RFP Attachment 34 - Drawings 695-21-700 Part 27.pdf

PDF 9 MB Posted

Attached to
Y1DZ--EHRM Infrastructure Upgrades Tier 1 Construction 695-21-700 Milwaukee
Solicitation number
36C77626R0002
Issued by

About this file

This file is a set of architectural and technology infrastructure drawings for Building 144 EHRM Infrastructure Upgrades at the Milwaukee VA Medical Center, located at 5000 W. National Avenue, Milwaukee, Wisconsin. The drawings were prepared by Romanyk Consulting Corp. as the Architect/Engineer of Record, with IMEG Corp. as the project coordinator. The final bid documents are dated September 5, 2025, and correspond to drawing number 695-21-700.

The drawings document comprehensive technology infrastructure work including network cabling, wireless access points, surveillance cameras, and telecommunications systems across multiple floors and areas of Building 144. The scope includes demolition plans for existing cabling with replacement of network infrastructure, installation of new CAT6A information outlets, and routing of new J-hook cable supports. Work is divided into basement areas (A through F) and first floor areas (A through F), with network cables terminating at specified telecommunication rooms (TR-144-G68, TR-144-G22, TR-144-175, and TR-144-146). The drawings note that existing wireless access points and surveillance cameras shall remain in place, with work limited to cable replacement only. Contractors are required to include allowances for 10% additional CAT6A information outlets in proposals, with final outlet locations to be determined by the VA at a later date. The design reflects 35% schematic design submission (May 2021), 65% design development submission (June 2021), and 65% design development resubmission (August 2021) phases.

View the file

Other files

File Type Posted
36C77626R0002 Amendment 0006.pdf PDF
695-21-700 Technical Question Tracking Sheet - Milw EHRM FINAL 7-22-26.pdf PDF
695-21-700 Amend 5 CIVIL UPDATED full set 2026-07-17.pdf PDF
36C77626R0002 Amendment 0004.pdf PDF
695-21-700 Spec and Drawing Narrative 7-10-26.pdf PDF
695-21-700 ARCH Full - 7-10-26.pdf PDF
695-21-700 PLUMB Full - 7-10-26.pdf PDF
695-21-700 Tech Qtn Tracking Sheet - Milw EHRM FINAL 7-15-26.pdf PDF
695-21-700 Specs Part 1 - 7-10-26.pdf PDF
695-21-700 Specs Part 3 - 7-10-26.pdf PDF
695-21-700 TECH Full - 7-10-26.pdf PDF
695-21-700 Specs Part 2 - 7-10-26.pdf PDF
695-21-700 ELEC Full - 7-10-26.pdf PDF
695-21-700 FIRE X Full - 7-10-26.pdf PDF
695-21-700 MECH Full - 7-10-26.pdf PDF
36C77626R0002 Amendment 0003.pdf PDF
36C77626R0002 Amendment 0002.pdf PDF
695-21-700 Site Visit Sign In Sheet 5-6-2026.pdf PDF
AMENDED RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
RFP 36C77626R0002.pdf PDF
RFP Attachment 2A - Site Visit Campus Map - Milwaukee.pdf PDF
RFP Attachment 5 - Specs 695-21-700 Part 1.pdf PDF
RFP Attachment 8 - Drawings 695-21-700 Part 1.pdf PDF
RFP Attachment 11 - Drawings 695-21-700 Part 4.pdf PDF
RFP Attachment 13 - Drawings 695-21-700 Part 6.pdf PDF
RFP Attachment 18 - Drawings 695-21-700 Part 11.pdf PDF
RFP Attachment 20 - Drawings 695-21-700 Part 13.pdf PDF
RFP Attachment 22 - Drawings 695-21-700 Part 15.pdf PDF
RFP Attachment 28 - Drawings 695-21-700 Part 21.pdf PDF
RFP Attachment 30 - Drawings 695-21-700 Part 23.pdf PDF
RFP Attachment 35 - Project Information Sheet for Contractors.docx DOCX document
RFP Attachment 2 - Site Visit - Milwaukee.pdf PDF
RFP Attachment 7 - Specs 695-21-700 Part 3.pdf PDF
RFP Attachment 12 - Drawings 695-21-700 Part 5.pdf PDF
RFP Attachment 16 - Drawings 695-21-700 Part 9.pdf PDF
RFP Attachment 19 - Drawings 695-21-700 Part 12.pdf PDF
RFP Attachment 23 - Drawings 695-21-700 Part 16.pdf PDF
RFP Attachment 24 - Drawings 695-21-700 Part 17.pdf PDF
RFP Attachment 25 - Drawings 695-21-700 Part 18.pdf PDF
RFP Attachment 32 - Drawings 695-21-700 Part 25.pdf PDF
RFP Attachment 36 - PPQ.docx DOCX document
RFP Attachment 1 - DBA Rates - Milwaukee County - 1-2-26.pdf PDF
RFP Attachment 4 - Limitations on Subcontracting - Milwaukee.docx DOCX document
RFP Attachment 6 - Specs 695-21-700 Part 2.pdf PDF
RFP Attachment 15 - Drawings 695-21-700 Part 8.pdf PDF
RFP Attachment 17 - Drawings 695-21-700 Part 10.pdf PDF
RFP Attachment 27 - Drawings 695-21-700 Part 20.pdf PDF
RFP Attachment 29 - Drawings 695-21-700 Part 22.pdf PDF
RFP Attachment 31 - Drawings 695-21-700 Part 24.pdf PDF
RFP Attachment 33 - Drawings 695-21-700 Part 26.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHEELCHAIR STORAGE

VISITOR

WAITING

AREA

ALCOVE

ALCOVE

ALCOVE

DINING

CART

STORAGE

VOLUNTEER STATION

REC

THERAPY

STORAGE

ALCOVE

ASSISTIVETECHNOLOGY/ 3DPRINTING LAB

SOILED LINEN

NOURISHMENT STATION

CLEAN LINEN

CLEAN UTILITY

MEDICAL

EQUIPMENT

STORAGE

HAC

ELEVATOR-2

ELEVATOR-1

STAIR 1

RECREATION

THERAPY

STORAGE

VISITOR TOILET

VISITOR TOILET

CORRIDOR

CORRIDOR

ELEVATOR LOBBY

TOILET

CORRIDOR

PATIENT

LAUNDRY

DAY RM

VESTIBULE

REC

THERAPY

OFFICE

RECREATIONTHERAPY MP RM

MULTI PURPOSE RM

ELECTRICAL

TELEPHONE

PATIENT BED RM-14

TOILET

TOILET

AL15

AL17

AL16

171A

170A

107HC

EL-SCI-2

EL-SCI-1

ST-SCI-1

C103

C102

181A

C101

174EC

176A

180A

1D-WAP 1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

V

1V

V

2D2V 2D2V

2D2V

1D-WAP

1D-WAP

1D-WAP

D

V

1D-CAM

D

- C A

M

V

1V1V

D

V

3D1V

D

V

1D-WAP

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:1

P M

BUILDING 144 FIRST FLOOR DEMO PLAN -

TECHNOLOGY - AREA B

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TD101B

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

SHEET NOTES:

1. REMOVE ALL NETWORK CABLING TO POINTS

OF TERMINATION IN ASSOCIATED TELECOM

ROOMS. REFER TO FLOOR PLANS AND SHEET

T1001 FOR TR ROOM LOCATIONS.

2. REFER TO ARCHITECTURAL PHASING PLANS

FOR WHEN EXISTING CABLING IS ALLOWED TO

BE DEMOLISHED.

3. FOR ALL EXISTING WIRELESS ACCESS POINTS

AND SURVEILLANCE CAMERAS, DEVICES

SHALL REMAIN. SCOPE OF WORK INCLUDES

CABLE REPLACEMENT ONLY. COORDINATE

WITH COR FOR ANY DOWNTIME OF DEVICES.

4. EXISTING LOCATIONS OF WORK AREA

OUTLETS SHOWN ON THIS SHEET MAY NOT

NECESSARILY BE IN THE EXACT LOCATION AS

IDENTIFIED.

Revisions: Date:

PNEUMATIC TUBE

CODE

CART

ALCOVE

SOILED UTILITY

NURSE STATION

CORRIDOR

ALCOVEALCOVE ALCOVE ALCOVE

VENT RM-15

TOILET TOILET

VENT RM-16 VENT RM-17

TOILET TOILET

VENT RM-18 PATIENT RM-19

RN EDUCATORS

CLINICAL

N.LEADER OFFICE

ELEVATOR-3

STAFF

CONFERENCE

/ KITCHENETTE

PROGRAM

MANAGER

OFFICE

PROGRAM

MANAGER

OFFICE

ASSISTIVE

TECHNOLOGY

THERAPIST OFFICE

RESIDENT/FELLOW

PHYSICIANS

OFFICE

PROGRAM MANAGER OFFICE

CORRIDOR

STAFF

TOILET-1

STAFF

TOILET-2

STAFF

TOILET-3

STAFF LOCKER

RM (UNISEX)

NURSE

WORK RMSTORAGE

SPECIAL

BED

STORAGE

CORRIDOR

CORRIDOR

ASSISTIVE

TECHNOLOGY/ 3D

PRINTING LAB

SOILED LINEN

NOURISHMENT STATION

CLEAN LINEN

CLEAN UTILITY

MEDICAL

EQUIPMENT

STORAGE

HAC

VISITOR TOILET

135A

C105

AL2AL1 AL3 AL4

130A 131A

131 132 132A 133A

EL-SCI-3

111 112

C108

117B117A117C

135B121

C106

C107

107HC

UNDER CONSTRUCTION

1D-WAP

D

V

D

V

D

V

D

V

1V

1D-WAP

1D-WAP

1D-WAP

D

V 2

D V

2D2V 2D2V 2D2V 2D2V

2D2V 2D2V 2D2V3D 3D 2D2V

2D2V

D

V

1V

1V

D

3D

D

2D2V

D

V

D

V

D

V 2 D

V

D

V

2D2V

2D2V

3D

1D-WAP

1D-WAP

1D-WAP 2

D

V

D

V

1D-WAP

3D 3D1 V 1 V

1D-WAP

3D 3D1 V 1 V

2D 2V

2D2V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

2D2V

3D

3D 3D

D

V

2D2V2D2V2D2V

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:1

P M

BUILDING 144 FIRST FLOOR DEMO PLAN -

TECHNOLOGY - AREA C

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TD101C

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

SHEET NOTES:

1. REMOVE ALL NETWORK CABLING TO POINTS

OF TERMINATION IN ASSOCIATED TELECOM

ROOMS. REFER TO FLOOR PLANS AND SHEET

T1001 FOR TR ROOM LOCATIONS.

2. REFER TO ARCHITECTURAL PHASING PLANS

FOR WHEN EXISTING CABLING IS ALLOWED TO

BE DEMOLISHED.

3. FOR ALL EXISTING WIRELESS ACCESS POINTS

AND SURVEILLANCE CAMERAS, DEVICES

SHALL REMAIN. SCOPE OF WORK INCLUDES

CABLE REPLACEMENT ONLY. COORDINATE

WITH COR FOR ANY DOWNTIME OF DEVICES.

4. EXISTING LOCATIONS OF WORK AREA

OUTLETS SHOWN ON THIS SHEET MAY NOT

NECESSARILY BE IN THE EXACT LOCATION AS

ALCOVEALCOVE

PATIENT RM-19

TOILET TOILET PATIENT

RM-21

SOILED UTILITY

ALCOVE

ALCOVE

ALCOVE

PATIENT

RM-24 A/B

REHAB

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-24 A/B

REHAB

PATIENT

RM-25 A/B

REHAB

ELECTRICAL

TELEPHONE

HAC

PATIENT

RM-22

ISOLATION

ANTE

RM-20 SOILED LINEN

ANTE

RM-22

TOILETTOILET

ISOLATION

RM-1

AL6AL5

136A 137A

AL7

AL8

162B

162A

161B

161A

147EC

145HC

141 142 143

144A140A140

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

1V

1V

D

D

1D-WAP

1D-WAP

1D-WAP

D

D

V

V

V

V3D 3D

1D-WAP

D

V

D

V

D

V

D

V

D

V

D

V

D

V

D

V

2D 1V 2D 1V

2D 1V 2D 1V

2D 1V

1D 1V

1D 1V 2D 1V

1D 1V1D 1V

1D 1V

2D1V 2D1V

2D1V 2D1V

2D1V 2D1V

2D1V

1D 1V 2D 1V

2D 1V

1D1V

1D1V 1D1V

2D1V 1D1V

1D1V

1D1V

2D1V

D

V

D

V

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:1

P M

BUILDING 144 FIRST FLOOR DEMO PLAN -

TECHNOLOGY - AREA D

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TD101D

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

SHEET NOTES:

1. REMOVE ALL NETWORK CABLING TO POINTS

OF TERMINATION IN ASSOCIATED TELECOM

ROOMS. REFER TO FLOOR PLANS AND SHEET

T1001 FOR TR ROOM LOCATIONS.

2. REFER TO ARCHITECTURAL PHASING PLANS

FOR WHEN EXISTING CABLING IS ALLOWED TO

BE DEMOLISHED.

3. FOR ALL EXISTING WIRELESS ACCESS POINTS

AND SURVEILLANCE CAMERAS, DEVICES

SHALL REMAIN. SCOPE OF WORK INCLUDES

CABLE REPLACEMENT ONLY. COORDINATE

WITH COR FOR ANY DOWNTIME OF DEVICES.

4. EXISTING LOCATIONS OF WORK AREA

OUTLETS SHOWN ON THIS SHEET MAY NOT

NECESSARILY BE IN THE EXACT LOCATION AS

FOLDING

CORRIDOR

PATIENT

RM-25 A/B

REHAB

ALCOVE

ALCOVE

PYXIS ALCOVE

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-27 A/B

REHAB

PATIENT

RM-29 A/B

REHAB

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-31 A/B

REHAB

BED RM

CLOSET

TOILET

PATIENT RM-33

DINING

KITCHEN

PATIENT RM-32

TOILET

TOILET

PATIENT RM 30

PATIENT RM-28

TOILET

TOILET

PATIENT RM-26

ELECTRICALISOLATION

STAFF

CONFERENCE

/ KITCHENETTE

PROGRAM

MANAGER

OFFICE

PROGRAM

MANAGER

OFFICE

C109

AL14

AL13

AL9

AL10

160B

160A

157B

157A

AL12

AL11

156A

155A

156B

155B

154B

154C 154A

154E

154D

153A

152A

151A

148A

147EC

144144A140A

EL-SCI-3

1D-WAP

D

V3D1V

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1V

1V

D

D

D

D

D

D

D

D

1V

1V

1D 1V

1D 1V 2D 1V

1D 1V1D 1V

1D 1V2D 1V

1D 1V

1D-WAP

1D-WAP

2D 1V

2D 1V

2D 1V2D 1V

2D 1V 2D 1V

2D 1V 2D 1V

1D1V 1D1V

1D1V 2D1V 1D1V

1D1V 1D1V

2D1V

1D 1V 1D 1V

2D 1V1D 1V 1D 1V

1D 1V2D 1V

1D 1V

2D1V 2D1V

2D1V 2D1V

2D 1V 2D 1V

2D 1V 2D 1V

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:1

P M

BUILDING 144 FIRST FLOOR DEMO PLAN -

TECHNOLOGY - AREA E

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TD101E

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E

SHEET NOTES:

1. REMOVE ALL NETWORK CABLING TO POINTS

OF TERMINATION IN ASSOCIATED TELECOM

ROOMS. REFER TO FLOOR PLANS AND SHEET

T1001 FOR TR ROOM LOCATIONS.

2. REFER TO ARCHITECTURAL PHASING PLANS

FOR WHEN EXISTING CABLING IS ALLOWED TO

BE DEMOLISHED.

3. FOR ALL EXISTING WIRELESS ACCESS POINTS

AND SURVEILLANCE CAMERAS, DEVICES

SHALL REMAIN. SCOPE OF WORK INCLUDES

CABLE REPLACEMENT ONLY. COORDINATE

WITH COR FOR ANY DOWNTIME OF DEVICES.

4. EXISTING LOCATIONS OF WORK AREA

OUTLETS SHOWN ON THIS SHEET MAY NOT

NECESSARILY BE IN THE EXACT LOCATION AS

VESTIBULE

1D-CAM

D

-C A

M

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:1

P M

BUILDING 144 FIRST FLOOR DEMO PLAN -

TECHNOLOGY - AREA F

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TD101F

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

SHEET NOTES:

1. REMOVE ALL NETWORK CABLING TO POINTS

OF TERMINATION IN ASSOCIATED TELECOM

ROOMS. REFER TO FLOOR PLANS AND SHEET

T1001 FOR TR ROOM LOCATIONS.

2. REFER TO ARCHITECTURAL PHASING PLANS

FOR WHEN EXISTING CABLING IS ALLOWED TO

BE DEMOLISHED.

3. FOR ALL EXISTING WIRELESS ACCESS POINTS

AND SURVEILLANCE CAMERAS, DEVICES

SHALL REMAIN. SCOPE OF WORK INCLUDES

CABLE REPLACEMENT ONLY. COORDINATE

WITH COR FOR ANY DOWNTIME OF DEVICES.

4. EXISTING LOCATIONS OF WORK AREA

OUTLETS SHOWN ON THIS SHEET MAY NOT

NECESSARILY BE IN THE EXACT LOCATION AS

TO

B

U

IL

D

IN

G

OVER HEAD DOOR WINDOW

RESEARCH STORAGE

PATIENT

LOCKER ALCOVE

DIRTY

LINEN RM

MED GAS

STORAGE

PATIENT

LOCKER RM

PNEUMATIC TUBE

DIGITAL

EQUIP

ALCOVE

DRUG

RECEIVING

CLEAN UTILITY

TUNNEL

WAITING

DIVISION

SECRETARY

OFFICE

MAIN

ENTRY

CORRIDOR

VESTIBULE

WHEELCHAIR

STORAGE

OUTPATIENT RECEPTION

VISITOR LOUNGE

PASSAGE

STAFF

LOUNGE/

KITCHENETTE

STAFF TOILET

HAC

CLEAN LINEN RM

STAFF CONFERENCE

PRIVATE

INTERVIEW RM

VISITOR TOILET VISITOR TOILET

EASY STREET

CODE

CART

ALCOVE

OCCUPATIONAL THERAPY

CORRIDOR

PT AND KINESIOTHERAPY

PT/OT/RT OFFICES

PT/OT

WHLCHR

STORAGEOT TOOL SHOP

PT/OT STORAGE

PVA

NSO

OFFICE

ELECTRICAL

TELEPHONE RM

PATIENT TOILETELEVATOR

MACHINE RM

ICE MIC

CORRIDOR

ELEVATOR-3

CORRIDOR

MED RM

SOILED UTILITY

EXAM/

TREATMENT RM 6

EXAM/

TREATMENT RM 4

EXAM/

TREATMENT RM-2

PATIENT WAITING

ELEVATOR

MACHINE RM

RECYCLING RM

OUT PATIENT

NURSE OFFICE

OUT PATIENT

NURSE WORK AREA

OUT PATIENT

NURSE OFFICE

CORRIDOR

ALCOVE EXAM/

TREATMENT RM-1

EXAM/

TREATMENT RM-3

EXAM/

TREATMENT RM-5

CLEAN STORAGE

CORRIDOR

PATIENT

SHOWER

CYSTO RM

RESEARCH PROJECT MANAGER

CLEAN

EQUIPMENT RM

TELERETINAL SCREENING RM

ELECTRICAL

SCI HOME

CARE OFFICE

EMERGENCY ELECTRICAL

HAC

VENDING

STAIR-1

ELEVATOR-1

ELEVATOR-2

ELEVATOR LOBBY

CORRIDOR

CORRIDOR

ADMIN

OFFICE

SOCIAL

WORKER-1

PSYCHOLOGIST OFFICE-2

PSYCHOLOGIST OFFICE

PHYSICIAN OFFICE

PHYSICIAN OFFICE

PHYSICIAN(S) OFFICE

PHYSICIAN OFFICE

PROGRAM

MANAGER OFFICE

PROGRAM

SPECIALIST OFFICE

DIVISION

MANAGER

OFFICE

CONFERENCE/ CLASS RM

CORRIDOR

MER

ENVIRONMENTAL MANAGEMENT STORAGE

SCI

SUPERVISORY

PHARM

PRESCRIPTION RECEIVING

ELECTRICAL

TELEPHONE

INTERN/ROTATING STAFF OFFICE

ADMIN

STORAGE

INTERN OFFICE

WOUND

CARE NURSE

DIETICIAN OFFICE-1

NURSE

PRACTITIONER

OFFICE-2

NURSE

PRACTITIONER-1

NURSE

PRACTITIONER-2

SCI

DIETICIAN

OFFICE

STAFF TOILET

ASSOCIATE

NURSE

DIVISION MGR

OFFICE

WITHOUT

COMPENSATION(S)

OFFICE

SCIDO/MIO OFFICE

STAIR-2

G49

G17A

G11

G10

G46B

G48

G66

G36

G44

CGT-1

G88A

G88

CG01

G02A

G71

G04

CG11

G13

G14

G15HC

G16

G12

G05 G06 G07

G17

G30

G17

CG10

G17

G28

G26 G27

G25

G24

G23EC

G22G21G20G19G18

CG04

EL-SCI-3

CG02

G35

G34

G37G38G39

G03

G53

G59

G55

G56

G57

CG03

G54

G40 G41 G42

G43

G46A CG06

G45

G46

G47 G50G51

G62EC

G52

G61EC

G60HC

G58

ST-SCI-1

EL-SCI-1

EL-SCI-2

G95

CG07

CG08

G71A

G73

G75

G77

G79

G81

G83

G85

G89

G91

G97

G92

CG09

G63

G64

G65

G65A

G67EC

G68

G69

G70

G72

G74

G76

G78

G80

G82

G84

G86

G90

G93

G96

ST-SCI-2

UNDER CONSTRUCTION

TN327

TN328

CONTINUES IN BUILDING 111 BASEMENT

A

B

D

C

F

E

TR-144-G22TR-144-G68

REFER TO T1003 FOR CONTINUATION

PW-HH-1

REFER TO T1003 FOR CONTINUATION

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03 0

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT OVERALL PLAN -

TECHNOLOGY

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/16" = 1'-0"

BUILDING 144 BASEMENT OVERALL PLAN - TECHNOLOGY

GENERAL NOTES:

1. REFER TO INDIVIDUAL AREA BUILDING DEMO FLOOR PLANS FOR ADDITIONAL

INFORMATION.

2. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING DATA

DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY INSTALLED

DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON THESE

DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

3. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES. WORK

AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE EXACT

LOCATION AS IDENTIFIED.

KEYNOTES:

1. FIBER PATHWAY A LEG.

2. TWO (2) 4" CONDUITS TO BACKBONE PATH.

3. EXISTING BACKBONE ENTRY POINT, PROTECT IN PLACE. DEMOLISH

EXISTING FIBER OPTIC CABLE TO POINTS OF TERMINATION AFTER

REDUNDANT PATH IS INSTALLED AND OPERATIONAL. REFER TO

ARCHITECTURAL PHASING PLAN FOR ADDITIONAL INFORMATION. CONDUIT

ENTERS ON LOWER LEVEL.

WAITING

DIVISION

SECRETARY

OFFICE

OUTPATIENT RECEPTION

CORRIDOR

ADMIN

OFFICE

SOCIAL

WORKER-1

PSYCHOLOGIST OFFICE-2

PSYCHOLOGIST OFFICE

PHYSICIAN OFFICE

PHYSICIAN OFFICE

PHYSICIAN(S) OFFICE

PHYSICIAN OFFICE

PROGRAMMANAGER OFFICE

PROGRAMSPECIALIST OFFICE

DIVISION

MANAGER

OFFICE

CONFERENCE/ CLASS RM

CORRIDOR

INTERN OFFICE

WOUND

CARE NURSE

DIETICIAN OFFICE-1

NURSE

PRACTITIONER

OFFICE-2

NURSE

PRACTITIONER-1

NURSE

PRACTITIONER-2

SCI

DIETICIAN

OFFICE

STAFF TOILET

ASSOCIATE

NURSE

DIVISION MGR

OFFICE

WITHOUTCOMPENSATION(S)OFFICE

SCIDO/MIO OFFICE

STAIR-2

G88A

G88

G71

CG08

G71A

G73

G75

G77

G79

G81

G83

G85

G89

G91

G97

G92

CG09

G72

G74

G76

G78

G80

G82

G84

G86

G90

G93

G96

ST-SCI-2

1D-WAP

D

3D

D

D 1D-WAP

1D-WAP

3D

2D

1D-WAP

1D-WAP

2D 2D

1D-WAP

D

2D

2D

D

1D-WAP

D

2D

D

D

D

2D

2D

2D

D

1D-WAP

1D-WAP

2D

2D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D

2D

2D

2D

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA A

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100A

5000 W. NATIONAL AVENUE MILWAUKEE, WI

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN

TR-144-G68.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

DETERMINED BY THE VA AT A LATER DATE.

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA A

DRUG

RECEIVING

OUTPATIENT RECEPTION

PATIENT WAITING

ELEVATOR

MACHINE RM

RECYCLING RM

OUT PATIENTNURSE OFFICE

OUT PATIENTNURSE WORK AREA

OUT PATIENTNURSE OFFICE

ELECTRICAL

SCI HOME

CARE OFFICE

EMERGENCY ELECTRICAL

HAC

VENDING

STAIR-1

ELEVATOR-1

ELEVATOR-2

ELEVATOR LOBBY

CORRIDOR

ADMIN

OFFICE

MER

ENVIRONMENTAL MANAGEMENT STORAGE

SCI

SUPERVISORY

PHARM

PRESCRIPTION RECEIVING

ELECTRICAL

TELEPHONE

INTERN/ROTATING STAFF OFFICE

ADMIN

STORAGE

INTERN OFFICE

G66

G71

G59

G55

G56

G62EC

G52

G61EC

G60HC

G58

ST-SCI-1

EL-SCI-1

EL-SCI-2

G95

CG07

G71A

G63

G64

G65

G65A

G67EC

G68

G69

G70

G72

1D-WAP

1D-WAP

3D

1D-WAP

2D

D

2D

2D 2D

1D-WAP

D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D

2D

2D

TR-144-G68

TN327

TN327

REFER TO SHEET

T1003 FOR

CONTINUATION

TWO (2) 4"

CONDUITS

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA B

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100B

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA B

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN

TR-144-G68.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

DETERMINED BY THE VA AT A LATER DATE.

KEYNOTES:

1. JCI PACS PANEL LOCATION. GC TO COORDINATE EXACT LOCATION AND

HEIGHT WITH COR TO CONNECT NEW RACK/SWITCH WITHIN ROOM WITH

CAT6A CABLE AS NECESSARY

OVER HEAD DOOR WINDOW

RESEARCH STORAGE

DIRTY

LINEN RM

MED GAS

STORAGE

PATIENT

LOCKER RM

PNEUMATIC TUBE

DIGITAL

EQUIP

ALCOVE

CLEAN UTILITY

MAIN

ENTRY

CORRIDOR

STORAGE

VISITOR LOUNGE

PASSAGE

STAFF

LOUNGE/

KITCHENETTE

STAFF TOILET

HAC

CLEAN LINEN RM

STAFF CONFERENCE

PRIVATE

INTERVIEW RM

VISITOR TOILET VISITOR TOILET

EASY STREET

CODE

CART

ALCOVE

ELEVATOR

MACHINE RM

ICE MIC

CORRIDOR

ELEVATOR-3

CORRIDOR

MED RM

SOILED UTILITY

EXAM/

TREATMENT RM 6

EXAM/

TREATMENT RM 4

EXAM/

TREATMENT RM-2

PATIENT WAITING

ELEVATOR

MACHINE RM

OUT PATIENT

NURSE OFFICE

OUT PATIENT

NURSE WORK AREA

OUT PATIENT

NURSE OFFICE

CORRIDOR

ALCOVE EXAM/

TREATMENT RM-1

EXAM/

TREATMENT RM-3

EXAM/

TREATMENT RM-5

CLEAN STORAGE

CORRIDOR

PATIENT

SHOWER

CYSTO RM

RESEARCH PROJECT MANAGER

CLEAN

EQUIPMENT RM

TELERETINAL SCREENING RMSCI HOME

CARE OFFICE

EMERGENCY ELECTRICAL

G49

G11

G10

G46B

G48

G36

G44

CG01

G02A

G04

CG11

G13

G14

G15HC

G16

G12

G05 G06 G07

G17

G30

CG04

EL-SCI-3

CG02

G35

G34

G37G38G39

G03

G53

G55

G56

G57

CG03

G54

G40 G41 G42

G43

G46A CG06

G45

G46

G47 G50G51G52

D

3D D

D

1D-WAP

D

1D-WAP

D

1D-WAP

1D-WAP

1D-WAP 1D-WAP 1D-WAP

2D 2D 2D

2D

1D-WAP

1D-WAP

D

2D

1D-WAP

1D-WAP

2D

2D

1D-WAP

1D-WAP

2D

2D

1D-WAP

1D-WAP

1D-WAP

1D-WAP 1D-WAP 1D-WAP

2D2D2D

1D-WAP

2D 2D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D 2D

2D

3D

2D 2D

ALL NETWORK CABLES ON THIS SIDE OF

LINE SHALL TERMINATE IN TR-144-G68

ALL NETWORK CABLES ON THIS SIDE OF

LINE SHALL TERMINATE IN TR-144-G22

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA C

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100C

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA C

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. REFER TO FLOOR PLANS FOR NETWORK CABLES TERMINATION

INFORMATION.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

DETERMINED BY THE VA AT A LATER DATE.

PATIENT

LOCKER ALCOVE

OCCUPATIONAL THERAPY

CORRIDOR

PT AND KINESIOTHERAPY

PVA

NSO

ELECTRICAL

TELEPHONE RM

PATIENT TOILETELEVATOR

MACHINE RM

G17A

G17

CG10

G17

G23EC

G22G21G20G19G18

1D-WAP

1D-WAP 1D-WAP

1D-WAP

2D2D

2D

2D

1D-WAP

TR-144-G22

TN328

TN328

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA D

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100D

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA D

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-

G22.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

PT/OT/RT OFFICES

PT/OT

WHLCHR

STORAGEOT TOOL SHOP

PT/OT STORAGE

PVA

NSO

OFFICE

TELEPHONE RM

G28

G26 G27

G25

G24

G23EC

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D

2D

2D

D

2D

2D

D

D

D

1D-WAP

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA E

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100E

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA E

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-G22.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

TO

B

U

IL

DI

N

G

TUNNEL

CGT-1

1D-CAM

1D-CAM

1D-WAP

1D-CAM

1D-CAM

1D-WAP

1D-WAP

2D

2D

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:2

P M

BUILDING 144 BASEMENT PLAN - TECHNOLOGY -

AREA F

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN100F

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA F

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-G68.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

VISITOR

WAITING

AREA

ALCOVE

ALCOVE

ALCOVE

ALCOVE

PYXIS

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

FOLDING

CODE

CART

ALCOVE

SOILED UTILITY

DINING

CART

STORAGE

NURSE STATION

VOLUNTEER STATION

REC

THERAPY

STORAGE

CORRIDOR

ALCOVE

ALCOVEALCOVE ALCOVEALCOVEALCOVE ALCOVE

VENT RM-15

TOILET TOILET

VENT RM-16 VENT RM-17

TOILET TOILET

VENT RM-18 PATIENT RM-19

TOILET TOILET PATIENT

RM-21

SOILED UTILITY

CORRIDOR

ALCOVE

ALCOVE

ALCOVE

PATIENT

RM-24 A/B

REHAB

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-24 A/B

REHAB

PATIENT

RM-25 A/B

REHAB

ALCOVE

ALCOVE

PYXIS ALCOVE

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-27 A/B

REHAB

PATIENT

RM-29 A/B

REHAB

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-31 A/B

REHAB

BED RM

CLOSET

TOILET

PATIENT RM-33

DINING

KITCHEN

PATIENT RM-32

TOILET

TOILET

PATIENT RM 30

PATIENT RM-28

TOILET

TOILET

PATIENT RM-26

ELECTRICAL

TELEPHONE

HAC

PATIENT

RM-22

ISOLATION

ANTE

RM-20 SOILED LINEN

ANTE

RM-22

TOILETTOILET

ISOLATION

RM-1

RN EDUCATORS

CLINICAL

N.LEADER OFFICE

ELEVATOR-3

STAFF

CONFERENCE

/ KITCHENETTE

PROGRAM

MANAGER

OFFICE

PROGRAM

MANAGER

OFFICE

ASSISTIVE

TECHNOLOGY

THERAPIST OFFICE

RESIDENT/FELLOW

PHYSICIANS

OFFICE

PROGRAM MANAGER OFFICE

CORRIDOR

STAFF

TOILET-1

STAFF

TOILET-2

STAFF

TOILET-3

STAFF LOCKER

RM (UNISEX)

NURSE

WORK RMSTORAGE

SPECIAL

BED

STORAGE

CORRIDOR

CORRIDOR

ASSISTIVE

TECHNOLOGY/ 3D

PRINTING LAB

SOILED LINEN

NOURISHMENT STATION

CLEAN LINEN

CLEAN UTILITY

MEDICAL

EQUIPMENT

STORAGE

HAC

ELEVATOR-2

ELEVATOR-1

STAIR 1

RECREATION

THERAPY

STORAGE

VISITOR TOILETVISITOR TOILET

CORRIDOR

CORRIDOR

CORRIDOR

ELEVATOR LOBBY

TOILET

PATIENT BED RM-13

PATIENT BED

RM-11

TOILET

TOILET

PATIENT BED RM-9

PATIENT BED RM-7

TOILET

TOILET

PATIENT BED RM-5

PATIENT BED RM-3

TOILET

TOILET

PATIENT BED

RM-1

HAC

CORRIDOR

PATIENT

LAUNDRY

DAY RM

VESTIBULE

REC

THERAPY

OFFICE

RECREATION

THERAPY MP RM

MULTI PURPOSE RM

ELECTRICAL

TELEPHONE

PATIENT BED RM-14

TOILET

TOILET

PATIENT BED RM-12

PATIENT BED RM-10

TOILET

TOILET

PATIENT BED RM-8

PATIENT BED RM-6

TOILET

TOILET

PATIENT BED RM-4

PATIENT BED RM-2

TOILET

STAIR 2

AL15

AL17

AL16

AL19

AL20

AL23

AL21

AL24

AL22

AL27

AL26

AL25

135A

171A

170A

C105

AL2AL1 AL6AL5AL3 AL4

130A 131A

131 132 132A 133A

133 136 136A 137A

C109

AL7

AL8

162B

162A

161B

161A

AL14

AL13

AL9

AL10

160B

160A

157B

157A

AL12

AL11

156A

155A

156B

155B

154B

154C 154A

154E

154D

153A

152A

151A

148A

147EC

145HC

141 142 143

144A140A140

EL-SCI-3

111 112

C108

117B117A117C

135B121

C106

C107

107HC

EL-SCI-2

EL-SCI-1

ST-SCI-1

105104

C104

C103

C102

181A

183A

185A

187A

191A

193A

195A

194HC

C101

174EC

176A

180A

182A

184A

186A

190A

192A

ST-SCI-2

UNDER CONSTRUCTION

TR-144-175

TR-144-146TN329

TN328

A

B

F E

D

C

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03 0

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:3

P M

BUILDING 144 FIRST FLOOR OVERALL PLAN -

TECHNOLOGY

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN101

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/16" = 1'-0"

BUILDING 144 FIRST FLOOR OVERALL PLAN - TECHNOLOGY

GENERAL NOTES:

1. REFER TO INDIVIDUAL AREA BUILDING DEMO FLOOR PLANS FOR

ADDITIONAL INFORMATION.

2. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY

EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE

TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY

+/- 10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S

SCOPE SHALL BE UNCHANGED.

3. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING

BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT

BE IN THE EXACT LOCATION AS IDENTIFIED.

ALCOVE

ALCOVE

ALCOVE

PYXIS

ALCOVE

ALCOVE

ALCOVEALCOVE

ALCOVEALCOVE

ALCOVE

ALCOVE

ALCOVE

ALCOVE

CORRIDOR

TOILET

PATIENT BED RM-13

PATIENT BED

RM-11

TOILET

TOILET

PATIENT BED RM-9

PATIENT BED RM-7

TOILET

TOILET

PATIENT BED RM-5

PATIENT BED RM-3

TOILET

TOILET

PATIENT BED

RM-1

HAC

TOILET

PATIENT BED RM-12

PATIENT BED RM-10

TOILET

TOILET

PATIENT BED RM-8

PATIENT BED RM-6

TOILET

TOILET

PATIENT BED RM-4

PATIENT BED RM-2

TOILET

STAIR 2

AL17

AL16

AL19

AL20

AL23AL21

AL24AL22

AL27

AL26

AL25

C104

181A

183A

185A

187A

191A

193A

195A

195194HC

180A

182A

184A

186A

190A

192A

ST-SCI-2

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D

2D

2D

2D

2D

2D 2D

2D

2D

2D

2D

2D

2D

D

D

D

D2 D

D

D

D

D

D

D 2 D

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:3

P M

BUILDING 144 FIRST FLOOR PLAN -

TECHNOLOGY - AREA A

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN101A

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA A

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-175.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

VISITOR

WAITING

AREA

ALCOVE

ALCOVE

ALCOVE

DINING

CART

STORAGE

VOLUNTEER STATION

REC

THERAPY

STORAGE

ALCOVE

ASSISTIVETECHNOLOGY/ 3DPRINTING LAB

SOILED LINEN

NOURISHMENT STATION

CLEAN LINEN

CLEAN UTILITY

MEDICAL

EQUIPMENT

STORAGE

HAC

ELEVATOR-2

ELEVATOR-1

STAIR 1

RECREATION

THERAPY

STORAGE

VISITOR TOILET

VISITOR TOILET

CORRIDOR

CORRIDOR

ELEVATOR LOBBY

TOILET

CORRIDOR

PATIENT

LAUNDRY

DAY RM

VESTIBULE

REC

THERAPY

OFFICE

RECREATIONTHERAPY MP RM

MULTI PURPOSE RM

ELECTRICAL

TELEPHONE

PATIENT BED RM-14

TOILET

TOILET

AL15

AL17

AL16

171A

170A

107HC

EL-SCI-2

EL-SCI-1

ST-SCI-1

C103

C102

181A

C101

174EC

176A

180A

V

1V

V

1D-WAP 1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

2D 2D

2D

1D-WAP

1D-WAP

1D-WAP

D

1D-CAM

D

- C A

M

D

2D

TR-144-175TN328

TN328

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:3

P M

BUILDING 144 FIRST FLOOR PLAN -

TECHNOLOGY - AREA B

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN101B

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA B

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-175.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

CODE

CART

ALCOVE

SOILED UTILITY

NURSE STATION

CORRIDOR

ALCOVEALCOVE ALCOVE ALCOVE

VENT RM-15

TOILET TOILET

VENT RM-16 VENT RM-17

TOILET TOILET

VENT RM-18 PATIENT RM-19

RN EDUCATORS

CLINICAL

N.LEADER OFFICE

ELEVATOR-3

STAFF

CONFERENCE

/ KITCHENETTE

PROGRAM

MANAGER

OFFICE

PROGRAM

MANAGER

OFFICE

ASSISTIVE

TECHNOLOGY

THERAPIST OFFICE

RESIDENT/FELLOW

PHYSICIANS

OFFICE

PROGRAM MANAGER OFFICE

CORRIDOR

STAFF

TOILET-1

STAFF

TOILET-2

STAFF

TOILET-3

STAFF LOCKER

RM (UNISEX)

NURSE

WORK RMSTORAGE

SPECIAL

BED

STORAGE

CORRIDOR

CORRIDOR

ASSISTIVE

TECHNOLOGY/ 3D

PRINTING LAB

SOILED LINEN

NOURISHMENT STATION

CLEAN LINEN

CLEAN UTILITY

MEDICAL

EQUIPMENT

STORAGE

HAC

VISITOR TOILET

135A

C105

AL2AL1 AL3 AL4

130A 131A

131 132 132A 133A

EL-SCI-3

111 112

C108

117B117A117C

135B121

C106

C107

107HC

UNDER CONSTRUCTION

1D-WAP

D

2D

1D-WAP

1D-WAP

1D-WAP

D

D

2D 2D 2D 2D

2D 2D 2D2D 2D 2D

2D

D

2D

D

3D

D

2D

D

D

D

D

D

2D

2D

2D

1D-WAP

1D-WAP

1D-WAP 2

D

D

1D-WAP

2D 2D

1D-WAP

2D 2D

2D

2D

D

D

D

D

2D

1V

V 1 V

V 1 V

ALL NETWORK CABLES ON

THIS SIDE OF LINE SHALL

TERMINATE IN TR-144-175.

ALL NETWORK CABLES ON

THIS SIDE OF LINE SHALL

TERMINATE IN TR-144-146.

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:3

P M

BUILDING 144 FIRST FLOOR PLAN -

TECHNOLOGY - AREA C

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN101C

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA C

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

3. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

4. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

5. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.

6. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

7. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

ALCOVEALCOVE

PATIENT RM-19

TOILET TOILET PATIENT

RM-21

SOILED UTILITY

ALCOVE

ALCOVE

ALCOVE

PATIENT

RM-24 A/B

REHAB

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-24 A/B

REHAB

PATIENT

RM-25 A/B

REHAB

ELECTRICAL

TELEPHONE

HAC

PATIENT

RM-22

ISOLATION

ANTE

RM-20 SOILED LINEN

ANTE

RM-22

TOILETTOILET

ISOLATION

RM-1

AL6AL5

136A 137A

AL7

AL8

162B

162A

161B

161A

147EC

145HC

141 142 143

144A140A140

V

V

V

D

D

D

D

1D-WAP

1D-WAP

1D-WAP

D

D

2D 2D

1D-WAP

D

2D

2D

2D

2D

D

TR-144-146

TN329

TN329

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT #18004375.03

PLAN NORTH

TRUE NORTH

NORTH

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Sprinklered

Office of Construction and Facilities Management

FULLY SPRINKLERED

35% SCHEMATIC DESIGN SUBMISSION 5.17.21

65% DESIGN DEVELOPMENT SUBMISSION 6.15.21

65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21

A u to d e s k D o c s /O

C F

M E a s t

M ilw a u k e e

E H

R M

R

T

.0

V A

M ilw

E H

R M

C

.r v t

/3

/2

:0

:3

P M

BUILDING 144 FIRST FLOOR PLAN -

TECHNOLOGY - AREA D

PHINIE MAIBEJ

FINAL BID DOCUMENTS 695-21-700

EHRM INFRASTRUCTURE

UPGRADES - MILWAUKEE, WI

SEPTEMBER 05, 2025

144-TN101D

5000 W. NATIONAL AVENUE MILWAUKEE, WI

1/8" = 1'-0"

BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA D

GENERAL NOTES:

1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.

2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN

TR-144-146.

3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW

CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER

RECOMMENDATIONS.

4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.

5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.

6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING

DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY

INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON

THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE

UNCHANGED.

7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.

WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE

EXACT LOCATION AS IDENTIFIED.

8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-

PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS

SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE

FOLDING

CORRIDOR

PATIENT

RM-25 A/B

REHAB

ALCOVE

ALCOVE

PYXIS ALCOVE

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-27 A/B

REHAB

PATIENT

RM-29 A/B

REHAB

ALCOVE

ALCOVE

TOILET

TOILET

TOILET

TOILET

PATIENT

RM-31 A/B

REHAB

BED RM

CLOSET

TOILET

PATIENT RM-33

DINING

KITCHEN

PATIENT RM-32

TOILET

TOILET

PATIENT RM 30

PATIENT RM-28

TOILET

TOILET

PATIENT RM-26

ELECTRICALISOLATION

STAFF

CONFERENCE

/ KITCHENETTE

PROGRAM

MANAGER

OFFICE

PROGRAM

MANAGER

OFFICE

C109

AL14

AL13

AL9

AL10

160B

160A

157B

157A

AL12

AL11

156A

155A

156B

155B

154B

154C 154A

154E

154D

153A

152A

151A

148A

147EC

144144A140A

EL-SCI-3

1D-WAP

D

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

1D-WAP

D

D

D

D

D

D

D

D

2D

2D

2D

2D

1D-WAP

1D-WAP

2D

2D

2D

2D

2D

2D

2D

2D

15 SUNNEN DRIVE

SUITE 104

ST. LOUIS, MO 63143

P: 314.645.1132 F: 314.645.1173

The FUTURE. Built Smarter www.imegcorp.com

PROJECT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .