This document consists of facility floor plans and layout diagrams for the Fermilab Data Center complex, dated January 7, 2020.

The document provides detailed architectural layouts for four primary data center facilities: FCC1 (2,890 square feet), FCC2 (10,283 square feet), FCC3W (2,868 square feet total), and the Grid Computing Center (14,963 square feet total with 9,203 square feet of under-floor space), plus WH8 Fiber Central (779 square feet). Each floor plan includes numbered room designations, equipment locations, and infrastructure components. The layouts identify critical cooling and power infrastructure including Computer Room Air Conditioning units (CRAC units numbered 1-32 across facilities), Uninterruptible Power Supply systems (UPS-FCC series), Power Distribution Units (PDU units), battery banks (BATT-FCC series), and generator sets (Cat Gen Set, Generac Gen Set). Additional infrastructure elements shown include humidifiers, maintenance bypass cabinets, and network equipment. The Grid Computing Center diagram details storage systems including IBM equipment, STK SL8500 tape libraries, TS4500 systems, and multiple network racks with specific power feed designations. Room numbering systems are provided for server racks and supporting equipment throughout all facilities. This documentation appears to serve as a technical reference for the physical layout and infrastructure configuration of Fermilab's distributed data center operations.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

103 101

102 106

FCC1

January 7, 2020

130 121 152 151 150 135 142

154 155 156 157

133 159 160

1346 1347 139

136 131

Cat Gen Set

UPS-FCC-3, CRAC-5

Generac Gen Set

UPS-FCC-2, CRAC-4 131W

132 (Mezzanine)

2,890 sq. ft.

UPS-FCC-3

UPS-FCC-2

BATT-FCC-2B

BATT-FCC-2D

BATT-FCC-2A

BATT-FCC-2C

BATT-FCC-3B

BATT-FCC-3D

BATT-FCC-3A

BATT-FCC-3C

UPS-FCC-3-2

Fermilab Data Center Square Footage

10,283 sq.ft.

39 250 a

242 247 243 244 245 246

249 251 b

252j

252l

252v

252q

252s

POST

F b 1709

PDU-FCC-3-2

A

B

D

PDU-FCC-3-2 PDU-FCC-3-2

E F

252t e r b

CRAC-10

PDU-FCC-3-

C

FCC2

January 7, 2020

DATA

DATA CENTER

FCC3W

950 sq.ft.

323 VES9TI5BULsE q.ft.

869 sq.ft.

ELECTRICAL

954 sq.ft.

NR-5

N5

NR-6

N6

2,868 sq.ft. total

NR-4

N4

NR-3

N3

NR-2

N2

NR-1

N1

PD

U

-D

PD

-C

-B

-A

CRAC-1

14,963 sq.ft.

total

9,203 sq.ft.

under-floor

CRAC- CRAC- CRAC-

878 sq.ft.

CRAC- CRAC- CRAC-

fnpc4016-4031 242 sq.ft.

3013 3012 3011 3010 3009 3008 3007 E E E E E fnpc4000-4015

3006 3005 3004 3003 3002 3001 3000 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 E E E E E E E E E E E E E E E E

3711 3710

C R A C

N1

3703 3702 3701 3700 C R A C

N2 N3 N4

N5 N6 N7

N8

I B M

3707 3706 3705 3704 3027 3026 3025 3024 3023 3022 3021 E E E E

3020 3019 3018 3017 3016 3015 3014 2031 2030 2029 2028 2027 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 E E E E E E E E

3709 3708

STK SL8500

3715 3714 3713 3712

3719 3718 3717 Network 3716 2047 2046 2045 2044 2043 2042 2041 2040 2039 2038 2037 2036 2035 2034 2033 2032 3041 3040 3039 3038 3037 3036 3035 3034 3033 3032 3031 3030 3029 3028

3723 3722 3721 3720

STK SL8500

3727 3726 3725 3724

3731 3730 3729 3728 fnpc4048-4064 2061 2060 2059 2058 2057 2056 2055 2054 2053 2052 2051 2050 2049 2048

T S

3735 3734 3733 3732 3055 3054 3053 3052 3051 3050 3049 3048 3047 3046 3045 3044 3043 3042

3739 3738 3737 3736 fnpc4032-4047

3747 3746 3745 3744

C R A C

2069 2068 2067 2066 2065 2064 2063 2062 E E

3069 3068 3067 3066 3065 3064 3063

C R A C

3743 3742 3741 GCC - TRR GCC - TRR GCC - TRR GCC - TRRGCC - TRR GCC - TRR GCC - TRR GCC - TR GCC - GCC - TRR

0508 0509 0502 0501 0503 0504 0505 0506 TRR 0507

3751 3750 3749 3748

3755 3754 3753 3752 603 sq.ft.

3062 3061 3060 3059 3058 3057 3056

E 680 sq.ft. UPS-GCC-13AA-1

PP-GCC-13AA-12-1

CRAC 9 UPS2 Fed from PP-GCC-13AA-12 1,955 sq.ft.

3759 3758 Filler rack 3756

3763 3762 Filler rack

Filler rack

2076 2075 2074 2073 2072 2071 2070 PP-UPS-GCC-13A-1 PP-GCC-13AA-12 PP-UPS-GCC-13A-1-2 Fed from 1000KVA UPS Fed from PP-UPS-GCC-13A-1

3083 3082 3081 3080 3079 3078 3077 3076 3075 3074 3073 3072 3071 3070

290 sq.ft. 448 sq.ft.

CRAC- CRAC- CRAC- CRAC- CRAC- CRAC- CRAC 10 CRAC 1 146 sq.ft.

2,479 sq.ft. South Lobby 2,476 sq.ft. 1,426 sq.ft. 1,119 sq.ft. 2,221 sq.ft. North Lobby

CRAC 11

C R

A C

-2

C R

A C

-2

C R

A C

-3

C R

A C

-3

Hu m id ifi er

C R

A C

-1

C R

A C

-1

C R

A C

-2

C R

A C

-2

Hu m id ifi er

Grid Computing Center

WH8 Fiber Central 779 sq.ft.

UPS-1

AC5

PP/UPS/WH8.4-1

PP/FO/WH8.4-1

S t PP/FO/WH8.4 e p

PP/UPS/WH8.4

Maintenance Bypass Cabinet

AC3

A. Purpose Statement
B. Proposal Scope
C. Description of Data Center Cleaning Services
D. DCO Contract Coordinator
39 250 a
241
242 247
248
251 b
222
217
950 sq.ft.
q.ft.
954 sq.ft.
2,868 sq.ft. total
S
e p

Untitled

File details come from the government source that posted it. Updated .