Report_Geotechnical_ER-HWY-67.pdf

PDF 5 MB Posted

Attached to
Landslide Repairs - West Region Contract 1
Solicitation number
693C73-22-R-000006
Issued by

About this file

This is a solicitation for landslide repair construction projects in Puerto Rico. The Department of Transportation Federal Highway Administration is seeking proposals from certified Small Business Concerns to perform repairs on PR-2, PR-119, PR-123, PR-128 and PR-440 in municipalities including San Sebastian, Las Marias, San German, Yauco, Utuado, Aguada, and Aguadilla. Work includes embankment restoration, retaining walls, drainage, and pavement reconstruction, with a total project cost between $1-5 million. A pre-bid meeting will be scheduled and the RFP issued on October 19, 2022. Technical and price proposals are due as specified in the RFP. Offerors must demonstrate landslide repair construction experience. This is a lowest price technically acceptable solicitation.

View the file

Other files

File Type Posted
Amendment 0003 - PR ER PRMNT RPR (9).pdf PDF
Amendment 0002 - PR ER PRMNT RPR(9).pdf PDF
Amendment 0001 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-882579.pdf PDF
Report_Geotechnical_ER-HWY-361.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Report_Geotechnical_ER_HWY_111.pdf PDF
Report_Geotechnical_ER-HWY-72.pdf PDF
Categorical Exclusion Form (NEPA) AC-816579.pdf PDF
Report_Geotechnical_ER-HWY-71.pdf PDF
Report_Lead-Abestos_AC-815579.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Categorical Exclusion Form (NEPA) AC-812579.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.9.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Categorical Excusion Form (NEPA) AC-815579.pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 90.pdf PDF
Plans_Sch A_AC-816579 - PR ER PRMNT RPR (9).pdf PDF
Report_Geotechnical_ER-HWY-63.pdf PDF
Categorical Exclusion Form (NEPA) AC-880579.pdf PDF
Plans_Sch C_AC-801579 - PR ER PRMNT RPR (9).pdf PDF
Report_Lead-Abestos_AC-801579_Site 332.pdf PDF
Report_Geotechnical_ER-HWY-66.pdf PDF
Report_Geotechnical_HWY-332.pdf PDF
Report_Geotechnical_ER_HWY_110.pdf PDF
VETS-4212 Form.pdf PDF
RFP Solicitation - PR ER PRMNT RPR(9).pdf PDF
USFWS Conservation Measures.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.8.pdf PDF
Report_Geotechnical_HWY-90.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report_Geotechnical_ER_HWY_112.pdf PDF
Plans_Sch B_AC-880579 - PR ER PRMNT RPR (9).pdf PDF
Report_Abestos Neg Cert_AC-882579_Site 361.pdf PDF
Plans_Sch C_AC-882579 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 332.pdf PDF
Plans_Sch A_AC-812579 - PR ER PRMNT RPR(9).pdf PDF
Report_Lead_AC-882579_Site 361.pdf PDF
PRHTAs Special Provisions applicable to the project.pdf PDF
Report_Lead-Abestos_AC-816579.pdf PDF
Report_Lead-Abestos_AC-812579.pdf PDF
Report_Abestos_AC-882579_Site 361.pdf PDF
Report_Lead-Abestos_AC-880579.pdf PDF
Report_Lead-Abestos_AC-801579_Site 90.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans_Sch A_AC-815579 - PR ER PRMNT RPR (9).pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOTECHNICAL SUBSOIL

EXPLORATION AND

REPORT ON LANDSLIDE AT

PR-119, KM. 41.6

SAN SEBASTIÁN, PUERTO RICO

Suelos, PSC Calle Chile 258, San Juan, P.R. 00917-2103 Tel. (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com mailto:suelosinc@gmail.com mailto:jackson.suelos@gmail.com

Suelos, PSC

Soil & Construction Materials Laboratory and Environmental Drilling Services

GEOTECHNICAL SUBSOIL EXPLORATION AND

REPORT ON LANDSLIDE AT PR-119, KM. 41.6

SAN SEBASTIÁN, PUERTO RICO

CMA, ARCHITECTS & ENGINEERS

*Prepared for*

Boring Logs Performed & Supervised By

*SUELOS, PSC.

Submitted on November 20, 2018 Job No. 4816.rep

258 Chile St., San Juan, PR 00917-2103. Phone (787) 753-0147 Emails: suelosinc@gmail.com / jackson.suelos@gmail.com mailto:jackson.suelos@gmail.co

GEOTECHNICAL SUBSOIL EXPLORATION AND

REPORT ON LANDSLIDE AT PR-119, KM. 41.6

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 SITE LOCATION AND MORPHOLOGY OF AFFECTED AREA

3.0 WORK PERFORMED

4.0 GENERAL GEOLOGY

4.1 Mal Paso Formation

5.0 SUBSOIL CONDITIONS

5.1 First Stratum

5.2 Second Layer

6.0 GROUNDWATER LEVELS

7.0 INCLINOMETER

8.0 DISCUSSION

9.0 SLOPE STABILITY ANALYSES AT REPRESENTATIVE CROSS SECTION

(STATION 1+60)

9.1 Strength Parameters Based on Empirical Correlations

10.0 ANALYSES FOR LONG TERM STABILITY AND RECOMMENDATIONS . . . 11

10.1 Alternative #1: Slope Reconstruction

10.2 Alternative #2: Gabion Wall Construction

10.3 Alternative #3: Soldier Pile + Lagging

11.0 FIELD MONITORING

12.0 ADDITIONAL CONSIDERATIONS

13.0 LIMITATION OF REPORT

14.0 GENERAL COMMENTS

INCLINOMETER TESTS

BORING LOGS

DRILLING APPENDIXES

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

Suelos, PSC.

Soil & Construction Materials Laboratory and Environmental Drilling Services

Figure 1. Approximate site location

GEOTECHNICAL SUBSOIL EXPLORATION AND

REPORT ON LANDSLIDE AT PR-119, KM. 41.6

SAN SEBASTIÁN, PUERTO RICO

1.0 INTRODUCTION

This report presents the results of a Geotechnical Exploration performed at a site where slope instability problems have been observed in State Road PR-119, Km.41.6, San Sebastián, Puerto

Rico.

The work was performed at the request of Eng. José Carro, on behalf of CMA, Architects

& Engineers, following the scope of work presented in our technical proposal.

The purpose of the exploration was to establish the physical properties of the subsurface soils in order to present possible alternatives for remedial works.

2.0 SITE LOCATION AND MORPHOLOGY OF AFFECTED AREA

The slope failure is located at Km. 41.6 in San Sebastián, Puerto Rico. Figure 1 shows the project location depicted on a copy of the topographic map.

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 2. Landslide location at Km. 41.6

Figure 2 shows an aerial view of the affected road. The local topography within the affected area grades downward from West to East with an overall relief of some 10 to 12 meters measured from PR-119 average elevation. According to the plans provided and field data gathered, the landslide affected the southbound lane and East shoulder of PR-119. Refer to Figure 3 for present conditions of the road at Km. 41.6.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 3. Present conditions of landslide at Km 41.6

At the study site the failure corresponds to a landslide which involves an approximate length of 60 to 70 meters (in plan view). The approximate landslide extension from the head scarp to its toe is approximately 15 meters. Its most obvious manifestation is a half moon depression at the southbound lane of PR#119, which forms the uppermost boundary of the landslide (the head scarp).

The general movement of the landslide heads towards the East.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 4. Approximate boring location plan.

3.0 WORK PERFORMED

A total of three (3) boreholes were drilled to a depth of 40 feet. The boring locations are shown on the site plan included as Figure 4. The boring logs are included as an Appendix to this report.

Various Atterberg Limit Tests were carried out on selected samples to perform parametric correlations with shear resistance. Also, three (3) inclinometer were installed at the location of borings #1, #2, and #3 for the monitoring of ground movements.

A review of available geologic and topographic data was also performed. Site visits and geologic reconnaissances were conducted during the field work. Finally, all the information was gathered and used to prepare a subsurface model for the stability evaluation and for developing mitigation recommendations.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 5. USGS Geologic plan with Approximate site location

4.0 GENERAL GEOLOGY

Figure 5 shows portion of the San Sebastián Geologic Quadrangle with the site approximately circled. According to this source of information, the site is underlaid by the Mal Paso

Formation.

4.1 Mal Paso Formation

Consists of a purple to red-purple to red green massive tuff-breccia.

5.0 SUBSOIL CONDITIONS

The test holes drilled for the exploration revealed fairly consistent subsurface conditions from borehole to borehole. Essentially, the borings found an upper layer of fill associated with the construction of PR-119, followed by the Mal Paso Formation. The later extends to the maximum depth of exploration.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

The conditions revealed by the borings can be generally summarized as follows:

5.1 First Stratum

The first horizon consists of 10 to 15 ft of fill made of reddish-brown and brown, soft to medium consistency clays with abundant rock fragments in its upper 3 feet. This material is likely part of embankment for the construction of PR-119. The exploration shows that the fill layer is of poor quality (clayey soils) and poorly compacted (soft to medium consistency). During the sampling operations the Standard Penetration Tests (SPT) obtained N-values from 3 to 29 blows per foot (bpf).

The higher N-value corresponds to gravel or rocks found in the layer. Natural Moisture Contents resulted relatively high indicative of high clay contents.

It is worth noting that the soil debris left by the sliding mass appears to be the fill material disclosed by the borings. Based on this, it is reasonable to think that the sliding mass is chiefly comprised of fill material.

5.2 Second Layer

Below the fill layer, the Mal Paso Formation was encountered. This is made of a brown and purple, generally very stiff to hard, silty clay and or clayey silts with various amounts of rock material. The soil horizon is actually a saprolitic clay. The Natural Moisture Content ranges from

23 to 40 percent. Figure 6 shows a schematic representation of the approximate soil profile.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 6. Schematic subsurface profile at Station 1+60

6.0 GROUNDWATER LEVELS

As part of the investigation, two (2) observation well (OW) was installed to observe the existence and variation in the groundwater table.

The following table shows the groundwater table level as recorded from the observation well at various dates after drilling.

TABLE 1; GWT Recorded in MW

Date of Reading Observation

Well or Boring Observation

Well or boring GWT (ft)

11/02/18 B- 1 B-3 Not Observed

10/26/18 B-1 B-3 Not Observed

10/22/18 B-1 B-3 Not Observed

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 7. Inclinometer reading procedure

7.0 INCLINOMETER

Three (3) inclinometers were installed at the area of interest to investigate possible slope movements. The inclinometer is made of a plastic casing with internal vertical grooves used to guide a probe which record changes in the slope of the casing. By comparing the slopes of present and previous readings, movements can be detected. Figure 7 shows Suelos personnel taking inclinometer readings.

Reference (zero) reading were taken on 10/19/2018. Subsequent readings were taken on

10/31/2018, 11/6/2018 and 11/16/2018. A summary of the inclinometer data is presented as an

Appendix to this report.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

During the monitoring period (10/19/18 to 11/16/2018) the inclinometers installed by Suelos, PSC. have not recorded evident subsurface motion. The small, arbitrary movements plotted by the inclinometers can be attributed to either systematic errors of the instrument or variances in field reading techniques. Based on this finding, a deep seated rotational landslides has not developed at the site. The slope instability observed at Km. 41.6 appears to be a landslide within the fill layer or with the plane of rupture located in the contact between the fill and the Mal Paso Formation. In any case, it appears that the upper limit of the slide corresponds to the present head scarp near the Jersey

Barrier. That is, there is no evidence showing that the upper reach of the unstable mass extends beyond the present head scarp.

8.0 DISCUSSION

In our opinion, the localized landslide has evolved from the combination of a relatively steep slope geometry, the presence of weak fill and possibly, significant run-off waters. Considering that the hill slope follows a steep angle and shows weak fill materials, it is conceived that severe weather conditions and extraordinary precipitation would tend to decrease the safety factor of the current slope. This has triggered instability problems in the hillside jeopardizing the integrity of PR-119 around Km 41.6

The following sections discuss possible remedial measures to improve the stability of the hillside at Km. 41.6. In plan view, the selected alternative shall span from Sta. 1+10 to 1+80. Refer to Figure 4 for stationing.

9.0 SLOPE STABILITY ANALYSES AT REPRESENTATIVE CROSS SECTION

(STATION 1+60)

9.1 Strength Parameters Based on Empirical Correlations

The prevailing fill material and the Mal Paso Formation are essentially plastic soils.

Correlations for estimating the effective stress friction angle for cohesive soils have been presented by numerous authors including Terzaghi, Peck, Meyerhof and Schmertmann.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Once the shear strength characteristics were identified the next step was to create a simplified soil model to run stability analyses. The stability analyses were performed by using Bishop, Janbu and Morgenstern-Price slope stability methods of slices for circular, non-circular and combined sliding surfaces.

In slope stability evaluations a safety factor can be defined as the ratio of the "forces trying to prevent failure” (F.P.) divided by the "forces trying to induce failure" (F.I.).

The following conditions may occur:

% F.P./F.I. > 1.0 The slope is considered stable (usually 1.5 minimum for long term stability).

% F.P./F.I. = 1 Failure is forthcoming.

% F.P./F.I. < 1 Failure has occurred.

Therefore, a safety factor of 1 (or close to 1) indicates incipient failure. No formal criteria for establishing threshold safety factors has been formally published by a regulating agency for the stability of slopes. Many technical papers have been published on the subject suggesting particular minimum values of factors of safety depending, among other things, on the methods of subsurface exploratory sampling (disturbed versus undisturbed sampling), laboratory testing for soil strength determination, and soil strength conditions (short term versus long term conditions). A common denominator to most of these papers, after the particular slope has been thoroughly modeled, is that each case analyzed is unique and specific to that site. Technical knowledge on site specific soil strength determination, added to previous experience within the site, diminishes the degree of uncertainties related to the modeling of the stability of the slope and leaves the final decisions to be based on engineering judgement.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

The criteria used for the slope stability analyzes in this report is as follows:

Condition Acceptable Safety Factor

Static 1.5

Pseudo Static 1.1

10.0 ANALYSES FOR LONG TERM STABILITY AND RECOMMENDATIONS

Detailed stability analyses were performed in order to investigate the future factor of safety of the hillside for three (3) possible remedial measures.

The position of the groundwater table was not considered in our analyses as a stabilized groundwater table was not found during field work. In addition, the existing drainage system at the study area controls the run-off water coming from PR-119. We are considering that the storm-water drainage system will be improved as required and/or maintained in working conditions.

Due to the relatively small topographic relieve between the PR-119 elevation and the toe of the landslide (about 25 to 30 feet), the following possible alternatives can be considered:

1. Slope reconstruction

2. Gabion wall construction near the edge of PR-119

3. Cantilever soldier pile/lagging wall near the edge of PR-119

The implementation of these remedial measures in the slope stability analyses lead to a safety factor greater than 1.5 for static conditions and 1.2 under seismic acceleration of 0.15g. A schematic representation of the long term stability alternative for slope reconstruction is presented in Figure

8.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 8. Slope stability analysis for reconstruction alternative

10.1 Alternative #1: Slope Reconstruction

This alternative consists of excavating the unstable soils down to 15 ft deep from PR-119 elevation, until reaching the competent Mal Paso Formation, and replacing the excavated soils with select A-1-a material compacted to 95% Modified Proctor.

Figure 9 is a schematic representation of the slope reconstruction alternative, where the weak material is removed and the exposed surface benched and conditioned. When performing the slope reconstruction, filling shall begin in the lowest section of the area, atop the stiff clays comprising

Mal Paso Formation. The select fill (A-1-a) shall be placed over properly conditioned and proof rolled subgrade, and compacted in 12-inch lifts. During compaction, a minimum density corresponding to 95% of the material maximum density (Modified Proctor Tests) shall be attained.

Final slope geometry shall be 2H:1V or flatter.

Prior to the construction of the new fill embankment, the sloped surface to be filled should be stepped in order to key-in the new A-1-a fill. Under no circumstances the fill should be placed over a sloping ground surface without first benching the ground surface.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 9. Alternative # 1 Slope Reconstruction

Benching requirements shall be decided by the observing resident Soil Engineer, depending on actual field conditions.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 10. Alternative # 2; Gabion Wall Construction

10.2 Alternative #2: Gabion Wall Construction

Under this alternative, a gravity gabion wall about 15 feet high should be constructed over the stiff clay layer located about 15 ft deep below PR-119 elevation. For design, an allowable soil bearing capacity of 3,500 psf can be safely used, provided a minimum depth of foundation of 5 ft is allowed. Behind the wall, new compacted fill will be necessary for the reconstruction of PR-119.

This backfill can consider A-2-4 or better fill material. Refer to Figure 10.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

The gabion wall shall be provided with a minimum depth of foundation (Df) of 1.5 meters

(5 ft). Foundation baskets shall be laid on top of the stiff clay and/or properly conditioned subgrade.

Additional Df may be required by the wall designer, if deemed necessary to increase sliding resistance

10.3 Alternative #3: Soldier Pile + Lagging

For the case of the soldier pile wall, W14x74 piles shall be installed at a spacing of 2 mt c-c, and to a minimum depth of 10 meters measured from PR-119 elevation (see Figure 11). Precast or cast-in-placed concrete panels may be considered between each pile in order to support the new fill material necessary for the re-construction of PR-119. The concrete panels shall be embedded a minimum of 1 meter below grade (below current sloping ground), to protect the new fill material from eroding beneath the base concrete panel. Concrete panels shall be designed by a structural engineer to resist shear forces and bending moments of the new fill wedge, which will be about 2 meters high. Traffic loads shall also be considered.

Designer must take into consideration hydrostatic pressures, which shall be added to the force and stress envelopes. Likewise, if the designer wants to consider earthquake loading, the additional forces resulting from ground acceleration shall be added to the pressures obtained for the static condition. The earth pressure coefficient for dynamic increase in lateral force can be approximated as 75 percent of kh, kh being the expected horizontal acceleration in g’s. That is, for a given wall subjected to an active “static” pressure (Pa) equal to 0.5@ã@H2@Ka, the combined effect of static and dynamic force (Pae) would be (0.5@ã@H2@Ka) + (0.5@ã@H2@75% kh). An internal friction angle of 26 degrees can be used for the determination of Ka.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Figure 11. Alternative #3; Soldier pile + Lagging

11.0 FIELD MONITORING

As it is always the case for this type of geotechnical problems, field monitoring must be conducted during and after construction of the long term remedial measure to carefully evaluate its effectiveness and detect any problem that may occur during construction. The field monitoring will consist of periodical measurements from a control bench marks, and inclinometers installed. During construction the instrumentation must be read at least three (3) times per week.

The results of this monitoring program will provide any need to have to incorporate additional control measures. This monitoring program needs to be evaluated weekly during construction and monthly thereafter.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

12.0 ADDITIONAL CONSIDERATIONS

The long term remedial measures presented in this report requires to strictly enforce closely-sequenced construction methods, where the excavation for benching and filling in any part of the hillside area occur in a close sequence such that the length of open excavations is left to a practical minimum at all times during the work day.

It is imperative that all reconstruction and stabilization works must be accompanied by a careful monitoring program, during and after construction, that will help in assessing the effectiveness of the recommended interim remedial measures. Although, long term remedial measures given herein should be effective in minimizing future landslides at the hillside, variations in the site soil conditions, may require some changes in the stabilization program that can be promptly implemented with the help of the field instrumentation measurements in the hands of a well experienced geotechnical engineer. Therefore, it is recommended to adopt the field monitoring program as a component of the remedial measures suggested for this project.

The exact amount of this instrumentation will be determined by the Soil Engineer in charge of the geotechnical inspection during construction, as the site conditions dictate the requirement of the instrumentation. A typical monitoring station shall consist of control bench marks and inclinometers.

The control of surface runoff waters in this project is of paramount importance. An effective surface drainage system will have to be provided in this project, including (but not limited to) paved ditches, swales and interceptors, in order to properly collect and dispose surface and groundwater to properly designed outlets, both during construction and after the hillside has been repaired. Run-off shall not be permitted to run freely during nor after the remediation has been completed. Road run-off shall not be disposed on the ground. This run-off shall be diverted by meas of the required piping, ditches, culverts, and other hydraulic works into properly designed outlets out and way from the project.

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018

Weak fills or incompetent soils are present on the current sloping ground (landslide debris).

This debris must be fully removed before starting the new filling operation. The contractor shall follow all cleaning, stripping and benching recommendations presented by Suelos, PSC., full time soil technician and geotechnical engineer field supervisor. The actual depth and extension of removal shall be identified at the field during actual earthworks.

13.0 LIMITATION OF REPORT

This report has been prepared taking into consideration the design factors presently known to us. The project designers shall be alert of any item that might have been overlooked, that could require clarification or that may need additional recommendations to those discussed herein.

This report specifically covers analyses and evaluations on global or overall stability. The stability of the gravity wall alternative must also be checked against:

1. Internal Stability

2. Bearing Capacity

3. Sliding along the base

4. Overturning of the wall

The soil parameters used to model the stability analyses were based on our experience and existing empirical relationships. If the project owner wishes to refine the soil parameters presented in this report, we strongly recommend the collection of various undisturbed soil samples to run special laboratory tests (triaxial and or direct shear tests).

14.0 GENERAL COMMENTS

The inspection or supervision of excavations, foundations, earthworks and wall construction is, in general, is a very delicate matter. In some cases this service is not rendered by the Soils

Engineer who made the subsoil investigation and recommended the specific foundation alternatives for a given project. In a large number of projects these operations are successfully completed due

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

SAN SEBASTIÁN, PUERTO RICO

November 20, 2018 to the prevalence of ideal and uniform conditions and to the fact that they are being performed by a competent and responsible contractor. But there are cases, where the lack of proper construction techniques and the lack of adequate supervision has given rise to the occurrence of foundation problems and failures.

Conscious of the above exposed problem, we wish to state that the validity of our recommendations about global stability are subordinated to the inspection of the foundation work operations by us. If the contract is awarded to another experienced Soils Engineer, he shall receive a copy of this report, evaluate the same and adopt it as his own, or request additional soil data to verify our foundation recommendations or modify them in accordance to his personal knowledge and judgement, thus assuming full responsibility for his recommendations and the report itself.

Respectfully submitted, CARLOS RODRIGUEZ MOLINA, PE, PG, MS

Partner mgn

Reference No. 4816.rep

Suelos, PSC.

258 Chile St., San Juan, P.R. 00917-2103 Phone (787) 753-0147. Emails: suelosinc@gmail.com / jackson.suelos@gmail.com

BORING LOGS

Calle Chile 258, San Juan, P.R. 00917-2103 Tel. (787) 753-0147. Email: suelosinc@gmail.com

BORING LOGS

The description of subsurface profile and results of field and laboratory tests, as enclosed, pertain to conditions actually encountered at the borings location proper and at the depths indicated.

Profile tracings between borings, when give, represent a reasonable interpolation of subsoil characteristics and should not be taken to indicate true intermediate conditions.

NOTES:

N - Number of blows required to drive the sampling spoon a distance of 12" with a 140 lbs hammer falling 30".

NW - No water.

WH - Weight of hammer.

WR - Weight of Rods.

W - Natural moisture content in % of dry weight.

qu - Unconfined compressive strength in tons/sq ft.

* - Penetrometer value.

Suelos, PSC

53-50-41

15-9-7

4-6-9

6-10-10

7-9-13

9-11-15

8-15-17

11-23-30

16-27-49

15-20-35

17-22-30

Fill: black and dark brown, asphalt with rock fragments

-same as above; with white concrete base

Reddish brown and brown, clayey silt

Brown, clayey silt firm clay

-same as above;

-same as above;

Clayey silt with some rock fragments, purple with white mottled

-same as above; firm consistency

-same as above;

-same as above;

-same as above;

END OF TEST HOLE - 40 FT

3.5

2.25

SUELOS, INC. BORING NO.: B-1

Soil and Construction Materials Laboratory Job No. 4816

SUBSURFACE EXPLORATION LOG

PROJECT: LANDSLIDE AT PR-119, KM. 41.6, SAN SEBASTIAN, P.R.

Spoon : 1.375"I.D. Driller : J. CALDERON Date Started : 10/24/18 WATER LEVEL: N < 100 = 40 Hammer: 140# Method : AUGER Date Completed: 10/24/18 Date : 10/24/18 N > 100 = Drop : 30" Drill Type: CME-45 Total Depth : 40 Depth: N/O CORE =

"N" values are the number of blows required to drive the sampling spoon a distance of twelve inches with a 140 lbs hammer falling 30 inches. Natural Moisture Content (2) is expressed in percentage of its dry weight. Unconfined Compressive Strength (Qu) values are expressed in tons per square foot. *Pocket penetrometer values are marked with an asterisk.

Depth ft

Samp No.

Recov

S.P.T.

values

RQD

Description of material

SPT-N

values

Qu

TSF

Moist Cont%

Sheet 1 of 1

1-1-2

2-2-2

2-4-5

3-4-3

5-7-9

8-14-17

11-15-26

Dark brown, clayey silt, very soft consistency with some roots and trace rock fragments

No Recovery

Brown, silty clay, soft to firm consistency with asphalt fragments and trace roots

Brown, clayey silt with trace roots, soft consistency to firm

Brown with light brown mottled, clayey silt, soft consistency

-same as above;

-same as above;

END OF TEST HOLE - 20.5 FT

SUELOS, INC. BORING NO.: B-2

Soil and Construction Materials Laboratory Job No. 4816

SUBSURFACE EXPLORATION LOG

PROJECT: LANDSLIDE AT PR-119, KM. 41.6, SAN SEBASTIAN, P.R.

Spoon : 1.375"I.D. Driller : J. CALDERON Date Started : 10/29/18 WATER LEVEL: N < 100 = 20.5 Hammer: 140# Method : WASH Date Completed: 10/29/18 Date : 10/29/18 N > 100 = Drop : 30" Drill Type: TRIPODE Total Depth : 20.5 Depth: N/O CORE =

"N" values are the number of blows required to drive the sampling spoon a distance of twelve inches with a 140 lbs hammer falling 30 inches. Natural Moisture Content (2) is expressed in percentage of its dry weight. Unconfined Compressive Strength (Qu) values are expressed in tons per square foot. *Pocket penetrometer values are marked with an asterisk.

Depth ft

Samp No.

Recov

S.P.T.

values

RQD

Description of material

SPT-N

values

Qu

TSF

Moist

25-31-16

8-10-9

3-11-3

3-3-3

4-3-5

3-5-7

4-6-11

7-9-13

8-12-19

17-28-53

16-14-70

Fill: black and white, asphalt with rock fragments

Brown, clayey silt, soft consistency with trac roots

-same as above;

-same as above;

-same as above;

-same as above;

Purple, silt with some clay, firm consistency

-same as above;

Brown silt with some clay

Purple, brown, black silt with some clay, hard consistency

END OF TEST HOLE - 40 FT

1.5

1.0

SUELOS, INC. BORING NO.: B-3

Soil and Construction Materials Laboratory Job No. 4816

SUBSURFACE EXPLORATION LOG

PROJECT: LANDSLIDE AT PR-119, KM. 41.6, SAN SEBASTIAN, P.R.

Spoon : 1.375"I.D. Driller : J. CALDERON Date Started : 10/23/18 WATER LEVEL: N < 100 = 40 Hammer: 140# Method : AUGER Date Completed: 10/23/18 Date : 10/23/18 N > 100 = Drop : 30" Drill Type: CME-45 Total Depth : 40 Depth: N/O CORE =

"N" values are the number of blows required to drive the sampling spoon a distance of twelve inches with a 140 lbs hammer falling 30 inches. Natural Moisture Content (2) is expressed in percentage of its dry weight. Unconfined Compressive Strength (Qu) values are expressed in tons per square foot. *Pocket penetrometer values are marked with an asterisk.

Depth ft

Samp No.

Recov

S.P.T.

values

RQD

Description of material

SPT-N

values

Qu

TSF

Moist

INCLINOMETER TESTS

DRILLING APPENDIX

APPENDIX NO. 1

General

Comprised in this report is a description of the project as made know to SUELOS, PSC. and details of the project with pertinent recommendations for the design of foundations and other earth related structures. It should be considered that the design recommendations are relative to the project aspects discussed and subject to the limitations imposed by all practical considerations in the determination of subsoil conditions.

The field and laboratory data shown in boring logs represent subsoil conditions encountered at the borehole proper. The analysis and conclusions herein presented and discussed are based on such results and on a reasonable interpolation of subsoil characteristics. Whenever cross-sections with a schematic representation of the interpreted subsoil stratification between borings are included, the same should not be taken to represent true intermediate conditions but are rather given for general comparison purposes only.

Copy of this report should be made available to the Project Designers for their information and guidance, as well as to the Contractor and Resident Engineer, in order to secure maximum protection in the case of possible unexpected variations. Any such variations as well as any changes or modifications to the scope of project described after submittance of this report shall be notified by writing to these Consultants in order to evaluate same and decide upon the need to alter or modify the recommendations given.

Suelos, PSC

APPENDIX NO. 2

Field and Laboratory Work

Field exploration was made by SUELOS, PSC., a private laboratory to the services of these

Consultants. The field work consisted of a visual observation of the area and existing structures at the site, if any, and of performance of test borings as indicated.

Test borings were made in accordance to the "Standard Penetration Test and Split-Spoon

Sampling of Soils Method", as proposed by the Standards of the American Society for testing and

Materials Designation ASTM D-1586, Latest Revision.

The testing hole is bored either by manual and mechanical augers or by driving a 2.5 inch inside diameter casing into the ground which is washed clean internally each time a soil sample is to be secured below its reach. While sampling, the Standard Penetration Test is performed and the

"N" values recorded. This is the number of blows required to drive the split-spoon sampler 12 inches into the ground using a 140 lbs. hammer with a free fall of 30 inches.

The value gives an indication of the consistency of cohesive soils and the relative density of granular soils as shown in the following table:

COHESIVE SOILS

"N" Values Consistency Unconfined Comp. Strength

(TSF)

less than 2 very soft less than 0.25

2 - 4 soft 0.25 - 0.50

4 - 8 medium 0.50 - 1.00

8 - 15 stiff 1.00 - 2.00

15 - 30 very stiff 2.00 - 4.00 over 30 hard over 4.00

Suelos, PSC

Appendix No. 2

GRANULAR SOILS

"N" Values Relative Density

0 - 5 very loose

5 - 10 loose

10 - 30 medium

30 - 50 dense over 50 very dense

Depth of water surface shown on logs indicate the phreatic level found either prior to use of any casing and water or taken 24 hours after the test borings was completed and the casing, if any, is pulled out. The information given, unless otherwise indicated, is not a adequate for study of deep excavations and is only to be used as an approximate level in the study of a normal foundation of the project. Phreatic or underground water levels may vary with seasonal rainshower variations thus water may appear where none is shown and the reader of this report should be aware of this fact.

For excavations where ground water levels are of utmost importance special studies consisting of long range observations on installed wellpoint-type devices should be performed. Where deep excavations are contemplated, as in pumping stations, study of artesian or sub-artesian aquifers should be made by means of deep test borings and pumping tests.

Suelos, PSC

DIAMOND CORE DRILLING

Whenever drilling through rock is necessary the same is made following the "Diamond Core

Drilling for Site Investigation" method as proposed by the standards of the American Society for

Testing and Materials Designation ASTM D-2113-L.R. In general a double tube core barrel with diamond bit is rotated under pressure into the rock. The drilled rock enters into the barrel using circulating water as cooling agent. At intervals of 2 to 5 feet the barrel is lifted and the core is removed. The length of each core run as well as the length of the core recovered is noted.

LABORATORY WORK

%Water Contents

The natural moisture content was determined for all samples, except for those with high percentage of gravel or coarse sand.

The tests follow standards of the American Society for Testing and Materials ASTM

Designation D-2216, Latest Revision. The water or moisture content of a given soil mass is by definition the ratio of the weight of water to the oven dry weight of the soil, expressed as a percentage.

%Unconfined Compression Tests

All suitable samples of cohesive soil recovered from the split-spoon sampler were tested in unconfined compression. The ratio of the maximum load required for failure to the corrected cross sectional area of the sample expressed in tons per square foot is defined as the unconfined compressive strength.

Suelos, PSC

%Examination and Description

Soil samples are classified according to their constituents, the following terminology used to denote the approximate percentage by weight of each component.

Description Term Percent by Weight

Trace 1 - 10

Little to some 10 - 20

Sandy, silty clayey 20 - 35 and 35 - 50

The examined samples are related into one of the following main groups; boulders, gravel, sand, clay, and silt. On peat, the presence of the decomposed and partly decomposed vegetable matter, is used for identification. The differentiation between a clay and a silt is based on the presence or lack of plasticity, dilatancy and dry strength rather than on grain size. The description of the soil includes: color, odor, minerals, presence of foreign matter, geological history, etc. These descriptions as well as the results of the laboratory testing are used in grouping similar samples into a stratigraphic unit as shown on the final boring logs. Therefore, the data on subsurface exploration logs represent subsoil conditions at the precise locations of the boreholes only.

Suelos, PSC

MTM

Line

MTM

Typewriter

35.8 cma

1.0 INTRODUCTION
2.0 SITE LOCATION AND MORPHOLOGY OF AFFECTED AREA
3.0 WORK PERFORMED
4.0 GENERAL GEOLOGY
4.1 Mal Paso Formation
5.0 SUBSOIL CONDITIONS
5.1 First Stratum
5.2 Second Layer
6.0 GROUNDWATER LEVELS
7.0 INCLINOMETER
8.0 DISCUSSION
9.0 SLOPE STABILITY ANALYSES AT REPRESENTATIVE CROSS SECTION (STATION 1+60)
9.1 Strength Parameters Based on Empirical Correlations
10.0 ANALYSES FOR LONG TERM STABILITY AND RECOMMENDATIONS
10.1 Alternative #1: Slope Reconstruction
10.2 Alternative #2: Gabion Wall Construction
10.3 Alternative #3: Soldier Pile + Lagging
11.0 FIELD MONITORING
12.0 ADDITIONAL CONSIDERATIONS
13.0 LIMITATION OF REPORT
14.0 GENERAL COMMENTS