This file is a set of architectural and technology infrastructure drawings for Building 144 EHRM Infrastructure Upgrades at the Milwaukee VA Medical Center, located at 5000 W. National Avenue, Milwaukee, Wisconsin. The drawings were prepared by Romanyk Consulting Corp. as the Architect/Engineer of Record, with IMEG Corp. as the project coordinator. The final bid documents are dated September 5, 2025, and correspond to drawing number 695-21-700.
The drawings document comprehensive technology infrastructure work including network cabling, wireless access points, surveillance cameras, and telecommunications systems across multiple floors and areas of Building 144. The scope includes demolition plans for existing cabling with replacement of network infrastructure, installation of new CAT6A information outlets, and routing of new J-hook cable supports. Work is divided into basement areas (A through F) and first floor areas (A through F), with network cables terminating at specified telecommunication rooms (TR-144-G68, TR-144-G22, TR-144-175, and TR-144-146). The drawings note that existing wireless access points and surveillance cameras shall remain in place, with work limited to cable replacement only. Contractors are required to include allowances for 10% additional CAT6A information outlets in proposals, with final outlet locations to be determined by the VA at a later date. The design reflects 35% schematic design submission (May 2021), 65% design development submission (June 2021), and 65% design development resubmission (August 2021) phases.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHEELCHAIR STORAGE
VISITOR
WAITING
AREA
ALCOVE
ALCOVE
ALCOVE
DINING
CART
STORAGE
VOLUNTEER STATION
REC
THERAPY
STORAGE
ALCOVE
ASSISTIVETECHNOLOGY/ 3DPRINTING LAB
SOILED LINEN
NOURISHMENT STATION
CLEAN LINEN
CLEAN UTILITY
MEDICAL
EQUIPMENT
STORAGE
HAC
ELEVATOR-2
ELEVATOR-1
STAIR 1
RECREATION
THERAPY
STORAGE
VISITOR TOILET
VISITOR TOILET
CORRIDOR
CORRIDOR
ELEVATOR LOBBY
TOILET
CORRIDOR
PATIENT
LAUNDRY
DAY RM
VESTIBULE
REC
THERAPY
OFFICE
RECREATIONTHERAPY MP RM
MULTI PURPOSE RM
ELECTRICAL
TELEPHONE
PATIENT BED RM-14
TOILET
TOILET
AL15
AL17
AL16
171A
170A
107HC
EL-SCI-2
EL-SCI-1
ST-SCI-1
C103
C102
181A
C101
174EC
176A
180A
1D-WAP 1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
V
1V
V
2D2V 2D2V
2D2V
1D-WAP
1D-WAP
1D-WAP
D
V
1D-CAM
D
- C A
M
V
1V1V
D
V
3D1V
D
V
1D-WAP
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:1
P M
BUILDING 144 FIRST FLOOR DEMO PLAN -
TECHNOLOGY - AREA B
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TD101B
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
IDENTIFIED.
Revisions: Date:
PNEUMATIC TUBE
CODE
CART
ALCOVE
SOILED UTILITY
NURSE STATION
CORRIDOR
ALCOVEALCOVE ALCOVE ALCOVE
VENT RM-15
TOILET TOILET
VENT RM-16 VENT RM-17
TOILET TOILET
VENT RM-18 PATIENT RM-19
RN EDUCATORS
CLINICAL
N.LEADER OFFICE
ELEVATOR-3
STAFF
CONFERENCE
/ KITCHENETTE
PROGRAM
MANAGER
OFFICE
PROGRAM
MANAGER
OFFICE
ASSISTIVE
TECHNOLOGY
THERAPIST OFFICE
RESIDENT/FELLOW
PHYSICIANS
OFFICE
PROGRAM MANAGER OFFICE
CORRIDOR
STAFF
TOILET-1
STAFF
TOILET-2
STAFF
TOILET-3
STAFF LOCKER
RM (UNISEX)
NURSE
WORK RMSTORAGE
SPECIAL
BED
STORAGE
CORRIDOR
CORRIDOR
ASSISTIVE
TECHNOLOGY/ 3D
PRINTING LAB
SOILED LINEN
NOURISHMENT STATION
CLEAN LINEN
CLEAN UTILITY
MEDICAL
EQUIPMENT
STORAGE
HAC
VISITOR TOILET
135A
C105
AL2AL1 AL3 AL4
130A 131A
131 132 132A 133A
EL-SCI-3
111 112
C108
117B117A117C
135B121
C106
C107
107HC
UNDER CONSTRUCTION
1D-WAP
D
V
D
V
D
V
D
V
1V
1D-WAP
1D-WAP
1D-WAP
D
V 2
D V
2D2V 2D2V 2D2V 2D2V
2D2V 2D2V 2D2V3D 3D 2D2V
2D2V
D
V
1V
1V
D
3D
D
2D2V
D
V
D
V
D
V 2 D
V
D
V
2D2V
2D2V
3D
1D-WAP
1D-WAP
1D-WAP 2
D
V
D
V
1D-WAP
3D 3D1 V 1 V
1D-WAP
3D 3D1 V 1 V
2D 2V
2D2V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
2D2V
3D
3D 3D
D
V
2D2V2D2V2D2V
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:1
P M
BUILDING 144 FIRST FLOOR DEMO PLAN -
TECHNOLOGY - AREA C
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TD101C
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
ALCOVEALCOVE
PATIENT RM-19
TOILET TOILET PATIENT
RM-21
SOILED UTILITY
ALCOVE
ALCOVE
ALCOVE
PATIENT
RM-24 A/B
REHAB
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-24 A/B
REHAB
PATIENT
RM-25 A/B
REHAB
ELECTRICAL
TELEPHONE
HAC
PATIENT
RM-22
ISOLATION
ANTE
RM-20 SOILED LINEN
ANTE
RM-22
TOILETTOILET
ISOLATION
RM-1
AL6AL5
136A 137A
AL7
AL8
162B
162A
161B
161A
147EC
145HC
141 142 143
144A140A140
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
1V
1V
D
D
1D-WAP
1D-WAP
1D-WAP
D
D
V
V
V
V3D 3D
1D-WAP
D
V
D
V
D
V
D
V
D
V
D
V
D
V
D
V
2D 1V 2D 1V
2D 1V 2D 1V
2D 1V
1D 1V
1D 1V 2D 1V
1D 1V1D 1V
1D 1V
2D1V 2D1V
2D1V 2D1V
2D1V 2D1V
2D1V
1D 1V 2D 1V
2D 1V
1D1V
1D1V 1D1V
2D1V 1D1V
1D1V
1D1V
2D1V
D
V
D
V
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:1
P M
BUILDING 144 FIRST FLOOR DEMO PLAN -
TECHNOLOGY - AREA D
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TD101D
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
FOLDING
CORRIDOR
PATIENT
RM-25 A/B
REHAB
ALCOVE
ALCOVE
PYXIS ALCOVE
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-27 A/B
REHAB
PATIENT
RM-29 A/B
REHAB
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-31 A/B
REHAB
BED RM
CLOSET
TOILET
PATIENT RM-33
DINING
KITCHEN
PATIENT RM-32
TOILET
TOILET
PATIENT RM 30
PATIENT RM-28
TOILET
TOILET
PATIENT RM-26
ELECTRICALISOLATION
STAFF
CONFERENCE
/ KITCHENETTE
PROGRAM
MANAGER
OFFICE
PROGRAM
MANAGER
OFFICE
C109
AL14
AL13
AL9
AL10
160B
160A
157B
157A
AL12
AL11
156A
155A
156B
155B
154B
154C 154A
154E
154D
153A
152A
151A
148A
147EC
144144A140A
EL-SCI-3
1D-WAP
D
V3D1V
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1V
1V
D
D
D
D
D
D
D
D
1V
1V
1D 1V
1D 1V 2D 1V
1D 1V1D 1V
1D 1V2D 1V
1D 1V
1D-WAP
1D-WAP
2D 1V
2D 1V
2D 1V2D 1V
2D 1V 2D 1V
2D 1V 2D 1V
1D1V 1D1V
1D1V 2D1V 1D1V
1D1V 1D1V
2D1V
1D 1V 1D 1V
2D 1V1D 1V 1D 1V
1D 1V2D 1V
1D 1V
2D1V 2D1V
2D1V 2D1V
2D 1V 2D 1V
2D 1V 2D 1V
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:1
P M
BUILDING 144 FIRST FLOOR DEMO PLAN -
TECHNOLOGY - AREA E
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TD101E
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
VESTIBULE
1D-CAM
D
-C A
M
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:1
P M
BUILDING 144 FIRST FLOOR DEMO PLAN -
TECHNOLOGY - AREA F
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TD101F
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
SHEET NOTES:
1. REMOVE ALL NETWORK CABLING TO POINTS
OF TERMINATION IN ASSOCIATED TELECOM
ROOMS. REFER TO FLOOR PLANS AND SHEET
T1001 FOR TR ROOM LOCATIONS.
2. REFER TO ARCHITECTURAL PHASING PLANS
FOR WHEN EXISTING CABLING IS ALLOWED TO
BE DEMOLISHED.
3. FOR ALL EXISTING WIRELESS ACCESS POINTS
AND SURVEILLANCE CAMERAS, DEVICES
SHALL REMAIN. SCOPE OF WORK INCLUDES
CABLE REPLACEMENT ONLY. COORDINATE
WITH COR FOR ANY DOWNTIME OF DEVICES.
4. EXISTING LOCATIONS OF WORK AREA
OUTLETS SHOWN ON THIS SHEET MAY NOT
NECESSARILY BE IN THE EXACT LOCATION AS
TO
B
U
IL
D
IN
G
OVER HEAD DOOR WINDOW
RESEARCH STORAGE
PATIENT
LOCKER ALCOVE
DIRTY
LINEN RM
MED GAS
STORAGE
PATIENT
LOCKER RM
PNEUMATIC TUBE
DIGITAL
EQUIP
ALCOVE
DRUG
RECEIVING
CLEAN UTILITY
TUNNEL
WAITING
DIVISION
SECRETARY
OFFICE
MAIN
ENTRY
CORRIDOR
VESTIBULE
WHEELCHAIR
STORAGE
OUTPATIENT RECEPTION
VISITOR LOUNGE
PASSAGE
STAFF
LOUNGE/
KITCHENETTE
STAFF TOILET
HAC
CLEAN LINEN RM
STAFF CONFERENCE
PRIVATE
INTERVIEW RM
VISITOR TOILET VISITOR TOILET
EASY STREET
CODE
CART
ALCOVE
OCCUPATIONAL THERAPY
CORRIDOR
PT AND KINESIOTHERAPY
PT/OT/RT OFFICES
PT/OT
WHLCHR
STORAGEOT TOOL SHOP
PT/OT STORAGE
PVA
NSO
OFFICE
ELECTRICAL
TELEPHONE RM
PATIENT TOILETELEVATOR
MACHINE RM
ICE MIC
CORRIDOR
ELEVATOR-3
CORRIDOR
MED RM
SOILED UTILITY
EXAM/
TREATMENT RM 6
EXAM/
TREATMENT RM 4
EXAM/
TREATMENT RM-2
PATIENT WAITING
ELEVATOR
MACHINE RM
RECYCLING RM
OUT PATIENT
NURSE OFFICE
OUT PATIENT
NURSE WORK AREA
OUT PATIENT
NURSE OFFICE
CORRIDOR
ALCOVE EXAM/
TREATMENT RM-1
EXAM/
TREATMENT RM-3
EXAM/
TREATMENT RM-5
CLEAN STORAGE
CORRIDOR
PATIENT
SHOWER
CYSTO RM
RESEARCH PROJECT MANAGER
CLEAN
EQUIPMENT RM
TELERETINAL SCREENING RM
ELECTRICAL
SCI HOME
CARE OFFICE
EMERGENCY ELECTRICAL
HAC
VENDING
STAIR-1
ELEVATOR-1
ELEVATOR-2
ELEVATOR LOBBY
CORRIDOR
CORRIDOR
ADMIN
OFFICE
SOCIAL
WORKER-1
PSYCHOLOGIST OFFICE-2
PSYCHOLOGIST OFFICE
PHYSICIAN OFFICE
PHYSICIAN OFFICE
PHYSICIAN(S) OFFICE
PHYSICIAN OFFICE
PROGRAM
MANAGER OFFICE
PROGRAM
SPECIALIST OFFICE
DIVISION
MANAGER
OFFICE
CONFERENCE/ CLASS RM
CORRIDOR
MER
ENVIRONMENTAL MANAGEMENT STORAGE
SCI
SUPERVISORY
PHARM
PRESCRIPTION RECEIVING
ELECTRICAL
TELEPHONE
INTERN/ROTATING STAFF OFFICE
ADMIN
STORAGE
INTERN OFFICE
WOUND
CARE NURSE
DIETICIAN OFFICE-1
NURSE
PRACTITIONER
OFFICE-2
NURSE
PRACTITIONER-1
NURSE
PRACTITIONER-2
SCI
DIETICIAN
OFFICE
STAFF TOILET
ASSOCIATE
NURSE
DIVISION MGR
OFFICE
WITHOUT
COMPENSATION(S)
OFFICE
SCIDO/MIO OFFICE
STAIR-2
G49
G17A
G11
G10
G46B
G48
G66
G36
G44
CGT-1
G88A
G88
CG01
G02A
G71
G04
CG11
G13
G14
G15HC
G16
G12
G05 G06 G07
G17
G30
G17
CG10
G17
G28
G26 G27
G25
G24
G23EC
G22G21G20G19G18
CG04
EL-SCI-3
CG02
G35
G34
G37G38G39
G03
G53
G59
G55
G56
G57
CG03
G54
G40 G41 G42
G43
G46A CG06
G45
G46
G47 G50G51
G62EC
G52
G61EC
G60HC
G58
ST-SCI-1
EL-SCI-1
EL-SCI-2
G95
CG07
CG08
G71A
G73
G75
G77
G79
G81
G83
G85
G89
G91
G97
G92
CG09
G63
G64
G65
G65A
G67EC
G68
G69
G70
G72
G74
G76
G78
G80
G82
G84
G86
G90
G93
G96
ST-SCI-2
UNDER CONSTRUCTION
TN327
TN328
CONTINUES IN BUILDING 111 BASEMENT
A
B
D
C
F
E
TR-144-G22TR-144-G68
REFER TO T1003 FOR CONTINUATION
PW-HH-1
REFER TO T1003 FOR CONTINUATION
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03 0
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT OVERALL PLAN -
TECHNOLOGY
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/16" = 1'-0"
BUILDING 144 BASEMENT OVERALL PLAN - TECHNOLOGY
GENERAL NOTES:
1. REFER TO INDIVIDUAL AREA BUILDING DEMO FLOOR PLANS FOR ADDITIONAL
INFORMATION.
2. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING DATA
DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY INSTALLED
DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON THESE
DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
3. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES. WORK
AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE EXACT
LOCATION AS IDENTIFIED.
KEYNOTES:
1. FIBER PATHWAY A LEG.
2. TWO (2) 4" CONDUITS TO BACKBONE PATH.
3. EXISTING BACKBONE ENTRY POINT, PROTECT IN PLACE. DEMOLISH
EXISTING FIBER OPTIC CABLE TO POINTS OF TERMINATION AFTER
REDUNDANT PATH IS INSTALLED AND OPERATIONAL. REFER TO
ARCHITECTURAL PHASING PLAN FOR ADDITIONAL INFORMATION. CONDUIT
ENTERS ON LOWER LEVEL.
WAITING
DIVISION
SECRETARY
OFFICE
OUTPATIENT RECEPTION
CORRIDOR
ADMIN
OFFICE
SOCIAL
WORKER-1
PSYCHOLOGIST OFFICE-2
PSYCHOLOGIST OFFICE
PHYSICIAN OFFICE
PHYSICIAN OFFICE
PHYSICIAN(S) OFFICE
PHYSICIAN OFFICE
PROGRAMMANAGER OFFICE
PROGRAMSPECIALIST OFFICE
DIVISION
MANAGER
OFFICE
CONFERENCE/ CLASS RM
CORRIDOR
INTERN OFFICE
WOUND
CARE NURSE
DIETICIAN OFFICE-1
NURSE
PRACTITIONER
OFFICE-2
NURSE
PRACTITIONER-1
NURSE
PRACTITIONER-2
SCI
DIETICIAN
OFFICE
STAFF TOILET
ASSOCIATE
NURSE
DIVISION MGR
OFFICE
WITHOUTCOMPENSATION(S)OFFICE
SCIDO/MIO OFFICE
STAIR-2
G88A
G88
G71
CG08
G71A
G73
G75
G77
G79
G81
G83
G85
G89
G91
G97
G92
CG09
G72
G74
G76
G78
G80
G82
G84
G86
G90
G93
G96
ST-SCI-2
1D-WAP
D
3D
D
D 1D-WAP
1D-WAP
3D
2D
1D-WAP
1D-WAP
2D 2D
1D-WAP
D
2D
2D
D
1D-WAP
D
2D
D
D
D
2D
2D
2D
D
1D-WAP
1D-WAP
2D
2D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D
2D
2D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA A
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100A
5000 W. NATIONAL AVENUE MILWAUKEE, WI
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-144-G68.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA A
DRUG
RECEIVING
OUTPATIENT RECEPTION
PATIENT WAITING
ELEVATOR
MACHINE RM
RECYCLING RM
OUT PATIENTNURSE OFFICE
OUT PATIENTNURSE WORK AREA
OUT PATIENTNURSE OFFICE
ELECTRICAL
SCI HOME
CARE OFFICE
EMERGENCY ELECTRICAL
HAC
VENDING
STAIR-1
ELEVATOR-1
ELEVATOR-2
ELEVATOR LOBBY
CORRIDOR
ADMIN
OFFICE
MER
ENVIRONMENTAL MANAGEMENT STORAGE
SCI
SUPERVISORY
PHARM
PRESCRIPTION RECEIVING
ELECTRICAL
TELEPHONE
INTERN/ROTATING STAFF OFFICE
ADMIN
STORAGE
INTERN OFFICE
G66
G71
G59
G55
G56
G62EC
G52
G61EC
G60HC
G58
ST-SCI-1
EL-SCI-1
EL-SCI-2
G95
CG07
G71A
G63
G64
G65
G65A
G67EC
G68
G69
G70
G72
1D-WAP
1D-WAP
3D
1D-WAP
2D
D
2D
2D 2D
1D-WAP
D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D
2D
TR-144-G68
TN327
TN327
REFER TO SHEET
T1003 FOR
CONTINUATION
TWO (2) 4"
CONDUITS
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA B
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100B
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA B
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-144-G68.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
KEYNOTES:
1. JCI PACS PANEL LOCATION. GC TO COORDINATE EXACT LOCATION AND
HEIGHT WITH COR TO CONNECT NEW RACK/SWITCH WITHIN ROOM WITH
CAT6A CABLE AS NECESSARY
OVER HEAD DOOR WINDOW
RESEARCH STORAGE
DIRTY
LINEN RM
MED GAS
STORAGE
PATIENT
LOCKER RM
PNEUMATIC TUBE
DIGITAL
EQUIP
ALCOVE
CLEAN UTILITY
MAIN
ENTRY
CORRIDOR
STORAGE
VISITOR LOUNGE
PASSAGE
STAFF
LOUNGE/
KITCHENETTE
STAFF TOILET
HAC
CLEAN LINEN RM
STAFF CONFERENCE
PRIVATE
INTERVIEW RM
VISITOR TOILET VISITOR TOILET
EASY STREET
CODE
CART
ALCOVE
ELEVATOR
MACHINE RM
ICE MIC
CORRIDOR
ELEVATOR-3
CORRIDOR
MED RM
SOILED UTILITY
EXAM/
TREATMENT RM 6
EXAM/
TREATMENT RM 4
EXAM/
TREATMENT RM-2
PATIENT WAITING
ELEVATOR
MACHINE RM
OUT PATIENT
NURSE OFFICE
OUT PATIENT
NURSE WORK AREA
OUT PATIENT
NURSE OFFICE
CORRIDOR
ALCOVE EXAM/
TREATMENT RM-1
EXAM/
TREATMENT RM-3
EXAM/
TREATMENT RM-5
CLEAN STORAGE
CORRIDOR
PATIENT
SHOWER
CYSTO RM
RESEARCH PROJECT MANAGER
CLEAN
EQUIPMENT RM
TELERETINAL SCREENING RMSCI HOME
CARE OFFICE
EMERGENCY ELECTRICAL
G49
G11
G10
G46B
G48
G36
G44
CG01
G02A
G04
CG11
G13
G14
G15HC
G16
G12
G05 G06 G07
G17
G30
CG04
EL-SCI-3
CG02
G35
G34
G37G38G39
G03
G53
G55
G56
G57
CG03
G54
G40 G41 G42
G43
G46A CG06
G45
G46
G47 G50G51G52
D
3D D
D
1D-WAP
D
1D-WAP
D
1D-WAP
1D-WAP
1D-WAP 1D-WAP 1D-WAP
2D 2D 2D
2D
1D-WAP
1D-WAP
D
2D
1D-WAP
1D-WAP
2D
2D
1D-WAP
1D-WAP
2D
2D
1D-WAP
1D-WAP
1D-WAP
1D-WAP 1D-WAP 1D-WAP
2D2D2D
1D-WAP
2D 2D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D 2D
2D
3D
2D 2D
ALL NETWORK CABLES ON THIS SIDE OF
LINE SHALL TERMINATE IN TR-144-G68
ALL NETWORK CABLES ON THIS SIDE OF
LINE SHALL TERMINATE IN TR-144-G22
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA C
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100C
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA C
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. REFER TO FLOOR PLANS FOR NETWORK CABLES TERMINATION
INFORMATION.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
DETERMINED BY THE VA AT A LATER DATE.
PATIENT
LOCKER ALCOVE
OCCUPATIONAL THERAPY
CORRIDOR
PT AND KINESIOTHERAPY
PVA
NSO
ELECTRICAL
TELEPHONE RM
PATIENT TOILETELEVATOR
MACHINE RM
G17A
G17
CG10
G17
G23EC
G22G21G20G19G18
1D-WAP
1D-WAP 1D-WAP
1D-WAP
2D2D
2D
2D
1D-WAP
TR-144-G22
TN328
TN328
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA D
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100D
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA D
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-
G22.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
PT/OT/RT OFFICES
PT/OT
WHLCHR
STORAGEOT TOOL SHOP
PT/OT STORAGE
PVA
NSO
OFFICE
TELEPHONE RM
G28
G26 G27
G25
G24
G23EC
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D
2D
D
2D
2D
D
D
D
1D-WAP
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA E
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100E
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA E
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-G22.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
TO
B
U
IL
DI
N
G
TUNNEL
CGT-1
1D-CAM
1D-CAM
1D-WAP
1D-CAM
1D-CAM
1D-WAP
1D-WAP
2D
2D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:2
P M
BUILDING 144 BASEMENT PLAN - TECHNOLOGY -
AREA F
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN100F
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 BASEMENT PLAN - TECHNOLOGY - AREA F
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-G68.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
VISITOR
WAITING
AREA
ALCOVE
ALCOVE
ALCOVE
ALCOVE
PYXIS
ALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
FOLDING
CODE
CART
ALCOVE
SOILED UTILITY
DINING
CART
STORAGE
NURSE STATION
VOLUNTEER STATION
REC
THERAPY
STORAGE
CORRIDOR
ALCOVE
ALCOVEALCOVE ALCOVEALCOVEALCOVE ALCOVE
VENT RM-15
TOILET TOILET
VENT RM-16 VENT RM-17
TOILET TOILET
VENT RM-18 PATIENT RM-19
TOILET TOILET PATIENT
RM-21
SOILED UTILITY
CORRIDOR
ALCOVE
ALCOVE
ALCOVE
PATIENT
RM-24 A/B
REHAB
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-24 A/B
REHAB
PATIENT
RM-25 A/B
REHAB
ALCOVE
ALCOVE
PYXIS ALCOVE
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-27 A/B
REHAB
PATIENT
RM-29 A/B
REHAB
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-31 A/B
REHAB
BED RM
CLOSET
TOILET
PATIENT RM-33
DINING
KITCHEN
PATIENT RM-32
TOILET
TOILET
PATIENT RM 30
PATIENT RM-28
TOILET
TOILET
PATIENT RM-26
ELECTRICAL
TELEPHONE
HAC
PATIENT
RM-22
ISOLATION
ANTE
RM-20 SOILED LINEN
ANTE
RM-22
TOILETTOILET
ISOLATION
RM-1
RN EDUCATORS
CLINICAL
N.LEADER OFFICE
ELEVATOR-3
STAFF
CONFERENCE
/ KITCHENETTE
PROGRAM
MANAGER
OFFICE
PROGRAM
MANAGER
OFFICE
ASSISTIVE
TECHNOLOGY
THERAPIST OFFICE
RESIDENT/FELLOW
PHYSICIANS
OFFICE
PROGRAM MANAGER OFFICE
CORRIDOR
STAFF
TOILET-1
STAFF
TOILET-2
STAFF
TOILET-3
STAFF LOCKER
RM (UNISEX)
NURSE
WORK RMSTORAGE
SPECIAL
BED
STORAGE
CORRIDOR
CORRIDOR
ASSISTIVE
TECHNOLOGY/ 3D
PRINTING LAB
SOILED LINEN
NOURISHMENT STATION
CLEAN LINEN
CLEAN UTILITY
MEDICAL
EQUIPMENT
STORAGE
HAC
ELEVATOR-2
ELEVATOR-1
STAIR 1
RECREATION
THERAPY
STORAGE
VISITOR TOILETVISITOR TOILET
CORRIDOR
CORRIDOR
CORRIDOR
ELEVATOR LOBBY
TOILET
PATIENT BED RM-13
PATIENT BED
RM-11
TOILET
TOILET
PATIENT BED RM-9
PATIENT BED RM-7
TOILET
TOILET
PATIENT BED RM-5
PATIENT BED RM-3
TOILET
TOILET
PATIENT BED
RM-1
HAC
CORRIDOR
PATIENT
LAUNDRY
DAY RM
VESTIBULE
REC
THERAPY
OFFICE
RECREATION
THERAPY MP RM
MULTI PURPOSE RM
ELECTRICAL
TELEPHONE
PATIENT BED RM-14
TOILET
TOILET
PATIENT BED RM-12
PATIENT BED RM-10
TOILET
TOILET
PATIENT BED RM-8
PATIENT BED RM-6
TOILET
TOILET
PATIENT BED RM-4
PATIENT BED RM-2
TOILET
STAIR 2
AL15
AL17
AL16
AL19
AL20
AL23
AL21
AL24
AL22
AL27
AL26
AL25
135A
171A
170A
C105
AL2AL1 AL6AL5AL3 AL4
130A 131A
131 132 132A 133A
133 136 136A 137A
C109
AL7
AL8
162B
162A
161B
161A
AL14
AL13
AL9
AL10
160B
160A
157B
157A
AL12
AL11
156A
155A
156B
155B
154B
154C 154A
154E
154D
153A
152A
151A
148A
147EC
145HC
141 142 143
144A140A140
EL-SCI-3
111 112
C108
117B117A117C
135B121
C106
C107
107HC
EL-SCI-2
EL-SCI-1
ST-SCI-1
105104
C104
C103
C102
181A
183A
185A
187A
191A
193A
195A
194HC
C101
174EC
176A
180A
182A
184A
186A
190A
192A
ST-SCI-2
UNDER CONSTRUCTION
TR-144-175
TR-144-146TN329
TN328
A
B
F E
D
C
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03 0
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 144 FIRST FLOOR OVERALL PLAN -
TECHNOLOGY
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN101
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/16" = 1'-0"
BUILDING 144 FIRST FLOOR OVERALL PLAN - TECHNOLOGY
GENERAL NOTES:
1. REFER TO INDIVIDUAL AREA BUILDING DEMO FLOOR PLANS FOR
ADDITIONAL INFORMATION.
2. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY
EXISTING DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE
TOTAL NEWLY INSTALLED DATA DROP COUNT DOES NOT VARY
+/- 10% IDENTIFIED ON THESE DRAWINGS, THE CONTRACTOR'S
SCOPE SHALL BE UNCHANGED.
3. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING
BOXES. WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT
BE IN THE EXACT LOCATION AS IDENTIFIED.
ALCOVE
ALCOVE
ALCOVE
PYXIS
ALCOVE
ALCOVE
ALCOVEALCOVE
ALCOVEALCOVE
ALCOVE
ALCOVE
ALCOVE
ALCOVE
CORRIDOR
TOILET
PATIENT BED RM-13
PATIENT BED
RM-11
TOILET
TOILET
PATIENT BED RM-9
PATIENT BED RM-7
TOILET
TOILET
PATIENT BED RM-5
PATIENT BED RM-3
TOILET
TOILET
PATIENT BED
RM-1
HAC
TOILET
PATIENT BED RM-12
PATIENT BED RM-10
TOILET
TOILET
PATIENT BED RM-8
PATIENT BED RM-6
TOILET
TOILET
PATIENT BED RM-4
PATIENT BED RM-2
TOILET
STAIR 2
AL17
AL16
AL19
AL20
AL23AL21
AL24AL22
AL27
AL26
AL25
C104
181A
183A
185A
187A
191A
193A
195A
195194HC
180A
182A
184A
186A
190A
192A
ST-SCI-2
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D
2D
2D
2D
2D
2D 2D
2D
2D
2D
2D
2D
2D
D
D
D
D2 D
D
D
D
D
D
D 2 D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 144 FIRST FLOOR PLAN -
TECHNOLOGY - AREA A
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN101A
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA A
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-175.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
VISITOR
WAITING
AREA
ALCOVE
ALCOVE
ALCOVE
DINING
CART
STORAGE
VOLUNTEER STATION
REC
THERAPY
STORAGE
ALCOVE
ASSISTIVETECHNOLOGY/ 3DPRINTING LAB
SOILED LINEN
NOURISHMENT STATION
CLEAN LINEN
CLEAN UTILITY
MEDICAL
EQUIPMENT
STORAGE
HAC
ELEVATOR-2
ELEVATOR-1
STAIR 1
RECREATION
THERAPY
STORAGE
VISITOR TOILET
VISITOR TOILET
CORRIDOR
CORRIDOR
ELEVATOR LOBBY
TOILET
CORRIDOR
PATIENT
LAUNDRY
DAY RM
VESTIBULE
REC
THERAPY
OFFICE
RECREATIONTHERAPY MP RM
MULTI PURPOSE RM
ELECTRICAL
TELEPHONE
PATIENT BED RM-14
TOILET
TOILET
AL15
AL17
AL16
171A
170A
107HC
EL-SCI-2
EL-SCI-1
ST-SCI-1
C103
C102
181A
C101
174EC
176A
180A
V
1V
V
1D-WAP 1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
2D 2D
2D
1D-WAP
1D-WAP
1D-WAP
D
1D-CAM
D
- C A
M
D
2D
TR-144-175TN328
TN328
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 144 FIRST FLOOR PLAN -
TECHNOLOGY - AREA B
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN101B
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA B
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN TR-144-175.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
CODE
CART
ALCOVE
SOILED UTILITY
NURSE STATION
CORRIDOR
ALCOVEALCOVE ALCOVE ALCOVE
VENT RM-15
TOILET TOILET
VENT RM-16 VENT RM-17
TOILET TOILET
VENT RM-18 PATIENT RM-19
RN EDUCATORS
CLINICAL
N.LEADER OFFICE
ELEVATOR-3
STAFF
CONFERENCE
/ KITCHENETTE
PROGRAM
MANAGER
OFFICE
PROGRAM
MANAGER
OFFICE
ASSISTIVE
TECHNOLOGY
THERAPIST OFFICE
RESIDENT/FELLOW
PHYSICIANS
OFFICE
PROGRAM MANAGER OFFICE
CORRIDOR
STAFF
TOILET-1
STAFF
TOILET-2
STAFF
TOILET-3
STAFF LOCKER
RM (UNISEX)
NURSE
WORK RMSTORAGE
SPECIAL
BED
STORAGE
CORRIDOR
CORRIDOR
ASSISTIVE
TECHNOLOGY/ 3D
PRINTING LAB
SOILED LINEN
NOURISHMENT STATION
CLEAN LINEN
CLEAN UTILITY
MEDICAL
EQUIPMENT
STORAGE
HAC
VISITOR TOILET
135A
C105
AL2AL1 AL3 AL4
130A 131A
131 132 132A 133A
EL-SCI-3
111 112
C108
117B117A117C
135B121
C106
C107
107HC
UNDER CONSTRUCTION
1D-WAP
D
2D
1D-WAP
1D-WAP
1D-WAP
D
D
2D 2D 2D 2D
2D 2D 2D2D 2D 2D
2D
D
2D
D
3D
D
2D
D
D
D
D
D
2D
2D
2D
1D-WAP
1D-WAP
1D-WAP 2
D
D
1D-WAP
2D 2D
1D-WAP
2D 2D
2D
2D
D
D
D
D
2D
1V
V 1 V
V 1 V
ALL NETWORK CABLES ON
THIS SIDE OF LINE SHALL
TERMINATE IN TR-144-175.
ALL NETWORK CABLES ON
THIS SIDE OF LINE SHALL
TERMINATE IN TR-144-146.
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 144 FIRST FLOOR PLAN -
TECHNOLOGY - AREA C
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN101C
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA C
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
3. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
4. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
5. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE UNCHANGED.
6. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
7. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
ALCOVEALCOVE
PATIENT RM-19
TOILET TOILET PATIENT
RM-21
SOILED UTILITY
ALCOVE
ALCOVE
ALCOVE
PATIENT
RM-24 A/B
REHAB
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-24 A/B
REHAB
PATIENT
RM-25 A/B
REHAB
ELECTRICAL
TELEPHONE
HAC
PATIENT
RM-22
ISOLATION
ANTE
RM-20 SOILED LINEN
ANTE
RM-22
TOILETTOILET
ISOLATION
RM-1
AL6AL5
136A 137A
AL7
AL8
162B
162A
161B
161A
147EC
145HC
141 142 143
144A140A140
V
V
V
D
D
D
D
1D-WAP
1D-WAP
1D-WAP
D
D
2D 2D
1D-WAP
D
2D
2D
2D
2D
D
TR-144-146
TN329
TN329
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT #18004375.03
PLAN NORTH
TRUE NORTH
NORTH
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Sprinklered
Office of Construction and Facilities Management
FULLY SPRINKLERED
35% SCHEMATIC DESIGN SUBMISSION 5.17.21
65% DESIGN DEVELOPMENT SUBMISSION 6.15.21
65% DESIGN DEVELOPMENT RESUBMISSION 8.25.21
A u to d e s k D o c s /O
C F
M E a s t
M ilw a u k e e
E H
R M
R
T
.0
V A
M ilw
E H
R M
C
.r v t
/3
/2
:0
:3
P M
BUILDING 144 FIRST FLOOR PLAN -
TECHNOLOGY - AREA D
PHINIE MAIBEJ
FINAL BID DOCUMENTS 695-21-700
EHRM INFRASTRUCTURE
UPGRADES - MILWAUKEE, WI
SEPTEMBER 05, 2025
144-TN101D
5000 W. NATIONAL AVENUE MILWAUKEE, WI
1/8" = 1'-0"
BUILDING 144 FIRST FLOOR PLAN - TECHNOLOGY - AREA D
GENERAL NOTES:
1. REFER TO 1/TN400 FOR TECHNOLOGY ROUGH IN DETAIL.
2. ALL NETWORK CABLES ON THIS SHEET SHALL TERMINATE IN
TR-144-146.
3. CONTRACTOR TO PROVIDE NEW J-HOOK ROUTES FOR ALL NEW
CABLING. J-HOOK SIZE AND QUANTITY TO BE PER MANUFACTURER
RECOMMENDATIONS.
4. REFER TO TN500-TN509 FOR RISER DIAGRAMS.
5. REFER TO SHEET TN402 FOR PENETRATION DETAILS.
6. THESE DRAWINGS MAKE THE BEST ATTEMPT TO IDENTIFY EXISTING
DATA DROPS/WORK AREA OUTLETS. AS LONG AS THE TOTAL NEWLY
INSTALLED DATA DROP COUNT DOES NOT VARY +/- 10% IDENTIFIED ON
THESE DRAWINGS, THE CONTRACTOR'S SCOPE SHALL BE
UNCHANGED.
7. NEW WORK AREA OUTLETS SHALL BE LOCATED IN EXISTING BOXES.
WORK AREA OUTLETS SHOWN ON THIS SHEET MAY NOT BE IN THE
EXACT LOCATION AS IDENTIFIED.
8. CONTRACTOR TO INCLUDE AN ALLOWANCE FOR 10% ADDITIONAL 2-
PORTS CAT6A INFORMATION OUTLETS IN THEIR PROPOSAL FOR THIS
SHEET. FUTURE INFORMATION OUTLET LOCATIONS WILL BE
FOLDING
CORRIDOR
PATIENT
RM-25 A/B
REHAB
ALCOVE
ALCOVE
PYXIS ALCOVE
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-27 A/B
REHAB
PATIENT
RM-29 A/B
REHAB
ALCOVE
ALCOVE
TOILET
TOILET
TOILET
TOILET
PATIENT
RM-31 A/B
REHAB
BED RM
CLOSET
TOILET
PATIENT RM-33
DINING
KITCHEN
PATIENT RM-32
TOILET
TOILET
PATIENT RM 30
PATIENT RM-28
TOILET
TOILET
PATIENT RM-26
ELECTRICALISOLATION
STAFF
CONFERENCE
/ KITCHENETTE
PROGRAM
MANAGER
OFFICE
PROGRAM
MANAGER
OFFICE
C109
AL14
AL13
AL9
AL10
160B
160A
157B
157A
AL12
AL11
156A
155A
156B
155B
154B
154C 154A
154E
154D
153A
152A
151A
148A
147EC
144144A140A
EL-SCI-3
1D-WAP
D
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
1D-WAP
D
D
D
D
D
D
D
D
2D
2D
2D
2D
1D-WAP
1D-WAP
2D
2D
2D
2D
2D
2D
2D
2D
15 SUNNEN DRIVE
SUITE 104
ST. LOUIS, MO 63143
P: 314.645.1132 F: 314.645.1173
The FUTURE. Built Smarter www.imegcorp.com
PROJECT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .