Report_Lead-Abestos_AC-880579.pdf

PDF 1 MB Posted

Attached to
Landslide Repairs - West Region Contract 1
Solicitation number
693C73-22-R-000006
Issued by

About this file

This document contains an environmental survey report and related federal contract opportunity. The environmental survey report details the results of an inspection for asbestos containing materials and lead based paint on Road PR-128 in Yauco, Puerto Rico. The inspection found the areas to be free of asbestos and lead paint. The related federal contract opportunity is a solicitation for the Landslide Repairs - West Region Contract 1 project located in municipalities in western Puerto Rico. The project scope involves repairing landslide and washout damage from Hurricanes Irma and Maria, including embankment restoration, retaining walls, drainage repairs, and other work. The estimated value is between $1,000,000 to $5,000,000. The solicitation is open only to certified small businesses. The proposal due date and pre-bid meeting details will be specified in the request for proposal documents, which are expected to be issued on or around October 19, 2022. Technical and price proposals will be required in a two-step evaluation process.

View the file

Other files

File Type Posted
Amendment 0003 - PR ER PRMNT RPR (9).pdf PDF
Amendment 0002 - PR ER PRMNT RPR(9).pdf PDF
Amendment 0001 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-882579.pdf PDF
Report_Geotechnical_ER-HWY-361.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Report_Geotechnical_ER_HWY_111.pdf PDF
Report_Geotechnical_ER-HWY-72.pdf PDF
Categorical Exclusion Form (NEPA) AC-816579.pdf PDF
Report_Geotechnical_ER-HWY-71.pdf PDF
Report_Lead-Abestos_AC-815579.pdf PDF
PRHTAs Standard Specifications.pdf PDF
Categorical Exclusion Form (NEPA) AC-812579.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.9.pdf PDF
DTOPs Manual de Senales de Transito (MST).pdf PDF
Categorical Excusion Form (NEPA) AC-815579.pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 90.pdf PDF
Plans_Sch A_AC-816579 - PR ER PRMNT RPR (9).pdf PDF
Report_Geotechnical_ER-HWY-63.pdf PDF
Categorical Exclusion Form (NEPA) AC-880579.pdf PDF
Plans_Sch C_AC-801579 - PR ER PRMNT RPR (9).pdf PDF
Report_Lead-Abestos_AC-801579_Site 332.pdf PDF
Report_Geotechnical_ER-HWY-66.pdf PDF
Report_Geotechnical_HWY-332.pdf PDF
Report_Geotechnical_ER_HWY_110.pdf PDF
VETS-4212 Form.pdf PDF
RFP Solicitation - PR ER PRMNT RPR(9).pdf PDF
USFWS Conservation Measures.pdf PDF
Report_Geotechnical_ER-HWY-64 KM 35.8.pdf PDF
Report_Geotechnical_HWY-90.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Report_Geotechnical_ER_HWY_112.pdf PDF
Plans_Sch B_AC-880579 - PR ER PRMNT RPR (9).pdf PDF
Report_Abestos Neg Cert_AC-882579_Site 361.pdf PDF
Report_Geotechnical_ER-HWY-67.pdf PDF
Plans_Sch C_AC-882579 - PR ER PRMNT RPR (9).pdf PDF
Categorical Exclusion Form (NEPA) AC-801579_Site 332.pdf PDF
Plans_Sch A_AC-812579 - PR ER PRMNT RPR(9).pdf PDF
Report_Lead_AC-882579_Site 361.pdf PDF
PRHTAs Special Provisions applicable to the project.pdf PDF
Report_Lead-Abestos_AC-816579.pdf PDF
Report_Lead-Abestos_AC-812579.pdf PDF
Report_Abestos_AC-882579_Site 361.pdf PDF
Report_Lead-Abestos_AC-801579_Site 90.pdf PDF
PRHTAs Standard Drawings.pdf PDF
Plans_Sch A_AC-815579 - PR ER PRMNT RPR (9).pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR-128, km 9.0, Km 15.2 & km 17.35, ER-HWY-110, ER-HWY-111 & ER-HWY-112

Project AC-823544, Federal No. ER-9999(332)

Yauco, P.R.

November

Prepared for:

Germán Torres Berríos & Assoc.

Engineering - Architectural - Planning – Surveying

HC-04 Box 5775 Barranquitas, PR, 00794-9609

Tel. 787-857-0520 / Fax. 787-857-2815

ASBESTOS & LEAD BASED PAINT

SURVEY REPORT

Prepared by:

Enviroresources, Inc.

HC 01 Box 5555 Barranquitas,P.R. 00794

Tel. (787) 319-5618 Fax (787) 857-2679 http://www.gtbassoc.com/home.html

Table of Contents

1.0 INTRODUCTION………………………………………………………………..3

2.0 TESTING / SAMPLING PROCEDURES……………………………………..3

3.0 INSPECTION RESULTS FOR LEAD BASED PAINT………………………4

4.0 INSPECTION RESULTS FOR ASBESTOS

5.0 CONCLUSION.………………………………………………………………….5

Appendix

Appendix A – Aerial Photo

Appendix B - Lead Based Paint Sampling Tables

Appendix C - Lead Based Paint Negative Certification

Appendix D - Asbestos Negative Certification

Appendix E - Certified Inspector Credentials

1.0 INTRODUCTION

An environmental survey for Asbestos Containing Materials &Lead Based Paint (LBP) Components was conducted by a Puerto Rico Environmental Quality Board certified Asbestos & Lead Inspector. The survey was conducted on November 30, 2018 for the PR-128, Km. 9.0, Km 15.2, Km 17.30 & Km. 17.35, AC Project 823544/ER9999(332), Yauco, Puerto Rico. Refer to Appendix A for Aerial Photo.

For Lead, the survey was conducted using a XRF instrument and using Department of Housing and Urban Development (HUD) protocol. The hazard level for lead in paint is 1.0 mg/cm², as measured by XRF.

For Asbestos, the survey was performed based on AHERA protocol, according the following scenario:

A. The structure was divided in functional spaces.

B. Physical and Hazard Assessment of suspected asbestos containing materials was performed.

Asbestos was used in the construction industry from 1900 to 1989 and still being today in various products. The mere presence of asbestos containing materials does not necessary constitute a health hazard. However, when these materials become disturbed from building renovation, maintenance, or other activities that allow asbestos fibers to be released into the environment, a potential hazard does exist.

2.0 TESTING / SAMPLING PROCEDURES

The main steps involved in lead based paint inspection are:

A. Perform inventory of all testing combinations.

B. Select painted area to be tested.

C. Perform the XRF testing including the calibration.

D. Evaluate and classify the data.

The identification of tested walls is based on HUD guidelines as follow, where the structure has rooms or functional spaces:

A. Wall A - entrance Wall

B. Walls B, C and D - sequential walls, clockwise from A.

C. For Roads or Highways the testing are selected in the painted areas and this type of projects is not part of HUD guidelines.

For asbestos, all functional spaces were visited and visually inspected to identify the location of any suspected ACM. An assessment was made of the friability of suspected ACM by touching the material to determine if could be pulverized, crumbled or reduced to power by hand pressure.

3.0 INSPECTION RESULTS FOR LEAD BASED PAINT

A total of three (3) selected areas were tested for lead. All of these testing were found under the regulatory limit of 1.0 mg/cm² for Lead. The project areas in Road PR-128, Km. 9.0 to Km. 17.35, AC Project 823544, Yauco, Puerto Rico is lead based paint free. See the Appendix B for lead based paint sampling results tables. See the Appendix C for the Negative Certification.

4.0 INSPECTION RESULTS FOR ASBESTOS

The samples are defined as asbestos containing materials (ACM) if they contain more than 1% of asbestos. Samples are analyzed by Polarized Light Microscopy method (PLM), in accordance to EPA recommended procedures. Any bulk sample was collected for PR-128 AC Project 823544, because no suspicious material for asbestos was found.

The PR-128, Km. 9.0 to Km. 17.35, AC Project 823544 is asbestos free. See the Appendix D for the Negative Certification.

CONCLUSIONS

For Road PR-128, Km. 9.0, Km 15.2, Km 17.30 & Km. 17.35, AC Project 823544, the works areas are asbestos and lead free. However the contractor should be comply, with the general’s permits before the renovation / demolition activities, following the local and federal regulation.

Prepare by, Raúl Matos Certified Inspector

Appendix A

Aerial Photo

Appendix B

Lead Based Paint XRF Sampling Tables

PROJECT: PR-128 Yauco-Lares

CLIENT: GTB & Associates

DATE: 30/11/18 STRUCTURE: Road PR-128

LBP INSPECTOR: Raúl Matos

Sample

ID

Funcional Space Location Color Subst. XRF Reading/mg/cm²

Pos/Neg Comments

001 Calibration ----------------------- --------------

----------- 1.1 ---------- ----------------------------

002 Calibration ----------------------- --------------

----------- 1.1 ---------- ----------------------------

003 Calibration ----------------------- --------------

----------- 1.0 ---------- ----------------------------

004 PR-128, ER-HWY-110 Km 9 white asphalt 0.1 - No traffic yellow lines 005 PR-128, ER-HWY-111 Km 15.20 white asphalt 0.1 - No traffic yellow lines 006 PR-128, ER-HWY-112 Km 17.3 – 17.35 white asphalt 0.1 - No traffic yellow lines 007 Calibration ----------------------- --------------

----------- 1.0 ---------- ----------------------------

008 Calibration ----------------------- --------------

----------- 1.1 ---------- ----------------------------

009 Calibration ----------------------- --------------

----------- 1.0 ---------- ----------------------------

Appendix C

Lead Based Paint Negative Certification

Appendix D

Asbestos Negative Certification

Appendix E

Certified Inspector Credentials

1.0 INTRODUCTION
2.0 TESTING / SAMPLING PROCEDURES
3.0 INSPECTION RESULTS FOR LEAD BASED PAINT
4.0 INSPECTION RESULTS FOR ASBESTOS
CONCLUSIONS