This is an AIA Document A141-2014 Standard Form of Agreement Between Owner and Design-Builder for a design-build project sponsored by the State of Rhode Island, Department of Administration, Division of Purchases, on behalf of the Rhode Island Department of Environmental Management (RIDEM). The project involves design, permitting, construction, and site readiness services for the Alton Jones Campus in West Greenwich, Rhode Island. Two non-mandatory pre-bid/proposal conferences are scheduled for May 27, 2026, and June 4, 2026, both at 9:00 AM at the RIDEM Main Office located at 401 Victory Highway, West Greenwich, Rhode Island, 02817. The Design-Builder is responsible for performing design services, construction activities, and related services required to fulfill obligations under the Design-Build Documents, including compliance with all applicable Rhode Island laws, codes, and regulations. The Design-Builder shall submit a schedule for the Work within a reasonable timeframe after agreement execution, and shall achieve Substantial Completion within the Contract Time as established in the Design-Build Amendment.
Compensation for Work performed prior to execution of the Design-Build Amendment shall be made according to specified hourly billing rates or fixed compensation amounts, with reimbursable expenses authorized in advance by the Owner. Progress payments for Work performed after execution of the Design-Build Amendment are based on the Contract Sum as agreed in the Design-Build Amendment, with the Owner retaining five percent (5%) retainage per progress payment in accordance with Rhode Island General Laws § 37-12-10.1. The Design-Builder must maintain insurance and bonds as specified in Exhibit B and comply with all Rhode Island procurement regulations, including the Public Works Arbitration Act for dispute resolution. Title to all Work passes to the Owner upon payment, and the Design-Builder must provide lien waivers from all contractors, consultants, and material suppliers with each Application for Payment. The agreement is based on Owner's Criteria including program requirements, design specifications, physical characteristics, sustainable objectives, budget parameters, and milestone dates, with any modifications requiring execution of a formal Design-Build Amendment.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
Consultation with an attorney is also encouraged with respect to professional licensing requirements in the jurisdiction where the Project is located.
AIA® Document A141TM – 2014DRAFT
Standard Form of Agreement Between Owner and Design-Builder
ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
AIA Document A141™ – 2014. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:11:48 ET on 02/19/2019 under Order No.3329720254 which expires on 08/27/2019, and is not for resale.DRAFT
User Notes: A141-2014 template revision date 9/23/2019 (1181505615)
AIA Document A141™ – 2014. Copyright © 2004 and 2014 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:11:48 ET on 02/19/2019 under Order No.3329720254 which expires on 08/27/2019, and is not for resale.DRAFT
User Notes: (1181505615)
AGREEMENT made as of the « » day of « » in the year « » (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
State of Rhode Island, acting by and through the Department of Administration, Division of Purchases, on behalf of the User Agency One Capitol Hill, Second Floor Providence, Rhode Island 02908-5855 401-578-8100 (telephone); 401-574-8387 (facsimile) www.ridop.ri.gov on behalf of the User Agency:
(Name, legal status, address, telephone and facsimile numbers, and website) and the Design-Builder:
(Name, legal status, address and other information) for the following Project:
(Name, location and detailed description)
The Owner and Design-Builder agree as follows.
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 COMPENSATION AND PROGRESS PAYMENTS
3 GENERAL REQUIREMENTS OF THE WORK OF THE DESIGN-BUILD CONTRACT
4 WORK PRIOR TO EXECUTION OF THE DESIGN-BUILD AMENDMENT
5 WORK FOLLOWING EXECUTION OF THE DESIGN-BUILD AMENDMENT
6 CHANGES IN THE WORK
7 OWNER’S RESPONSIBILITIES
8 TIME
9 PAYMENT APPLICATIONS AND PROJECT COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 UNCOVERING AND CORRECTION OF WORK
12 COPYRIGHTS AND LICENSES
13 TERMINATION OR SUSPENSION
14 CLAIMS AND DISPUTE RESOLUTION
15 MISCELLANEOUS PROVISIONS
16 SCOPE OF THE AGREEMENT
TABLE OF EXHIBITS
A DESIGN-BUILD AMENDMENT
B INSURANCE AND BONDS
C SUSTAINABLE PROJECTS
ARTICLE 1 GENERAL PROVISIONS
§ 1.1 Owner’s Criteria This Agreement is based on the Owner’s Criteria set forth in this Section 1.1.
(Note the disposition for the following items by inserting the requested information or a statement such as “not applicable” or “unknown at time of execution.” If the Owner intends to provide a set of design documents, and the requested information is contained in the design documents, identify the design documents and insert “see Owner’s design documents” where appropriate.)
§ 1.1.1 The Owner’s program for the Project:
(Set forth the program, identify documentation in which the program is set forth, or state the manner in which the program will be developed.)
§ 1.1.2 The Owner’s design requirements for the Project and related documentation:
(Identify below, or in an attached exhibit, the documentation that contains the Owner’s design requirements, including any performance specifications for the Project.)
§ 1.1.3 The Project’s physical characteristics:
(Identify or describe, if appropriate, size, location, dimensions, or other pertinent information, such as geotechnical reports; site, boundary and topographic surveys; traffic and utility studies; availability of public and private utilities and services; legal description of the site; etc.)
§ 1.1.4 The Owner’s anticipated Sustainable Objective for the Project, if any:
(Identify the Owner’s Sustainable Objective for the Project such as Sustainability Certification, benefit to the environment, enhancement to the health and well-being of building occupants, or improvement of energy efficiency. If the Owner identifies a Sustainable Objective, incorporate AIA Document A141™–2014, Exhibit C, Sustainable Projects, into this Agreement to define the terms, conditions and Work related to the Owner’s Sustainable Objective.)
§ 1.1.5 Incentive programs the Owner intends to pursue for the Project, including those related to the Sustainable Objective, and any deadlines for receiving the incentives that are dependent on, or related to, the Design-Builder’s services, are as follows:
(Identify incentive programs the Owner intends to pursue for the Project and deadlines for submitting or applying for the incentive programs.)
§ 1.1.6 The Owner’s budget for the Work to be provided by the Design-Builder is set forth below:
(Provide total for Owner’s budget, and if known, a line item breakdown of costs.)
§ 1.1.7 The Owner’s design and construction milestone dates:
.1 Design phase milestone dates:
.2 Submission of Design-Builder Proposal:
.3 Phased completion dates:
.4 Substantial Completion date:
.5 Other milestone dates:
§ 1.1.8 The Owner requires the Design-Builder to retain the following Architect, Consultants and Contractors at the Design-Builder’s cost and to the extent Design-Builder does not name these entities prior to executing this Agreement, then Design-Builder shall propose the names of the Architect, Consultants and Contractors that Design-Builder intends to retain to Owner for approval, which approval shall not be unreasonably withheld:
(List name, legal status, address and other information.)
.1 Architect
.2 Consultants
.3 Contractors
§ 1.1.9 Additional Owner’s Criteria upon which the Agreement is based:
(Identify special characteristics or needs of the Project not identified elsewhere, such as historic preservation requirements.)
§ 1.1.10 The Design-Builder shall confirm that the information included in the Owner’s Criteria complies with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities.
§ 1.1.10.1 If the Owner’s Criteria conflicts with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Design-Builder shall notify the Owner of the conflict.
§ 1.1.11 If there is a change in the Owner’s Criteria, the Owner and the Design-Builder shall execute a Modification in accordance with Article 6.
§ 1.1.12 If the Owner and Design-Builder intend to transmit Instruments of Service or any other information or documentation in digital form, they shall endeavor to establish necessary protocols governing such transmissions. The parties may use AIA Document E203™–2013 to establish the protocols for the development, use, transmission, and exchange of digital data and building information modeling.
§ 1.2 Project Team § 1.2.1 The Owner identifies the following representative in accordance with Section 7.1.1:
(List name, address and other information.)
§ 1.2.2 The User Agency identifies the following representative:
(List name, title address, and other contact information for the preferred methods of contact.)
§ 1.2.3 The persons or entities, in addition to the Owner’s representative, who are required to review the Design-Builder’s Submittals are as follows:
(List name, address and other information.)
§ 1.2.4 The Owner will retain the following consultants and separate contractors:
(List discipline, scope of work, and, if known, identify by name and address.)
§ 1.2.5 The Design-Builder identifies the following representative to be the primary point of contact for this project:
(List name, address and other information.)
§ 1.2.6 Neither the Owner’s nor the Design-Builder’s representative shall be changed without 10 working days’ written notice to the other party.
§ 1.3 Binding Dispute Resolution. For any Claim not resolved by the Initial Decision Maker procedures set forth in Section 14.2, or mediation at the option of the parties pursuant to Section 14.3, the method of binding dispute resolution shall be determined in accordance with the provisions of the “Public Works Arbitration Act,” R.I. Gen. Laws §§ 37-16-1 et seq.
§ 1.4 Definitions § 1.4.1 Design-Build Documents. The Design-Build Documents are enumerated in the Agreement between Owner and Design-Builder and its attached Exhibits (hereinafter, the “Agreement”); Conditions of the Contract (General Conditions, Supplementary conditions, if any, and other Conditions), Drawings, Specifications, Addenda issued prior to the execution of the Contract if listed in this Agreement, other documents listed in this Agreement; and Modifications issued after execution of this Agreement. A Modification is (1) a written amendment to the Contract signed by both parties, including the Design-Build Amendment, (2) a Change Order, (3) a Change Directive, or (4) a written order for a minor change in the Work issued by the Design-Builder.
§ 1.4.2 The Contract. The Design-Build Documents form the Contract. The Contract represents the entire and integrated agreement between the parties and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Design-Build Documents shall not be construed to create a contractual relationship of any kind (1) between the Owner and a Subcontractor or a Sub-subcontractor, (2) between the Owner and any Subconsultants, or (3) any persons or entities other than the Owner and the Design-Builder.
§ 1.4.3 The Work. The term “Work” means the design, construction and related services required to fulfill the Design-Builder’s obligations under the Design-Build Documents, whether completed or partially completed, and includes all labor, materials, equipment and services provided or to be provided by the Design-Builder. The Work may constitute the whole or a part of the Project.
§ 1.4.4 The Project. The Project is the total design and construction of which the Work performed under the Design-Build Documents may be the whole or a part, and may include design and construction by the Owner and by separate contractors.
§ 1.4.5 The Drawings. The Drawings are the graphic and pictorial portions of the Design-Build Documents showing the design, location, and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.
§ 1.4.6 The Specifications. The Specifications are that portion of the Design-Build Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.
§ 1.4.7 Instruments of Service. Instruments of Service are representations, in any medium of expression now known or later developed, of the tangible and intangible creative work performed by the Design-Builder, Contractor(s), Architect, and Consultant(s) under their respective agreements. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, digital models and other similar materials.
§ 1.4.6 Submittal. A Submittal is any submission to the Owner for review and approval demonstrating how the Design-Builder proposes to conform to the Design-Build Documents for those portions of the Work for which the Design-Build Documents require Submittals. Submittals include, but are not limited to, shop drawings, product data, and samples. Submittals are not Design-Build Documents unless incorporated into a Modification.
§ 1.4.7 Owner. The Owner is the person or entity identified as such in the Agreement and is referred to throughout the Design-Build Documents as if singular in number. The term “Owner” means the Owner or the Owner’s authorized representative.
§ 1.4.8 Design-Builder. The Design-Builder is the person or entity identified as such in the Agreement and is referred to throughout the Design-Build Documents as if singular in number. The term “Design-Builder” means the Design-Builder or the Design-Builder’s authorized representative.
§ 1.4.9 Consultant. A Consultant is a person or entity providing professional services for the Design-Builder for all or a portion of the Work, and is referred to throughout the Design-Build Documents as if singular in number. To the extent required by the relevant jurisdiction, the Consultant shall be lawfully licensed to provide the required professional services.
§ 1.4.10 Architect. The Architect is a person or entity providing design services for the Design-Builder for all or a portion of the Work, and is lawfully licensed to practice architecture in the applicable jurisdiction. The Architect is referred to throughout the Design-Build Documents as if singular in number.
§ 1.4.11 Contractor. A Contractor is a person or entity performing all or a portion of the construction, required in connection with the Work, for the Design-Builder. The Contractor shall be lawfully licensed, if required in the jurisdiction where the Project is located. The Contractor is referred to throughout the Design-Build Documents as if singular in number and means a Contractor or an authorized representative of the Contractor.
§ 1.4.12 Confidential Information. Confidential Information is information containing confidential or business proprietary information that is clearly marked as “confidential.” This provision is subject to 220-RICR-30-00-13.3(D).
§ 1.4.13 Contract Time. Unless otherwise provided, Contract Time is the period of time, including authorized adjustments, as set forth in the Design-Build Amendment for Substantial Completion of the Work. The Contract Time shall be measured from the date of commencement of the Work.
§ 1.4.14 Day. The term “day” as used in the Design-Build Documents shall mean working day unless otherwise specifically defined.
§ 1.4.15 Contract Sum. The Contract Sum is the amount to be paid to the Design-Builder for performance of the Work after execution of the Design-Build Amendment, as identified in Article A.1 of the Design-Build Amendment.
ARTICLE 2 COMPENSATION AND PROGRESS PAYMENTS
§ 2.1 Compensation for Work Performed Prior To Execution of Design-Build Amendment § 2.1.1 Unless otherwise agreed, payments for Work performed prior to Execution of the Design-Build Amendment shall be made in accordance with Section 2.1.4.1. For the Design-Builder’s performance of Work prior to the execution of the Design-Build Amendment, the Owner shall compensate the Design-Builder as follows:
(Insert amount of, or basis for, compensation, including compensation for any Sustainability Services, or indicate the exhibit in which the information is provided. If there will be a limit on the total amount of compensation for Work performed prior to the execution of the Design-Build Amendment, state the amount of the limit.)
§ 2.1.2 The hourly billing rates for services of the Design-Builder and the Design-Builder’s Architect, Consultants and Contractors, if any, are set forth below.
(If applicable, attach an exhibit of hourly billing rates or insert them below.)
| Individual or Position |
| Rate |
§ 2.1.3 Compensation for Reimbursable Expenses Prior To Execution of Design-Build Amendment § 2.1.3.1 Reimbursable Expenses are in addition to compensation set forth in Section 2.1.1 and 2.1.2 and include expenses, directly related to the Project, incurred by the Design-Builder and the Design-Builder’s Architect, Consultants, and Contractors, are as follows, if authorized in advance by the Owner:
| .1 | Transportation and authorized out-of-town travel and subsistence; |
| .2 | Dedicated data and communication services, teleconferences, Project web sites, and extranets; |
| .3 | Fees paid for securing approval of authorities having jurisdiction over the Project; |
| .4 | Printing, reproductions, plots, standard form documents; |
| .5 | Postage, handling and delivery; |
| .6 | Expense of overtime work requiring higher than regular rates; |
| .7 | Renderings, physical models, mock-ups, professional photography, and presentation materials requested by the Owner; |
| .8 | All taxes levied on professional services and on reimbursable expenses; and |
| .9 | Other Project-related expenditures. |
§ 2.1.3.2 For Reimbursable Expenses, the compensation shall only be the expenses the Design-Builder and the Design-Builder’s Architect, Consultants and Contractors incurred.
§ 2.1.4 Payments to the Design-Builder Prior To Execution of Design-Build Amendment § 2.1.4.1 Payments are due and payable within 30 working days of approval of the Design-Builder’s proper invoice. No interest shall be due or payable on account of any payment due or unpaid except in accordance with the provisions of “Prompt Payment by Department of Administration,” R. I. Gen. Laws §§ 42-11.1-1 et seq.
§ 2.1.4.2 Records of Reimbursable Expenses and services performed on the basis of hourly rates shall be available to the Owner at mutually convenient times for a period of two years following execution of the Design-Build Amendment or termination of this Agreement, whichever occurs first.
§ 2.2 Contract Sum and Payment for Work Performed After Execution of Design-Build Amendment For the Design-Builder’s performance of the Work after execution of the Design-Build Amendment, the Owner shall pay to the Design-Builder the Contract Sum in current funds as agreed in the Design-Build Amendment.
§ 2.3 For each progress payment made prior to Substantial Completion of the Work, the Owner may withhold 5% (five percent), as retainage in accordance with R.I. Gen. Laws § 37-12-10.1.
ARTICLE 3 GENERAL REQUIREMENTS OF THE WORK OF THE DESIGN-BUILD CONTRACT
§ 3.1 General § 3.1.1 The Design-Builder shall comply with any applicable State or municipal licensing requirements.
§ 3.1.2 The Design-Builder shall designate in writing a representative who is authorized to act on the Design-Builder’s behalf with respect to the Project.
§ 3.1.3 The Design-Builder shall perform the Work in accordance with the Solicitation and the rest of the Design-Build Documents. The Design-Builder shall not be relieved of the obligation to perform the Work in accordance with the Design-Build Documents by the activities, tests, inspections or approvals of the Owner.
§ 3.1.3.1 The Design-Builder shall perform the Work in compliance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities in existence at the time of the performance of the work. Any changes shall be addressed pursuant to Article 6. If the Design-Builder performs Work contrary to applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities, the Design-Builder shall assume responsibility for such Work and shall bear the costs attributable to correction.
§ 3.1.3.2 Neither the Design-Builder nor any Contractor, Consultant, or Architect shall be obligated to perform any act which they believe will violate any applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities. If the Design-Builder determines that implementation of any instruction received from the Owner, including those in the Owner’s Criteria, would cause a violation of any applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Design-Builder shall notify the Owner in writing. Upon verification by the Owner that a change to the Owner’s Criteria is required to remedy the violation, the Owner and the Design-Builder shall execute a Modification in accordance with Article 6.
§ 3.1.4 The Design-Builder shall be responsible to the Owner for acts and omissions of the Design-Builder’s employees, Architect, Consultants, Contractors, and their agents and employees, and other persons or entities performing portions of the Work.
§ 3.1.5 General Consultation. The Design-Builder shall schedule and conduct periodic meetings with the Owner to review matters such as procedures, progress, coordination, and scheduling of the Work.
§ 3.1.6 When applicable law requires that services be performed by licensed professionals, the Design-Builder shall provide those services through qualified, licensed professionals. The Owner understands and agrees that the services of the Design-Builder’s Architect and the Design-Builder’s other Consultants are performed in the sole interest of, and for the exclusive benefit of, the Design-Builder.
§ 3.1.7 The Design-Builder, with the assistance of the Owner, shall prepare and file documents required to obtain necessary approvals of governmental authorities having jurisdiction over the Project.
§ 3.1.8 No part of the professional services shall be performed by a subcontractor or subconsultant without the Owner’s prior written consent.
§ 3.1.8 Progress Reports § 3.1.8.1 The Design-Builder shall keep the Owner informed of the progress and quality of the Work. On a regular basis and as requested from time to time by the Owner and the User Agency, the Design-Builder shall submit written progress reports to the Owner, showing estimated percentages of completion and other information identified below:
| .1 | Work completed for the period; |
| .2 | Project schedule status; |
| .3 | Submittal schedule and status report, including a summary of outstanding Submittals; |
| .4 | Responses to requests for information to be provided by the Owner; |
| .5 | Approved Change Orders and Change Directives; |
| .6 | Pending Change Order and Change Directive status reports; |
| .7 | Tests and inspection reports; |
| .8 | Status report of Work rejected by the Owner; |
| .9 | Status of Claims previously submitted in accordance with Article 14; |
| .10 | Cumulative total of the Cost of the Work to date including the Design-Builder’s compensation and Reimbursable Expenses, if any; |
| .11 | Current Project cash-flow and forecast reports; and |
| .12 | Additional information as agreed to by the Owner and Design-Builder. |
§ 3.1.8.2 In addition, where the Contract Sum is the Cost of the Work with or without a Guaranteed Maximum Price, the Design-Builder shall include the following additional information in its progress reports:
| .1 | Design-Builder’s work force report; |
| .2 | Equipment utilization report; and |
| .3 | Cost summary, comparing actual costs to updated cost estimates. |
§ 3.1.9 Design-Builder’s Schedules § 3.1.9.1 As soon as practicable after the date of this Agreement, the Design-Builder shall prepare and submit for the Owner’s and User Agency’s written approval a schedule for the Work. The schedule initially shall include anticipated dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The schedule, including the time required for design and construction, shall not exceed time limits current under the Design-Build Documents, shall be revised at appropriate intervals, not less frequently than monthly, as required by the conditions of the Work and Project, shall be related to the entire Project to the extent required by the Design-Build Documents, shall provide for expeditious and practicable execution of the Work, and shall include allowances for periods of time required for the Owner’s review and for approval of submissions by authorities having jurisdiction over the Project. Once approved by the Owner and the User Agency, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Design-Builder. With the prior written approval of the Owner and the User Agency, the Design-Builder shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction.
§ 3.1.9.2 The Design-Builder shall perform the Work in general accordance with the most recent schedules submitted to the Owner.
§ 3.1.9.3 If the Owner determines, in its reasonable judgment, that the rate of progress of the Work as reflected by the Design-Builder’s submitted schedule and its progress reports is not satisfactory, and such delay is not excusable under other provisions of this Agreement, Owner may require Design-Builder to provide an action plan to recover the schedule.
§ 3.1.9.4 If Design-Builder fails to provide such a recovery schedule reasonably acceptable to Owner within five (5) working days, Owner may direct Design-Builder to increase its forces, equipment, plant, or any of them sufficient, in Owner’s judgment to complete the Work by the Substantial Completion date.
§ 3.1.9.5 Design-Builder’s failure to perform as directed by Owner per Sections 3.1.9.3 and 3.1.9.4 is material breach of the Contract.
§ 3.1.9.6 The Owner’s exercise of its authority under this Section 3.1.9 will not constitute an assumption by Owner of responsibility or control over construction means, methods, techniques, sequence, or procedures or over Design-Builder’s responsibility and authority for safety precautions and programs in connections with the Work.
§ 3.1.10 Certifications. Upon the Owner’s written request, the Design-Builder shall obtain from the Architect, Consultants, and Contractors, and furnish to the Owner, certifications with respect to the documents and services provided by the Architect, Consultants, and Contractors (a) that, to the best of their knowledge, information and belief, the documents or services to which the certifications relate (i) are consistent with the Design-Build Documents, except to the extent specifically identified in the certificate, and (ii) comply with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities governing the design of the Project; and (b) that the Owner and its consultants shall be entitled to rely upon the accuracy of the representations and statements contained in the certifications. The Design-Builder’s Architect, Consultants, and Contractors shall not be required to execute certificates or consents that would require knowledge, services or responsibilities beyond the scope of their services and without the Design-Builder’s review and consent which will not be unreasonably withheld.
§ 3.1.11 Design-Builder’s Submittals § 3.1.11.1 Prior to submission of any Submittals, the Design-Builder shall prepare a Submittal schedule, and shall submit the schedule for the Owner’s approval. The Owner’s approval shall not unreasonably be delayed or withheld. The Submittal schedule shall (1) be coordinated with the Design-Builder’s schedule provided in Section 3.1.9.1, (2) allow the Owner reasonable time to review Submittals, and (3) be periodically updated to reflect the progress of the Work. If the Design-Builder fails to submit a Submittal schedule, the Design-Builder shall not be entitled to any increase in Contract Sum or extension of Contract Time based on the time required for review of Submittals.
§ 3.1.11.2 By providing Submittals the Design-Builder represents to the Owner that it has (1) reviewed and approved them, (2) determined and verified materials, field measurements and field construction criteria related thereto, or will do so and (3) checked and coordinated the information contained within such Submittals with the requirements of the Work and of the Design-Build Documents.
§ 3.1.11.3 The Design-Builder shall perform no portion of the Work for which the Design-Build Documents require Submittals until the Owner has approved the respective Submittal.
§ 3.1.11.4 The Work shall be in accordance with approved Submittals except that the Design-Builder shall not be relieved of its responsibility to perform the Work consistent with the requirements of the Design-Build Documents. The Work may deviate from the Design-Build Documents only if the Design-Builder has notified the Owner in writing of a deviation from the Design-Build Documents at the time of the Submittal and a Modification is executed authorizing the identified deviation. The Design-Builder shall not be relieved of responsibility for errors or omissions in Submittals by the Owner’s approval of the Submittals.
§ 3.1.11.5 All professional design services or certifications to be provided by the Design-Builder, including all drawings, calculations, specifications, certifications, shop drawings and other Submittals, shall contain the signature and seal of the licensed design professional preparing them. Submittals related to the Work designed or certified by the licensed design professionals, if prepared by others, shall bear the licensed design professional’s written approval. The Owner and its consultants shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals.
§ 3.1.11.6 Any Submittals, Instruments of Service, designs, drawings, or specifications prepared or furnished by Design-Builder that contain errors, conflicts or omissions will be promptly corrected by the Design-Builder at no additional cost to the Owner. Owner’s approval, acceptance, use or payment for all or any part of Design-Builder’s services shall in no way alter Design-Builder’s obligations or Owner’s rights hereunder.
§ 3.1.12 Warranty. The Design-Builder warrants to the Owner that materials and equipment furnished under the Contract will be of good quality and new unless the Design-Build Documents require or permit otherwise. The Design-Builder further warrants that the Work will conform to the requirements of the Design-Build Documents and will be free from defects, except for those inherent in the quality of the Work or otherwise expressly permitted by the Design-Build Documents. All manufactured articles and other material or equipment shall be applied, installed, connected, erected, used, cleaned, conditions, etc., as directed by the manufacturer, unless herein or in Design Build Documents specifically to the contrary. Construction Work, materials, or equipment not conforming to these requirements may be considered defective. The Design-Builder’s warranty excludes remedy for damage or defect caused by abuse, alterations to the Work not executed by the Design-Builder, improper or insufficient maintenance, improper operation, or normal wear and tear and normal usage. If required by the Owner, the Design-Builder shall furnish satisfactory evidence as to the kind and quality of materials and equipment. The Design-Builder shall assign any manufacturer warranties provided to the Design-Builder to the Owner, and such pass-through warranties or guarantees shall be the Design-Builder’s exclusive obligation with respect to the provision of any warranties or guarantees of these manufacturers to the Owner.
§ 3.1.12.1 For design and engineering services provided by the Design-Builder, the Design-Builder shall perform design and engineering services consistent with the professional skill and care ordinarily provided by design-builders practicing in the same or similar locality under the same or similar circumstances.
§ 3.1.13 Royalties, Patents and Copyrights § 3.1.13.1 The Design-Builder shall pay all royalties and license fees.
§ 3.1.13.2 The Design-Builder shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and its separate contractors and consultants harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer or manufacturers is required by the Owner, or where the copyright violations are required in the Owner’s Criteria. However, if the Design-Builder has reason to believe that the design, process or product required in the Owner’s Criteria is an infringement of a copyright or a patent, the Design-Builder shall be responsible for such loss unless such information is promptly furnished to the Owner. If the Owner receives notice from a patent or copyright owner of an alleged violation of a patent or copyright, attributable to the Design-Builder, the Owner shall give prompt written notice to the Design-Builder.
§ 3.1.14 Indemnification § 3.1.14.1 For the purposes of this Agreement only, Procurement Regulation 220-RICR-30-00-13.21 shall be superseded and replaced with the following language: Design-Builder shall defend, indemnify, release and hold harmless the Owner and its agencies, together with their respective officers, agents and employees, from and against any and all third-party claims, demands, liabilities, causes of action, losses, damages, judgments and other costs and expenses (including attorneys’ fees) arising out of, or related to, directly or indirectly, the performance of the Work, but only to the extent caused by Design-Builder’s breach of the Design-Builder or the act(s), error(s) or omission(s) of the Design-Builder or its employees, agents, subcontractors or volunteers at any tier.
§ 3.1.14.3 The indemnification obligation under this Section 3.1.14 shall not be limited by a limitation on amount or type of damages, compensation, or benefits payable by or for Design-Builder, Architect, a Consultant, a Contractor, or anyone directly or indirectly employed by them, under workers’ compensation acts, disability benefit acts or other employee benefit acts.
§ 3.1.14.3 Without limiting the generality of the foregoing, the defense and indemnity set forth in this Section 3.1.14 includes, without limitation, all judgments, liabilities, damages, losses, claims, demands, and actions on account of bodily injury, death, or property loss to a person or entity indemnified hereunder or any other persons or entities, whether based upon statutory (including, without limitation, workers compensation), contractual, tort, or other liability of any person or entity so indemnified.
§ 3.1.14.4 The remedies set forth herein shall not deprive any person indemnified hereunder of any other indemnity action, right, or remedy otherwise available to any such person or entity at common law or otherwise.
§ 3.1.14.5 Notwithstanding any other language in the Design-Build Documents to the contrary, the indemnity hereunder shall survive Final Completion of the Work and final payment under this Agreement and shall survive any termination of this Agreement.
§ 3.1.14.6 The Owner shall have the right to deduct from any payments due to the Design-Builder the amount of any unpaid obligations owed to the State of Rhode Island by the Design-Builder, including without limitation, any and all unpaid taxes, the amount of any claim against the Design-Builder arising out of this Agreement, or any amount on account of any other reason permitted by applicable law.
§ 3.1.15 Design-Builder’s Insurance and Bonds. The Design-Builder shall purchase and maintain insurance and provide bonds as set forth in Exhibit B.
§ 3.1.16 By beginning Work, the Design-Builder represents that the Design Builder has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated its personal observations with the requirements of the Design-Build Documents. Design-Builder shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and all other relevant information with the Design-Build Documents before commencing work. Errors, inconsistencies, or omissions discovered by the Design Builder in the Submittals or the Design-Build Documents shall be reported to the Owner at once.
§ 3.1.17 The Design-Builder shall, at the written request of the Owner, prior to the commencement of the Work and thereafter, furnish to Owner reasonable evidence, following the Owner’s request therefor, that Design-Builder has the financial capacity to fulfill Design-Builder’s obligations under the Contract. Furnishing such evidence shall be a condition precent to Owner’s authorization for Design-Builder to commence or continue the Work. Design-Builder shall notify Owner immediately upon any event of any material impairment in Design-Builder’s financial capacity to fulfill Design-Builder’s obligations under the Contract. Failure to provide such information as required hereunder will be a material breach of this Contract.
§ 3.1.18 The Design-Builder shall exercise the Design-Builder’s reasonable skill and judgment in furthering the interest of the Owner; to furnish efficient construction administration, management services and supervisions; to furnish at all times an adequate supply of workers and materials; and to perform the Work in an expeditious and economical manner consistent with the Owner’s interests.
ARTICLE 4 WORK PRIOR TO EXECUTION OF THE DESIGN-BUILD AMENDMENT
§ 4.1 General § 4.1.1 Any information submitted by the Design-Builder, and any interim decisions made by the Owner, shall be for the purpose of facilitating the design process and shall not modify the Owner’s Criteria unless the Owner and Design-Builder execute a Modification.
§ 4.1.2 The Design-Builder shall advise the Owner on proposed site use and improvements, selection of materials, and building systems and equipment. The Design-Builder shall also provide the Owner with recommendations, consistent with the Owner’s Criteria, on constructability; availability of materials and labor; time requirements for procurement, installation and construction; and factors related to construction cost including, but not limited to, costs of alternative designs or materials, preliminary budgets, life-cycle data, and possible cost reductions.
§ 4.2 Evaluation of the Owner’s Criteria § 4.2.1 The Design-Builder shall schedule and conduct meetings with the Owner and any other necessary individuals or entities to discuss and review the Owner’s Criteria as set forth in Section 1.1.The Design-Builder shall thereafter again meet with the Owner to discuss a preliminary evaluation of the Owner’s Criteria. The preliminary evaluation shall address possible alternative approaches to design and construction of the Project and include the Design-Builder’s recommendations, if any, with regard to accelerated or fast-track scheduling, procurement, or phased construction. The preliminary evaluation shall consider cost information, constructability, and procurement and construction scheduling issues.
§ 4.2.2 After the Design-Builder meets with the Owner and presents the preliminary evaluation, the Design-Builder shall provide a written report to the Owner, summarizing the Design-Builder’s evaluation of the Owner’s Criteria. The report shall also include:
| .1 | allocations of program functions, detailing each function and their square foot areas; |
| .2 | a preliminary estimate of the Cost of the Work, and, if necessary, recommendations to adjust the Owner’s Criteria to conform to the Owner’s budget; |
| .3 | a preliminary schedule, which shall include proposed design milestones; dates for receiving additional information from, or for work to be completed by, the Owner; anticipated date for the Design-Builder’s Proposal; and dates of periodic design review sessions with the Owner; and |
| .4 | the following: |
(List additional information, if any, to be included in the Design-Builder’s written report.)
§ 4.2.2.5 As necessary or appropriate, the Design-Builder, its Architect, Consultants, and Contractors shall participate in value engineering review meetings with the Owner.
§ 4.2.3 The Owner shall review the Design-Builder’s written report and, if acceptable, provide the Design-Builder with written consent to proceed to the development of the Preliminary Design as described in Section 4.3. The consent to proceed shall not be understood to modify the Owner’s Criteria unless the Owner and Design-Builder execute a Modification.
§ 4.3 Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:
| .1 | Confirmation of the allocations of program functions; |
| .2 | Site plan; |
| .3 | Building plans, sections and elevations; |
| .4 | Structural system; |
| .5 | Selections of major building systems, including but not limited to mechanical, electrical and plumbing systems; and |
| .6 | Outline specifications or sufficient drawing notes describing construction materials. |
The Preliminary Design may include some combination of physical study models, perspective sketches, or digital modeling.
§ 4.3.2 The Owner shall review the Preliminary Design. The Preliminary Design shall not modify the Owner’s Criteria unless the Owner and Design-Builder execute a Modification.
§ 4.4 Design-Builder’s Proposal § 4.4.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.3.2, the Design-Builder shall prepare and submit the Design-Builder’s Proposal to the Owner. The Design-Builder’s Proposal shall include the following:
| .1 | A list of the Preliminary Design documents and other information, including the Design-Builder’s clarifications, assumptions and deviations from the Owner’s Criteria, upon which the Design-Builder’s Proposal is based; |
| .2 | The proposed Contract Sum, including the compensation method and, if based upon the Cost of the Work plus a fee, a written statement of estimated cost organized by trade categories, allowances, contingencies, Design-Builder’s Fee, and other items that comprise the Contract Sum; |
| .3 | The proposed date the Design-Builder shall achieve Substantial Completion; |
| .4 | An enumeration of any qualifications and exclusions, if applicable; |
| .5 | A list of the Design-Builder’s key personnel, Contractors and suppliers; and |
| .6 | The date on which the Design-Builder’s Proposal expires. |
§ 4.4.2 Submission of the Design-Builder’s Proposal shall constitute a representation by the Design-Builder that it has visited the site and become familiar with local conditions under which the Work is to be completed.
§ 4.4.3 If the Owner and Design-Builder agree on a proposal, the Owner and Design-Builder shall execute the Design-Build Amendment setting forth the terms of their agreement.
ARTICLE 5 WORK FOLLOWING EXECUTION OF THE DESIGN-BUILD AMENDMENT
§ 5.1 Construction Documents § 5.1.1 Upon the execution of the Design-Build Amendment, the Design-Builder shall prepare Construction Documents. The Construction Documents shall establish the quality levels of materials and systems required. The Construction Documents shall be consistent with the Design-Build Documents.
§ 5.1.2 The Design-Builder shall submit the Construction Documents to the Owner for the Owner’s information. If the Owner discovers any deviations between the Construction Documents and the Design-Build Documents, the Owner shall promptly notify the Design-Builder of such deviations in writing. The Construction Documents shall not modify the Design-Build Documents unless the Owner and Design-Builder execute a Modification. The failure of the Owner to discover any such deviations shall not relieve the Design-Builder of the obligation to perform the Work in accordance with the Design-Build Documents.
§ 5.2 Construction § 5.2.1 Commencement. Except as permitted in Section 5.2.2, construction shall not commence prior to execution of the Design-Build Amendment.
§ 5.2.2 If the Owner and Design-Builder agree in writing, construction may proceed prior to the execution of the Design-Build Amendment. However, such authorization shall not waive the Owner’s right to reject the Design-Builder’s Proposal.
§ 5.2.3 The Design-Builder shall supervise and direct the Work, using the Design-Builder’s best skill and attention. The Design-Builder shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work under the Contract, unless the Design-Build Documents give other specific instructions concerning these matters.
§ 5.2.4 The Design-Builder shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work.
§ 5.2.5 The Design-Builder shall report to the Owner any errors, inconsistencies, or omissions discovered in the Design-Build Documents. If the Design-Builder performs any of the construction activity knowing it involves a recognized error, inconsistency, or omissions without notice to Owner, Design-Builder shall assume responsibility for such performance and shall bear all costs for correction of such Work.
§ 5.3 Labor and Materials § 5.3.1 Unless otherwise provided in the Design-Build Documents, the Design-Builder shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services, necessary for proper execution and completion of the Work, whether temporary or permanent, and whether or not incorporated or to be incorporated in the Work. Whenever the Design-Builder has an obligation to provide labor and materials under the Design-Build Documents, the Design-Builder, at a minimum, shall provide the labor for, and furnish and install and place in operation all items, including without limitation, all proper connections.
§ 5.3.2 Except in the case of minor changes in the Work authorized by the Design-Builder in accordance with Section 6.4, the Design-Builder may only make substitutions only in accordance with Article 6.
§ 5.3.3 The Design-Builder shall enforce strict discipline and good order among the Design-Builder’s employees and other persons carrying out the Work. The Design-Builder shall not permit employment of unfit persons or persons not properly skilled in tasks assigned to them.
§ 5.4 Taxes § 5.4.1 The Design-Builder shall pay sales, consumer, use and similar taxes, for the Work provided by the Design-Builder, that are legally enacted when bids are received or negotiations concluded, whether or not yet effective or merely scheduled to go into effect. The Design-Builder, in performing the construction work for an exempt organization, is entitled to use the State of Rhode Island Contractor Exempt Purchase Certificate in all purchases of materials and supplies essential to the construction project and utilized in the construction thereof.
§ 5.4.2 Pursuant to R.I. Gen. Laws § 44-1-6, the Owner shall withhold payment in the amount of three (3%) percent until 30 calendar days after Final Completion and compliance by the Design-Builder with the requirements of such section, from the Design-Builder if the Design-Builder does not maintain a regular place of business in Rhode Island. The three (3%) percent withheld pursuant to R.I. Gen. Laws § 44-1-6 is not considered retainage which is held pursuant to Section 2.3.
§ 5.4.3 The State of Rhode Island is exempt from payment of any federal or state excise, transportation, or sales tax. The Rhode Island Department of Administration Division of Purchases will furnish Exemption Certificates upon request.
§ 5.5 Permits, Fees, Notices and Compliance with Laws § 5.5.1 Unless otherwise provided in the Design-Build Documents, the Design-Builder shall secure and pay for the building permit as well as any other permits, fees, licenses, and inspections required by the Rhode Island State Building Code, necessary for proper execution of the Work that are customarily secured after execution of the Contract and legally required at the time bids are received or negotiations concluded. The Design-Builder shall be responsible for obtaining the Certificate of Occupancy from the appropriate governmental authorities.
§ 5.5.2 The Design-Builder shall comply with and give notices required by applicable laws, statutes, ordinances, codes, rules and regulations, and lawful orders of public authorities, applicable to performance of the Work.
§ 5.5.2 The Design-Builder shall promptly notify the Owner if the Design-Builder becomes aware that the Design-Build Documents are not in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities. If the Design-Builder performs Work knowing it to be contrary to applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities, the Design-Builder shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction, consistent with this Agreement.
§ 5.5.3 Concealed or Unknown Conditions. If the Design-Builder encounters conditions at the site that are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Design-Build Documents or (2) unknown physical conditions of an unusual nature that differ materially from those ordinarily found to exist and generally recognized as inherent in construction activities of the character provided for in the Design-Build Documents, the Design-Builder shall promptly provide notice to the Owner before conditions are disturbed and in no event later than 21 working days after first observance of the conditions.