RFP Atch 1b - Moody Installation Guide Specs (Vol 2).pdf

PDF 12 MB Posted

Attached to
Multiple Award Construction Contract (MACC), Moody AFB Federal contract opportunity
Solicitation number
FA483024R0007
Issued by
Department of the Air Force Air Combat Command

About this file

This document is an attachment to a Request for Proposal (RFP) for a Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for general construction requirements at Moody AFB, Grand Bay Range, Grassy Pond, Spence Field, Valdosta Regional Airport in Georgia, and Avon Park Range in Florida. The estimated total MACC IDIQ value shall not exceed $150,000,000. The contract will have a single five-year ordering period with two one-year option periods. Individual task orders are estimated to be between $2,000 and $7,000,000 and will vary in size and complexity. The competition is set-aside for 8(a), HUBZone, and Small Businesses, with the Government intending to award nine contracts (three in each set-aside category). Offerors must submit the requested documentation and complete the Representations and Certifications in Section K. Offerors must also be registered and active in the System for Award Management (SAM).

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), Moody AFB, newest first.
File Type Posted
RFP Atch 5d(iii)- WD FL20240207 Building 06 Dec 24 Highlands FL.pdf PDF
RFP Atch 5c(ii)- WD FL20240131 Heavy 12 Jul 24 Polk FL.pdf PDF
RFP Atch 3b(iiii) - Bldg 1108 Utility Map.pdf PDF
RFP Atch 3a(iiii) Bldg 1107 Utility Map.pdf PDF
RFP Atch 3d(i) Bldg 1121 Ancillary Explosives Facility LPS Specs.pdf PDF
RFP Atch 3b(i) Bldg 1108 Missile Assembly Shop LPS Specs 28 Nov 24.pdf PDF
RFP Atch 5c(iii)- WD FL20240223 Building 6 Dec 24 Polk FL.pdf PDF
RFP Atch 5b(i) WD GA20240212 Highway 05 Jan 24 Colquitt GA.pdf PDF
RFP Atch 3c(iiii) Bldg 1109 Utility Map.pdf PDF
RFP Atch 3 Seed Project SOW QSEU 23-0118 Repair LPS 25 Nov 24.pdf PDF
MACC Site Visit Sign-In.pdf PDF
RFP Atch 5d(i) WD FL20240251 Highway 13 Sep 24 Highlands FL.pdf PDF
RFP Atch 5b(ii) - WD GA20240060 Heavy 18 Oct 24 Colquitt GA.pdf PDF
RFP Atch 3d(iiii) Bldg 1121 Utility Map.pdf PDF
Solicitation Amendment - FA483024R00070004.pdf PDF
Solicitation Amendment 0003 FA483024R0007.pdf PDF
RFP Atch 12 Pre-Proposal Conference Site Visit Invitation Amended 0002.pdf PDF
RFP Atch 7 Past Performance Questionnaire (PPQ) Amended 0002.docx DOCX document
MACC Site Visit Sign-In_Redacted.pdf PDF
Solicitation FA483024R0007 0002.pdf PDF
RFP Atch 12 Amended Pre-Proposal Conference Site Visit Invitation.pdf PDF
RFP Atch 3 Seed Project SOW QSEU 23-0118 Repair Lighting Protection System (LPS).pdf PDF
Solicitation FA483024R0007.pdf PDF
RFP Atch 3a(iii)- Bldg. 1107 Submittal Register.pdf PDF
RFP Atch 9 - Client Authorization Letter.docx DOCX document
RFP Atch 5a(i) WD FL20240066 Highway 20 Sep 24 (Lowndes GA).pdf PDF
RFP Atch 5e(ii) - WD FL20240093 Heavy 05 Jan 24 (Highlands FL).pdf PDF
RFP Atch 3a(i) - Bldg 1107 Rocket Test Cell Shop LPS Specs.pdf PDF
RFP Atch 3d(iii) - Bldg 1121 Submittal Register.pdf PDF
RFP Atch 1c- Moody AFB A-E Design Guide.pdf PDF
RFP Atch 11 - Question and Answer Form.docx DOCX document
RFP Atch 8 - Past Performance Information (PPI).docx DOCX document
RFP Atch 7 - Past Performance Questionnaire (PPQ).docx DOCX document
RFP Atch 5c(iii) WD FL20240166 Building 20 Sep 24 (Colquitt GA).pdf PDF
RFP Atch 5e(i) WD FL20240251 Highway 13 Sep 24 (Highland FL).pdf PDF
RFP Atch 5d(i) WD FL20240267 Highway 13 Sep 24 (Polk FL).pdf PDF
RFP Atch 5b(i) WD FL20240066 Highway 20 Sep 24 (Lanier GA).pdf PDF
RFP Atch 5a(ii) - WD GA20240290 Heavy 05 Jan 24 (Lowndes and Lanier GA).pdf PDF
RFP Atch 5c(i) - WD GA20240212 Highway 05 Jan 24 (Colquitt GA).pdf PDF
RFP Atch 5e(iii)- WD FL20240207 Building 12 Jul 24 (Highlands FL).pdf PDF
RFP Atch 5d(ii)- WD FL20240131 Heavy 12 Jul 24 (Polk FL).pdf PDF
RFP Atch 3c(i) - Bldg 1109 Conventional Munitions Shop LPS Specs.pdf PDF
RFP Atch 3a(ii) - Bldg 1107 LPS Drawings.pdf PDF
RFP Atch 10- Subcontractor Consent Letter.docx DOCX document
RFP Atch 5a(iii) WD FL20240316 Building 20 Sep 24 (Lanier and Lowndes GA).pdf PDF
RFP Atch 3d(i) - Bldg 1121 Ancillary Explosives Facility LPS Specs.pdf PDF
RFP Atch 3c(ii) - Bldg 1109 LPS Drawings.pdf PDF
RFP Atch 3b(ii) - Bldg 1108 LPS Drawings.pdf PDF
RFP Atch 3c(iii)- Bldg. 1109 Submittal Register.pdf PDF
RFP Atch 1a - Moody Installation Guide Specs (Vol 1).pdf PDF
Show all 50

Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOODY AIR FORCE BASE

GEORGIA

MOODY INSTALLATION GUIDE

SPECIFICATIONS

June 2024

VOLUME 2

DIVISIONS 21-42

RFP FA483024R0007

Attachment 1b

MOODY INSTALLATION GUIDE SPECIFICATIONS MOODYAFB

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS

01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 02/15 PROJECT SCHEDULE

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 11/16, CHG 2: 11/21 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING

02 41 00 08/22 DEMOLITION

02 42 51 11/19 CARPET REMOVAL AND RECLAMATION

02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL

02 65 00 02/10, CHG 1: 11/13 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 85 00 11/18, CHG 1: 05/22 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE

03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

PROJECT TABLE OF CONTENTS Page 1

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 50 14 08/18 STRUCTURAL METAL FABRICATIONS

05 51 00 02/17, CHG 1: 05/17 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING

VAULTS

05 72 00 05/18 DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 18 00 08/16, CHG 1: 11/18 GLUED-LAMINATED CONSTRUCTION

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS

07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES

07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS

07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES

07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING

07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING

07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER

ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING

07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD

WINDOWS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 11 69 02/10 METAL STORM DOORS

08 11 73 08/20 SLIDING FIRE DOORS

08 13 73 02/11 SLIDING METAL DOORS

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 22 20 11/19 FIBERGLASS REINFORCED PLASTIC (FRP)

DOORS AND FRAMES

PROJECT TABLE OF CONTENTS Page 2

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 32 13 08/20, CHG 1: 02/22 ALUMINUM SLIDING GLASS DOORS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 01 08/09 FORCED ENTRY RESISTANT COMPONENTS

08 34 02 08/09 BULLET-RESISTANT COMPONENTS

08 34 16 05/17 CORROSION CONTROL HANGAR DOORS

08 34 58 08/08 FILE ROOM DOORS AND FRAMES

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES

08 34 63 05/11 DETENTION HOLLOW METAL FRAMES, DOORS,

AND DOOR FRAMES

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 36 13 08/20 SECTIONAL OVERHEAD DOORS

08 36 19 08/20 VERTICAL LIFT DOORS

08 39 53 02/19, CHG 1: 05/20 BLAST RESISTANT DOORS (EARTH COVERED

MAGAZINES)

08 39 54 08/09 BLAST RESISTANT DOORS

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES

08 51 13 05/19 ALUMINUM WINDOWS

08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS

08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS

08 53 00 08/20, CHG 1: 02/22 PLASTIC WINDOWS

08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS

08 56 63 04/06 DETENTION AND SECURITY WINDOWS

08 60 45 08/20 [SKYLIGHTS][ AND ][TRANSLUCENT PANELS]

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 71 63 04/06 DETENTION HARDWARE

08 81 00 05/19 GLAZING

08 88 53 05/11 DETENTION AND SECURITY GLAZING

08 88 58 05/14 AIR TRAFFIC CONTROL TOWER CAB GLASS

08 91 00 08/20 METAL [WALL] [AND] [DOOR] LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING

09 23 82 11/19 FIREPROOF GYPSUM PLASTERING

09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO

09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 64 66 08/16, CHG 1: 08/18 WOOD ATHLETIC FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 65 66 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING

09 66 13 08/16, CHG 2: 11/18 PORTLAND CEMENT TERRAZZO FLOORING

09 66 16 08/16, CHG 1: 08/18 TERRAZZO FLOOR TILE

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING

09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,

3-COAT SYSTEM

09 67 23.16 02/21 FUEL RESISTIVE RESINOUS FLOORING,

5-COAT SYSTEM

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING

PROJECT TABLE OF CONTENTS Page 3

09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

09 96 00 11/14 HIGH-PERFORMANCE COATINGS

09 96 59 05/11, CHG 1: 08/17 HIGH-BUILD GLAZE COATINGS

09 97 02 02/20, CHG 1: 11/21 PAINTING: HYDRAULIC STRUCTURES

09 97 13.00 40 11/19 STEEL COATINGS

09 97 13.16 05/11, CHG 2: 08/19 INTERIOR COATING OF WELDED STEEL WATER

TANKS

09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF

WELDED STEEL PETROLEUM FUEL TANKS

09 97 13.25 05/11, CHG 1: 08/17 MAINTENANCE, REPAIR, AND COATING OF

TALL ANTENNA TOWERS

09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL

STRUCTURES

09 97 13.28 02/10 PROTECTION OF BURIED STEEL PIPING AND

STEEL BULKHEAD TIE RODS

09 97 23 08/18 METALLIC TYPE CONDUCTIVE/SPARK

RESISTANT CONCRETE FLOOR FINISH

09 97 23.16 11/10 LINSEED OIL PROTECTION OF CONCRETE

SURFACES

09 97 23.17 08/16, CHG 1: 11/16 CORROSION INHIBITOR COATING OF

CONCRETE SURFACES

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS

10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

10 56 13 04/06 STEEL SHELVING

DIVISION 12 - FURNISHINGS

12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS

12 22 00 08/16, CHG 1: 08/18 CURTAINS AND DRAPES

12 35 30.23 20 08/11 BATHROOM CASEWORK

12 35 39 08/17, CHG 1: 08/18 COMMERCIAL KITCHEN CASEWORK

12 35 70 08/16, CHG 2: 11/18 HEALTHCARE CASEWORK

12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION

12 61 13 08/20 UPHOLSTERED AUDIENCE SEATING

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

13 49 20.00 10 10/07 RFI/EMI SHIELDING

DIVISION 21 - FIRE SUPPRESSION

21 12 00 05/11 STANDPIPE SYSTEMS

PROJECT TABLE OF CONTENTS Page 4

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 25 02/19, CHG 1: 02/21 HIGH-EXPANSION FOAM SYSTEM, FIRE

PROTECTION

21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR

KITCHEN CABINET

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES

22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR

PLUMBING APPLICATIONS

22 07 19.00 40 08/16 PLUMBING PIPING INSULATION

22 13 29 02/11 SANITARY SEWERAGE PUMPS

22 13 36 02/09 PNEUMATIC SEWAGE EJECTORS

22 14 29.00 40 05/17 SUMP PUMPS

22 15 09.00 40 05/22 GENERAL SERVICE COMPRESSED-AIR SYSTEMS

CLEANING PROCEDURES

22 15 13.16 40 11/17 HIGH-PRESSURE COMPRESSED-AIR PIPING,

PIPING COMPONENTS, AND VALVES,

STAINLESS

22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR

SYSTEMS, LOW PRESSURE

22 15 19.13 20 11/09 LARGE NONLUBRICATED RECIPROCATING AIR

COMPRESSORS (OVER 300 HP)

22 15 19.19 20 05/11 NONLUBRICATED ROTARY SCREW AIR

COMPRESSORS (100 HP AND LARGER)

22 15 26.00 20 04/06 HIGH AND MEDIUM PRESSURE COMPRESSED

AIR PIPING

22 16 19.26 20 11/09 LARGE CENTRIFUGAL AIR COMPRESSORS

(OVER 200 HP)

22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE

(SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 13.34 40 02/17 CONTROL VALVES, SELF-CONTAINED

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 23 00 08/21 REFRIGERANT PIPING

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 31 13.00 40 08/22 METAL DUCTS

PROJECT TABLE OF CONTENTS Page 5

23 33 56 02/09 SELF-ACTING BLAST VALVES

23 34 23.00 40 02/17 HVAC POWER VENTILATORS

23 35 16.17 10 05/20 MECHANICAL ENGINE[ AND WELDING FUME]

EXHAUST SYSTEMS

23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST

23 36 00.00 40 08/22 AIR TERMINAL UNITS

23 37 13.00 40 08/22 DIFFUSERS, REGISTERS, AND GRILLES

23 41 13.00 40 02/16 PANEL FILTERS

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR

23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING

WATER AND STEAM HEAT EXCHANGERS

23 64 00 11/16, CHG 2: 08/18 PACKAGED WATER CHILLERS, ABSORPTION

TYPE

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE

EVAPORATIVELY-COOLED CONDENSERS

23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS

23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS

23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

23 82 16.00 40 08/22 AIR COILS

23 82 19.00 40 05/17 FAN COIL UNITS

23 82 23.00 40 05/17 UNIT VENTILATORS

23 82 43.00 40 05/17 ELECTRIC DUCT HEATERS

23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS

23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM

TESTING

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES

26 05 19.10 10 05/16 INSULATED WIRE AND CABLE

26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL

SYSTEMS

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE

DEVICES

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES

26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION

26 11 16 11/21 SECONDARY UNIT SUBSTATIONS

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS

26 18 23.00 40 08/16 MEDIUM-VOLTAGE SURGE ARRESTERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 22 00.00 10 10/07 480-VOLT STATION SERVICE SWITCHGEAR

PROJECT TABLE OF CONTENTS Page 6

AND TRANSFORMERS

26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR

26 23 00.00 40 11/17 SWITCHBOARDS AND SWITCHGEAR

26 24 16.00 40 08/19 PANELBOARDS

26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS

26 28 00.00 10 08/22 MOTOR CONTROL CENTERS, SWITCHBOARDS

AND PANELBOARDS

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL

INDUCTION TYPE

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC

PROTECTION (GACP) SYSTEM

26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE

INTERIOR OF STEEL WATER TANKS

26 42 19.10 11/08 CATHODIC PROTECTION SYSTEMS (IMPRESSED

CURRENT) FOR LOCK MITER GATES

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 52 00.00 40 11/17 EMERGENCY LIGHTING

26 53 00.00 40 11/15 EXIT SIGNS

26 55 53.00 40 11/14 SECURITY LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND

VISUAL NAVIGATION AIDS

26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS

DIVISION 27 - COMMUNICATIONS

27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 21 10.00 40 11/20 FIBER OPTIC DATA TRANSMISSION SYSTEM

27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 02.00 20 02/10 FIRE ALARM REPORTING SYSTEMS - DIGITAL

COMMUNICATORS

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/08, CHG 2: 02/21 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 10 00 02/21 SITE CLEARING

31 11 00 11/18 CLEARING AND GRUBBING

31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL

PROJECT TABLE OF CONTENTS Page 7

31 31 16.13 08/22 CHEMICAL TERMITE CONTROL

31 31 16.19 08/22 TERMITE CONTROL BARRIERS

31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 05/16, CHG 2: 08/17 RUBBER AND PAINT REMOVAL FROM AIRFIELD

PAVEMENTS

32 01 13.62 05/18 ASPHALT SURFACE TREATMENT

32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING

32 01 18.71 05/17 GROOVING OF AIRFIELD PAVING

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 01 29.61 05/17, CHG 1: 08/17 PARTIAL DEPTH PATCHING OF RIGID PAVING

32 01 29.62 11/18 CONCRETE PAVEMENT RAISING

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR

FLEXIBLE PAVING

32 11 23 05/22 AGGREGATE BASE COURSE AND/ORGRADED

CRUSHED AGGREGATE BASE COURSE FOR

FLEXIBLE PAVING

32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 11 26.19 05/20 BITUMINOUS-STABILIZED BASE AND SUBBASE

COURSES

32 11 33.13 05/20 PORTLAND CEMENT-STABILIZED BASE COURSES

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 12 17.19 11/20 FUEL RESISTANT ASPHALT PAVING FOR

AIRFIELDS - SURFACE COURSE

32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND

OTHER HEAVY DUTY PAVEMENTS

32 13 43 05/20 PERVIOUS CONCRETE PAVING

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 18 16.13 08/17 PLAYGROUND PROTECTIVE SURFACING

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 84 23 02/21 UNDERGROUND SPRINKLERS

32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 01 30.16 11/21 TV INSPECTION OF SEWER LINES

33 01 30.72 11/21 RELINING SEWERS

33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS

33 01 50.55 02/21 CLEANING OF PETROLEUM STORAGE TANKS

33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION

33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING

33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 16 15 11/20 WATER STORAGE STEEL TANKS

33 26 00.00 10 04/08 RELIEF WELLS

PROJECT TABLE OF CONTENTS Page 8

33 30 00 05/18 SANITARY SEWERAGE

33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING

33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING

STATIONS

33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS

33 40 00 11/21 STORMWATER UTILITIES

33 46 13 05/20 FOUNDATION DRAINAGE

33 46 16 05/18 SUBDRAINAGE PIPING

33 47 13 11/14, CHG 2: 11/15 POND AND RESERVOIR LINERS

33 51 13.00 30 05/10 NATURAL-GAS METERING

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 51 39 08/17 MONITORING WELLS

33 51 43 05/22 INSTRUMENTATION AND PERFORMANCE

MONITORING OF STRUCTURES

33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)

33 56 53 05/20 COMPRESSED GASES STORAGE TANKS

33 57 55 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

33 60 02 04/08 ABOVEGROUND HEAT DISTRIBUTION SYSTEM

33 61 13 08/10, CHG 1: 02/20 PRE-ENGINEERED UNDERGROUND HEAT

DISTRIBUTION SYSTEM

33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC

ENERGY DISTRIBUTION

33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE

MANHOLES

33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER

PIPING

33 63 13 04/06 EXTERIOR UNDERGROUND STEAM

DISTRIBUTION SYSTEM

33 63 13.19 02/16 CONCRETE TRENCH HYDRONIC AND STEAM

ENERGY DISTRIBUTION

33 63 14 04/06 EXTERIOR BURIED PUMPED CONDENSATE

RETURN

33 63 16 07/06 EXTERIOR SHALLOW TRENCH STEAM

DISTRIBUTION

33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION

33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 01.00 40 11/14, CHG 1: 02/17 OVERHEAD TRANSMISSION AND DISTRIBUTION

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 73 00.00 40 05/19 UTILITY TRANSFORMERS

33 75 00.00 40 11/14 SWITCHGEAR AND PROTECTION DEVICES

33 77 19.00 40 08/16 MEDIUM-VOLTAGE SWITCH

33 77 36.00 40 05/17 MEDIUM-VOLTAGE UTILITY FUSES

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP

RUNNING

41 22 13.15 02/20, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC,

UNDER RUNNING

41 22 13.16 04/08, CHG 1: 02/20 GANTRY CRANES

41 22 13.55 02/22 CHG 1: 05/22 BRIDGE CRANES, UNDER RUNNING, AIRCRAFT

HANGAR

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 9

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 201 PAGES

MOODY INSTALLATION GUIDE SPECIFICATIONS

21 12 00 SD-02 Shop Drawings

1.4.4 GStandpipe System

SD-03 Product Data

2.1.1 GPipe and Fittings

2.1.1 GMechanical Couplings

2.1.2 GPipe Hangers and Supports

2.1.3 GValves

2.1.9 GFire Department Connections

2.1.10 GAlarm Valves

2.1.11 GWater Motor Alarms

2.1.12Pressure Switch

G]

2.1.13 GWaterflow Detector

2.1.14 GFire hose Cabinets

2.1.15 GValve Tamper Switch

2.1.17 GBackflow Preventer

2.2.1 GBuried Pipe and Fittings

SD-06 Test Reports

3.8.1 GPreliminary Tests

3.8.2 GAcceptance Tests

SD-07 Certificates

1.6.1 GQualifications of Installer

SD-10 Operation and Maintenance Data

2.1.10 GAlarm Valves

2.1.17 GBackflow Preventer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 201 PAGES

21 12 00 SD-11 Closeout Submittals

1.6.2 GSystem As-Built Drawings

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection

Engineer (QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

2.3.1.2 GFittings

2.3.5 GValves

2.3.6 GAlarm Valves

2.8.5 GRelief Valves

2.7 GSprinklers

2.3.4 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

2.8.6 GAir Vent

2.5.1 GHose Valve

2.3.4 GSeismic Bracing

2.1.2 GNameplates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 201 PAGES

21 13 13 SD-05 Design Data

2.3.4 GSeismic Bracing

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test SD-10 Operation and Maintenance Data

3.9 GOperating and Maintenance

(O&M) Instructions

1.6 GSpare Parts

SD-11 Closeout Submittals

3.9As-built drawings 21 13 25 SD-01 Preconstruction Submittals

3.23 GOPTICAL FLAME DETECTOR

AND FOAM/WATER DISCHARGE

TESTING, SAFETY, AND

ENVIRONMENTAL PLAN

SD-02 Shop Drawings

1.2 GHigh-Expansion Foam Systems

SD-03 Product Data 2.3.1Pipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 201 PAGES

21 13 25 2.3.5 GFittings and Couplings

1.3.8 GValves

2.3.8 Ghangers

2.15.2 GWaterflow Pressure Alarm Switch

3.1.3 GSurge Arresters

3.1.3 GSurge Arresters

2.14.1 GFoam System Control Panel

(FSCP)

2.14.1 GFoam System Control Panel

(FSCP)

2.14.2 GFoam System Control Panel

(FSCP)

2.14.2 GFoam System Control Panel

(FSCP)

2.14.3 GFoam System Control Panel

(FSCP)

2.14.3 GFoam System Control Panel

(FSCP)

2.14.6.2 GBattery Chargers

2.14.6.1 GBatteries

2.14.4 GAnnunciator Panel

2.17 GFOAM SYSTEM BEACONS

2.18 GManual Foam Releasing Stations

2.19 GManual Foam Stop Stations

1.3.10 GManual Foam Stop Station

Operation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 201 PAGES

21 13 25 2.20 GOptical Flame Detectors and Controller

2.11.5 GIn-Line Balanced Pressure

Proportioner Assembly

3.11 GIn-Line Balanced Pressure

Proportioner Assembly

2.12 GFOAM GENERATORS

3.1.1 GSway Bracing

3.3.1 GWater Tight Junction Boxes

2.6 GFoam/Water Flow Control Valves

3.1.4 GFoam/Water Flow Control Valves

2.5 GStrainer

2.8 GFoam Concentrate

2.9 GCONCENTRATE STORAGE

TANK

2.13 GContainment Tank Remote

Capacity Monitoring and Diverter Valve Panel - Army

2.11.1 GFoam Concentrate Pump

2.11.2 GFoam Concentrate Jockey Pump

2.11 GFOAM/WATER

PROPORTIONING BY ILBP

PROPORTIONER

1.3.13 GTrench Drainage Diverter Valve

Controls

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 201 PAGES

21 13 25 3.18 GOPTICAL FLAME DETECTION

SUPERVISED DISCONNECT IN

HANGAR BAY

2.10 GFOAM/WATER

PROPORTIONING BY

INDUCTOR

1.8 GSpare Parts

3.20.1 GFoam Systems

1.5.2 GSprinkler System Designer

1.5.1 GFire Protection Specialist

1.6 GInstaller's Qualifications

3.35 GPost-discharge Test

Requirements SD-05 Design Data

3.5.1 GBattery Power

1.3.12 GSystem hydraulic surge analysis

3.34 GTest Data

1.3.7 GHydraulic Calculations

1.3.7 GFoam Spread/Coverage

Calculations

3.1.1 GSeismic

SD-06 Test Reports

3.34 GTests

3.38Final Acceptance Test Report 3.38Digital

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 201 PAGES

21 13 25 1.6 GINSTALLER'S QUALIFICATIONS

1.7.1 GMaterials and Equipment

SD-10 Operation and Maintenance Data

1.3.14 GFoam System

SD-11 Closeout Submittals

3.38 GAs-built Drawings

21 23 00.00 20 SD-02 Shop Drawings

1.2 GFire Extinguishing System

SD-03 Product Data

3.2.1 GStorage Cylinder

2.2 GFusible Links

2.2 GRelease Mechanisms

1.2.1 GValve

3.2.1 GDischarge Nozzle

3.2.1 GPipe and Fittings

2.1 GPiping and Accessories

2.2 GRemote Manual Actuation

Stations

3.2.1 GPressure-operated Switches

3.1 GManufacturer's Installation and

Maintenance Manuals SD-07 Certificates

1.5.1 GQualifications of Installer

SD-08 Manufacturer’s Instructions

1.2 GFire Extinguishing System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 201 PAGES

21 23 00.00 20 SD-10 Operation and Maintenance Data

1.2 GFire Extinguishing System

1.5.1 GAs-built Drawings

SD-11 Closeout Submittals

2.4 GSign Legends

21 30 00 SD-01 Preconstruction Submittals 1.3Fire Pump Installation Related

Submittals

1.7.1 GFire Protection Specialist

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

3.11.2 GAs-Built Drawings

3.3.2 GPiping Layout

3.3.2 GPump Room

SD-03 Product Data

2.1 GCatalog Data

1.6Spare Parts 3.8.2Preliminary Tests

3.8 GField Tests

1.7.6 GManufacturer's Representative

3.11.1 GField Training

Army Final Acceptance Test Navy Formal Inspection and Tests

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 201 PAGES

21 30 00 3.8.2Preliminary Tests Army Final Acceptance Test

GNavy Formal Inspection and Tests

SD-07 Certificates 1.7.1Fire Protection Specialist 1.7.2Qualifications of Welders 1.7.3Qualifications of Installer 1.7.4Preliminary Test Certification 1.7.5Final Test Certification

SD-10 Operation and Maintenance Data

3.11.1 GOperating and Maintenance

Instructions

2.17Flow Meter 22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.1 SRecycled Content for Steel Pipe

2.1 SRecycled Content for Cast Iron

Pipe

3.9.1.1 GBackflow Prevention Assemblies

2.6.2 GShower Faucets

2.6.9 GSwimming Pool Suction Fittings

2.4.1 SWaterSense Label for Lavatory

Faucet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 201 PAGES

22 00 00 2.4Fixtures 2.4.3Flush Valve Water Closets

2.4.3 SWaterSense Label for Flush

Valve Water Closet 2.4.4Flush Valve Urinals

2.4.4 SWaterSense Label for Urinal

2.4.6Flush Tank Water Closets

2.4.6 SWaterSense Label for Flush Tank

Water Closet 2.4.7Wall Hung Lavatories 2.4.8Countertop Lavatories 2.4.9Kitchen Sinks 2.4.10Service Sinks

2.4.11 GDrinking-Water Coolers

2.4.11 SEnergy Star Label for Electric

Water Cooler

2.4.12 SEnergy Star Label for Wheelchair

Electric Water Cooler

2.6.2 SWaterSense Label for

Showerhead 2.4.14Plastic Bathtubs 2.4.15Plastic Shower Stalls 2.4.16Plastic Bathtub Liners 2.4.17Plastic Bathtub Wall Surrounds

2.10 GWater Heaters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 201 PAGES

22 00 00 SEnergy Star Label for Gas Storage Water Heater

2.10.2 SEnergy Star Label for Gas

Instantaneous Water Heater

2.12 GPumps

2.16 GPool Water Pump Safety Vacuum

Release System 1.5.1Welding

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports 3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.9.1 GPlumbing System

22 00 70 SD-01 Preconstruction Submittals

GEnvironmental Data SD-02 Shop Drawings

3.16.1 GPlumbing System

3.16.7 GDomestic Water Systems

Flushing Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 201 PAGES

22 00 70 SD-03 Product Data

2.4 GPipe and Fittings

2.8 GPipe Hangers, Inserts, and

Supports

2.9 GValves

2.10 GPlumbing Fixtures

2.11 GBackflow Preventers

2.12 GDrains and Backwater Valves

2.13 GCleanouts

2.15 GInterceptors

2.16 GWater Heaters

2.17 GStorage Tanks

2.18 GPumps

2.19 GWater Pressure Booster System

2.20 GWater Service Meter

2.21 GCopper-Silver Ionization System

2.22 GPotable Water Monitoring System

3.13Vibration-Absorbing Features

SRecycled content for cast iron pipe

2.3 SRecycled content for steel pipe

2.10.4.6.1SWaterSense label for shower head

2.10.4.1 SEnergy Star label for electric

water cooler 2.10.4.10.1SWaterSense label for urinal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 201 PAGES

22 00 70 2.10.4.11.1SWaterSense label for water closet SEnergy Star label for gas storage water heater

2.16.3 SEnergy Star label for gas

instantaneous water heater 3.16.1Plumbing System

SD-06 Test Reports 3.16Tests, Flushing and Disinfection 3.16.1.1Test of Backflow Prevention

Assemblies SD-07 Certificates

2.3Materials and Equipment 1.4.2Welding 2.5Bolts 3.5.6.3Pressure-Seal (Press-Fit) System

Installation Training 3.5.6.3Pressure-Seal (Press-Fit) Tools

Calibration 2.21EPA Registration for

Copper-Silver Ionization 2.21NSF Certification for

Copper-Silver Ionization SD-10 Operation and Maintenance Data

3.16.1 GPlumbing System

1.4.5Maintenance Data Package

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 201 PAGES

22 05 48.00 20 SD-02 Shop Drawings 2.7Inertia Bases 2.6Machinery Bases 2.6Platforms 2.6Rails 2.6Saddles

SD-03 Product Data 2.3Isolators 2.8Flexible Connectors 2.9Flexible Duct Connectors 2.11Pipe Guides 2.10Seismic Snubbers 3.1.3Vertical Stops 2.12Thrust Restraints 2.7Inertia Bases 2.6Machinery Bases 3.1.13Machinery Foundations and

Subbases 2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery Manufacturer's Sound

Data SD-05 Design Data

2.7Inertia Bases 2.6Machinery Bases

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 201 PAGES

22 05 48.00 20 2.6Platforms 2.6Rails 2.6Saddles 1.4.3Machinery 1.4.4Machinery Over 300 Pounds

SD-06 Test Reports 2.10Seismic Snubbers 3.2.3.1Equipment Vibration Tests 3.2.3.2Equipment Sound Level Tests 2.4Protected Spring Isolators

SD-08 Manufacturer’s Instructions 3.1.1Vibration and Noise Isolation

Components 2.13Seismic Protection Components

22 05 83.63 SD-03 Product Data

2.1 GInstallation Equipment

2.2.1 GCIPP Lining Tube

2.1 GEpoxy Resin

2.1 GLiner Materials

SD-08 Manufacturer’s Instructions 3.2CIPP Manufacturer's Written

Installation Instructions SD-11 Closeout Submittals

3.2 GReport Summarizing The Extent

Of the Pipe Lining Performed

3.2Pre-Lining Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 201 PAGES

22 05 83.63 3.2Post-Lining Inspection 1.4Manufacturer's Warranty 3.2Record Drawings

22 07 19.00 40 SD-02 Shop Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.3 GAdhesives

2.3 GCoatings

2.3 GInsulating Cement

2.3 GInsulation Materials

2.3 GJacketing

2.3 GTape

SD-08 Manufacturer’s Instructions

3.1 GInstallation Manual

SD-11 Closeout Submittals 3.4Record Drawings

2.3 SAdhesives

2.3 SCoatings

2.3 SInsulation Materials

1.3.1 SRecycled Materials

22 13 29 SD-02 Shop Drawings

3.2 GEquipment Installation

SD-03 Product Data 2.1Materials and Equipment 3.4Framed Instructions 1.4Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 201 PAGES

22 13 29 SD-06 Test Reports 3.5Field Testing and Adjusting

Equipment SD-10 Operation and Maintenance Data

3.7 GOperating and Maintenance

Manuals

22 13 36 SD-02 Shop Drawings 3.4Equipment Installation

SD-03 Product Data 2.2Materials and Equipment 2.3Sewage Receiver 2.4Air Compressor 2.5Air Reservoir 2.6Electric Motor 2.7Controls 1.5Spare Parts

SD-10 Operation and Maintenance Data

3.8 GOperation and Maintenance

Manuals

22 14 29.00 40 SD-02 Shop Drawings

2.1 GConnection Diagrams

2.1 GControl Diagrams

2.1 GInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 201 PAGES

22 14 29.00 40 2.1 GManufacturer's Catalog Data

2.1 GPump Performance Curve

3.3 GSpare Parts List

3.3 GSpecial Tools

2.2.1 GWet-Pit Sump Pumps

2.2.2 GSubmersible Pumps

2.2.2 GAccessories

2.2.1.11 GFloatless Electrode Level

Controls SD-06 Test Reports

3.2.2 GHydrostatic Leak

3.2.2 GStatic Heads

3.2.2 GPump Flow Capacity

SD-07 Certificates 2.2.1.6Manufacturer's Certification of

Bearing Life SD-08 Manufacturer’s Instructions

2.1Manufacturer's Installation Instructions

2.1Vibration Specifications 22 15 09.00 40 SD-01 Preconstruction Submittals

1.4.1 GPrequalification Statement

SD-03 Product Data

2.1.1 GDemineralized Water

2.1.2 GDrying or Preservation Gas

2.1.3 GFilter Discs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 201 PAGES

22 15 09.00 40 2.1.4 GNitric Acid

2.1.5 GCitric Acid

2.1.6 GMuriatic Acid

2.1.7 GHydrofluoric Acid

2.1.8 GNormal - Propyl Bromide

2.1.9 GTape

2.1.10 GPolyethylene Film

2.1.11 GLow Water-Vapor Transmission

Film

2.1.12 GAluminum Foil

SD-04 Samples

2.1.10 GPolyethylene Film

2.1.13 GCertification Tags

2.1.11 GLow Water-Vapor Transmission

Film SD-06 Test Reports

3.1.2 GInspection Records

SD-07 Certificates

1.4.2 GCleaning Procedures

22 15 13.16 40 SD-01 Preconstruction Submittals

Part 1 GProposed Deviations SD-02 Shop Drawings

1.3 GDetail Drawings

SD-03 Product Data

2.2.1 GUnderground Piping

2.2.2 GAboveground Piping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 201 PAGES

22 15 13.16 40 2.1.1 GAir Compressors

2.1.2 GManual Valves

2.1.4 GPiping Specialties

2.2.3 GMiscellaneous Materials

2.1.3 GSupporting Elements

SD-06 Test Reports

3.2.1 GSystem Pressure Test

SD-07 Certificates 2.2.1Underground Piping 2.2.2Aboveground Piping 2.1.1Air Compressors 2.1.2Manual Valves 2.1.4Piping Specialties 2.2.3Miscellaneous Materials 2.1.3Supporting Elements

22 15 14.00 40 SD-02 Shop Drawings

2.1 GInstallation Drawings

SD-03 Product Data

2.1.1 GEquipment and Performance

Data

2.3.1 GUnderground Piping Materials

2.3.2 GAboveground Piping Materials

2.2.1 GPiping Specialties

2.4.2 GSupporting Elements

2.2.2 GAir Compressors

2.2.3 GValves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 201 PAGES

22 15 14.00 40 3.1.2.1 GAccessories

2.4.1 GMiscellaneous Materials

SD-05 Design Data

2.1.1 GDesign Analysis and Calculations

SD-06 Test Reports 3.2.1.4Piping System Test Report

SD-07 Certificates 2.3.1Underground Piping Materials 2.3.2Aboveground Piping Materials 2.4.2Supporting Elements 2.2.3Valves 2.4.1Miscellaneous Materials

SD-10 Operation and Maintenance Data

3.4Operation and Maintenance Manuals

22 15 19.13 20 SD-02 Shop Drawings 1.4.7Air Compressor System

SD-03 Product Data 2.2Air Compressor 2.2.10Inlet Air Filters 2.2.11Inlet Line Silencer 2.3Air Flow Rate and Pressure

Recorder 2.4Carbon Monoxide Monitor 2.2.9.1Filter Housing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 201 PAGES

22 15 19.13 20 SD-05 Design Data 1.4.1Intake and Discharge Pipe

Calculations SD-06 Test Reports

2.5.1Air Compressor Performance Tests

2.5.1Sound Level and Run-In Tests 3.3.1.1Performance Tests 3.3.1.2Instrumentation Test 3.3.1.3Sound Level Tests 3.3.1Air Compressor System Test

SD-07 Certificates 1.4.2Work Plan 2.5.1Factory Test Procedures 1.4.3Factory Testing Certification 1.4.4Qualifications of Field

Supervisors 3.3.1Field Test Procedures 1.4.5Training Material 1.4.7Air Compressor System 1.4.6System Installation

SD-10 Operation and Maintenance Data

1.4.7Air Compressor System SD-11 Closeout Submittals

1.11Posted Operating Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 201 PAGES

22 15 19.19 20 SD-02 Shop Drawings 1.6.1Air Compressor System

SD-03 Product Data 2.2Air Compressor 2.2.10Inlet Air Filters 2.2.11Line Silencer 2.3Air Flow Rate and Pressure

Recorder 2.4Carbon Monoxide Monitor 2.2.9.2Filter Housing

SD-06 Test Reports 2.5.1performance tests 3.3.1.3Sound Level Tests 3.3.1.1Air Compressor Performance

Tests 3.3.1.2Instrumentation Test 2.5.1Sound Level and Run-in Tests 3.3.1Air Compressor System Test

SD-07 Certificates 1.4.1Work Plan 2.5.1Factory Test Procedures 1.4.2Factory Testing Certification 1.4.3Qualifications of Field

Supervisors 3.3.1Field Test Procedures 1.4.4Training Material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 201 PAGES

22 15 19.19 20 1.6.1Air Compressor System 1.4.5System Installation

SD-10 Operation and Maintenance Data

1.6.1Air Compressor System SD-11 Closeout Submittals

1.11Posted Operating Instructions 22 15 26.00 20 SD-02 Shop Drawings

1.4.2High Pressure Compressed Air System

SD-03 Product Data 2.1Air Compressor 2.2Air Dryer 2.2.4Instrumentation and Controls 2.3Air Receivers and Separators 2.5Air Receivers and Separators 2.8Desiccant Air Dryers 2.9.1Piping and Tubing 2.10.2Fittings 2.10.6Valves 2.9.7Adapters 2.9.8Pressure gages 2.9.9Snubbers 2.9.10Timed Solenoid Drain 2.10.10Traps 2.9.11Filters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 201 PAGES

22 15 26.00 20 2.9.12Strainers 2.9.13Unions 2.9.14O-ring Gaskets 2.10.11Flexible connections 2.9.15Hangers and Supports 2.12Valve box 2.13Identification Labels For Piping

SD-06 Test Reports 3.1.3Non-Destructive Examination

(NDE) Report For Welding of Piping

3.4.2.2Leak Tightness Test SD-07 Certificates

1.4.5Employer's Record Documents 1.4.6Welding Procedures and

Qualifications SD-08 Manufacturer’s Instructions

2.3Air receivers and Separators 2.5Air receivers and Separators

SD-10 Operation and Maintenance Data

2.1Air Compressor 2.2Air Dryer

SD-11 Closeout Submittals 2.1Air Compressor 2.2Air Dryer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 201 PAGES

22 15 26.00 20 1.4Compressed Air Systems 22 16 19.26 20 SD-02 Shop Drawings

2.2Air Compressor SD-03 Product Data

2.2Air Compressor 2.2.10.2Air Intake Devices 2.2.12Bypass Line Silencer 2.3Air Flow Rate and Pressure

Recorder 2.4Carbon Monoxide Monitor

SD-06 Test Reports 2.5.1performance tests 2.5.1Balance Tests 2.5.1Sound Level and Run-In Tests 3.3.1.1Air Compressor Performance

Tests 3.3.1.2Instrumentation Test 3.3.1.3Sound Level Tests 3.3.1Air Compressor System Tests

SD-07 Certificates 1.4.6Air Compressor System 1.4.5System Installation 1.4.1Work Plan…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .