Pl Adrian Pl Motes Pl 0.05 Motes Pl End of Rd Walton Pl 0.18
6.85
Pave the Way Package 3
Total Bid $______________________________________
Item Unit Quantity Unit Price Total
Milling TONS 8124.0
Bituminous Tack GAL 5908.35
Roadway Patching SY 9847.24
12.5 mm Superpave Asphalt TONS 8124.0
9.5 mm Superpave Asphalt TONS 0
Install Furnished Sewer Manhole, Storm Manholes, EA 113
Install Furnished Water Valve Riser EA 79
Manhole (Adjustment) EA 113
Water Valve (Adjustment) EA 79
Traffic Signal Loop Install EA 9
Striping (Center Lines, Edge Lines, Lane Lines)
LF 92948
Painted Arrows EA 10
Bike Symbols EA 0
Painted Messages EA 0
Painted Crosswalks LF 356
Painted Stop Bars LF 320
Painted RR Symbols EA 0
Painted Hatching LF 40
Rumble Stripe SET 0
RPMs MILE 6.85
Clipping Grassed Shoulders MILE 6