Repair Building Envelope and Interior Finishes, Building 1016 WO # N40085-19-F-6948 Building 1016, Cherry Point, North Carolina

PART 3 - CHAPTER 6 - Page 554 06/12/2020

G101004 GRUBBING

G101005 SELECTIVE THINNING

G101006 DEBRIS DISPOSAL

Waste materials will become the property of the Contractor; transport, dispose of or recycle waste materials in accordance with Part 2 Section 01 57 19, Temporary Environmental Controls.

G1020 SITE DEMOLITION & RELOCATIONS

The items to be reused or relocated include dumpsters, pumps, meters, valves, and topsoil.

G102001 BUILDING MASS DEMOLITION

G102002 ABOVEGROUND SITE DEMOLITION

G102002 1.1 ABOVEGROUND STORAGE TANKS

Perform aboveground storage tanks work in accordance with the specifications and plans provided in Part 6.

Specifications for the above grade storage tank to be provided by the propane tank supplier.

G102003 UNDERGROUND SITE DEMOLITION

Preserve the following underground site elements: existing utilities required to maintain function of building during phasing of project.

Remove utilities as indicated on the drawings in Part 6. Remove all appurtenances associated with the utility to be removed so there is no presence of the utility at ground surface.

Abandon utility systems in a manner that conforms to applicable codes and regulations. When piping is abandoned in place, fill abandoned piping with flowable fill. Remove existing utility structures to 3 feet (900 mm) below existing or new adjacent grade, whichever is greater. Break up bases to permit drainage. Fill with clean sand.

All conduits to be abandoned must remove the wiring in place.

G102003 1.1 UNDERGROUND STORAGE TANKS

The project site does not require underground storage tank removal.

G102004 BUILDING RELOCATION