Repair Building Envelope and Interior Finishes, Building 1016 WO # N40085-19-F-6948 Building 1016, Cherry Point, North Carolina
Part 3 – CHAPTER 5 - Page 373 06/12/2020
Warehouse Space – IMRL A-101
Space Characteristics
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 32,631 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14 Number of Occupants varies Other/Special Requirements:
Uniformat Section
Description Qty Size Specific Requirements
B202002 Exterior Doors 5 3-0 x 7-0 Replace existing with insulated metal doors and frames
B202002 Exterior Doors 3 12 x 9-10 Replace existing Overhead Coiling Doors
C102001 Standard Interior Doors 2 3-0 x 7-0 Hollow Metal Doors and Frames
C102023 Fire Doors 1 10-0 x 10-0 Overhead Coiling Doors in CMU wall between bays C and D
C102007 Exterior Door Hardware 5 Hardware Set 01
C102007 Interior Door Hardware Hardware Set 06
C103004 Identifying Devices A/R
(1) at each exterior door and (1) at each interior door
C201090 Handrails, Guardrails A/R At Existing stairs to Mezzanine
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes
Existing concrete to remain where level with warehouse floor, raised portion to be removed and replaced with new concrete floor to match existing. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
D305002 Unit Heaters A/R Gas fired infrared heaters at roll-up doors and hot water fan forced for area heating.
D304007 Exhaust Systems A/R Rooftop per ESR.
Part 3 – CHAPTER 5 - Page 374 06/12/2020
Warehouse Space – IMRL A-101
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 32,631 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Per ESR
D5020 Lighting A/R High Bay LED Lighting per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
E202090 Fire Extinguishers A/R Per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: Bay C: 2 30” x 60” desks, 3 task chairs, 1 large or 2 medium worktables (min. 36” x 60”), 1 bookshelf, 1 under counter refrigerator, 1 microwave.
Part 3 – CHAPTER 5 - Page 375 06/12/2020
Secure Cage Area – A101A
Function/adjacencies: Located in Bay A, see Concept plan
Dimensions: 192 SF Minimum Ceiling Height: Open to the structure
Acoustics:
Access: Authorized Staff Number of Occupants: 0
Description Qty Size Specific Requirements
C101002 Demountable Partitions
1 12’ x16’ min.
Steel mesh with steel mesh ceiling
C102090 Interior Specialty Doors
1 5’ wide Lockable steel mesh for partitioned space
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: NONE
Part 3 – CHAPTER 5 - Page 376 06/12/2020
Receiving – A-101B
Function/adjacencies: Near Overhead door at loading dock Dimensions: 490 SF Minimum Ceiling Height: Open to the structure
Acoustics:
Access: Authorized Staff
Description Qty Size Specific Requirements
C101002 Demountable Partitions 1 20’ x 24’ Steel mesh with steel mesh ceiling
C102090 Interior Specialty Doors 1 5’wide Lockable steel mesh for partitioned space
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
Part 3 – CHAPTER 5 - Page 377 06/12/2020
Warehouse Space – Pack and Preserve A-102
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 23,762 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
B202002 Exterior Doors 3 3-0 x 7-0 Replace existing with insulated metal doors and frames
B202002 Exterior Doors 3 12 x 9-10 Replace existing Overhead Coiling Doors
C102001 Standard Interior Doors
1 3-0 x 7-0 Hollow Metal Doors and Frames
C102007 Interior Door Hardware
1 Hardware Set 06
C102023 Fire Doors 1 10-0 x 10-0 Overhead Coiling Doors in CMU walls between bays E and F
C102007 Exterior Door Hardware
Hardware Set 01
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
D201090 Emergency Fixtures 1 Eyewash and Emergency Shower in Bay D and E – Pack and Preserve Area
D305002 Unit Heaters A/R Gas fired infrared heaters at roll-up doors and hot water fan forced for area heating.
D304007 Exhaust Systems A/R Rooftop per ESR.
D309090 Other Special Mechanical A/R
Dust collection system suitable for wood working
D4010 Fire Alarm and Detection Systems A/R Per ESR
Part 3 – CHAPTER 5 - Page 378 06/12/2020
Warehouse Space – Pack and Preserve A-102
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 23,762 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
D4040 Sprinkler Systems Per ESR
D5020 Lighting A/R High Bay LED Lighting per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
E202090 Fire Extinguishers A/R Per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: one (1) Stanley Vidmar or equal 60’ Packing station, four (4) 36” x 60” utility tables
Part 3 – CHAPTER 5 - Page 379 06/12/2020
Secure Cage Area – A102A
Function/adjacencies:
Dimensions: 530 SF Minimum Ceiling Height: Open to the structure
Acoustics:
Access: Authorized Staff
Description Qty Size Specific Requirements
B202002 Exterior Doors 1 3-0 x 7-0 Replace existing with insulated metal doors and frames
C102007 Exterior Door Hardware
1 1 Hardware Set 01
C101002 Demountable Partitions
1 28’ x 16’ min.
Steel mesh with steel mesh ceiling
C102090 Interior Specialty Doors
1 5’ wide Lockable steel mesh gate for partitioned space
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: one (1) Stanley Vidmar 60” or equal Packing station, four (4) 36” x 60” utility tables 1 wall locker.
Part 3 – CHAPTER 5 - Page 380 06/12/2020
Warehouse Space – MALS 14 AVIATION SUPPLY A-103
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 23,871 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
B202002 Exterior Doors 3 3-0 x 7-0 Replace existing with insulated Metal Doors and frames
B202002 Exterior Doors 3 12 x 9-10 Replace existing Overhead Coiling Doors
C102007 Exterior Door Hardware
3 Hardware Set 01
C3010 Wall Finishes Existing to Remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
D201006 Drinking Fountains And Coolers
1 Water cooler with bottle filler.
D201090 Emergency Fixtures 1 Eyewash and Emergency Shower in Bay F and G – Pack and Preserve Area
D305002 Unit Heaters A/R Gas fired infrared heaters at roll-up doors and hot water fan forced for area heating.
D304007 Exhaust Systems A/R Rooftop per ESR.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Per ESR
D5020 Lighting A/R High Bay LED Lighting per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
Part 3 – CHAPTER 5 - Page 381 06/12/2020
Warehouse Space – MALS 14 AVIATION SUPPLY A-103
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 23,871 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
E202090 Fire Extinguishers A/R Per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: Bay F: 3 30” x 60” desks, 4 task chairs, 1 60” utility table, 2 file cabinets, Part 3 – CHAPTER 5 - Page 382 06/12/2020
Boiler Room – A103.A
Function/adjacencies: Existing Steam Pit Location
Dimensions: 229 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Authorized Staff
Description Qty Size Specific Requirements
B202002 Exterior Doors 1 3-0 x 7-0 Replace existing doors with insulated steel doors and frames
C102007 Exterior Door Hardware
Hardware Set 01
C103004 Identifying Devices
1 Exterior mounted on building
C3010 Wall Finishes 1 hr. rated Concrete Masonry Unit assembly
C3020 Floor Finishes New Concrete to match existing floor elevation
C3030 Ceiling Finish 1 hr. rated Gyp bd. assembly
C3010 Interior Painting SF GWB wall and ceiling surfaces.
D305002 Unit Heaters A/R Gas fired unit heater.
D304007 Exhaust Systems A/R Provide ducted exhaust per ESR.
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
Part 3 – CHAPTER 5 - Page 383 06/12/2020
Warehouse Space – MALS 14 AVIATION SUPPLY A-104
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 33,128 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
B202002 Exterior Doors 5 3-0 x 7-0 Replace existing with insulated metal doors and frames
B202002 Exterior Doors 4 12 x 9-10 Replace existing Overhead Coiling Doors
C102023 Fire Doors 1 10-0 x 10-0 Overhead Coiling Doors in CMU walls between bays H and G
C3010 Wall Finishes Existing to remain
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
D201006 Drinking Fountains And Coolers
1 Water cooler with bottle filler.
D305002 Unit Heaters A/R Gas fired infrared heaters at roll-up doors and hot water fan forced for area heating.
D304007 Exhaust Systems A/R Rooftop per ESR.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Per ESR
D5020 Lighting A/R High Bay LED Lighting per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
D5030 Other Communications and Alarm Systems
A/R Per ESR
Part 3 – CHAPTER 5 - Page 384 06/12/2020
Warehouse Space – MALS 14 AVIATION SUPPLY A-104
Function/adjacencies: Open warehouse space for use by MALS14 Supply and Maintenance units. Warehouse is used for storing and maintaining aircraft parts and operates 24 hours a day, seven days a week to support the Fleet.
Dimensions: 33,128 SF Minimum Ceiling Height: Open to the structure
Acoustics: N/A Access: MALS 14
Description Qty Size Specific Requirements
E2010 Fixed Furnishings Existing secure storage rack system to remain in Bay J
E2010 Fixed Furnishings Two 48” x 60” magnetic marker boards, one 48” cork tack board
E202090 Fire Extinguishers A/R Per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: Bay H: Eleven (11)30” x 60” desks with task chairs, 2 bookshelves, 1 60” utility table, 1 under counter refrigerator, 1 microwave.
Part 3 – CHAPTER 5 - Page 385 06/12/2020
Receiving – A-104A
Function/adjacencies: Loading Dock and Overhead door Bay H
Dimensions: 484 SF Minimum Ceiling Height: Open to the structure
Acoustics:
Access: Authorized Staff
Description Qty Size Specific Requirements
C101002 Demountable Partitions
Steel mesh with steel mesh ceiling
C102090 Interior Specialty Doors
Lockable steel mesh for partitioned space
C3020 Floor Finishes Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3010 Wall Finish Existing to remain
C3030 Ceiling Finish No ceiling finish, open to structure above, no painting required.
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following items: 30” x 48” Desk and task chair
Part 3 – CHAPTER 5 - Page 401 06/12/2020
Level 3 Secure Storage – A113
Function/adjacencies: In Bay H, by existing exterior door
Dimensions: 335 SF Ideal Plan Dimensions: 335 SF Level 3 area, 320 SF Level 2 area Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Authorized Staff
Other/Special Requirements: Cipher Security Locks at gate and door
Description Qty Size Specific Requirements
C102001 Interior Doors 2 3-0 x 7-0 Hollow Metal Doors and Frames
C102007 Interior Door Hardware
2 3-0 x 7-0 Hardware Set 08 with cipher lock
C103004 Identifying Devices
1 Room name and number sign
C3010 Wall Finish High Impact GWB
C3010 Interior Painting GWB walls and ceiling
C3020 Floor Finish Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
C3030 Ceiling Finish GWB
D3040 HVAC A/R Provide ducted supply and return per ESR.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
D5020 Lighting A/R 1’ X 4’ LED Troffer
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
Part 3 – CHAPTER 5 - Page 402 06/12/2020
Level 3 Secure Storage – A-113A
Function/adjacencies: Entrance to Secure Storage A-113
Dimensions: SF Ideal Plan Dimensions: 335 SF Level 3 area, 320 SF Level 2 area Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Authorized Staff
Other/Special Requirements: Cipher Security Locks at gate and door
Description Qty Size Specific Requirements
C101002 Demountable Partitions Steel mesh with steel mesh ceiling
C102090 Interior Specialty Doors 5’ wide Lockable steel mesh for partitioned space
C103004 Identifying Devices Room Number sign on mesh by gate
C3020 Floor Finish SF Existing concrete to remain. All striping demarcations to be removed. Power clean existing concrete.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must
Part 3 – CHAPTER 5 - Page 439 06/12/2020
Fire Pump Room – A-134
Function/adjacencies: Must meet Requirements of UFC 3-600-01 for Fire Pump Room with exception of being on grade
Dimensions: 132 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Maintenance Staff
Description Qty Size Specific Requirements
B102001 Exterior Doors 2 3-0 x 7-0 Steel Door and frame
C102001 Standard Interior Doors
1 3-0 x 7-0 Hollow metal door and frame
C102007 Door Hardware 1 Hardware Set 08
C103004 Identifying Devices
1 Room Name Sign
C3010 Wall Finish Impact Resistant GWB
C3020 Floor Finish SF Existing Concrete
C3010 Interior Painting SF GWB wall surfaces.
C3030 Ceiling Finish Existing to remain, no new finish
D3040 HVAC A/R Provide ducted exhaust per ESR.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
D5020 Lighting A/R 1’ X 4’ LED Troffer per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must workshop (CDW). Space will accommodate, at a minimum, the following items: None
Part 3 – CHAPTER 5 - Page 440 06/12/2020
Corridor – A-135
Function/adjacencies:
Dimensions: 837 SF Minimum Ceiling Height: 8’-0”
Acoustics:
Access: Staff Number of Occupants:
Description Qty Size Specific Requirements
C102001 Standard Interior Doors
1 8’ x 8’ Manually operated overhead coiling door with hardware by manufacturer
C3010 Wall Finish Impact Resistant GWB
C3010 Interior Painting SF GWB wall surfaces.
C3020 Floor Finish SF Epoxy Resin
C3020 Wall Base Finish LF Epoxy Resin
C3030 Ceiling Finish SF 24”X24” ACT
D201006 Drinking Fountains and Coolers
1 Water cooler with bottle filler.
D3040 HVAC A/R Provide ducted supply and return per ESR.
D4010 Fire Alarm and Detection Systems A/R Per ESR
D4040 Sprinkler Systems Add sprinkler heads as required per ESR
D5020 Lighting A/R Recessed 2’ X 4’ LED Troffers per ESR
D5020 Branch Wiring A/R Branch Circuits & Outlets per ESR
FF&E Information for Coordination: FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the base bid/construction contract. Contractor’s Interior Designer must workshop (CDW). Space will accommodate, at a minimum, the following items: None