This is Addendum 2 to a Request for Qualifications (RFQ) issued by the Melbourne Airport Authority for professional design services related to mechanical, electrical, and plumbing (MEP) renovations at Melbourne Orlando International Airport in Brevard County, Florida. The addendum, issued December 8, 2025, clarifies that the proposal submission deadline remains Thursday, January 8, 2026, at 2:00 PM (EST). The project scope involves designing MEP system replacements for the airport's existing terminal constructed in 1989, with the overall proposed renovation budget of $10,000,000. The design must be completed with bids received no later than February 27, 2026. Key design considerations include a new Central Energy Plant, chilled water storage tanks, and related systems, with the specific location and sizing of these facilities to be determined as part of the design analysis. The addendum addresses four clarifying questions from prospective proposers, confirming that the Central Energy Plant location, sizing scope, equipment space requirements, and feasibility of chilled water storage systems will all be determined by the selected design professional.
The first phase of work will be funded by $3,500,000 in Federal Aviation Administration (FAA) grant funding, which covers both the overall design costs and the initial construction phase for the new chiller plant. The Melbourne Airport Authority is not requiring all requested qualifications to be available within a single firm but welcomes combinations of firms with relevant experience and project history in specific scopes of work. Scoring in the RFQ will be specific to each qualification requested, and firms lacking particular qualifications do not need to submit responses for those sections. Proposers must acknowledge receipt of this addendum by signing and returning the first sheet via email to Sandra Acevedo at sacevedo@mlbair.com or by facsimile at (321) 723-1194, with failure to do so potentially resulting in disqualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 2/PAGE 1 OF 2
ADDENDUM 2
FOR
PROFESSIONAL DESIGN SERVICES
for MECHANICAL, ELECTRICAL, PLUMBING RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY
RFQ-25-010-01
December 8, 2025
This addendum is issued as part of the Proposing Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original documents. The Proposer shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Proposer shall acknowledge receipt of this addendum under TAB 1 by addendum number and date. Failure to do so may subject Proposer to disqualification.
SENT VIA E-MAIL – 2 PAGES TOTAL (including attachments)
________________________________________(NAME OF YOUR COMPANY)
NOTE:
PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIA
E-MAIL OR FAX to SANDRA ACEVEDO, sacevedo@mlbair.com or (321) 723-1194 Fax
THIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.
GENERAL
1. THE PROPOSAL SUBMISSION DATE REMAINS THURSDAY, JANUARY 8, 2026, at 2:00 PM
(EST).
SPECIFICATIONS
1. N/A.
DRAWINGS
1. N/A.
QUESTIONS AND RESPONSES:
1. CIF-006: Where is the new Central Energy Plant referenced in bullet point 1 of the Scope of Work intended to be located? Is the chilled water tank intended to be located in the same area as the CEP?
RESPONSE: None of this has been decided yet as will be part of the design analysis.
mailto:sacevedo@mlbair.com
PROFESSIONAL DESIGN SERVICES for TERMINAL MEP RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY
RFQ-25-010-01
ADDENDUM 2/PAGE 2 OF 2
2. CIF-007: Is the intent for the new central energy plant be sized for more than just the 1989 installed HVAC?
RESPONSE: Yes.
3. CIF-008: The mechanical equipment for the central energy plant will require dedicated space, has an area within the existing building been identified to house the equipment or will a new building be required. If a new building is required, have available locations been identified?
RESPONSE: No. This will be part of the design analysis.
4. CIF-009: The RFP scope of work indicates the addition of new chilled water storage tanks and related systems. Has the feasibility of this approach been evaluated with the local utility provider? If a new chilled water tank is necessary, have potential installation locations already been identified?
RESPONSE: No. We will look to the Design Professional to determine what is best for the airport.
END OF ADDENDUM #2