RFP Atch 1b - Moody Installation Guide Specs (Vol 2).pdf
PDF 12 MB Posted
- Attached to
- Multiple Award Construction Contract (MACC), Moody AFB Federal contract opportunity
- Solicitation number
- FA483024R0007
About this file
This document is an attachment to a Request for Proposal (RFP) for a Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for general construction requirements at Moody AFB, Grand Bay Range, Grassy Pond, Spence Field, Valdosta Regional Airport in Georgia, and Avon Park Range in Florida. The estimated total MACC IDIQ value shall not exceed $150,000,000. The contract will have a single five-year ordering period with two one-year option periods. Individual task orders are estimated to be between $2,000 and $7,000,000 and will vary in size and complexity. The competition is set-aside for 8(a), HUBZone, and Small Businesses, with the Government intending to award nine contracts (three in each set-aside category). Offerors must submit the requested documentation and complete the Representations and Certifications in Section K. Offerors must also be registered and active in the System for Award Management (SAM).
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOODY AIR FORCE BASE
GEORGIA
MOODY INSTALLATION GUIDE
SPECIFICATIONS
June 2024
VOLUME 2
DIVISIONS 21-42
RFP FA483024R0007
Attachment 1b
MOODY INSTALLATION GUIDE SPECIFICATIONS MOODYAFB
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 14: 02/22 WORK RESTRICTIONS
01 30 00 11/20, CHG 2: 05/22 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES
01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16, CHG 2: 11/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING
02 41 00 08/22 DEMOLITION
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 65 00 02/10, CHG 1: 11/13 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 85 00 11/18, CHG 1: 05/22 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
PROJECT TABLE OF CONTENTS Page 1
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING
VAULTS
05 72 00 05/18 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 18 00 08/16, CHG 1: 11/18 GLUED-LAMINATED CONSTRUCTION
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 24 00 05/11, CHG 4: 08/18 EXTERIOR INSULATION AND FINISH SYSTEMS
07 31 13 08/16, CHG 2: 08/18 ASPHALT SHINGLES
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 42 63 05/11, CHG 4: 08/20 FABRICATED WALL PANEL ASSEMBLIES
07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 53 23 05/12, CHG 2: 08/18 ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 61 14.00 20 08/16, CHG 1: 08/18 STEEL STANDING SEAM ROOFING
07 72 20 08/09 GRAVITY-TYPE ROOF VENTILATORS
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 01 52 08/09 OPERATION AND MAINTENANCE OF WOOD
WINDOWS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 11 69 02/10 METAL STORM DOORS
08 11 73 08/20 SLIDING FIRE DOORS
08 13 73 02/11 SLIDING METAL DOORS
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 22 20 11/19 FIBERGLASS REINFORCED PLASTIC (FRP)
DOORS AND FRAMES
PROJECT TABLE OF CONTENTS Page 2
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 32 13 08/20, CHG 1: 02/22 ALUMINUM SLIDING GLASS DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 01 08/09 FORCED ENTRY RESISTANT COMPONENTS
08 34 02 08/09 BULLET-RESISTANT COMPONENTS
08 34 16 05/17 CORROSION CONTROL HANGAR DOORS
08 34 58 08/08 FILE ROOM DOORS AND FRAMES
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS AND DAY GATES
08 34 63 05/11 DETENTION HOLLOW METAL FRAMES, DOORS,
AND DOOR FRAMES
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 36 13 08/20 SECTIONAL OVERHEAD DOORS
08 36 19 08/20 VERTICAL LIFT DOORS
08 39 53 02/19, CHG 1: 05/20 BLAST RESISTANT DOORS (EARTH COVERED
MAGAZINES)
08 39 54 08/09 BLAST RESISTANT DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
08 51 23 08/20, CHG 1: 02/22 STEEL WINDOWS
08 52 00 08/20, CHG 1: 02/22 WOOD WINDOWS
08 53 00 08/20, CHG 1: 02/22 PLASTIC WINDOWS
08 56 53 08/20 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 56 63 04/06 DETENTION AND SECURITY WINDOWS
08 60 45 08/20 [SKYLIGHTS][ AND ][TRANSLUCENT PANELS]
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 71 63 04/06 DETENTION HARDWARE
08 81 00 05/19 GLAZING
08 88 53 05/11 DETENTION AND SECURITY GLAZING
08 88 58 05/14 AIR TRAFFIC CONTROL TOWER CAB GLASS
08 91 00 08/20 METAL [WALL] [AND] [DOOR] LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 08/16, CHG 1: 11/18 GYPSUM PLASTERING
09 23 82 11/19 FIREPROOF GYPSUM PLASTERING
09 24 23 08/17, CHG 2: 11/18 CEMENT STUCCO
09 26 00 08/16, CHG 1: 08/18 VENEER PLASTER
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 35 16 08/16, CHG 1: 08/18 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 64 66 08/16, CHG 1: 08/18 WOOD ATHLETIC FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 65 66 08/16, CHG 1: 08/18 RESILIENT ATHLETIC FLOORING
09 66 13 08/16, CHG 2: 11/18 PORTLAND CEMENT TERRAZZO FLOORING
09 66 16 08/16, CHG 1: 08/18 TERRAZZO FLOOR TILE
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 67 23.14 08/16, CHG 1: 08/18 CHEMICAL RESISTANT RESINOUS FLOORING
09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 67 23.16 02/21 FUEL RESISTIVE RESINOUS FLOORING,
5-COAT SYSTEM
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
PROJECT TABLE OF CONTENTS Page 3
09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING
09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 59 05/11, CHG 1: 08/17 HIGH-BUILD GLAZE COATINGS
09 97 02 02/20, CHG 1: 11/21 PAINTING: HYDRAULIC STRUCTURES
09 97 13.00 40 11/19 STEEL COATINGS
09 97 13.16 05/11, CHG 2: 08/19 INTERIOR COATING OF WELDED STEEL WATER
TANKS
09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF
WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.25 05/11, CHG 1: 08/17 MAINTENANCE, REPAIR, AND COATING OF
TALL ANTENNA TOWERS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
09 97 13.28 02/10 PROTECTION OF BURIED STEEL PIPING AND
STEEL BULKHEAD TIE RODS
09 97 23 08/18 METALLIC TYPE CONDUCTIVE/SPARK
RESISTANT CONCRETE FLOOR FINISH
09 97 23.16 11/10 LINSEED OIL PROTECTION OF CONCRETE
SURFACES
09 97 23.17 08/16, CHG 1: 11/16 CORROSION INHIBITOR COATING OF
CONCRETE SURFACES
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 22 19 08/17, CHG 1: 08/18 DEMOUNTABLE AND MOVABLE PARTITIONS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
10 56 13 04/06 STEEL SHELVING
DIVISION 12 - FURNISHINGS
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
12 22 00 08/16, CHG 1: 08/18 CURTAINS AND DRAPES
12 35 30.23 20 08/11 BATHROOM CASEWORK
12 35 39 08/17, CHG 1: 08/18 COMMERCIAL KITCHEN CASEWORK
12 35 70 08/16, CHG 2: 11/18 HEALTHCARE CASEWORK
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 08/17, CHG 1: 11/18 FURNITURE AND FURNITURE INSTALLATION
12 61 13 08/20 UPHOLSTERED AUDIENCE SEATING
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 49 20.00 10 10/07 RFI/EMI SHIELDING
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
PROJECT TABLE OF CONTENTS Page 4
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 25 02/19, CHG 1: 02/21 HIGH-EXPANSION FOAM SYSTEM, FIRE
PROTECTION
21 23 00.00 20 04/06 WET CHEMICAL FIRE EXTINGUISHING FOR
KITCHEN CABINET
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 00 70 05/20 PLUMBING FOR HEALTHCARE FACILITIES
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
22 05 83.63 08/22 CURED-IN-PLACE PIPE (CIPP) LINING FOR
PLUMBING APPLICATIONS
22 07 19.00 40 08/16 PLUMBING PIPING INSULATION
22 13 29 02/11 SANITARY SEWERAGE PUMPS
22 13 36 02/09 PNEUMATIC SEWAGE EJECTORS
22 14 29.00 40 05/17 SUMP PUMPS
22 15 09.00 40 05/22 GENERAL SERVICE COMPRESSED-AIR SYSTEMS
CLEANING PROCEDURES
22 15 13.16 40 11/17 HIGH-PRESSURE COMPRESSED-AIR PIPING,
PIPING COMPONENTS, AND VALVES,
STAINLESS
22 15 14.00 40 11/17 GENERAL SERVICE COMPRESSED-AIR
SYSTEMS, LOW PRESSURE
22 15 19.13 20 11/09 LARGE NONLUBRICATED RECIPROCATING AIR
COMPRESSORS (OVER 300 HP)
22 15 19.19 20 05/11 NONLUBRICATED ROTARY SCREW AIR
COMPRESSORS (100 HP AND LARGER)
22 15 26.00 20 04/06 HIGH AND MEDIUM PRESSURE COMPRESSED
AIR PIPING
22 16 19.26 20 11/09 LARGE CENTRIFUGAL AIR COMPRESSORS
(OVER 200 HP)
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 13.34 40 02/17 CONTROL VALVES, SELF-CONTAINED
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 31 13.00 40 08/22 METAL DUCTS
PROJECT TABLE OF CONTENTS Page 5
23 33 56 02/09 SELF-ACTING BLAST VALVES
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 35 16.17 10 05/20 MECHANICAL ENGINE[ AND WELDING FUME]
EXHAUST SYSTEMS
23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST
23 36 00.00 40 08/22 AIR TERMINAL UNITS
23 37 13.00 40 08/22 DIFFUSERS, REGISTERS, AND GRILLES
23 41 13.00 40 02/16 PANEL FILTERS
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING
WATER AND STEAM HEAT EXCHANGERS
23 64 00 11/16, CHG 2: 08/18 PACKAGED WATER CHILLERS, ABSORPTION
TYPE
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 5: 11/19 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 65 00 11/16, CHG 2: 08/18 COOLING TOWERS AND REMOTE
EVAPORATIVELY-COOLED CONDENSERS
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 76 00 08/21 EVAPORATIVE COOLING SYSTEMS
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
23 82 16.00 40 08/22 AIR COILS
23 82 19.00 40 05/17 FAN COIL UNITS
23 82 23.00 40 05/17 UNIT VENTILATORS
23 82 43.00 40 05/17 ELECTRIC DUCT HEATERS
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 08 10 05/21 UTILITY MONITORING AND CONTROL SYSTEM
TESTING
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 26.00 40 08/19 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE
DEVICES
26 08 00 11/21 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 08/19 LIGHTING CONTROL DEVICES
26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 12 21 05/17, CHG 2: 11/19 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
26 18 23.00 40 08/16 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 22 00.00 10 10/07 480-VOLT STATION SERVICE SWITCHGEAR
PROJECT TABLE OF CONTENTS Page 6
AND TRANSFORMERS
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 23 00.00 40 11/17 SWITCHBOARDS AND SWITCHGEAR
26 24 16.00 40 08/19 PANELBOARDS
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 28 00.00 10 08/22 MOTOR CONTROL CENTERS, SWITCHBOARDS
AND PANELBOARDS
26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION
26 29 01.00 10 11/08 ELECTRIC MOTORS, 3-PHASE VERTICAL
INDUCTION TYPE
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE
INTERIOR OF STEEL WATER TANKS
26 42 19.10 11/08 CATHODIC PROTECTION SYSTEMS (IMPRESSED
CURRENT) FOR LOCK MITER GATES
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 52 00.00 40 11/17 EMERGENCY LIGHTING
26 53 00.00 40 11/15 EXIT SIGNS
26 55 53.00 40 11/14 SECURITY LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND
VISUAL NAVIGATION AIDS
26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 05/17 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 21 10.00 40 11/20 FIBER OPTIC DATA TRANSMISSION SYSTEM
27 51 16 05/20, CHG 1: 05/22 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 02.00 20 02/10 FIRE ALARM REPORTING SYSTEMS - DIGITAL
COMMUNICATORS
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08, CHG 2: 02/21 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 10 00 02/21 SITE CLEARING
31 11 00 11/18 CLEARING AND GRUBBING
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
PROJECT TABLE OF CONTENTS Page 7
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 31 16.19 08/22 TERMITE CONTROL BARRIERS
31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 05/16, CHG 2: 08/17 RUBBER AND PAINT REMOVAL FROM AIRFIELD
PAVEMENTS
32 01 13.62 05/18 ASPHALT SURFACE TREATMENT
32 01 17.61 05/22 SEALING CRACKS IN ASPHALT PAVING
32 01 18.71 05/17 GROOVING OF AIRFIELD PAVING
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 01 29.61 05/17, CHG 1: 08/17 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 01 29.62 11/18 CONCRETE PAVEMENT RAISING
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID AND SUBBASE FOR
FLEXIBLE PAVING
32 11 23 05/22 AGGREGATE BASE COURSE AND/ORGRADED
CRUSHED AGGREGATE BASE COURSE FOR
FLEXIBLE PAVING
32 11 23.23 08/17 BASE COURSE DRAINAGE LAYERS
32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR
ROADS AND STREETS
32 11 26.19 05/20 BITUMINOUS-STABILIZED BASE AND SUBBASE
COURSES
32 11 33.13 05/20 PORTLAND CEMENT-STABILIZED BASE COURSES
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 12 17.19 11/20 FUEL RESISTANT ASPHALT PAVING FOR
AIRFIELDS - SURFACE COURSE
32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS
32 13 43 05/20 PERVIOUS CONCRETE PAVING
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 18 16.13 08/17 PLAYGROUND PROTECTIVE SURFACING
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 32 23.13 02/20 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 84 23 02/21 UNDERGROUND SPRINKLERS
32 84 24 08/11, CHG 1: 05/17 IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 01 30.16 11/21 TV INSPECTION OF SEWER LINES
33 01 30.72 11/21 RELINING SEWERS
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
33 01 50.55 02/21 CLEANING OF PETROLEUM STORAGE TANKS
33 05 23 08/15, CHG 2: 08/16 TRENCHLESS UTILITY INSTALLATION
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18, CHG 1: 02/22 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 16 15 11/20 WATER STORAGE STEEL TANKS
33 26 00.00 10 04/08 RELIEF WELLS
PROJECT TABLE OF CONTENTS Page 8
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 34 56.00 10 08/18 DRAINAGE FIELD DOSING CHAMBERS
33 40 00 11/21 STORMWATER UTILITIES
33 46 13 05/20 FOUNDATION DRAINAGE
33 46 16 05/18 SUBDRAINAGE PIPING
33 47 13 11/14, CHG 2: 11/15 POND AND RESERVOIR LINERS
33 51 13.00 30 05/10 NATURAL-GAS METERING
33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS
DISTRIBUTION PIPELINES
33 51 39 08/17 MONITORING WELLS
33 51 43 05/22 INSTRUMENTATION AND PERFORMANCE
MONITORING OF STRUCTURES
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 56 53 05/20 COMPRESSED GASES STORAGE TANKS
33 57 55 11/18, CHG 1: 11/20 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 60 02 04/08 ABOVEGROUND HEAT DISTRIBUTION SYSTEM
33 61 13 08/10, CHG 1: 02/20 PRE-ENGINEERED UNDERGROUND HEAT
DISTRIBUTION SYSTEM
33 61 13.13 02/16 PREFABRICATED UNDERGROUND HYDRONIC
ENERGY DISTRIBUTION
33 61 13.19 02/16 VALVES, PIPING, AND EQUIPMENT IN VALVE
MANHOLES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 63 13 04/06 EXTERIOR UNDERGROUND STEAM
DISTRIBUTION SYSTEM
33 63 13.19 02/16 CONCRETE TRENCH HYDRONIC AND STEAM
ENERGY DISTRIBUTION
33 63 14 04/06 EXTERIOR BURIED PUMPED CONDENSATE
RETURN
33 63 16 07/06 EXTERIOR SHALLOW TRENCH STEAM
DISTRIBUTION
33 63 23 04/06 EXTERIOR ABOVEGROUND STEAM DISTRIBUTION
33 71 01 05/19, CHG 1: 11/19 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 01.00 40 11/14, CHG 1: 02/17 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 73 00.00 40 05/19 UTILITY TRANSFORMERS
33 75 00.00 40 11/14 SWITCHGEAR AND PROTECTION DEVICES
33 77 19.00 40 08/16 MEDIUM-VOLTAGE SWITCH
33 77 36.00 40 05/17 MEDIUM-VOLTAGE UTILITY FUSES
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP
RUNNING
41 22 13.15 02/20, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING
41 22 13.16 04/08, CHG 1: 02/20 GANTRY CRANES
41 22 13.55 02/22 CHG 1: 05/22 BRIDGE CRANES, UNDER RUNNING, AIRCRAFT
HANGAR
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 9
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 201 PAGES
MOODY INSTALLATION GUIDE SPECIFICATIONS
21 12 00 SD-02 Shop Drawings
1.4.4 GStandpipe System
SD-03 Product Data
2.1.1 GPipe and Fittings
2.1.1 GMechanical Couplings
2.1.2 GPipe Hangers and Supports
2.1.3 GValves
2.1.9 GFire Department Connections
2.1.10 GAlarm Valves
2.1.11 GWater Motor Alarms
2.1.12Pressure Switch
G]
2.1.13 GWaterflow Detector
2.1.14 GFire hose Cabinets
2.1.15 GValve Tamper Switch
2.1.17 GBackflow Preventer
2.2.1 GBuried Pipe and Fittings
SD-06 Test Reports
3.8.1 GPreliminary Tests
3.8.2 GAcceptance Tests
SD-07 Certificates
1.6.1 GQualifications of Installer
SD-10 Operation and Maintenance Data
2.1.10 GAlarm Valves
2.1.17 GBackflow Preventer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 201 PAGES
21 12 00 SD-11 Closeout Submittals
1.6.2 GSystem As-Built Drawings
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection
Engineer (QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
2.3.1.2 GFittings
2.3.5 GValves
2.3.6 GAlarm Valves
2.8.5 GRelief Valves
2.7 GSprinklers
2.3.4 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.8.6 GAir Vent
2.5.1 GHose Valve
2.3.4 GSeismic Bracing
2.1.2 GNameplates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 201 PAGES
21 13 13 SD-05 Design Data
2.3.4 GSeismic Bracing
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test SD-10 Operation and Maintenance Data
3.9 GOperating and Maintenance
(O&M) Instructions
1.6 GSpare Parts
SD-11 Closeout Submittals
3.9As-built drawings 21 13 25 SD-01 Preconstruction Submittals
3.23 GOPTICAL FLAME DETECTOR
AND FOAM/WATER DISCHARGE
TESTING, SAFETY, AND
ENVIRONMENTAL PLAN
SD-02 Shop Drawings
1.2 GHigh-Expansion Foam Systems
SD-03 Product Data 2.3.1Pipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 201 PAGES
21 13 25 2.3.5 GFittings and Couplings
1.3.8 GValves
2.3.8 Ghangers
2.15.2 GWaterflow Pressure Alarm Switch
3.1.3 GSurge Arresters
3.1.3 GSurge Arresters
2.14.1 GFoam System Control Panel
(FSCP)
2.14.1 GFoam System Control Panel
(FSCP)
2.14.2 GFoam System Control Panel
(FSCP)
2.14.2 GFoam System Control Panel
(FSCP)
2.14.3 GFoam System Control Panel
(FSCP)
2.14.3 GFoam System Control Panel
(FSCP)
2.14.6.2 GBattery Chargers
2.14.6.1 GBatteries
2.14.4 GAnnunciator Panel
2.17 GFOAM SYSTEM BEACONS
2.18 GManual Foam Releasing Stations
2.19 GManual Foam Stop Stations
1.3.10 GManual Foam Stop Station
Operation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 201 PAGES
21 13 25 2.20 GOptical Flame Detectors and Controller
2.11.5 GIn-Line Balanced Pressure
Proportioner Assembly
3.11 GIn-Line Balanced Pressure
Proportioner Assembly
2.12 GFOAM GENERATORS
3.1.1 GSway Bracing
3.3.1 GWater Tight Junction Boxes
2.6 GFoam/Water Flow Control Valves
3.1.4 GFoam/Water Flow Control Valves
2.5 GStrainer
2.8 GFoam Concentrate
2.9 GCONCENTRATE STORAGE
TANK
2.13 GContainment Tank Remote
Capacity Monitoring and Diverter Valve Panel - Army
2.11.1 GFoam Concentrate Pump
2.11.2 GFoam Concentrate Jockey Pump
2.11 GFOAM/WATER
PROPORTIONING BY ILBP
PROPORTIONER
1.3.13 GTrench Drainage Diverter Valve
Controls
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 201 PAGES
21 13 25 3.18 GOPTICAL FLAME DETECTION
SUPERVISED DISCONNECT IN
HANGAR BAY
2.10 GFOAM/WATER
PROPORTIONING BY
INDUCTOR
1.8 GSpare Parts
3.20.1 GFoam Systems
1.5.2 GSprinkler System Designer
1.5.1 GFire Protection Specialist
1.6 GInstaller's Qualifications
3.35 GPost-discharge Test
Requirements SD-05 Design Data
3.5.1 GBattery Power
1.3.12 GSystem hydraulic surge analysis
3.34 GTest Data
1.3.7 GHydraulic Calculations
1.3.7 GFoam Spread/Coverage
Calculations
3.1.1 GSeismic
SD-06 Test Reports
3.34 GTests
3.38Final Acceptance Test Report 3.38Digital
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 201 PAGES
21 13 25 1.6 GINSTALLER'S QUALIFICATIONS
1.7.1 GMaterials and Equipment
SD-10 Operation and Maintenance Data
1.3.14 GFoam System
SD-11 Closeout Submittals
3.38 GAs-built Drawings
21 23 00.00 20 SD-02 Shop Drawings
1.2 GFire Extinguishing System
SD-03 Product Data
3.2.1 GStorage Cylinder
2.2 GFusible Links
2.2 GRelease Mechanisms
1.2.1 GValve
3.2.1 GDischarge Nozzle
3.2.1 GPipe and Fittings
2.1 GPiping and Accessories
2.2 GRemote Manual Actuation
Stations
3.2.1 GPressure-operated Switches
3.1 GManufacturer's Installation and
Maintenance Manuals SD-07 Certificates
1.5.1 GQualifications of Installer
SD-08 Manufacturer’s Instructions
1.2 GFire Extinguishing System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 201 PAGES
21 23 00.00 20 SD-10 Operation and Maintenance Data
1.2 GFire Extinguishing System
1.5.1 GAs-built Drawings
SD-11 Closeout Submittals
2.4 GSign Legends
21 30 00 SD-01 Preconstruction Submittals 1.3Fire Pump Installation Related
Submittals
1.7.1 GFire Protection Specialist
SD-02 Shop Drawings
3.3.1 GInstallation Drawings
3.11.2 GAs-Built Drawings
3.3.2 GPiping Layout
3.3.2 GPump Room
SD-03 Product Data
2.1 GCatalog Data
1.6Spare Parts 3.8.2Preliminary Tests
3.8 GField Tests
1.7.6 GManufacturer's Representative
3.11.1 GField Training
Army Final Acceptance Test Navy Formal Inspection and Tests
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 201 PAGES
21 30 00 3.8.2Preliminary Tests Army Final Acceptance Test
GNavy Formal Inspection and Tests
SD-07 Certificates 1.7.1Fire Protection Specialist 1.7.2Qualifications of Welders 1.7.3Qualifications of Installer 1.7.4Preliminary Test Certification 1.7.5Final Test Certification
SD-10 Operation and Maintenance Data
3.11.1 GOperating and Maintenance
Instructions
2.17Flow Meter 22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.1 SRecycled Content for Steel Pipe
2.1 SRecycled Content for Cast Iron
Pipe
3.9.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
2.6.9 GSwimming Pool Suction Fittings
2.4.1 SWaterSense Label for Lavatory
Faucet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 201 PAGES
22 00 00 2.4Fixtures 2.4.3Flush Valve Water Closets
2.4.3 SWaterSense Label for Flush
Valve Water Closet 2.4.4Flush Valve Urinals
2.4.4 SWaterSense Label for Urinal
2.4.6Flush Tank Water Closets
2.4.6 SWaterSense Label for Flush Tank
Water Closet 2.4.7Wall Hung Lavatories 2.4.8Countertop Lavatories 2.4.9Kitchen Sinks 2.4.10Service Sinks
2.4.11 GDrinking-Water Coolers
2.4.11 SEnergy Star Label for Electric
Water Cooler
2.4.12 SEnergy Star Label for Wheelchair
Electric Water Cooler
2.6.2 SWaterSense Label for
Showerhead 2.4.14Plastic Bathtubs 2.4.15Plastic Shower Stalls 2.4.16Plastic Bathtub Liners 2.4.17Plastic Bathtub Wall Surrounds
2.10 GWater Heaters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 201 PAGES
22 00 00 SEnergy Star Label for Gas Storage Water Heater
2.10.2 SEnergy Star Label for Gas
Instantaneous Water Heater
2.12 GPumps
2.16 GPool Water Pump Safety Vacuum
Release System 1.5.1Welding
3.4 GVibration-Absorbing Features
3.9.1Plumbing System
SD-06 Test Reports 3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.9.1 GPlumbing System
22 00 70 SD-01 Preconstruction Submittals
GEnvironmental Data SD-02 Shop Drawings
3.16.1 GPlumbing System
3.16.7 GDomestic Water Systems
Flushing Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 201 PAGES
22 00 70 SD-03 Product Data
2.4 GPipe and Fittings
2.8 GPipe Hangers, Inserts, and
Supports
2.9 GValves
2.10 GPlumbing Fixtures
2.11 GBackflow Preventers
2.12 GDrains and Backwater Valves
2.13 GCleanouts
2.15 GInterceptors
2.16 GWater Heaters
2.17 GStorage Tanks
2.18 GPumps
2.19 GWater Pressure Booster System
2.20 GWater Service Meter
2.21 GCopper-Silver Ionization System
2.22 GPotable Water Monitoring System
3.13Vibration-Absorbing Features
SRecycled content for cast iron pipe
2.3 SRecycled content for steel pipe
2.10.4.6.1SWaterSense label for shower head
2.10.4.1 SEnergy Star label for electric
water cooler 2.10.4.10.1SWaterSense label for urinal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 201 PAGES
22 00 70 2.10.4.11.1SWaterSense label for water closet SEnergy Star label for gas storage water heater
2.16.3 SEnergy Star label for gas
instantaneous water heater 3.16.1Plumbing System
SD-06 Test Reports 3.16Tests, Flushing and Disinfection 3.16.1.1Test of Backflow Prevention
Assemblies SD-07 Certificates
2.3Materials and Equipment 1.4.2Welding 2.5Bolts 3.5.6.3Pressure-Seal (Press-Fit) System
Installation Training 3.5.6.3Pressure-Seal (Press-Fit) Tools
Calibration 2.21EPA Registration for
Copper-Silver Ionization 2.21NSF Certification for
Copper-Silver Ionization SD-10 Operation and Maintenance Data
3.16.1 GPlumbing System
1.4.5Maintenance Data Package
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 201 PAGES
22 05 48.00 20 SD-02 Shop Drawings 2.7Inertia Bases 2.6Machinery Bases 2.6Platforms 2.6Rails 2.6Saddles
SD-03 Product Data 2.3Isolators 2.8Flexible Connectors 2.9Flexible Duct Connectors 2.11Pipe Guides 2.10Seismic Snubbers 3.1.3Vertical Stops 2.12Thrust Restraints 2.7Inertia Bases 2.6Machinery Bases 3.1.13Machinery Foundations and
Subbases 2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery Manufacturer's Sound
Data SD-05 Design Data
2.7Inertia Bases 2.6Machinery Bases
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 201 PAGES
22 05 48.00 20 2.6Platforms 2.6Rails 2.6Saddles 1.4.3Machinery 1.4.4Machinery Over 300 Pounds
SD-06 Test Reports 2.10Seismic Snubbers 3.2.3.1Equipment Vibration Tests 3.2.3.2Equipment Sound Level Tests 2.4Protected Spring Isolators
SD-08 Manufacturer’s Instructions 3.1.1Vibration and Noise Isolation
Components 2.13Seismic Protection Components
22 05 83.63 SD-03 Product Data
2.1 GInstallation Equipment
2.2.1 GCIPP Lining Tube
2.1 GEpoxy Resin
2.1 GLiner Materials
SD-08 Manufacturer’s Instructions 3.2CIPP Manufacturer's Written
Installation Instructions SD-11 Closeout Submittals
3.2 GReport Summarizing The Extent
Of the Pipe Lining Performed
3.2Pre-Lining Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 201 PAGES
22 05 83.63 3.2Post-Lining Inspection 1.4Manufacturer's Warranty 3.2Record Drawings
22 07 19.00 40 SD-02 Shop Drawings
3.1 GInstallation Drawings
SD-03 Product Data
2.3 GAdhesives
2.3 GCoatings
2.3 GInsulating Cement
2.3 GInsulation Materials
2.3 GJacketing
2.3 GTape
SD-08 Manufacturer’s Instructions
3.1 GInstallation Manual
SD-11 Closeout Submittals 3.4Record Drawings
2.3 SAdhesives
2.3 SCoatings
2.3 SInsulation Materials
1.3.1 SRecycled Materials
22 13 29 SD-02 Shop Drawings
3.2 GEquipment Installation
SD-03 Product Data 2.1Materials and Equipment 3.4Framed Instructions 1.4Spare Parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 201 PAGES
22 13 29 SD-06 Test Reports 3.5Field Testing and Adjusting
Equipment SD-10 Operation and Maintenance Data
3.7 GOperating and Maintenance
Manuals
22 13 36 SD-02 Shop Drawings 3.4Equipment Installation
SD-03 Product Data 2.2Materials and Equipment 2.3Sewage Receiver 2.4Air Compressor 2.5Air Reservoir 2.6Electric Motor 2.7Controls 1.5Spare Parts
SD-10 Operation and Maintenance Data
3.8 GOperation and Maintenance
Manuals
22 14 29.00 40 SD-02 Shop Drawings
2.1 GConnection Diagrams
2.1 GControl Diagrams
2.1 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 201 PAGES
22 14 29.00 40 2.1 GManufacturer's Catalog Data
2.1 GPump Performance Curve
3.3 GSpare Parts List
3.3 GSpecial Tools
2.2.1 GWet-Pit Sump Pumps
2.2.2 GSubmersible Pumps
2.2.2 GAccessories
2.2.1.11 GFloatless Electrode Level
Controls SD-06 Test Reports
3.2.2 GHydrostatic Leak
3.2.2 GStatic Heads
3.2.2 GPump Flow Capacity
SD-07 Certificates 2.2.1.6Manufacturer's Certification of
Bearing Life SD-08 Manufacturer’s Instructions
2.1Manufacturer's Installation Instructions
2.1Vibration Specifications 22 15 09.00 40 SD-01 Preconstruction Submittals
1.4.1 GPrequalification Statement
SD-03 Product Data
2.1.1 GDemineralized Water
2.1.2 GDrying or Preservation Gas
2.1.3 GFilter Discs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 201 PAGES
22 15 09.00 40 2.1.4 GNitric Acid
2.1.5 GCitric Acid
2.1.6 GMuriatic Acid
2.1.7 GHydrofluoric Acid
2.1.8 GNormal - Propyl Bromide
2.1.9 GTape
2.1.10 GPolyethylene Film
2.1.11 GLow Water-Vapor Transmission
Film
2.1.12 GAluminum Foil
SD-04 Samples
2.1.10 GPolyethylene Film
2.1.13 GCertification Tags
2.1.11 GLow Water-Vapor Transmission
Film SD-06 Test Reports
3.1.2 GInspection Records
SD-07 Certificates
1.4.2 GCleaning Procedures
22 15 13.16 40 SD-01 Preconstruction Submittals
Part 1 GProposed Deviations SD-02 Shop Drawings
1.3 GDetail Drawings
SD-03 Product Data
2.2.1 GUnderground Piping
2.2.2 GAboveground Piping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 201 PAGES
22 15 13.16 40 2.1.1 GAir Compressors
2.1.2 GManual Valves
2.1.4 GPiping Specialties
2.2.3 GMiscellaneous Materials
2.1.3 GSupporting Elements
SD-06 Test Reports
3.2.1 GSystem Pressure Test
SD-07 Certificates 2.2.1Underground Piping 2.2.2Aboveground Piping 2.1.1Air Compressors 2.1.2Manual Valves 2.1.4Piping Specialties 2.2.3Miscellaneous Materials 2.1.3Supporting Elements
22 15 14.00 40 SD-02 Shop Drawings
2.1 GInstallation Drawings
SD-03 Product Data
2.1.1 GEquipment and Performance
Data
2.3.1 GUnderground Piping Materials
2.3.2 GAboveground Piping Materials
2.2.1 GPiping Specialties
2.4.2 GSupporting Elements
2.2.2 GAir Compressors
2.2.3 GValves
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 201 PAGES
22 15 14.00 40 3.1.2.1 GAccessories
2.4.1 GMiscellaneous Materials
SD-05 Design Data
2.1.1 GDesign Analysis and Calculations
SD-06 Test Reports 3.2.1.4Piping System Test Report
SD-07 Certificates 2.3.1Underground Piping Materials 2.3.2Aboveground Piping Materials 2.4.2Supporting Elements 2.2.3Valves 2.4.1Miscellaneous Materials
SD-10 Operation and Maintenance Data
3.4Operation and Maintenance Manuals
22 15 19.13 20 SD-02 Shop Drawings 1.4.7Air Compressor System
SD-03 Product Data 2.2Air Compressor 2.2.10Inlet Air Filters 2.2.11Inlet Line Silencer 2.3Air Flow Rate and Pressure
Recorder 2.4Carbon Monoxide Monitor 2.2.9.1Filter Housing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 201 PAGES
22 15 19.13 20 SD-05 Design Data 1.4.1Intake and Discharge Pipe
Calculations SD-06 Test Reports
2.5.1Air Compressor Performance Tests
2.5.1Sound Level and Run-In Tests 3.3.1.1Performance Tests 3.3.1.2Instrumentation Test 3.3.1.3Sound Level Tests 3.3.1Air Compressor System Test
SD-07 Certificates 1.4.2Work Plan 2.5.1Factory Test Procedures 1.4.3Factory Testing Certification 1.4.4Qualifications of Field
Supervisors 3.3.1Field Test Procedures 1.4.5Training Material 1.4.7Air Compressor System 1.4.6System Installation
SD-10 Operation and Maintenance Data
1.4.7Air Compressor System SD-11 Closeout Submittals
1.11Posted Operating Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 201 PAGES
22 15 19.19 20 SD-02 Shop Drawings 1.6.1Air Compressor System
SD-03 Product Data 2.2Air Compressor 2.2.10Inlet Air Filters 2.2.11Line Silencer 2.3Air Flow Rate and Pressure
Recorder 2.4Carbon Monoxide Monitor 2.2.9.2Filter Housing
SD-06 Test Reports 2.5.1performance tests 3.3.1.3Sound Level Tests 3.3.1.1Air Compressor Performance
Tests 3.3.1.2Instrumentation Test 2.5.1Sound Level and Run-in Tests 3.3.1Air Compressor System Test
SD-07 Certificates 1.4.1Work Plan 2.5.1Factory Test Procedures 1.4.2Factory Testing Certification 1.4.3Qualifications of Field
Supervisors 3.3.1Field Test Procedures 1.4.4Training Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 201 PAGES
22 15 19.19 20 1.6.1Air Compressor System 1.4.5System Installation
SD-10 Operation and Maintenance Data
1.6.1Air Compressor System SD-11 Closeout Submittals
1.11Posted Operating Instructions 22 15 26.00 20 SD-02 Shop Drawings
1.4.2High Pressure Compressed Air System
SD-03 Product Data 2.1Air Compressor 2.2Air Dryer 2.2.4Instrumentation and Controls 2.3Air Receivers and Separators 2.5Air Receivers and Separators 2.8Desiccant Air Dryers 2.9.1Piping and Tubing 2.10.2Fittings 2.10.6Valves 2.9.7Adapters 2.9.8Pressure gages 2.9.9Snubbers 2.9.10Timed Solenoid Drain 2.10.10Traps 2.9.11Filters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 201 PAGES
22 15 26.00 20 2.9.12Strainers 2.9.13Unions 2.9.14O-ring Gaskets 2.10.11Flexible connections 2.9.15Hangers and Supports 2.12Valve box 2.13Identification Labels For Piping
SD-06 Test Reports 3.1.3Non-Destructive Examination
(NDE) Report For Welding of Piping
3.4.2.2Leak Tightness Test SD-07 Certificates
1.4.5Employer's Record Documents 1.4.6Welding Procedures and
Qualifications SD-08 Manufacturer’s Instructions
2.3Air receivers and Separators 2.5Air receivers and Separators
SD-10 Operation and Maintenance Data
2.1Air Compressor 2.2Air Dryer
SD-11 Closeout Submittals 2.1Air Compressor 2.2Air Dryer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 201 PAGES
22 15 26.00 20 1.4Compressed Air Systems 22 16 19.26 20 SD-02 Shop Drawings
2.2Air Compressor SD-03 Product Data
2.2Air Compressor 2.2.10.2Air Intake Devices 2.2.12Bypass Line Silencer 2.3Air Flow Rate and Pressure
Recorder 2.4Carbon Monoxide Monitor
SD-06 Test Reports 2.5.1performance tests 2.5.1Balance Tests 2.5.1Sound Level and Run-In Tests 3.3.1.1Air Compressor Performance
Tests 3.3.1.2Instrumentation Test 3.3.1.3Sound Level Tests 3.3.1Air Compressor System Tests
SD-07 Certificates 1.4.6Air Compressor System 1.4.5System Installation 1.4.1Work Plan…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .