RFP Solicitation - PR ER PRMNT RPR(9).pdf

PDF 5 MB Posted

Attached to
Landslide Repairs - West Region Contract 1
Solicitation number
693C73-22-R-000006
Issued by

About this file

This Request for Proposal solicits landslide repair construction services for the Puerto Rico Highway and Transportation Authority. Certified small businesses are invited to submit technical and price proposals for repairing landslides and washouts caused by hurricanes on various roads in Puerto Rico municipalities. The work includes embankment restoration, retaining walls, drainage, pavement reconstruction, and traffic control. The project is split into multiple schedules with total costs estimated between $1 million to $5 million. A two-step evaluation will first assess technical qualifications like experience performing similar landslide projects, then rank price proposals from technically qualified firms. The contract is expected to be awarded in December 2021 with a 600-day performance period starting in January 2022 upon bond approval. Interested parties must register at SAM.gov to receive solicitation documents and updates issued on or around October 19th, with proposals due on the date specified in Block 13a of the solicitation form. This request is issued by the Eastern Federal Lands Highway Division of the Department of Transportation.

View the file

Other files

File Type Posted
Amendment 0003 - PR ER PRMNT RPR (9).pdf PDF
Amendment 0002 - PR ER PRMNT RPR(9).pdf PDF
Amendment 0001 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-882579.pdf PDF
Report_Geotechnical_ER-HWY-361.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Report_Geotechnical_ER_HWY_111.pdf PDF
Report_Geotechnical_ER-HWY-72.pdf PDF
Categorical Exclusion Form (NEPA) AC-816579.pdf PDF
Report_Geotechnical_ER-HWY-71.pdf PDF
Report_Lead-Abestos_AC-815579.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Categorical Exclusion Form (NEPA) AC-812579.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.9.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Categorical Excusion Form (NEPA) AC-815579.pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 90.pdf PDF
Plans_Sch A_AC-816579 - PR ER PRMNT RPR (9).pdf PDF
Report_Geotechnical_ER-HWY-63.pdf PDF
Categorical Exclusion Form (NEPA) AC-880579.pdf PDF
Plans_Sch C_AC-801579 - PR ER PRMNT RPR (9).pdf PDF
Report_Lead-Abestos_AC-801579_Site 332.pdf PDF
Report_Geotechnical_ER-HWY-66.pdf PDF
Report_Geotechnical_HWY-332.pdf PDF
Report_Geotechnical_ER_HWY_110.pdf PDF
VETS-4212 Form.pdf PDF
USFWS Conservation Measures.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.8.pdf PDF
Report_Geotechnical_HWY-90.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report_Geotechnical_ER_HWY_112.pdf PDF
Plans_Sch B_AC-880579 - PR ER PRMNT RPR (9).pdf PDF
Report_Abestos Neg Cert_AC-882579_Site 361.pdf PDF
Report_Geotechnical_ER-HWY-67.pdf PDF
Plans_Sch C_AC-882579 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 332.pdf PDF
Plans_Sch A_AC-812579 - PR ER PRMNT RPR(9).pdf PDF
Report_Lead_AC-882579_Site 361.pdf PDF
PRHTAs Special Provisions applicable to the project.pdf PDF
Report_Lead-Abestos_AC-816579.pdf PDF
Report_Lead-Abestos_AC-812579.pdf PDF
Report_Abestos_AC-882579_Site 361.pdf PDF
Report_Lead-Abestos_AC-880579.pdf PDF
Report_Lead-Abestos_AC-801579_Site 90.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans_Sch A_AC-815579 - PR ER PRMNT RPR (9).pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CONTRACTOR:

ADDRESS:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PR ER PRMNT RPR(9)

Puerto Rico Highway and Transportation Authority

Landslide Repairs - West Region Contract 1

REQUEST FOR PROPOSAL

RFP No. 693C73- 22-R-000006

This Contract Cites

PRHT A's Standard Specifications for Road and Bride Construction

STATE Puerto Rico

COUNTY Various Municipalities

AGENCY Puerto Rico Highway and Transportation Authority

TYPE OF IMPROVEMENT

The project consists of repairing landslides and washouts caused by Hurricanes Inna and Maria on PR-2, PR-119, PR-123, PR-128 and PR-440, and other miscellaneous work.

Project Length Totals

0.00 0.00

For Parking Areas, Lane Miles is calculated as SQFT/11 ft (nominal) lane

Parking Roadway / Parking Area / Other Stations / SQFT Linear Route Lane

Schedule Area Feet Miles Miles

A □ PR-119 (Site 63) KM32.1 To KM32.l 0.00 0.00

A □ PR-119 (Site 64) KM35.9 To KM35.9 0.00 0.00

A □ PR-119 (Site 66) KM41.15 To KM 41.15 0.00 0.00

A □ PR-119 (Site 67) KM41.6 To KM41.6 0.00 0.00

A □ PR-119 (Site 71) KM56.9 To KM56.9 0.00 0.00

A □ PR-119 (Site 72) KM 76.1 To KM76.l 0.00 0.00

B □ PR-128 (Site 110) KM9 To KM9 0.00 0.00

B □ PR-128 (Site 111) KM 15.2 To KM 15.2 0.00 0.00

B □ PR-128 (Site 112) KM 17.30 To KM 17.35 0.00 0.00

C □ PR-123 (Site 90) KM48.5 To KM48.5 0.00 0.00

C □ PR-2 (Site 332) KM 140.2 To KM 140.2 0.00 0.00

C □ PR-440 (Site 361) KM0.2 To KM0.2 0.00 0.00

TABLE OF CONTENTS

Page

Notice to Offerors 1 through 2

Checklist for Offer Submission 1 through 2

RFP Statement 1 through 3

*SF-1442 Solicitation, Offer, and Award 1 through 7

Proposal Schedule Instructions 1 through 5

*Proposal Schedule B-1 through B-14

*SF-24 Bid Bond C-1 through C-2

FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION

REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES

Index to Federal and Transportation Acquisition Regulations 1 through 7

Representations and Certifications (SAMs online) D-1 through D-2

Instructions to Offerors E-1

*Socioeconomic Program Requirements F-1 through F-4

Minimum Wage Schedule F-5 through F-10

*General Contract Requirements G-1 through G-9

Construction Contract Requirements H-1 through H-5

Special Contract Requirements J-1 through J-348

Section K K-1 through K-3

Permits pending

SPECIFICATIONS via File Sharing Email

Plans_Sch A_AC-812579 1 through 103

Plans_Sch A_AC-815579 1 through 25

Plans_Sch A_AC-816579 1 through 31

Plans_Sch B_AC-880579 1 through 63

Plans_Sch C_AC-801579 1 through 76

Plans_Sch C_AC-882579 1 through 13

PRHTA's Standard Specifications for Roads and Bridge Construction Manual 1 through 1158

Categorical Exclusion Form (NEPA) AC-801579_Site 90 1 through 82

Categorical Exclusion Form (NEPA) AC-801579_Site 332 1 through 90

TABLE OF CONTENTS

Categorical Exclusion Form (NEPA) AC-812579 1 through 186

Categorical Exclusion Form (NEPA) AC-816579 1 through 99

Categorical Exclusion Form (NEPA) AC-880579 1 through 151

Categorical Exclusion Form (NEPA) AC-882579 1 through 76

Categorical Excusion Form (NEPA) AC-815579 1 through 117

DTOP's Manual de Senales de Transito (MST) 1 through 174

PRHTA's Standard Drawings 1 through 400

PRHTA's Special Provisions applicable to the project 1 through 43

PRHTA's Material Testing Schedule 1 through 30

Report_Abestos Neg Cert_AC-882579_Site 361 1 through 4

Report_Abestos_AC-882579_Site 361 1 through 7

Report_Lead_AC-882579_Site 361 1 through 14

Report_Lead-Abestos_AC-801579_Site 90 1 through 35

Report_Lead-Abestos_AC-801579_Site 332 1 through 29

Report_Lead-Abestos_AC-812579 1 through 19

Report_Lead-Abestos_AC-815579 1 through 14

Report_Lead-Abestos_AC-816579 1 through 13

Report_Lead-Abestos_AC-880579 1 through 16

Report_Geotechnical_ER_HWY_110 1 through 69

Report_Geotechnical_ER_HWY_111 1 through 37

Report_Geotechnical_ER_HWY_112 1 through 77

Report_Geotechnical_ER-HWY-63 1 through 49

Report_Geotechnical_ER-HWY-64 KM 35.8 1 through 40

Report_Geotechnical_ER-HWY-64 KM 35.9 1 through 50

Report_Geotechnical_ER-HWY-66 1 through 28

Report_Geotechnical_ER-HWY-67 1 through 62

Report_Geotechnical_ER-HWY-71 1 through 28

Report_Geotechnical_ER-HWY-72 1 through 24

Report_Geotechnical_ER-HWY-361 1 through 76

Report_Geotechnical_HWY-90 1 through 32

Report_Geotechnical_HWY-332 1 through 13

USFWS Conservation Measures 1 through 23

*Offeror’s Qualifications Form 1 through 7

* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5

*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE PROPOSAL SUBMITTAL

PACKAGE

NOTICE TO OFFERORS

CONTRACT FORMAT:

Offerors should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-pages in this booklet.

FAR provisions and clauses incorporated by reference can be accessed on the Internet website at https://www.acquisition.gov/. Offerors are encouraged to review the documents thoroughly before submitting a proposal.

PROPOSAL BOOKLET AND OFFER SUBMITTAL:

It is the responsibility of the Offeror to verify that this proposal is complete as listed in the Table of Contents. The Offeror is responsible for submitting all required forms and documents with the offer.

Offerors should use the Checklist for Offer Submission included in this booklet to check that their proposals are complete.

CONSTRUCTION CONTRACTS:

Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.

HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:

As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDSs) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in Section G of this booklet. Failure to submit MSDSs may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDSs within two weeks after bid opening.

INTERNET BASED DATA BASES - REQUIRED INPUT:

According to FAR Subpart 4.1102 contractors are required to be registered in the System for Award Management (SAM) at the time an offer is submitted. Access the following web site to register: https://www.sam.gov/.

According to FAR Subpart 4.1201 contractors are required to complete electronic annual representations and certifications in SAM accessed via https://www.sam.gov/ as a part of required registration.

According to FAR Subpart 22.1302 (b) federal contractors and sub-contractors MUST complete the required annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.

PAYMENT:

Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.

PROGRESS PAYMENTS:

ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in SAM must be accurate in order for contractors' invoices to be considered proper invoices for the https://www.sam.gov/ https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm

NOTICE TO OFFERORS - (CONT'D.)

purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the SAM database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.

WELFARE-TO-WORK INITIATIVE:

The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.

INCREASING SEAT BELT USE IN THE UNITED STATES:

The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.

OBTAINING PROPOSAL DOCUMENTS:

Request For Proposal (RFP) documents will not be mailed. All solicitation documents are available for direct download from the Contract Opportunities website: https://sam.gov/. Contractors are encouraged to register on the website (for this specific project) in order to receive automatic notifications when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:

eflhd.contracts@dot.gov.

THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES

NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON

THOSE CHANGES.

https://sam.gov/ mailto:eflhd.contracts@dot.gov

CHECKLIST FOR OFFER SUBMISSION

The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the Offeror. Failure to submit a complete proposal may be a cause to reject your proposal.

1. Proposal Envelope:

a. Addressed as shown in Block 7 of SF-1442

b. In the lower left corner, indicate the following: Solicitation No., Project Name & Number, and mail to Suite E2-3-300, ATTENTION: ACQUISITIONS. If proposals are hand-delivered, bring them to the main entrance of Quantum Park, and ask for the Federal Highway Administration (EFLHD) Receptionist to be contacted and an EFLHD representative will come to collect the proposal.

2. Standard Form 1442: Solicitation, Offer and Award

a. Block 14: Name and Address of Offeror.

b. Block 15: Telephone Number of Offeror.

c. Block 16: Remittance Address if different from Block 14.

d. Block 19: All Amendments Acknowledged, with dates of Amendments.

e. Block 20: Proposal is signed and dated.

3. Proposal Schedule - (Pages B-1 through B-14)

a. Unit proposal price and proposal amount provided for each pay item in numbers.

b. Corrections initialed.

4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)

a. Date executed

b. Legal name and address of Offeror.

c. Type of organization.

d. State of incorporation (if applicable).

e. Name and business address of Treasury approved surety.

f. Penal sum of bond (not less than 20% of proposal total).

g. Proposal identification.

h. Signature of Offeror

i. Seal, if corporation

j. Signature of Surety

k. Seal, if corporation

PROPOSALS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.

5. Power of Attorney.

a. Dated on or before execution date of bond

b. Power has original signature of surety, or is embossed with surety's seal in the certification section

PROPOSALS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED

CHECKLIST FOR OFFER SUBMISSION

6. Offeror's Qualifications form (provided separately as part of the proposal Documents Package). Form completed, signed and submitted with proposal

7. System for Award Management (SAM): The contractor is currently registered in the System For Award Management (SAM) database at https://www.sam.gov/ at the time the offer is submitted. If the contractor elects to not have its active SAM registration viewable by the public, then the contractor must submit a copy with the proposal.

8. Online Representations and Certifications Application: The contractor's Representations and Certifications have been input online via the electronic database at https://www.sam.gov/.

9. VETS – 4212 Reporting: The contractor has completed the annual reporting requirement online at http://www.dol.gov/vets/vets4212.htm.

The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.

NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL

DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A PROPOSAL

PACKAGE IS SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR

UPDATE YOUR DATA PRIOR TO OFFER SUBMISSION MAY CAUSE THE

PROPOSAL TO BE REJECTED.

https://www.sam.gov/ https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT PR ER PRMNT RPR(9)

Landslide Repairs – West Region Contract 1

REQUEST FOR PROPOSALS

693C73-22-R-000006

Project Description: The project consists of repairing landslide and washout damaged by Hurricanes Irma and Maria on PR-2, PR-119, PR-123, PR-128 and PR-440. The work includes embankment restoration, gravity retaining walls, gabion basket walls, mechanically stabilized earth walls, traffic control, excavation, pavement reconstruction, erosion and sediment control, drainage repairs, and other miscellaneous work. The project is located in the Municipalities of San Sebastian, Las Marias, San German, Yauco, Utuado, Aguada, and Aguadilla in Puerto Rico.

The project will be split into multiple work schedules, with the cost of the entire project expected to fall between $1,000,0000 and $5,000,000.

Scope of Work: The detailed scope of work to be undertaken by the successful Offeror under the contract for this project is outlined in the Request for Proposal (RFP) solicitation documents.

These include the Plans, Special Contract Requirements (J Pages), and supplemental Government Furnished Information.

Procurement Overview of the Project: In accordance with Federal Acquisition Regulation (FAR) Subpart 14.5, the Eastern Federal Lands Highway Division (EFLHD) is conducting a Lowest Price Technically Acceptable Source Selection Process for this project. Under this Notice, the EFLHD (also referred to as “the Government”) is soliciting all eligible Contractor firms/teams (Offerors) to participate in a two-step RFP process. The two steps will include the submittal of two proposal packages; a Technical Proposal and a Price Proposal. A description of these proposals and their requirements can be found in the RFP’s Proposal Instructions (B Pages).

During step one, a selection evaluation board will review and evaluate the technical proposals submitted by all interested, responsive Offerors. The selection committee will select qualified Offerors based on the pass/fail (acceptable/unacceptable) evaluation criteria as stated in the RFP’s Proposal Instructions - Evaluation of Proposal Documents (B Pages). Offerors should submit technical proposals that are acceptable without additional explanation or information.

The Government may make a final determination regarding a technical proposal’s acceptability solely on the basis of the technical proposal as submitted. The Government may proceed with the second step (lowest price evaluation) without requesting further information from any Offeror; however, the Government may request additional information from any Offeror with a technical proposal considered reasonable and close to acceptable, and may discuss any technical proposal with any Offeror. Only one technical proposal may be submitted by each Offeror. The step one technical proposal shall not include any prices or pricing information.

During step two, only technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for award. The price proposals corresponding to the acceptable technical proposals will be opened and ranked according to price and the contract will be awarded to the lowest responsive, responsible Offeror as stated in the RFP’s Proposal Instructions - Basis of Award (B Pages). Only one price proposal may be submitted by each Offeror and the price proposal must be based upon the Offeror’s own technical proposal.

Contract award is anticipated to be no earlier than December 2021, with Notice to Proceed anticipated to be issued after the receipt of valid Performance and Payment Bonds (see Block 12a of the SF-1412 and FAR Clause 52.228-15), but no earlier than January 2022.

It is not the intent of EFLHD to receive project specific design or engineering recommendations as part of the step one technical proposal other than what is necessary to support the technical proposal. Offerors should limit their technical proposal to the information required by this Notice, and other information that may be relevant to the qualifications and experience of the Offeror. No reimbursement will be made for any expenses associated with the preparation of a step one technical proposal or a step two price proposal.

Obligation to Keep Team Intact: In connection with the services covered by this procurement process, any in-house personnel, subcontractors, and outside associates will be limited to the individuals or firms that are specifically identified during the step one technical proposal. The Contractor shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, or outside associates.

Supplemental Work: Offerors are expected to provide qualified and experienced staff to develop appropriate pre-construction or construction protocols as designated by Federal, state, and local regulations/guidelines, including but not limited to the following:

• Work Plan.

• Accident Prevention Plan.

• Health and Safety Plan.

• Environmental Management Plan.

• Waste Management Plan.

• Recycling Plan.

Submittals: Each Offeror must provide the required number of Technical and Price Proposals as described below to EFLHD in separate, sealed envelopes/boxes clearly addressed and identified for “Project No: PR ER PRMNT RPR(9) - Solicitation No. 693C73-22-R-000006.”

Submit three (3) bound paper copies, one (1) unbound copy, and one (1) CD-ROM copy of the Technical Proposal. Submit the Technical Proposal copies separately from the Price Proposal in a sealed envelope/box and clearly labeled as the “Technical Proposal.”

Submit two (2) unbound paper copies and one (1) CD-ROM copy of the Price Proposal. Submit the Price Proposal separately from the Technical Proposal in a sealed envelope and clearly labeled as the “Price Proposal.”

Submit all proposal documents by the due date specified in Block 13 of the SF-1442 to the following address:

Federal Highway Administration Eastern Federal Lands Highway Division Quantum Park 22001 Loudoun County Parkway Suite E2-3-300 Ashburn, VA 20147 Attn: Mr. C. Shawn Long

It is the Offeror’s sole responsibility to see that its proposal is received. Proposal documents received after the time due will be rejected and returned without consideration or further evaluation.

Other Information: Questions concerning this solicitation may be directed to Mr. Long via e-mail to: EFLHD.Contracts@dot.gov. Please be sure to put the solicitation number and project title in the subject line of your email.

Questions can be submitted at any time, but questions submitted within 10 days of the bid opening may not be answered or answered in time for the bidder to properly incorporate the responses into their bids.

mailto:EFLHD.Contracts@dot.gov

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

693C73

ATTN: ACQUISITIONS

ASHBURN VA 20147

See Block 7

YULIYA KENT

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

EFLHD.CONTRACTS@DOT.GOV

See Block 10 x 10/19/2021

693C7322R000006

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This Request for Proposal is for the Landslide Repairs - West Region Contract 1, Project No. PR ER PRMNT RPR (9), located in municipalities of San Sebastian, Las

Marias, San German, Yauco, Utuado, Aguada, and Aguadilla in Puerto Rico in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.

PRHTA's Standard Specifications for Roads and Bridge Construction Manual, pages 1 to

1158.

Bid Schedule, Section B - pages B-1 through B-14.

Special Contract Requirements, Section J - pages J-1 through J-348.

Plans_Sch A_AC-812579, Sheets 1 through 103.

Plans_Sch A_AC-815579, Sheets 1 through 25.

Plans_Sch A_AC-816579, Sheets 1 through 31.

Plans_Sch B_AC-880579, Sheets 1 through 63.

Plans_Sch C_AC-801579, Sheets 1 through 76.

Plans_Sch C_AC-882579, Sheets 1 through 13.

Categorical Exclusion Form (NEPA) AC-801579_Site 90, pages 1 through 82.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 600 calendar days and complete it within ________________ ________________ calendar days after receiving

Continuation Sheet, Block 11

11/18/2021

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

�����./�0::/303�#73//5�20�9/3:03;�2./�=03D�3/AB83/>�#2�2./�9384/5�59/48:8/>�$/60=�81�523842�#4403>#14/�=82.�2./�2/3;5�0:�2.85�5068482#2801?�8:�2.85�0::/3�85�#44/92/>

$@�2./��0E/31;/12�81�=382817�=82.81�--------------------�4#6/1>#3�>#@5�#:2/3�2./�>#2/�0::/35�#3/�>B/����������

�%(��
�)��
�������
���
����� �������������������
���

�����./�0::/303�#73//5�20�:B3185.�#1@�3/AB83/>�9/3:03;#14/�#1>�9#@;/12�$01>5�

0��#������ ��2�

������������
H������

������� �)4��

3�2���%����

�����"��� � ��������
�������������
��" ��������������
�������������"���

����������3 4��� '5 '6 �--����7��

3�2���%���

�����������������������
H������

������� )4������ �$���� �� �4������

���� 2 of 7��������������������������

����2�� #��0 ��2�����

�)��������� )�&4'��������������� ������������ &4'���������������

�"������&��*���G��'����, Block 26

Federal Highway Administration Eastern Federal Lands Highway Division ATTN: Construction Branch Quantum Park 22001 Loudoun County Parkway Suite E2-2-200 Ashburn, VA 20147

Federal Highway Administration Eastern Federal Lands Highway Division A/P Branch, AMZ-150 P.O. Box 25710 or E-MAIL

9-AMC-AMZ-EFLINVOICES@FAA.GOV

Oklahoma City, OK 73125

EFLHD-CO

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693C7322R000006

Categorical Exclusion Form (NEPA) AC-801579_Site

332, pages 1 through 90.

Categorical Exclusion Form (NEPA) AC-812579, pages 1 through 186.

Categorical Exclusion Form (NEPA) AC-816579, pages 1 through 99.

Categorical Exclusion Form (NEPA) AC-880579, pages 1 through 151.

Categorical Exclusion Form (NEPA) AC-882579, pages 1 through 76.

Categorical Excusion Form (NEPA) AC-815579, pages

1 through 117.

DTOP's Manual de Senales de Transito (MST), pages

1 through 174.

PRHTA's Standard Drawings, pages 1 through 400.

PRHTA's Special Provisions applicable to the project, pages 1 through 43.

PRHTA's Material Testing Schedule, pages 1 through 30.

Report_Abestos Neg Cert_AC-882579_Site 361, 1 through 4.

Report_Abestos_AC-882579_Site 361, pages 1 through 7.

Report_Lead_AC-882579_Site 361, pages 1 through

14.

Report_Lead-Abestos_AC-801579_Site 90, pages 1 through 35.

Report_Lead-Abestos_AC-801579_Site 332, pages 1 through 29.

Report_Lead-Abestos_AC-812579, pages 1 through 19.

Report_Lead-Abestos_AC-815579, pages 1 through 14.

Report_Lead-Abestos_AC-816579, pages 1 through 13.

Report_Lead-Abestos_AC-880579, pages 1 through 16.

Report_Geotechnical_ER_HWY_110, pages 1 through

69.

Report_Geotechnical_ER_HWY_111, pages 1 through

37.

Report_Geotechnical_ER_HWY_112, pages 1 through

77.

Report_Geotechnical_ER-HWY-63, pages 1 through 49.

Report_Geotechnical_ER-HWY-64 KM 35.8, pages 1 through 40.

Report_Geotechnical_ER-HWY-64 KM 35.9, pages 1 through 50.

Report_Geotechnical_ER-HWY-66, pages 1 through 28.

Report_Geotechnical_ER-HWY-67, pages 1 through 62.

Report_Geotechnical_ER-HWY-71, pages 1 through 28.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

693C7322R000006

Report_Geotechnical_ER-HWY-72, pages 1 through 24.

Report_Geotechnical_ER-HWY-361, pages 1 through

76.

Report_Geotechnical_HWY-90, pages 1 through 32.

Report_Geotechnical_HWY-332, pages 1 through 13.

USFWS Conservation Measures, pages 1 through 23.

Permits pending.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Block 2:

This project is RESTRICTED - Proposals will be accepted from all eligible Small Business concerns.

This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10)

Facsimile and electronic bids will not be accepted.

PHYSICAL DATA AVAILABLE FOR REVIEW

1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2009 Edition, published by the Federal Highway Administration. http://mutcd.fhwa.dot.gov.

2. PRHTA’s Standard Specifications for Roads and Bridge Construction Manual.

3. Categorical Exclusion Form (NEPA) AC-801579_Site 90

4. Categorical Exclusion Form (NEPA) AC-801579_Site 332.

5.Categorical Exclusion Form (NEPA) AC-812579.

6.Categorical Exclusion Form (NEPA) AC-816579.

7. Categorical Exclusion Form (NEPA) AC-880579.

8. Categorical Exclusion Form (NEPA) AC-882579.

9. Categorical Excusion Form (NEPA) AC-815579.

10. DTOP's Manual de Senales de Transito (MST).

11. PRHTA's Standard Drawings.

12. PRHTA's Special Provisions applicable to the project.

13. PRHTA's Material Testing Schedule.

14. Report_Abestos Neg Cert_AC-882579_Site 361.

15. Report_Abestos_AC-882579_Site 361..

16. Report_Lead_AC-882579_Site 361.

17. Report_Lead-Abestos_AC-801579_Site 90.

18. Report_Lead-Abestos_AC-801579_Site 332.

19. Report_Lead-Abestos_AC-812579.

20. Report_Lead-Abestos_AC-815579.

21. Report_Lead-Abestos_AC-816579.

22. Report_Lead-Abestos_AC-880579.

23. Report_Geotechnical_ER_HWY_110.

24. Report_Geotechnical_ER_HWY_111.

25. Report_Geotechnical_ER_HWY_112.

26. Report_Geotechnical_ER-HWY-63.

27. Report_Geotechnical_ER-HWY-64 KM 35.8.

28. Report_Geotechnical_ER-HWY-64 KM 35.9.

29. Report_Geotechnical_ER-HWY-66.

30. Report_Geotechnical_ER-HWY-67.

31. Report_Geotechnical_ER-HWY-71.

32. Report_Geotechnical_ER-HWY-72.

33. Report_Geotechnical_ER-HWY-361.

34. Report_Geotechnical_HWY-90.

35. Report_Geotechnical_HWY-332.

36. USFWS Conservation Measures.

37. Permits pending.

CONTINUATION OF SF 1442

Block 9:

In accordance with FAR Provision 52.236-27, Site Visit, a Government representative can be available to show the project to prospective bidders. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.

Block 11:

Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same Time:

If the Government awards the contract as Schedules A + B + C, the performance period to complete all contract work will be 600 calendar days and will start on the effective date of Schedules A + B + C’s Notice to Proceed.

See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above.

Work restrictions can be found in SCR Sections 108 and 156.

Offerors are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-

15) may result in the start of construction activities to be no earlier than January 2022.

See Subsection 108.01 of the SCR’s for additional details.

Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)

Block 12A:

Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.

Block 13:

A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee.

Block 17:

Amounts should be completed as follows:

Schedule A - $ Schedule B - $

Schedule C - $ mailto:eflhd.contracts@dot.gov

Other:

The estimated price is expected to fall within the price range of $1,000,000 to $5,000,000.

Responsibility of Offerors shall be evaluated in accordance with the information provided on the Offeror's Qualification Form, which can be downloaded from the Contract Opportunities website located at http://SAM.gov. Puerto Rico Highway and Transportation Authority’s Standard Specifications for Road and Bridge Construction Manual can be downloaded at the ACT (Autoridad de Carreteras y Transportación) web site. ACT web site is:

https://act.dtop.pr.gov/manual-de-especificaciones-estandares-para-la-construccion-decarreteras-y-puentes/

Basis for Award:

The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals for technical acceptability.

After all of the technical proposals have been evaluated, the Offerors that were found technically acceptable will be ranked according to price and the contract will be awarded to the responsive, responsible Offeror with the lowest Evaluation Total Price of Project, which is defined as:

Schedule A Bid Total + Schedule B Bid Total + Schedule C Bid Total.

Please Note:

This solicitation is a Request for Proposal (RFP). Therefore, there will not be a public bid opening and proposals are not available for review.

http://sam.gov/ https://act.dtop.pr.gov/manual-de-especificaciones-estandares-para-la-construccion-decarreteras-y-puentes/ https://act.dtop.pr.gov/manual-de-especificaciones-estandares-para-la-construccion-decarreteras-y-puentes/

PROPOSAL INSTRUCTIONS

PROJECT: PR ER PRMNT RPR(9)

OFFERORS PLEASE NOTE: Before preparing the proposal, carefully read the Instructions to Offerors. While preparing the proposal, comply with the following:

The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals from all eligible Contractor firms/teams (Offerors) for technical acceptability. After all of the technical proposals have been evaluated, the Offerors that are found technically acceptable will be ranked according to price and the lowest priced Offeror will be awarded the contract.

Each Offeror must provide the required number of Technical and Price Proposals as described below to the Eastern Federal Land Highway Division (EFLHD) in separate, sealed envelopes/boxes clearly addressed and identified for “Project No: PR ER PRMNT RPR(9) - Solicitation No. 693C73-22-R-000006.” Submit all proposals so that they will arrive at the address shown in Block 7 of the SF-1442 on the due date specified in Block 13 of the SF-1442.

Send proposals directly to the attention of the person listed in Block 9 of the SF-1442.

It is the Offeror’s sole responsibility to see that its proposal is received. Proposals received after the time due will be rejected without consideration or further evaluation. In addition, it is the Offeror’s responsibility to ensure all requirements of both the Technical Proposal and Price Proposal are included in their respective envelopes/boxes.

EVALUATION OF PROPOSAL DOCUMENTS

STEP 1 - TECHNICAL ACCEPTABILITY - Experience and Past Performance Performing Landslide Repairs, Proposed Project Team, and Capacity.

1.A. TECHNICAL ACCEPTABILITY EVALUATION DESCRIPTION

Competing Technical Proposals will be evaluated against the solicitation requirements; they are not compared with each other. Each of the technical evaluation factors described below will be rated on a pass/fail (acceptable/unacceptable) basis and must receive a passing score for an Offeror's proposal to receive further consideration. Failure to receive a passing score for any single technical evaluation factor will result in rejection of an Offeror's proposal notwithstanding passing scores for the other technical evaluation factors. Proposals which satisfy the technical requirements of the solicitation, in light of the evaluation criteria, will be determined technically acceptable.

Offerors will be evaluated on past performance, experience, and capacity to repair landslides in roadways including performing roadway excavation and backfill, restoring roadway embankments, constructing earth retaining structures including gravity walls, reinforced concrete walls, gabion walls, mechanically stabilized earth walls, reinforced soil slope structures, implementing temporary traffic control measures per MUTCD, performing pavement reconstruction and paving, implementing erosion and sediment control, and constructing culverts and other storm drain system installations and repairs.

1.B. TECHNICAL PROPOSAL EVALUATION FACTORS

Submit the following qualifications and information, and label as the Technical Proposal.

(a) Relevant experience and past performance

The Offeror must have a minimum of five years of experience performing landslide repair and roadway reconstruction work, as shown in Section 1.A above, that was similar in scope, cost, and difficulty to the work required by the contract resulting from this RFP.

(1) Provide a statement indicating the Offeror’s experience and technical competence performing work in environmentally and culturally sensitive locations, as well as experience with implementing and maintaining temporary traffic control in state owned roadways or roadways where maintaining traffic access at all times was paramount.

(2) Provide a list of three to five projects, successfully performed (completed or currently more than 80% completed) within the past 5 calendar years showing the relevant experience. Describe the project scope and how it is similar in scope, cost, and difficulty to the work required in the contract. Provide customer/owner point of contact, phone number, and email address for each relevant project. Include project performance details regarding project cost (original cost vs. final cost) and scheduled (original completion date vs. actual completion date). List any relevant experience working with the Eastern Federal Lands Highway Division (EFLHD) and the Puerto Rico Highway and Transportation Authority (PRHTA).

Prepare the information for these sample landslide repair projects in Times New Roman 12-point font, in no more than five 8-1/2” x 11” sheets, and incorporate the information listed below in bullet points. Keep the discussion for any one project within one 8-1/2” x 11” page.

• Project Name;

• Project Location;

• Project Owner and Contact Information including phone number and email address;

• Schedule Performance (Award of Contract and Completion Date);

• Name of Contractor Project Manager or Resident Engineer;

• Name of Contractor Superintendent;

• Cost Performance - Initial Bid (Contract Award Amount), Final Construction

Cost, Reasons for Change; and

• Discussion of project scope and how it is similar in scope, cost, and difficulty to the work required in the contract.

(b) Proposed Project Team

(1) Provide an organizational chart and submit resumes of the Offeror’s key personnel selected to deliver this project. At a minimum, include the Project Manager, Construction Superintendent, Traffic Safety Supervisor, and the Construction QA/QC Manager, each having experience within the past 5 years performing technically the same or similar work.

(2) Provide a table summarizing each key personnel’s specific experience. Limit your table to one 11” x 17” sheet.

(3) Provide a table listing any subcontractors whom the Offeror proposes to provide services in the project and indicate their experience performing similar work to the one they will be performing for this project. Limit your table to one 11” x 17” sheet.

(c) Capacity

(1) Provide a brief statement indicating the Offeror’s capability to ensure work will be completed on time and within budget. Limit your statement to no more than two 8 ½” x 11” sheets.

(2) Provide information on current project workload, including customer, total cost, percent completed, and projected completion date for each active project listed.

1.C. TECHNICAL PROPOSAL SUMMITTAL

Submit three (3) bound paper copies, one (1) unbound copy, and one (1) CD-ROM copy of the Technical Proposal. Submit the Technical Proposal copies separately from the Price Proposal in a sealed envelope/box and clearly labeled as the “Technical Proposal.”

STEP 2 - LOWEST PRICE - Cost to Perform the Proposed Work

2.A. LOWEST PRICE EVALUATION DESCRIPTION

Only Cost Proposals from Offerors that passed the technical acceptability phase will be evaluated. Cost Proposals from Offerors that did not pass the technical acceptability phase will be returned unopened. All acceptable Cost Proposals will be reviewed and evaluated for completeness and reasonableness.

2.B. COMPLETING THE BID SCHEDULE

Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit

Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.

To be eligible for award, Offerors must submit prices for each pay item.

Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.

Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Price Proposal Summary page (B-14). Fill in the Evaluation Total Price of Project in the space provided on the Price Proposal Summary page (B-14).

The completed Bid Schedule, pages B-1 through B-14, is considered the Offeror's Price Proposal.

The amount in Block 17 of the SF 1442 should be completed as follows:

Schedule A - $ .

Schedule B - $ .

Schedule C - $ .

2.C. SCHEDULES OF WORK

The Bid Schedule is comprised of the following separate schedules and options of work:

Schedule A - Pages B-1 thru B-6 Schedule B - Pages B-7 thru B-10 Schedule C - Pages B-11 thru B-13

The Government intends to award all the schedules.

2.D. COMPLETION OF WORK

The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion. The maximum number of calendar days allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.

The performance period to complete all Schedules A+B+C work will be 600 calendar days and will start on the effective date of Schedule A+B+C’s Notice to Proceed.

In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).

Offerors are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-

15) may result in the start of construction activities to be no earlier than January 2022. See Subsection 108.01 of the SCR’s for additional details.

2.E. PRICE PROPOSAL SUBMITTAL

Submit two (2) unbound paper copies and one (1) CD-ROM copy of the Price Proposal. As stated above, the completed Bid Schedule, pages B-1 through B-14, is considered the Offeror’s Price Proposal. Submit the Price Proposal copies separately from the Technical Proposal in a sealed envelope and clearly labeled as the “Price Proposal”.

BASIS FOR AWARD

The Government will award the project to the lowest priced/technically acceptable responsible Offeror. The Contracting Officer intends to evaluate all proposals for technical acceptability.

After all of the technical proposals have been evaluated, the Offerors that were found technically acceptable will be ranked according to price and the contract will be awarded to the responsive, responsible Offeror with the lowest Evaluation Total Price of Project, which is defined as:

Schedule A Bid Total + Schedule B Bid Total + Schedule C Bid Total.

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

Bid Schedule

Project No: PR ER PRMNT RPR(9) Project Name: Landslide Repairs - West Region Contract 1

B-0

B-1

B I D S C H E D U L E Schedule A

Project No:

Item No.

Quantity Unit Unit Price Amount

15001-0000

Line A0020 ALL LPSM $

15100-1000

Line A0040 ALL LPSM $

15102-0000

Line A0060 1 CTSM $

15401-0000

Line A0080 ALL LPSM $

15401-1000

Line A0100 ALL LPSM $

15501-0000

Line A0120 ALL LPSM $

20100-2000

Line A0140 7 Each $ $

20100-3000

Line A0160 ALL LPSM $

20200-0000

Line A0180 ALL LPSM $

20300-0000

Line A0200 6,382 m3 $ $

20301-0000

Line A0220 5,153 m3 $ $

20301-1000

Line A0240 488 m3 $ $

20301-3000

Line A0260 349 m2 $ $

20500-0000

Line A0280 142 m3 $ $

20500-1000

Line A0300 35 m3 $ $

20900-0000

Line A0320 32 m3 $ $

21000-2000

Line A0340 703 m $ $

21000-5000

Line A0360 75 Each $ $

PR ER PRMNT RPR(9) - Landslide Repairs - West Contract 1 Name: ER HWY Sites - 63, 64, 66, 67, 71, & 72

Schedule Total: ________________________

Submitted by: _________________________

Sheathing

Soil erosion control, silt fence

Soil erosion control, straw bales

Construction survey and staking

Mobilization

Reimbursement for Municipality

Contractor testing

Contractor Testing (Biological Species Monitoring)

Construction schedule

Proof Rolling

Trench Excavation

Trench Excavation, Unclassified

Cutting and Removing Trees, Small

Clearing and Grubbing

Removal Structures and Obstructions

Unclassified Excavation

Borrow Class B

Borrow Class A

267,000.00

10.00

15.00

7,030.00

1,125.00

B-2

Schedule A

Project No:

Item No.

Quantity Unit Unit Price Amount

PR ER PRMNT RPR(9) - Landslide Repairs - West Contract 1 Name: ER HWY Sites - 63, 64, 66, 67, 71, & 72

21001-3000

Line A0380 7 Each $ $

21200-0000

Line A0400 ALL LPSM $

21200-1000

Line A0420 85 m $ $

21200-2000

Line A0440 40 m $ $

30400-3000

Line A0460 34 m3 $ $

30400-4000

Line A0480 35 m3 $ $

30500-1000

Line A0500 65 m3 $ $

30500-2000

Line A0520 440 m2 $ $

40200-0000

Line A0540 64 m3 $ $

40200-1000

Line A0560 64 m3 $ $

40300-1000

Line A0580 195 m3 $ $

42100-7000

Line A0600 606 TON $ $

42100-9000

Line A0620 220 TON $ $

60302-0000

Line A0640 5 M $ $

60302-1000

Line A0660 1 Each $ $

60500-4000

Line A0680 69 M $ $

60500-7000

Line A0700 105 M $ $

60600-1000

Line A0720 528 M $ $

3" Under Drain

4" Pipe Underdrain

W-Beam Guardrail, Single Face

Replacement Aggregate Base Course

Asphalt Cold Milling

HPM Bituminous Pavement Mix Type S (75)(12)

Reconditioning of Waterway

Aggregate Base Course

Aggregate Base Course Grading A

HPM Bituminous Pavement Mix Type B (75)(34)

30 in. Reinf. Conc. Pipe, Class III

30 inch Pre-Cast Concrete End Section Type I

Soil erosion control, construction entrance

Reconditioning of Shoulder & ditches

Reconditioning of Concrete Swale

Lean Concrete Base

Lean Concrete 0.20 M Thick

Full Depth Removal of Bituminous Conc. Pav.

B-3

Schedule A

Project No:

Item No.

Quantity Unit Unit Price Amount

PR ER PRMNT RPR(9) - Landslide Repairs - West Contract 1 Name: ER HWY Sites - 63, 64, 66, 67, 71, & 72

60600-4000

Line A0740 170 M $ $

60604-4000

Line A0760 3 Each $ $

60700-1000

Line A0780 21 M $ $

60700-6000

Line A0800 334 M $ $

60900-1000

Line A0820 307 M $ $

60900-2000

Line A0840 24 M $ $

60900-6000

Line A0860 40 M $ $

61000-2000

Line A0880 8 M $ $

61000-3000

Line A0900 4 M $ $

61000-4000

Line A0920 14 M $ $

61101-0000

Line A0940 22 mo $ $

61300-0000

Line A0960 8 Each $ $

61300-2000

Line A0980 4 Each $ $

61300-5000

Line A1000 1 Each $ $

61300-6000

Line A1020 1 Each $ $

61300-7000

Line A1040 1 Each $ $

61303-0000

Line A1060 2 Each $ $

61303-2000

Line A1080 2 Each $ $

Traffic Sign Assembly, Code 2

Traffic Sign Assembly, Code 5

Traffic Sign Assembly, Code 6

Traffic Sign Assembly, Code 7

Traffic Sign Assembly, Code 2 & 3

Traffic Sign Assembly, Code No. 3 & 4

Reconstruction of Existing Concrete Shallow Gutter

Concrete Barrier F Shape, Type C

Concrete Barrier, Case I, Type C

Special Concrete Barrier, Case I, Type D

Field Office

Traffic Sign Assembly, Code 2, 3, 4 & 5

Removal, Storage and Delivery of Guardrail

Thrie-Beam Transition Section, Type II

Chain-Link Fence, Type B

Barbed Wire Fence, Type A

Curb & Gutter Type-F

Curb Type-D

B-4

Schedule A

Project No:

Item No.

Quantity Unit Unit Price Amount

PR ER PRMNT RPR(9) - Landslide Repairs - West Contract 1 Name: ER HWY Sites -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .