Report_Lead-Abestos_AC-812579.pdf

PDF 4 MB Posted

Attached to
Landslide Repairs - West Region Contract 1
Solicitation number
693C73-22-R-000006
Issued by

About this file

This document consists of an asbestos and lead based paint survey report and related federal contract opportunity. The survey report details inspection results for a road repair project along PR-119 from kilometer 32.1 to 41.6 in San Sebastian, Puerto Rico. Testing found no lead based paint or asbestos containing materials present.

The related federal contract opportunity is solicitation number 693C73-22-R-000006 for landslide repairs in western Puerto Rico municipalities. The project scope involves embankment restoration, retaining walls, drainage repairs and other work to address hurricane damage along PR-2, PR-119, PR-123, PR-128 and PR-440. The solicitation is open to certified small businesses only and will utilize a two-step proposal process with technical and price submissions. The contract award is subject to permit receipt with an estimated value between $1,000,000 to $5,000,000. The proposal due date will be specified in the solicitation issued on or around October 19, 2022. The Department of Transportation Federal Highway Administration is the issuing agency.

View the file

Other files

File Type Posted
Amendment 0003 - PR ER PRMNT RPR (9).pdf PDF
Amendment 0002 - PR ER PRMNT RPR(9).pdf PDF
Amendment 0001 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-882579.pdf PDF
Report_Geotechnical_ER-HWY-361.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Report_Geotechnical_ER_HWY_111.pdf PDF
Report_Geotechnical_ER-HWY-72.pdf PDF
Categorical Exclusion Form (NEPA) AC-816579.pdf PDF
Report_Geotechnical_ER-HWY-71.pdf PDF
Report_Lead-Abestos_AC-815579.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Categorical Exclusion Form (NEPA) AC-812579.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.9.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Categorical Excusion Form (NEPA) AC-815579.pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 90.pdf PDF
Plans_Sch A_AC-816579 - PR ER PRMNT RPR (9).pdf PDF
Report_Geotechnical_ER-HWY-63.pdf PDF
Categorical Exclusion Form (NEPA) AC-880579.pdf PDF
Plans_Sch C_AC-801579 - PR ER PRMNT RPR (9).pdf PDF
Report_Lead-Abestos_AC-801579_Site 332.pdf PDF
Report_Geotechnical_ER-HWY-66.pdf PDF
Report_Geotechnical_HWY-332.pdf PDF
Report_Geotechnical_ER_HWY_110.pdf PDF
VETS-4212 Form.pdf PDF
RFP Solicitation - PR ER PRMNT RPR(9).pdf PDF
USFWS Conservation Measures.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.8.pdf PDF
Report_Geotechnical_HWY-90.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report_Geotechnical_ER_HWY_112.pdf PDF
Plans_Sch B_AC-880579 - PR ER PRMNT RPR (9).pdf PDF
Report_Abestos Neg Cert_AC-882579_Site 361.pdf PDF
Report_Geotechnical_ER-HWY-67.pdf PDF
Plans_Sch C_AC-882579 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 332.pdf PDF
Plans_Sch A_AC-812579 - PR ER PRMNT RPR(9).pdf PDF
Report_Lead_AC-882579_Site 361.pdf PDF
PRHTAs Special Provisions applicable to the project.pdf PDF
Report_Lead-Abestos_AC-816579.pdf PDF
Report_Abestos_AC-882579_Site 361.pdf PDF
Report_Lead-Abestos_AC-880579.pdf PDF
Report_Lead-Abestos_AC-801579_Site 90.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans_Sch A_AC-815579 - PR ER PRMNT RPR (9).pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CMA 18112, AC-804544 Project, Federal - ER - 9999(313), Oracle No. RPE0499544

PR-119, KM. 32.1 TO 41.6 (Sites 63, 64A, 64B, 66 & 67), San Sebastián, P.R.

April

Prepared for:

CMA ARCHITECTS & ENGINEERS LLC

1509 F.D. Roosevelt Ave.

Guaynabo, P.R. 00968-2612 Tel. (787) 792-1509

ASBESTOS & LEAD BASED PAINT

SURVEY REPORT

Prepared by:

Enviroresources, Inc.

HC 01 Box 5555 Barranquitas,P.R. 00794

Tel. (787) 319-5618 Fax (787) 857-2679

Table of Contents

1.0 INTRODUCTION

2.0 TESTING / SAMPLING PROCEDURES

3.0 INSPECTION RESULTS FOR LEAD BASED PAINT

4.0 INSPECTION RESULTS FOR ASBESTOS

5.0 CONCLUSIONS

6.0 SURVEY CERTIFICATION

Appendix

Appendix A - Lead Based Paint Sampling Tables

Appendix B - Asbestos & Lead Negative Certification

Appendix C - Certified Inspector Credentials

1.0 INTRODUCTION

An environmental survey for Asbestos Containing Materials (ACM) & Lead Based Paint (LBP) Components was conducted by a Puerto Rico Environmental Quality Board certified Asbestos & Lead Inspector. The survey was conducted on March 15, 2019 for the road PR-119, Km. 32.1 to Km. 41.6, Sites 63, 64A, 64B, 66 & 67, AC- 804544 Project, San Sebastian, Puerto Rico. Figures Number 1, 2 and 3 shows an aerial photo of the inspected area.

For LBP, the survey was conducted using an XRF instrument. The federal threshold for LBP is equal to or exceeding 1.0 milligrams per square centimeter (mg/cm2), as measured by XFR.

For ACM, the survey was performed based on Asbestos Hazard Emergency Response Act (AHERA) protocol, according the following scenario:

A. The structure was divided in functional spaces.

B. Physical and Hazard Assessment of suspected asbestos containing materials was performed.

Asbestos was used in the construction industry from 1900 to 1989 and still being today in various products. The mere presence of asbestos containing materials does not necessary constitute a health hazard. However, when these materials become disturbed from building renovation, maintenance, or other activities that allow asbestos fibers to be released into the environment, a potential hazard does exist.

2.0 TESTING / SAMPLING PROCEDURES

The main steps involved in lead-based paint inspection are:

A. Perform inventory of all testing combinations.

B. Select painted area to be tested.

C. Perform the XRF testing including the calibration.

D. Evaluate and classify the data.

E. For Roads or Highways, the testing are selected in the painted areas and this type of projects is not part of HUD guidelines.

STATE ROAD NO. 119

SITE 63

FROM KM 32.1

COLISEO LUIS AYMAT

TITI BENIQUEZ STADIUM

SEVENTH-DAY

ADVENTIST CHURCH

SAN SEBASTIAN

AERIAL PHOTO SITE 63

FIGURE 1

SCALE=1:4000

F I L E

M

P

R O

J E

C T

S T r a n s p F

I G

U R

E S

F

I G

U R

E

A

E R

I A

L

P

H O

T O

S

I T

E d w g

DATE = 10/16/18

© 2018, CMA Architects & Engineers LLC

SAN SEBASTIAN, PUERTO RICO

PR-119 - KM 32.1

LANDSLIDE & ROAD DAMAGE EVALUATION AND REPAIR

AutoCAD SHX Text

KM 32.1

AutoCAD SHX Text

CONCRETE GUTTER

AutoCAD SHX Text

CONCRETE GUTTER

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

CURB

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

EDGE OF PAVEMENT

AutoCAD SHX Text

CURB

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

CYCLONE FENCE

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

TEMPORARY NJ BARRIER

AutoCAD SHX Text

BROKEN EDGE OF PAVEMENT

AutoCAD SHX Text

LANDSLIDE AREA

AutoCAD SHX Text

LANDSLIDE AREA

AutoCAD SHX Text

STA. 6

CEMENTERIO MUNUCIPAL

SAN SEBASTIAN

SAN SEBASTIAN

SITE 64

FROM KM 35.89 TO KM 35.94

AERIAL PHOTO SITE 64

FIGURE 2

SCALE=1:1000

F I L E

M

P

R O

J E

C T

S T r a n s p F

I G

U R

E S

F

I G

U R

E

A

E R

I A

L

P

H O

T

E d w g

DATE = 10/16/18

© 2018, CMA Architects & Engineers LLC

SAN SEBASTIAN, PUERTO RICO

PR-119 - KM 35.89 TO 35.94

LANDSLIDE & ROAD DAMAGE EVALUATION AND REPAIR

AutoCAD SHX Text

DRIVEWAY

AutoCAD SHX Text

KM 35.8

AutoCAD SHX Text

CHAIN LINK FENCE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

CHAIN LINK FENCE

AutoCAD SHX Text

BARBED WIRE FENCE

AutoCAD SHX Text

BARBED WIRE FENCE

AutoCAD SHX Text

CHAIN LINK FENCE

AutoCAD SHX Text

PR-119

AutoCAD SHX Text

LATIN AMERICAN

AutoCAD SHX Text

MOTORCYCLE ASSOC.

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

GUARD RAIL

AutoCAD SHX Text

CONCRETE BARRIER

AutoCAD SHX Text

AutoCAD SHX Text 78.843

AutoCAD SHX Text

STA. ANTENA

AutoCAD SHX Text

AutoCAD SHX Text 78.631

AutoCAD SHX Text

STA. ANTENA

AutoCAD SHX Text N-1

AutoCAD SHX Text N-3

AutoCAD SHX Text

AutoCAD SHX Text 78.631

AutoCAD SHX Text STA. opus

AutoCAD SHX Text

AutoCAD SHX Text 78.631

AutoCAD SHX Text STA. opus

AutoCAD SHX Text

DRIVEWAY

AutoCAD SHX Text

AutoCAD SHX Text 77.840

AutoCAD SHX Text

STA.1

AutoCAD SHX Text

KM 35.9

AutoCAD SHX Text N-1

AutoCAD SHX Text

CHAIN LINK FENCE

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

CONCRETE BARRIER

AutoCAD SHX Text

PR-119

AutoCAD SHX Text

LATIN AMERICAN

AutoCAD SHX Text

MOTORCYCLE ASSOC.

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

SWALE

AutoCAD SHX Text

INV.=76.22

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

TOP=77.96

AutoCAD SHX Text

INV.=76.80

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

IGLESIA ADVENTISTA

DE GUACIO

SITE 66

SITE 67

SAN SEBASTIAN

SAN SEBASTIAN

FROM KM 41.14 TO KM 41.16

FROM KM 41.57 TO KM 41.64

© 2018, CMA Architects & Engineers LLC

SAN SEBASTIAN, PUERTO RICO

PR-119 - KM 41.14 TO 41.16 & KM 41.57 TO 41.64

LANDSLIDE & ROAD DAMAGE EVALUATION AND REPAIR

AERIAL PHOTO SITES 66 & 67

FIGURE 3

SCALE=1:3000

F I L E

M

P

R O

J E

C T

S T r a n s p F

I G

U R

E S

F

I G

U R

E

A

E R

I A

L

P

H O

T

E d w g

DATE = 10/16/18

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

KM 41.2

AutoCAD SHX Text

DRIVEWAY

AutoCAD SHX Text

KM 41.1

AutoCAD SHX Text

PR-119

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

CONCRETE BARRIER

AutoCAD SHX Text

DRIVEWAY

AutoCAD SHX Text

AutoCAD SHX Text 186.479

AutoCAD SHX Text

STA. OPUS

AutoCAD SHX Text

AutoCAD SHX Text 186.139

AutoCAD SHX Text

STA.PK

AutoCAD SHX Text N-5

AutoCAD SHX Text N-4

AutoCAD SHX Text

PR-119

AutoCAD SHX Text

STRUCTURE

AutoCAD SHX Text

CONCRETE SLAB

AutoCAD SHX Text

CONCRETE BARRIER

AutoCAD SHX Text

CONCRETE SWALE

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

AutoCAD SHX Text 200.830

AutoCAD SHX Text

STA. STEEL ROD

AutoCAD SHX Text

AutoCAD SHX Text 203.010

AutoCAD SHX Text

STA. PK

AutoCAD SHX Text

AutoCAD SHX Text 203.010

AutoCAD SHX Text

STA. ANTENA

AutoCAD SHX Text

AutoCAD SHX Text 202.190

AutoCAD SHX Text

STA. PK

AutoCAD SHX Text N-7

AutoCAD SHX Text

KM 41.6

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

TOP=199.31

AutoCAD SHX Text

INV.=197.74

AutoCAD SHX Text

30"%%C PIPE

AutoCAD SHX Text

INV.=196.530

AutoCAD SHX Text

CATCH BASIN

AutoCAD SHX Text

TOP=197.90

AutoCAD SHX Text

INV.=196.49

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

HEADWALL

AutoCAD SHX Text

TOP=195.64

AutoCAD SHX Text

INV.=194.88

AutoCAD SHX Text

24"%%C PIPE

AutoCAD SHX Text N-6

AutoCAD SHX Text N-8

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

EDGE OF ASPHALT

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUTTER

AutoCAD SHX Text

GUTTER

GUARD RAIL

For asbestos, all functional spaces will be visited and visually inspected to identify the location of any suspected ACM. An assessment will be made of the friability of suspected ACM by touching the material to determine if could be pulverized, crumbled or reduced to power by hand pressure. Upon completion of functional space investigation, bulk samples were collected of all suspect materials (if any) and grouped into homogeneous sampling areas (areas which are uniform by color, texture, construction / application date and general appearance). The following photos show the general view of the site.

Photo Number 1 – Kilometer 32.1

Photo Number 2 – Kilometer 35.8

Photo Number 3 – Kilometer 35.9

3.0 INSPECTION RESULTS FOR LEAD BASED PAINT

A total of five (5) selected areas were tested for lead. All of these testing was found under the regulatory limit of 1.0 mg/cm². See the Appendix A for lead based paint sampling results table. The road PR-119, Km. 32.1 to Km. 41.6, Sites 63, 64A, 64B, 66 & 67, AC-804544 Project, San Sebastian, Puerto Rico, is lead based paint free.

See the Appendix B for the Negative Certification. Sampling areas are shown at the following photos.

Photo Number 4 – Kilometer 35.9

Photo Number 5 – Kilometer 32,1

4.0 INSPECTION RESULTS FOR ASBESTOS

The samples are defined as asbestos containing materials (ACM) if they contain more than 1% of asbestos. Samples are analyzed by Polarized Light Microscopy method (PLM), in accordance with EPA recommended procedures. No bulk sampling was collected for the road PR-119, Km. 44.1 to Km. 44.3, Sites 68, 69 & 70, AC-804544 Project, San Sebastian, Puerto Rico, because no suspicious material for asbestos was found.

The road PR-119, Km. 32.1 to Km. 41.6, Sites 63, 64A, 64B, 66 & 67, AC-804544 Project, San Sebastian, Puerto Rico is asbestos free. See the Appendix B for the Negative Certification.

5.0 CONCLUSIONS

The construction activities proposed at State Road PR-119, from kilometer

32.1 to Km 41.6 in the Municipality of San Sebastián, can be performed in compliance with the local and federal regulations. No environmental condition related to ACM and LBP are present in the proposed project site.

6.0 SURVEY CERTIFICATION

I, Raúl Matos, have conducted this Asbestos & Lead Based Paint Survey at CMA 18112, AC-804544 Project, Federal - ER - 9999(313) Oracle No. RPE0499544, PR- 119, KM. 32.1 to KM 41.6 (Sites 63, 64A, 66 & 67), San Sebastián, P.R. in general accordance with the Environmental Quality Board & Federal Applicable Regulations.

By:

Raúl Matos Asbestos & Lead Based Paint Certified Inspector

ASB-0418-0304-SI & 3251-12-LI-004

CMA 18112-1A, AC-804544 Project, Federal - ER-9999(313) Oracle No. RPE0499544

PR-119, KM. 32.1 TO 41.6 (Sites 63, 64A, 64B, 66 & 67), San Sebastían, P.R.

Appendix A

Lead Based Paint XRF Sampling Table

PROJECT: PR-119, Km 32.1, 39.5, 41.1-42.2, 41.6, San Sebastian, P.R.

CLIENT: CMA Architects & Engineers, LLC

DATE: 3/15/2019 ROAD: PR-119

LBP INSPECTOR: Raúl Matos

Sample ID Funcional Space Location Color Subst. XRF

Reading/mg/cm² Pos/Neg Comments

001 Calibration ----------------- -------------- ---------- 1.0 -----------

002 Calibration ----------------- -------------- ---------- 1.0 -----------

003 Calibration ----------------- -------------- ---------- 1.1 -----------

004 PR-119, Site 63 Km 32.1 Yellow Asphalt 0.1 -

005 PR-119, Site 64A Km 39.5 Yellow Asphalt 0.1 -

006 PR-119, Site 64B Km 41.1 Yellow Asphalt 0.1 -

007 PR-119, Site 66 Km 41.2 Yellow Asphalt 0.1 -

008 PR-119, Site 67 Km 41.6 Yellow Asphalt 0.1 -

009 Calibration ----------------- -------------- ---------- 1.1 -----------

010 Calibration ----------------- -------------- ---------- 1.1 -----------

011 Calibration ----------------- -------------- ---------- 1.0 -----------

Appendix B

Asbestos & Lead Negative Certification

Appendix C

Certified Inspector Credentials

File details come from the government source that posted it. Updated .