RFQ26006564 Scope of work.pdf
PDF 252 KB Posted
- Solicitation number
- TRFP26006507
- Issued by
- Bristol County, Rhode Island
About this file
This is a Scope of Work document for a Request for Quote (RFQ26006564) issued by the University of Rhode Island for wireless fire alarm reporting system conversion at the Kingston Campus, Phase 3. The project involves converting 36 buildings from hardwire fire alarm reporting (Gamewell boxes) to a wireless mesh system, mandated by the Town of South Kingstown. The scope includes wireless conversion work across all 36 buildings and fire alarm control panel (FACP) upgrades in 11 specified buildings: Alumni Center, Beck Batting Building, Facilities Services Storage Building, GH Gardner Building, Hope Dining Hall, Newman Hall, Skogley Turfgrass Research Center, Surge Building, Taft Hall, Texas Instruments Building, and Tyler Hall. The contractor must provide all tools, labor, materials, and equipment; obtain 36 building permits; coordinate network connections with CAT 6 cable terminations and testing; and perform system startup, testing, and commissioning. Work in five residence halls (Hopkins, Hutchinson, Merrow, Peck, and Tucker Halls) must be scheduled during break times. Construction begins upon purchase order issuance with substantial completion required by December 15, 2026, and final completion by January 26, 2027.
The contract requires bid surety bonds and payment and performance bonds. The awarded contractor must be a registered General Contractor in Rhode Island and must maintain general liability insurance with combined single limits of $1,000,000 per occurrence, workers compensation coverage of $100,000 each accident, automobile liability of $1,000,000 per occurrence, and builder's risk insurance equal to the contract amount. The base bid must include four owner-controlled allowances totaling $200,000 (Unforeseen Architectural Interior and Exterior Coordination, Unforeseen Electrical and/or Network Infrastructure Upgrades, Unforeseen Fire Alarm Reporting System Coordination, and Additional Owner Requested Programming and Testing), with allowance usage limited to 10 percent markup and requiring owner's written pre-approval. All work must be performed at prevailing wage rates in accordance with governing codes. Liquidated damages are assessed at $500 per day, and the contractor must submit monthly requisitions with updated subcontractor lists, MBE compliance forms, certified payrolls, updated schedules, daily manpower attendance logs for projects exceeding $1 million, lien waivers, and cash flow projections. The contract utilizes the University of Rhode Island's custom AIA A101-2017 and A201-2017 standard forms.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2021-1.A Page 1 of 5 Revised 01/17/2023
RFQ – REQUEST FOR QUOTE PUBLIC WORKS
TITLE: RFQ26006564 URI Wireless Fire Alarm Reporting Kingston Campus Phase 3
DESCRIPTION: Phase 3 Wireless Fire Alarm reporting for the conversion of Fire Alarm reporting from hardwire reporting (Gamewell boxes) to a wireless mesh system. This is the 3rd phase of a campus-wide conversion mandated by the town of South Kingstown. This also includes Fire Alarm panel upgrades in a portion of the buildings as defined in the scope below and the Project Manual.
BONDING REQUIREMENTS
Bid Surety Bond Required: YES Payment and Performance Bond Required: YES
CONTRACT TERMS
The initial contract period will begin upon issuance of purchase order.
Insurance Requirements (#14 in Instructions to Vendors on Requirements tab) In accordance with this solicitation, or as outlined in Section 13.19 of the General Conditions of Purchase, found at https://rules.sos.ri.gov/regulations/part/220-30-00-13 and General Conditions - Addendum A found at https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf, the following insurance coverage shall be required of the awarded vendor(s):
General Requirements:
14a) ☒ Liability - combined single limit of $1,000,000 per occurrence, $1,000,000 general aggregate and $1,000,000 products/completed operations aggregate.
14b) ☒ Workers compensation - $100,000 each accident, $100,000 disease or policy limit and
$100,000 each employee.
14c) ☒ Automobile liability - $1,000,000 each occurrence combined single limit.
Other:
Specify insurance type and minimum coverage required, e.g. builder’s risk insurance, vessel operation (marine or aircraft):
14j) ☒ Other – Builders Risk – Coverage Equal to Contract Amount https://rules.sos.ri.gov/regulations/part/220-30-00-13 https://www.ridop.ri.gov/documents/general-conditions-addendum-a.pdf
2021-1.A Page 2 of 5 Revised 01/17/2023
AIA Contract
The University of Rhode Island/State of Rhode Island custom AIA contract designated below outlining the scope and special terms and conditions covering the work, executed by an authorized representative of your company. Vendor shall obtain the University of Rhode Island custom AIA contract directly from the University during the descoping meeting with the tentatively selected vendor.
☒ Other – URI AIA A101-2017 Standard Form of Agreement Between Owner and Contractor and URI AIA A201-2017 General Conditions of the Contract for Construction
SECTION A. BACKGROUND
The Wireless Fire Alarm reporting is mandated by South Kingstown to be converted to a wireless reporting system. This project is Phase 3 of a multi phased conversion program.
SECTION B: SCOPE OF WORK AND REQUIREMENTS
The awarded Contractor is to provide all Tools, Labor, Materials (except as specifically note to be by Owner) and Equipment to convert the existing Fire Alarm Systems to Wireless Reporting as shown on the Project Manual and Drawings.
This project includes the following buildings:
1. Alumni Center (Includes Upgrading The FACP)
2. Automotive Garage
3. Beck Batting Building (Includes Upgrading The FACP)
4. Bliss Hall
5. Chafee Hall
6. Coastal Institute (Kingston)
7. Davis Hall
8. Facilities Services Storage Building (Includes Upgrading The FACP)
9. Fascitelli Wellness Center
10. Fine Arts Center
11. Fogarty Hall
12. GH Gardner Building (Includes Upgrading The FACP)
13. Green Hall
14. Hope Dining Hall (Includes Upgrading The FACP)
15. Hopkins Hall
16. Human Resource Administration
17. Hutchinson Hall
18. International Student Center
19. Land’s And Grounds Vehicle Garage
20. Memorial Union
21. Merrow Hall
22. Morrill Hall
23. Newman Hall (Admissions) (Includes Upgrading The FACP)
2021-1.A Page 3 of 5 Revised 01/17/2023
24. Pastore Hall
25. Peck Hall
26. Roosevelt Hall
27. Skogley Turfgrass Research Center (Includes Upgrading The FACP)
28. Surge Building (Includes Upgrading The FACP)
29. Taft Hall (Includes Upgrading The FACP)
30. Texas Instruments Building (Includes Upgrading The FACP)
31. Tucker Hall
32. Tyler Hall (Includes Upgrading The FACP)
33. Uri Foundation Building
34. Washburn Hall
35. White Hall
36. Woodward Hall
The scope of Work is to include but not be limited to the following:
1. All work is to be done in accordance with the Solicitation Documents.
2. Install all work necessary to convert the existing Fire Alarm Panels to report wirelessly. Note that this is a single source contract where all work is to be provided by the awarded contractor. Contractor is to provide all materials. Network connections are to be by the awarded Contractor. This includes terminations on both ends of the CAT 6 cable, testing and certification. URI is to Contractor is to coordinate with URI.
3. In addition to the wireless conversions, Vendor is to include the panel replacements for the following buildings:
1) Alumni Center
2) Beck Batting Building
3) Facilities Services Storage Building
4) GH Gardner Building
5) Hope Dining Hall
6) Newman Hall (Admissions)
7) Skogley Turfgrass Research Center
8) Surge Building
9) Taft Hall
10) Texas Instruments Building
11) Tyler Hall.
4. Work in Residence Halls is to be scheduled during break times. The following buildings are residence halls. With limited access:
1) Hopkins Hall
2) Hutchinson Hall
3) Merrow Hall
4) Peck Hall
5) Tucker Hall.
5. Vendor is to include the Allowances in their Base Bid. OSP does not add the allowance into your base bid. You must include Base Bid and Allowance into your base bid total.
6. Allowances are Owner Controlled Allowances and will require Owner’s written pre-approval
2021-1.A Page 4 of 5 Revised 01/17/2023 prior to usage.
7. For the purpose of this contract, Allowance usage will be entitled to 10% markup only.
8. Daily cleanup includes damp moping and vacuuming of work areas. No trace amounts of construction debris or dust will be permitted.
9. Disposal of all construction waste in accordance with regulatory requirements.
10. Testing and commissioning of the Wireless system.
11. System startup, testing and commissioning.
12. All work is to be prevailing Rate.
13. Construct in accordance with all governing codes.
14. Vendor is to be a registered General Contractor in the State of Rhode Island. Vendor must submit a copy of their GC registration number at time of bid. Only a General Contractor will be awarded this contract
15. Awarded contractor will be required to submit the following backup with each monthly requisition:
A. Updated subcontractor list B. MBE Compliance form C. Certified Payrolls (when applicable) D. Updated Schedule E. Daily manpower attendance logs (for projects >$1M) F. Lien waivers G. Cash flow projections
16. Once each building’s wireless conversion is accepted by the AHJ, Vendor will be responsible for the disconnection and removal of conductors from the FACP to the Gamwell Boxes.
Removal of the Gamwell boxes and associated loop wiring IS NOT included in the Scope of Work.
17. The Awarded Contractor will be responsible for the following:
A. Obtaining all required Building Permits (1 for each of the 36 buildings) B. Provide Submission of subcontractor list for URI review & approval C. Where applicable, Tradesman must possess a RI Equipment & Operator Licenses D. All Tradesman must possess OSHA 10-hour Training Certificates E. On site technicians are to be properly attired. No tank tops, sleeveless shirts, hats with anything other than vendor company logo will be allowed. Shirts shall only display the company logo or be unadorned with a company identification badge clearly displayed and be available for inspection at any time:
1. No sunglasses will be worn inside any building
2. Pants will be properly secured at the waist
3. Safety shoes are required.
F. The University of Rhode Island is a “Tobacco-free Campus.” No smoking or vaping is allowed on campus.
G. The latest version of the following documents, available on the URI Capital Projects website, http://web.uri.edu/capitalprojects/manual-for-construction-project-safety-procedures/, will apply to all of the work of this project and are hereby incorporated by reference:
1. URI Sexual Harassment Policy
2. Manual for Construction Project Safety Procedures
3. Hot Work Procedure
4. Managing Fire Protection System Impairment
5. URI Water System Regulations/Policies
6. Contractor to provide Spill Prevention Plan http://web.uri.edu/capitalprojects/manual-for-construction-project-safety-procedures/ http://web.uri.edu/capitalprojects/manual-for-construction-project-safety-procedures/
2021-1.A Page 5 of 5 Revised 01/17/2023
7. Contractor to provide Storm Water Management Plan for construction
8. Contractor to maintain on site and submit copies of all safety data sheets for materials on site and
9. Contractor is responsible for the scheduling and receipt of all deliveries.
SECTION C: CONTRACT TIME
Start of construction: upon issuance of Purchase order
Substantial completion: 12/15/2026
Final Completion: 1/26/2027
SECTION D: ALLOWANCES
The Base Bid Price includes the cost of Allowances.
1. Unforeseen Architectural Interior and Exterior Coordination _ $ 50,000.00
2. Unforeseen Electrical and/or Network Infrastructure Upgrades_ $ 50,000.00
3. Unforeseen Fire Alarm Reporting System Coordination ____ $50,000.00
4. Additional Owner Requested Programming & Testing ________$50,000.00
TOTAL ALLOWANCES: $200,000.00
SECTION E: LIQUIDATED DAMAGES
$ ____500_____Per day
SECTION F: ALTERNATES
No Alternates
SECTION G: UNIT PRICE
No Unit costs
| SECTION A. BACKGROUND |
| SECTION B: SCOPE OF WORK AND REQUIREMENTS |
| SECTION C: CONTRACT TIME |
| SECTION D: ALLOWANCES |
| SECTION E: LIQUIDATED DAMAGES |
| SECTION F: ALTERNATES |
| SECTION G: UNIT PRICE |