RFP Atch 8 - Past Performance Information PPI.docx

DOCX document 62 KB Posted

Attached to
Multiple Award Construction Contract (MACC), Moody AFB Federal contract opportunity
Solicitation number
FA483024R0007
Issued by
Department of the Air Force Air Combat Command

About this file

This is a Past Performance Information (PPI) template form, Attachment 8 to RFP FA483024R0007 for the Multiple Award Construction Contract (MACC) at Moody AFB. The form requires offerors to provide detailed information about previous relevant contracts, including contract numbers, values, periods of performance, and points of contact.

The template requires specific details about contract completion dates, price changes, and performance issues. Offerors must identify key personnel who worked on previous contracts and are proposed for this effort, describe their experience managing multiple simultaneous contracts, and specifically note any MACC experience. The form emphasizes the need for frank, concise comments about performance and any corrective actions taken to address problems. Offerors are limited in the number of past performance submissions as specified in Section L of the solicitation, and must provide at least two points of contact for each referenced contract.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), Moody AFB, newest first.
File Type Posted
RFP Atch 11 Question and Answer Form.docx DOCX document
RFP Atch 5d(ii) - WD FL20240093 Heavy 05 Jan 24 Highlands FL.pdf PDF
RFP Atch 5c(i) WD FL20240267 Highway 13 Sep 24 Polk FL.pdf PDF
RFP Atch 5b(iii) WD GA20240166 Building 18 Oct 24 Colquitt GA.pdf PDF
RFP Atch 5a(iii) WD GA20240316 Building 15 Nov 24 Lanier and Lowndes GA.pdf PDF
RFP Atch 5a(i) WD GA20240066 Highway 20 Sep 24 Lanier and Lowndes GA.pdf PDF
RFP Atch 3c(i) Bldg 1109 Conventional Munitions Shop LPS Specs 28 Nov 24.pdf PDF
RFP Atch 3a(i) Bldg 1107 Rocket Test Cell Shop LPS Specs 28 Nov 24.pdf PDF
Solicitation Amendment FA483024R00070004 SF 30.pdf PDF
RFP Atch 5d(iii)- WD FL20240207 Building 06 Dec 24 Highlands FL.pdf PDF
RFP Atch 5c(ii)- WD FL20240131 Heavy 12 Jul 24 Polk FL.pdf PDF
RFP Atch 3b(iiii) - Bldg 1108 Utility Map.pdf PDF
RFP Atch 3a(iiii) Bldg 1107 Utility Map.pdf PDF
RFP Atch 3d(i) Bldg 1121 Ancillary Explosives Facility LPS Specs.pdf PDF
RFP Atch 3b(i) Bldg 1108 Missile Assembly Shop LPS Specs 28 Nov 24.pdf PDF
Solicitation Amendment 0003 FA483024R0007 SF 30.pdf PDF
MACC Pre-Proposal Conference Briefing Slides.pptx PPTX presentation
RFP Atch 10 Subcontractor Consent Letter Amended 0002.docx DOCX document
Solicitation Amendment 0002 FA483024R0007 0002 SF 30.pdf PDF
RFP Atch 12 Pre-Proposal Conference Site Visit Invitation Amended 0002.pdf PDF
RFP Atch 7 Past Performance Questionnaire (PPQ) Amended 0002.docx DOCX document
Solicitation Amendment 0001 FA483024R00070001 SF 30.pdf PDF
RFP Atch 12 Amended Pre-Proposal Conference Site Visit Invitation.pdf PDF
RFP Atch 3 Seed Project SOW QSEU 23-0118 Repair Lighting Protection System (LPS).pdf PDF
Solicitation - FA483024R0007.pdf PDF
RFP Atch 12 Pre-Proposal Conference Site Visit Invitation.pdf PDF
RFP Atch 6 Site Visit Pre-Registration_Form.pdf PDF
RFP Atch 5d(iii)- WD FL20240223 Building 12 Jul 24 (Polk FL).pdf PDF
RFP Atch 5c(ii) - WD GA20240060 Heavy 26 Jul 24 (Colquitt GA).pdf PDF
RFP Atch 4 - Seed Project WBS and Price Worksheet.xlsx XLSX spreadsheet
RFP Atch 3b(i) - Bldg 1108 Missile Assembly Shop LPS Specs.pdf PDF
RFP Atch 3d(ii) - Bldg 1121 LPS Drawings.pdf PDF
RFP Atch 3b(iii) - Bldg 1108 Submittal Register.pdf PDF
RFP Atch 2a Special Contract Requirements.pdf PDF
RFP Atch 2 - General MACC Statement of Work (SOW) (3 Jul 24).pdf PDF
RFP Atch 1b - Moody Installation Guide Specs (Vol 2).pdf PDF
RFP Atch 9 - Client Authorization Letter.docx DOCX document
RFP Atch 5a(i) WD FL20240066 Highway 20 Sep 24 (Lowndes GA).pdf PDF
RFP Atch 5e(ii) - WD FL20240093 Heavy 05 Jan 24 (Highlands FL).pdf PDF
RFP Atch 3a(i) - Bldg 1107 Rocket Test Cell Shop LPS Specs.pdf PDF
RFP Atch 3d(iii) - Bldg 1121 Submittal Register.pdf PDF
RFP Atch 1c- Moody AFB A-E Design Guide.pdf PDF
RFP Atch 11 - Question and Answer Form.docx DOCX document
RFP Atch 8 - Past Performance Information (PPI).docx DOCX document
RFP Atch 7 - Past Performance Questionnaire (PPQ).docx DOCX document
RFP Atch 5c(iii) WD FL20240166 Building 20 Sep 24 (Colquitt GA).pdf PDF
RFP Atch 5e(i) WD FL20240251 Highway 13 Sep 24 (Highland FL).pdf PDF
RFP Atch 5d(i) WD FL20240267 Highway 13 Sep 24 (Polk FL).pdf PDF
RFP Atch 5b(i) WD FL20240066 Highway 20 Sep 24 (Lanier GA).pdf PDF
RFP Atch 5a(ii) - WD GA20240290 Heavy 05 Jan 24 (Lowndes and Lanier GA).pdf PDF
Show all 50

Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP FA483024R0007

Attachment 8

PAST PERFORMANCE INFORMATION (PPI)

Provide the information requested in this form for each contract being described. Provide frank, concise comments regarding your performance on the contracts you identify. Provide a separate completed form for each contract submitted. Limit the number of past efforts submitted to the limitations set forth in Section L, Instructions to Offerors, paragraph L-5.2.3 of this solicitation.

A. Offeror Name (Company/Division):

CAGE Code:

UEI Number:

(NOTE: If the company or division performing this effort is different than the offeror, or the relevance of this effort to the solicited acquisition is impacted by any company/corporate organizational change, please note those changes. Refer to the “Organizational Structure Change History” provided as part of your Past Performance Volume).

B. PROGRAM TITLE:

C. CONTRACT SPECIFICS

1. Contracting Agency or Customer:

2. Contract Number (include order number if applicable):

3. Contract Type (FFP, cost, etc.)

4. Period of Performance: (Note option years, if applicable)

5. Original Contract $ Value: (Including all option years, if applicable)

6. Current Contract $ Value: (Including all option years, if applicable)

7. If Amounts for 5 and 6 above are different, provide a brief description of the reason:

CONTROLLED UNCLASSIFIED INFORMATION

D. BRIEF DESCRIPTION OF EFFORTS/NATURE OF WORK AS

PRIME OR

SUBCONTRACTOR:

(Please highlight portions considered most relevant to the solicited acquisition. Discuss efforts/management actions accomplished to successfully overcome and resolve any problems encountered.)

E. COMPLETION DATE:

1. Original Date:

2. Current Schedule:

3. Final Contract Price at Completion:

4. Number of Period of Performance Changes:

5. Primary Causes of Change:

F. PRIMARY CUSTOMER POINTS OF CONTACT (POCs): (Identified POCs should be individuals most knowledgeable about your performance, i.e., contracting officers, technical representatives, program manager. Please identify a minimum of two (2) POCs for each contract. Questionnaires shall be sent to these same individual(s) IAW Section L, Instructions to Offerors, Paragraph L-5.2.3, Past Performance Information (PPI), of this solicitation.)

1.
Name:

Office:

Telephone:

E-mail:

2.
Name:

Office:

Telephone:

E-mail:

G. Specify, by name, any key individual(s) who participated in this contract and are proposed to support the solicited acquisition. Also, indicate their contractual roles for both acquisitions.

H. Estimate the percentage of work performed by the prime and subcontractor.

I. Identify and explain which aspects of the proposed effort relate to the requirement described in this solicitation. Please see Section L, Instructions to Offerors, Paragraph L.5.2.3.

CONTROLLED UNCLASSIFIED INFORMATION

J. Throughout the entirety of this project, were there other contracts that you were simultaneously managing? If so, please describe your methods and or approach to supervising/administering multiple contracts. Please note the exact quantity and magnitude (complexity), of other simultaneous on-going projects.

K. Have you ever participated in a Multiple Award Construction Contract (MACC)? If so, please specify the details of the requirement. Additionally, please note the place of performance for the length of the contract, (e.g., John Doe AFB).

L. Provide a self-assessment of your past performance record by sharing information on any problems encountered or adverse past performance information and your corrective actions.

File details come from the government source that posted it. Updated .