RFQ-25-010-01_Prof_Design_Services_Term_MEP_Reno_ADD_2_251208.pdf
PDF 72 KB Posted
- Solicitation number
- RFQ-25-010-01
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This is Addendum 2 to a Request for Qualifications issued by the Melbourne Airport Authority for Professional Design Services related to Mechanical, Electrical, and Plumbing (MEP) renovations at Melbourne Orlando International Airport in Brevard County, Florida. The addendum clarifies that the proposal submission deadline remains Thursday, January 8, 2026, at 2:00 PM EST. The document addresses four specific questions raised by prospective proposers regarding the scope of work: the location of the new Central Energy Plant and chilled water tank, the sizing requirements for the CEP beyond the existing 1989 HVAC systems, space allocation for mechanical equipment, and the feasibility of chilled water storage tanks with local utility providers. All responses indicate that these determinations will be made during the design analysis phase and are not pre-determined, placing significant design responsibility on the selected design professional firm.
The addendum confirms that specific technical decisions including equipment location, building requirements, and utility coordination have not been finalized and will be part of the design professional's responsibility. Proposers must acknowledge receipt of this addendum by addendum number and date under TAB 1 of their submission, with failure to do so potentially resulting in disqualification. The overall project involves replacing 1989-vintage MEP systems with a total proposed budget of $10,000,000 across multiple phases, with the first phase funded by a $3,500,000 FAA grant covering design costs and initial chiller plant work. The first phase design must be completed with bids received no later than February 27, 2026, and compensation will be negotiated on a fee basis following firm selection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 2/PAGE 1 OF 2
ADDENDUM 2
FOR
PROFESSIONAL DESIGN SERVICES
for MECHANICAL, ELECTRICAL, PLUMBING RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY
RFQ-25-010-01
December 8, 2025
This addendum is issued as part of the Proposing Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original documents. The Proposer shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Proposer shall acknowledge receipt of this addendum under TAB 1 by addendum number and date. Failure to do so may subject Proposer to disqualification.
SENT VIA E-MAIL – 2 PAGES TOTAL (including attachments)
________________________________________(NAME OF YOUR COMPANY)
NOTE:
PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIA
E-MAIL OR FAX to SANDRA ACEVEDO, sacevedo@mlbair.com or (321) 723-1194 Fax
THIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.
GENERAL
1. THE PROPOSAL SUBMISSION DATE REMAINS THURSDAY, JANUARY 8, 2026, at 2:00 PM
(EST).
SPECIFICATIONS
1. N/A.
DRAWINGS
1. N/A.
QUESTIONS AND RESPONSES:
1. CIF-006: Where is the new Central Energy Plant referenced in bullet point 1 of the Scope of Work intended to be located? Is the chilled water tank intended to be located in the same area as the CEP?
RESPONSE: None of this has been decided yet as will be part of the design analysis.
mailto:sacevedo@mlbair.com
PROFESSIONAL DESIGN SERVICES for TERMINAL MEP RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY
RFQ-25-010-01
ADDENDUM 2/PAGE 2 OF 2
2. CIF-007: Is the intent for the new central energy plant be sized for more than just the 1989 installed HVAC?
RESPONSE: Yes.
3. CIF-008: The mechanical equipment for the central energy plant will require dedicated space, has an area within the existing building been identified to house the equipment or will a new building be required. If a new building is required, have available locations been identified?
RESPONSE: No. This will be part of the design analysis.
4. CIF-009: The RFP scope of work indicates the addition of new chilled water storage tanks and related systems. Has the feasibility of this approach been evaluated with the local utility provider? If a new chilled water tank is necessary, have potential installation locations already been identified?
RESPONSE: No. We will look to the Design Professional to determine what is best for the airport.
END OF ADDENDUM #2