Building1016_Part3_Ch6_G30_Revised.pdf
PDF 168 KB Posted
- Solicitation number
- N6247020R6004
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Building Envelope and Interior Finishes, Building 1016 WO # N40085-19-F-6948 Building 1016, Cherry Point, North Carolina
PART 3 - CHAPTER 6 - Page 568 06/12/2020
G304003 UNDERGROUND HOT WATER SYSTEMS
G304004 UNDERGROUND STEAM SYSTEMS
G304005 REINFORCED CONCRETE MANHOLES & VALVE BOXES
Provide valve boxes for building supply taps and system isolation.
G304090 OTHER HEATING DISTRIBUTION
G3050 COOLING DISTRIBUTION
G305001 OVERHEAD COOLING SYSTEMS
G305002 UNDERGROUND COOLING SYSTEMS
G305090 OTHER COOLING DISTRIBUTION
G3060 FUEL DISTRIBUTION
G306001 LIQUID FUEL DISTRIBUTION PIPING
G306003 LIQUID FUEL STORAGE TANKS
Provide aboveground storage tanks for fuel.
G306004 LIQUID FUEL DISPENSING EQUIPMENT
G306006 GAS DISTRIBUTION PIPING PROPANE
Provide steel natural piping system.
G306007 GAS STORAGE TANKS
Provide propane storage tank with a capacity of 2,000 gallons. Two (2) 1,000 gallon propane storage tanks are to be provided and installed.
Providing gas to fill the tanks is the responsibility of the general contractor. Contractor is responsible to fill these tanks.
G306009 OTHER GAS DISTRIBUTION
G306090 OTHER FUEL DISTRIBUTION
Provide warning, identification tape, and tracer wire for underground utilities.
G3090 OTHER SITE MECHANICAL UTILITIES
-- End of Section --
Repair Building Envelope and Interior Finishes, Building 1016 WO # N40085-19-F-6948 Building 1016, Cherry Point, North Carolina
PART 3 - CHAPTER 6 - Page 569 06/12/2020
G40 SITE ELECTRICAL UTILITIES
SYSTEM DESCRIPTION
Demolish the existing underground primary service, pad-mounted transformer and secondary service and provide a new underground primary service, pad-mounted transformer and secondary building service.
The site electrical utility system consists of all power from the existing distribution system point of connection including all connections, accessories and devices as necessary and required for a complete and usable system. This section covers installations up to within 5 feet (1.5 meters) of new (or existing) building location.
The existing underground primary system in the area of the facility is scheduled for upgrade/replacement. Multiple tie-ins may be required to accommodate existing and new circuit placement. Point of connection of the electrical is proposed in the area of the existing manhole.
The point of connection to for the underground communication system to the building is from manhole C-113 and will remain.
GENERAL SYSTEM REQUIREMENTS
Provide an Electrical System complete in place, tested and approved, as specified throughout this RFP, as needed for a complete, usable and proper installation. Install all equipment in accordance with PTS Section G40 and the manufacturer's recommendations. Where the word "should" is used in the manufacturer's recommendations, substitute the word "must".
Provide site electrical utilities systems and components that support project sustainability goals of Part 2 Section 01 33 29.05 20, Sustainability Reporting for Design Build.
G4010 ELECTRICAL DISTRIBUTION
Connect to the existing 12.47kV, three phase, four wire, 60 Hertz electrical power system. The connection point must be underground at Manhole 113 and extended to the project site underground in ductbank to a Pad Mounted Transformer. A temporary tap or connection can be made at manhole 113, but must be removed once the existing pad mounted transformer is removed.
The available fault current at the point of connection must be assumed to be an infinite bus.
G401001 SUBSTATIONS
Not used
G401002 TRANSFORMERS
Provide a three phase pad mounted transformer to feed the facility.
Provide the following features:
File details come from the government source that posted it. Updated .