RFQ-25-010-01_Prof_Design_Services_Term_MEP_Reno_ADD_3_251211_-_FINAL.pdf

PDF 73 KB Posted

Attached to
Professional Design Services for Terminal Mechanical, Electrical , Plumbing Renovations
Solicitation number
RFQ-25-010-01
Issued by
Brevard County, Miramar Beach CDP, Florida

About this file

This is Addendum 3 to a Request for Qualifications (RFQ) issued by the Melbourne Airport Authority for Professional Design Services related to Mechanical, Electrical, and Plumbing (MEP) renovations at Melbourne Orlando International Airport in Brevard County, Florida. The addendum clarifies submission requirements and responses to bidder inquiries while maintaining the original proposal submission deadline of Thursday, January 8, 2026, at 2:00 PM EST. The project involves designing the replacement of MEP systems within the existing terminal constructed in 1989, with an overall proposed budget of $10,000,000 to be completed in multiple phases over several years. The first phase design must be completed with bids received no later than February 27, 2026.

The first phase of the project is funded by a $3,500,000 grant from the Federal Aviation Administration (FAA), which covers both the overall design costs and the first phase of work including a new chiller plant. Key clarifications in this addendum address submission requirements: Tab 3 responses are required from the prime firm only, while Tab 4 responses are required from the prime and any subconsultant whose State of Florida professional registration license will be used. Proposers must list all currently active or intended-to-be-active projects and explain how they will meet contractual obligations if selected. "Local knowledge" is defined as familiarity with Melbourne Orlando International Airport and work performed there, followed by work within the City of Melbourne with knowledge of local codes and regulations, and finally work within Brevard County. Receipt of this addendum must be acknowledged and returned to Sandra Acevedo at sacevedo@mlbair.com or (321) 723-1194.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 3/PAGE 1 OF 2

ADDENDUM 3

FOR

PROFESSIONAL DESIGN SERVICES

for MECHANICAL, ELECTRICAL, PLUMBING RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY

RFQ-25-010-01

December 31, 2025

This addendum is issued as part of the Proposing Documents for the above described project. The changes incorporated in this addendum shall be considered as a part of the documents and shall supersede, amend, add to, clarify, or subtract from those conditions shown in the original documents. The Proposer shall take care to coordinate modifications herein with all trades and disciplines related to the work. The Proposer shall acknowledge receipt of this addendum under TAB 1 by addendum number and date. Failure to do so may subject Proposer to disqualification.

SENT VIA E-MAIL – 2 PAGES TOTAL (including attachments)

________________________________________(NAME OF YOUR COMPANY)

NOTE:

PLEASE SIGN_______________________________AND RETURN THIS FIRST SHEET ONLY VIA

E-MAIL OR FAX to SANDRA ACEVEDO, sacevedo@mlbair.com or (321) 723-1194 Fax

THIS VERIFIES THAT YOU HAVE RECEIVED THE ADDENDUM.

GENERAL

1. THE PROPOSAL SUBMISSION DATE REMAINS THURSDAY, JANUARY 8, 2026, at 2:00 PM

(EST).

SPECIFICATIONS

1. N/A.

DRAWINGS

1. N/A.

QUESTIONS AND RESPONSES:

1. CIF-010: Are you expecting tab 3 and tab 4 responses from all sub consultants or just the respondent firm?

RESPONSE: Tab 3 will be for the prime. Tab 4 will be for the prime and any subconsultant whose State of Florida professional registration license will be used for the project.

mailto:sacevedo@mlbair.com

PROFESSIONAL DESIGN SERVICES for TERMINAL MEP RENOVATIONS for the MELBOURNE AIRPORT AUTHORITY

RFQ-25-010-01

ADDENDUM 3/PAGE 2 OF 2

2. CIF-011: For Tab 11: List each project currently under contract or pending contract including contracts as consultant to another firm. Describe how you will meet your current contract obligations if you are selected for an Airport project(s). Identify where key personnel assigned to this project are currently working. Are we to list all active projects (as we currently have 662) or will we limit it by a certain stage? A good portion of these are still open in our accounting, but that does not mean they are being actively being worked

on. Please clarify how you want this represented.

RESPONSE: All projects currently active or intended to be active during the course of this project should be listed. Your response should be to let the selection committee know how you plan to meet your contractual obligations with other active projects.

3. CIF-012: The RFQ refers to “Local knowledge”. What exactly do you consider local?

RESPONSE: Local knowledge starts with familiarity of the Melbourne Orlando International Airport and any work performed at the airport, either for the Authority or its tenants. This is followed by any work performed within the City of Melbourne and your knowledge of City codes and regulations. Next would be local knowledge or work performed within the County of Brevard.

END OF ADDENDUM #3