RFP N6247020R6004.pdf
PDF 730 KB Posted
- Solicitation number
- N6247020R6004
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION N6247020R6004
OFFICER IN CHARGE OF CONSTRUCTION FLORENCE
NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC
1121 HAMMOND ROAD, CAMP LEJEUNE, NC 28547-2521
POC: Primary: Jennifer Stewart, (910) 320-9213, jennifer.l.stewart1@navy.mil
Secondary: Meghan Hislop, (757) 675-0535, meghan.hislop@navy.mil
INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION
CONTRACT FOR LARGE GENERAL CONSTRUCTION PROJECTS
PROPOSED TASK ORDER:
REPAIR BUILDING ENVELOPE AND INTERIOR FINISHES, BUILDING 1016
MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA
DATE OF SOLICITATION: 13 MAY 2020
OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT
AVAILABLE, NO AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERORS
WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS
SOLICITATION.
ONLY THE FOLLOWING LIST OF CONTRACTORS MAY
SUBMIT A PROPOSAL FOR THIS PROJECT:
N4008520D0032
AMERESCO
5550 Seventy-Seven Center Drive
Suite 380
Charlotte, NC 28217
Email: nbulgarino@ameresco.com
N4008520D0033
Archer Western Federal JV
929 West Adams Street
Chicago, IL 60607
Email: dmarchiori@walshgroup.com adecarlo@walshgroup.com
N4008520D0034
RQ Construction, LLC
1620 Faraday Ave.
Carlsbad, CA 92008
Email: grogers@rqconstruction.com tnichols@rqconstruction.com
N4008520D0035
Sauer Incorporated
11223 Phillips Parkway Drive East
Jacksonville, FL 32256
Email: Sauerjaxestimating@sauer-inc.com
N4008520D0036
The Whiting-Turner Contracting Company
6305 Ivy Lane, Suite 800
Greenbelt, Maryland 20770
Email: sam.abutaleb@whiting-turner.com mailto:jennifer.l.stewart1@navy.mil mailto:meghan.hislop@navy.mil mailto:nbulgarino@ameresco.com mailto:dmarchiori@walshgroup.com mailto:adecarlo@walshgroup.com mailto:grogers@rqconstruction.com mailto:tnichols@rqconstruction.com mailto:Sauerjaxestimating@sauer-inc.com mailto:sam.abutale@whiting-turner.com
Repair Building Envelope and Interior Finishes, Building 1016 Solicitation N6247020R6004
Marine Corps Air Station Cherry Point, North Carolina WO# 6792686
GENERAL REQUIREMENTS
All terms and conditions of N4008520D0032/0033/0034/0035/0036 Indefinite Delivery Indefinite
Quantity Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not stated in this RFP package or the Task Order award document.
For clarification on any clause or other contractual issue please contact Meghan Hislop at meghan.hislop@navy.mil.
Amendments will be posted directly to https://beta.sam.gov/.
NAVFAC Solicitation No.: N6247020R6004
The specifications, drawings, and other pertinent attachments are posted on https://beta.sam.gov/ under ‘Attachments/Links.’
Title: Repair Building Envelope and Interior Finishes, Building 1016, Marine Corps Air Station Cherry
Point, North Carolina
Description of the Work: The work includes design and construction for the repair and renovation of
Building 1016, associated parking and walks, accessible walkways/entrances and electrical connectivity for MILVAN and associated site support improvements and incidental related work.
The project is comprised of one site:
Building 1016 site: Building 1016 is an existing 140,238 square foot building serving as a warehouse for several groups. Building 1016 is primarily a single-story facility with portions of the facility being two-story. Hurricane Florence caused significant damage to Building 1016 including envelope and interior damages. This requirement is for the design and construction for the repair and renovation of Building
1016, associated parking and walks, accessible walkways/entrances, and associated site support improvements and incidental related work. The project will include replacement of the existing roofing, canopy with metal column support, select interior walls, renovation of existing second floor spaces, addition of a second floor space, floor coverings, ceilings lighting, HVAC System, dust collection system, furnishings, windows, doors (man doors and roll-up doors), metal exterior stairs, metal roof ladders, asphalt parking, replacement of concrete loading docks, gutters and downspouts, exterior building and site lighting, and all utilities serving the building.
Work will be phased with the temporary relocation of certain user groups. Laydown areas and construction shall be completed as to facilitate parking and movement of people to phased areas.
Temporary use of MILVANs will be provided to house personnel during phasing. The MILVAN exact site adjacent to Building 1016 will be coordinated between the contractor, FRC East, IMRL, MAG-14, and MALS-14. Electrical hookup connections for the MILVANs will be provided based on MILVAN locations and quantity as part of this contract.
Contract Completion Date: Contract completion date is 754 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the contract/task order. Bond approval is considered notice to proceed.
Estimated Budget Amount for Design and Construction: Approximately $25,000,000.00.
https://beta.sam.gov/ https://beta.sam.gov/
Wage Determination: General Decision Number NC20200065 dated 01/03/2020, Construction Type:
Building, applies and is included below.
Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,550.00 for each calendar day of delay until the work is completed or accepted.
Basis for Award: This task order will be awarded on a fair opportunity basis pursuant to FAR 16.505 ordering procedures. The proposed task order will be awarded to the responsible offeror, offering the best value to the Government.
Evaluation:
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the proposal determined to represent the best value-the proposal most advantageous to the Government, price and other factors considered.
2. The Government intends to evaluate proposals and award a contract without discussions with
Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced Offeror or other than the highest technically rated Offeror.
4. Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple
Weaknesses that impact either the individual factor rating or the overall rating for the proposal.
The evaluation report must document the evaluation board’s assessment of the identified
Weakness(s) and the associated risk to successful contract performance resulting from the
Weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
Evaluation Factors for Award:
The proposed task order will be awarded to the responsible Offeror offering the best value to the
Government. To make a determination of Best Value, the Government shall evaluate price and the following non-cost/price factors:
Factor 1 – Technical Solution
Factor 2 – Management Approach
Factor 3 – Past Performance
All technical factors (Factors 1 and 2), when combined, are of equal importance to the performance confidence assessment (past performance) rating (Factor 3); and all technical factors and the performance confidence assessment (past performance) rating, when combined, are approximately equal to price. The importance of price will increase if the Offerors' non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal's superiority to the Government. In any event, award will be made to the responsible Offeror representing the best value to the Government, price and non-price factors considered.
Non-Price Evaluation Factors
Non-price Factors 1, 2 & 3:
(1) Solicitation Submittal Requirements:
Non-price binder: The Offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. Additionally, the Offeror shall submit one (1) hard copy Original, marked “Original”; one (1) CD-ROM; and two (2) copies, marked “Copy”, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments.
All hard copies shall be in separate 3-ring binders. All submissions shall include the following:
Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, CAGE Code, Point of Contact, Phone Number, and
Email Address;
8 ½ x 11 paper, 10-point font;
Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated; and
Additionally, include an electronic version of the price and non-price proposal on one CD-
ROM.
As with the price proposal, in the event of a discrepancy between the original and copies (or CD-
ROM), the electronic version marked “Original” of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered.
Likewise, any technical/non-price information within the price proposal will not be considered.
Factor 1 – Technical Solution
(a) Solicitation Submittal Requirements:
Offeror shall provide a narrative describing its proposed technical solution for executing the project in a manner that meets the requirements of the RFP. The description shall include the following at a minimum:
- A narrative of the general concept proposed
- Interior circulation/adjacencies
- Mechanical systems and DDC Controls, to include accessibility to mechanical room and circulation within the mechanical system. Resiliency to include cyber secure EMCS integration, utility metering, and controls
- Anti-terrorism/force protection (ATFP) features
- Exterior façade describing how the proposed construction integrates with the surrounding area and existing base facilities design or architectural theme
- Site layout including a description of the building orientation, roadways, parking (include ingress and egress), emergency vehicle access, and ATFP standoff distances
Narrative shall not exceed two (2) double-sided pages (or four (4) single-sided pages). Up to three (3) conceptual drawings may be provided to supplement the narrative (i.e., floor plan, exterior elevation, and site plan).
(b) Basis of Evaluation:
The Government will evaluate the narrative and conceptual drawings (if included) considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the effectiveness of the design-build team's technical solution to determine the likelihood that the work will be performed in accordance with the technical requirements of the RFP.
The narrative does not require the identification of specific subcontractors. However, if the Offeror identifies a specific subcontractor to perform major or critical aspects of the requirement to demonstrate an acceptable technical solution under this evaluation factor, the proposal must provide a letter of commitment and explanation of the meaningful involvement that the subcontractor will have in performance of this contract. Any provided letters will be exempt from the page count.
Factor 2 – Management Approach
Provide a narrative describing the project management approach that meets the requirements of the RFP.
Organize the narrative into three parts to address the following:
(1) Management Team
- Provide a description of the proposed team members, including a) Offeror’s key personnel and b) proposed major subcontractors and their respective experience in executing requirements similar to the RFP.
- Address plan for securing, managing, and maintaining subcontracted labor for this RFP.
- Provide a chart and accompanying narrative to demonstrate the management hierarchy (by position) to include both the design and construction teams. This narrative shall include authorities; roles; responsibilities; and a brief synopsis of the names, education, training and experience of key individuals based on the proposed management structure. (Note: key personnel may vary among Offerors based on the proposed management structure.)
(2) Safety Program
- Describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
- Fully describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.
- Describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
- Describe methodology to execute an effective safety program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(3) Schedule
- Describe the key elements of your scheduling/phasing plan to demonstrate understanding of the project requirements. The schedule and narrative shall address potential impacts of submittals, reviews, and permits and detail a logical sequence of events to accomplish the scope of work as described in the RFP.
- Address, at a minimum, the ability to complete all the work within the provided timeframe or earlier. Offerors may propose a shorter duration in their schedule; however, the proposed duration will be incorporated into the contract and liquidated damages shall start the day following the completion date included the Offeror’s proposal.
The Narrative for elements (1) Management Team and (2) Safety Program as detailed above shall not exceed four (4) double-sided pages (or eight (8) single-sided pages). Up to three (3) organizational charts may be provided to supplement the narrative. The Government will not consider information submitted beyond this page limit (which does not include the organizational charts).
The Narrative for element (3) Schedule detailed above shall not exceed two (2) double-sided pages (or four (4) single-sided pages) and one (1) 11x17 sheet for the schedule.
(1) Management Team: The Government is seeking to determine that the Offeror has a defined management team identified to properly manage the project. A project management approach that creatively puts people or processes in place to minimize potential construction delays may be considered more favorably.
(2) Safety Program: The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which the safety management system described ensure safety compliance and performance of self-performed and subcontractor performed work. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
(3) Schedule: The Government will evaluate the Offeror’s proposed schedule to ensure it is technically feasible within the designated construction completion date and adequately addresses significant phasing while not impacting on-going operations.
Factor 3 – Past Performance:
Offerors do not need to provide any information under this factor as the Government will base the evaluation on information from the evaluation of the basic contract award.
This evaluation focuses on how well the Offeror performed on projects submitted for evaluation under the basic MACC award. More emphasis will be placed on projects that are more similar to the RFP. The
Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval
System (PPIRS), inquiries of owner representative(s), Federal Awardee Performance and Integrity
Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources.
The Government will consider the recency and relevancy of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the
Offeror’s past performance will be used as a means of evaluating the Offeror’s ability to successfully meet the requirements of the RFP. Offerors lacking past performance will receive a Neutral Confidence rating.
Price
Price shall be submitted on the Price Proposal Form included in the solicitation. The Offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. Additionally, the
Offeror shall submit one (1) hard copy Original, marked “Original”; one (1) CD-ROM (located on the same CD-ROM as the non-price proposal); and one (1) hard copy, marked “Copy”, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. All hard copies shall be in separate 3-ring binders. All submissions shall including the following:
Cover page with solicitation number, solicitation title, Offeror name, address, phone number, fax number, DUNS, CAGE code, Point of Contact (POC), POC phone number, and POC email address;
Price Proposal Form;
Acknowledged Amendments (if applicable);
Copy of Representation and Certifications and proof of registration in System for
Award Management (SAM); and
Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million
In the event of a discrepancy between the original and copies, the electronic version marked
“Original” of the proposal will govern. Also, price information included in the non-price/technical proposal will not be considered. Likewise, non-price/technical information included in the price proposal will not be considered.
The price proposal shall be submitted separately, but at the same time as the technical proposal.
Offerors may ship both the price proposal and the technical proposal in the same shipping container.
(b) Basis of Evaluation: The Government will evaluate price based on the total lump sum price.
Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of proposed prices with the Independent Government Cost Estimate
(IGCE).
c. Comparison of proposed prices with available historical information.
d. Comparison of market survey results.
Proposal Acceptance Period: 120 days from receipt of offers
Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. PPIs must be submitted in writing to Jennifer Stewart at jennifer.L.stewart1@navy.mil. The cutoff for PPIs is 29 May 2020 by 2:00 p.m. EST in order to process all inquiries by the proposal due date. Additionally, all inquiries shall be submitted using the Pre-
Proposal Inquiry (PPI) form, filed under “Attachments/Links.” Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates.
A response will be published via an amendment to https://beta.sam.gov/.
Site Visit: All MACC holders are invited to attend Site Visit for the project. Firms participating in the site visit will not be directly compensated for their participation. The site visit will be held 22 May 2020 at 0900. Attendees will meet at the Facilities Engineering and Acqusition Division (FEAD) Office, Building 163, Curtis Road, Marine Corps Air Station, Cherry Point NC 28533.
Departure for the Site visit will begin promptly at 0900. The Government will not wait for registered attendees who are late. Attendees will transport themselves in their own vehicles. In light of COVID-19, a maximum of two (2) attendees per Contractor will be permitted. Attendees will be required to wear a facemask.
If your company is interested in attending the site visit, please email jennifer.L.stewart1@navy.mil by close of business 20 May 2020 Names shall be provided as they appear on the attendee’s REAL ID.
Security Information: All contractors who are not in possession of a valid DBIDS badge for the specific sites must submit the complete name(s) of the individuals attending the site visit via email to jennifer.L.stewart1@navy.mil. Names should be submitted via email no later than close of business
20 May 2020.
Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed may be charged to or paid for by the Contractor at prevailing rates charged to the
Government or, where the utility is produced by the Government, at reasonable rates determined by the
Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge.
Record Shop Drawings: In accordance with FAR 52.236.21 Specifications and Drawings for
Construction, record shop drawings are required. Reproducible copies of these record drawings are required.
mailto:jennifer.L.stewart1@navy.mil https://beta.sam.gov/ mailto:jennifer.L.stewart1@navy.mil
Government Furnished Property: Not Included.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less. An electronic copy of your bid bond may be submitted with your proposal. A hard copy of your bid bond must be submitted to the OICC Florence office within one (1) week after the due date and time for receipt of proposals. Failure to submit a bid bond by the deadline will result in your proposal being removed from consideration.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Due Date: 17 June 2020 no later than 2:00 pm EST. LATE PROPOSALS WILL NOT
BE CONSIDERED.
Proposal Delivery Information: All proposals shall be emailed or hand carried to the following address:
Email Address for Proposals: jennifer.L.stewart1@navy.mil AND meghan.hislop@navy.mil
Proposals may also be hand-delivered to Building 163:
Resident Officer In Charge of Construction, Florence Cherry Point
Attn: Jennifer L. Stewart
779 Roosevelt Blvd, Cherry Point, NC 28533
Offerors who would like to hand deliver their proposal must have a valid DBIDS badge to enter Marine
Corps Air Station Cherry Point.
ATTACHMENTS:
(A) Price Proposal Form
(B) Wage Determination
PRICE PROPOSAL FORM
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001: DB Repair Building Envelope and Interior Finished, Building 1016
CLIN DESCRIPTION PRICE FOR
CLIN 0001
0001AA Price for the entire work for Facility Building 1016, complete to the 5-foot line outside of the building including the loading docks and roof overhangs, in accordance with the drawings and specifications, but excluding work described in
Contract Line Item (CLIN) 0001AB, 0001AC, 0001AD, 0002, and 0003
0001AB Price for the entire project Site Work, outside the
Facility Building 1016's 5-foot line, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AC, 0001AD, 0002, and
0003.
0001AC Price for the entire project Site Work, outside the
MILVANs 5-foot line, complete in accordance with the drawings and specifications but excluding work described in
CLIN 0001AA, 0001AB, 0001AD, 0002, and 0003.
0001AD Price for entire Design of the Project, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AB, 0001AC, 0002, and
0003.
Total Price for CLIN 0001: $______________
CLIN 0002: Planned Modification to procure, supervise, and install the Furniture, Fixtures, and
Equipment (FF&E), for Facility Building 1016, complete in accordance with the plans and specifications and in accordance with the following schedule:
CLIN Item Government
FF& E Estimate
HAR (NTE%) EST HAR Amount
(Gov’t FF&E Est x
HAR %)
Total CLIN 0002
FF&E
$840,497.68
CLIN 0003: Planned Modification to provide work in connection with all labor, material, equipment, transportation, and supervision required for the Audio/Visual (A/V) for Facility Building 1016, complete in accordance with the plans and specifications and in accordance with the following schedule:
CLIN Item Government
FF& E Estimate
HAR (NTE%) EST HAR Amount
(Gov’t FF&E Est x
HAR %)
Total CLIN 0004
A/V
$509,520
Total Price for CLINs 0001 – 0003: $______________________________________________
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, and
0001AD.
b. The Performance Bond must reflect 100 percent of the aggregate amount of all Items.
1.3 PLANNED MODIFICATION BID NOTES
These notes apply to the Planned Modification CLINS.
a. The estimated amount for FF&E and A/V has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E and A/V including freight and installation charges. The
Government FF&E and A/V Estimate is only an estimated amount.
b. If awarded, line items will be funded separately after completion of FF&E and A/V design package review by the Government, and receipt of appropriate funding by the
Government. Requirements and details are provided in E20, FURNISHINGS and E10, EQUIPMENT of the RFP.
c. Bonding is not required for the design, procurement and installation of FF&E and A/V equipment.
d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and A/V not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of
FF&E and A/V. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the
FF&E and A/V. The proposed HAR is a fixed rate.
e. The Government is not obligated to award the Planned Modification line item(s). Should the Government choose to award the Planned Modification, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V.
f. If awarded, the FF&E and A/V modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and
A/V as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and A/V package was submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government's award of the modification is in the last six months of the contract.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document
Wage Determination
General Decision Number: NC20200065 01/03/2020
Superseded General Decision Number: NC20190065
State: North Carolina
Construction Type: Building
Counties: Chowan, Craven, Dare, Gates, Jones, Martin and Washington
Counties in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of
$10.80 for calendar year 2020 applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The
EO minimum wage rate will be adjusted annually. Please note that this
EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon
Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
* PLUM0421-004 07/01/2018
Rates Fringes
PIPEFITTER (Excluding HVAC
System Installation).............$ 28.00 12.01
SUNC2011-046 08/26/2011
Rates Fringes
BRICKLAYER.......................$ 19.38 8.73
CARPENTER (Drywall Hanging
Only)............................$ 18.13 1.31
CARPENTER (Form Work Only).......$ 14.21 0.41
CARPENTER, Excludes Drywall
Hanging, and Form Work...........$ 14.64 2.39
CEMENT MASON/CONCRETE FINISHER...$ 14.02 0.00
ELECTRICIAN......................$ 17.10 1.47
HVAC MECHANIC (HVAC Duct
Installation Only)...............$ 15.58 1.53
IRONWORKER, STRUCTURAL...........$ 18.75 5.62
LABORER: Common or General......$ 10.57 0.67
LABORER: Landscape &
Irrigation.......................$ 10.29 1.82
LABORER: Mason
Tender-Brick/Cement/Concrete.....$ 10.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 14.71 2.33
OPERATOR: Crane.................$ 19.25 2.37
OPERATOR: Grader/Blade..........$ 15.71 1.49
PAINTER: Brush, Roller and
Spray............................$ 14.36 1.97
PLUMBER (HVAC Unit
Installation)....................$ 16.96 3.17
PLUMBER, Excludes HVAC Unit
Installation.....................$ 17.34 2.09
ROOFER...........................$ 13.55 0.80
SHEET METAL WORKER, Excludes
HVAC Duct and Unit
Installation.....................$ 13.09 1.28
TRUCK DRIVER: Dump Truck........$ 12.50 1.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for
Federal Contractors applies to all contracts subject to the Davis-Bacon
Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the
EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE:
UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional
Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of
Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part
1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .