RFP26006654 Design Build Cost Proposal Form.docx
DOCX document 18 KB Posted
- Solicitation number
- RFP26006654
- Issued by
- Kent County, Rhode Island
About this file
This is a Cost Proposal Form for RFP26006654 issued by the Rhode Island Department of Environmental Management (RIDEM) for Design Build Construction and Site Readiness Services at the Alton Jones Campus. The project encompasses design, permitting, construction, and site readiness services. Two non-mandatory pre-bid meetings are scheduled for May 27, 2026 at 9:00 AM and June 4, 2026 at 9:00 AM, both held at RIDEM's Main Office located at 401 Victory Highway, West Greenwich, Rhode Island 02817.
The Cost Proposal Form requires vendors to submit pricing information organized into several components: design fees expressed as both a lump sum and percentage; architect's construction administration fees as a lump sum; contractor's pre-construction fees as a lump sum; contractor's overhead and profit fee as a percentage of the project Guaranteed Maximum Price (GMP); contractor's general conditions cost as a lump sum for staffing; and contractor's general requirements as a lump sum. Vendors must provide their legal name, primary contact information, and present a base subtotal with a total project cost written in both words and numerical figures. Bidders may submit additional information as a separate attachment through the OSP system.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A Cost Proposal RFP26006654 – DEM Design Build Construction and Site Readiness Services Alton Jones Campus
COST PROPOSAL INFORMATION SHEET
Please complete the information below.
If you wish to provide additional information, please attach as a separate document to the Attach document section in OSP.
General Information
Vendor Legal Name
Primary Contact Name(s)
Contact phone
Contact email address
Cost Proposal
1. Design Fees expressed as a lump sum and percentage.
1. Architect’s construction administration fees in a lump sum.
1. Contractor’s pre-construction fees in a lump sum.
1. Contractor’s OH & Profit fee based on a percentage of the project GMP
1. Contractor’s General Conditions cost based on a lump sum; for staffing
1. Contractor’s General Requirements expressed in a lump sum
Base Sub-Total:
1. Construction Costs
Total Cost written in words and figures:
File details come from the government source that posted it. Updated .