About this file

This document is a Submittal Register related to a federal contract opportunity for a Lightning Protection System for Building 1107 at Moody AFB.

The Submittal Register lists various submittals required for the contract, including plans, drawings, product data, test reports, certifications, and closeout documents across multiple specification sections such as demolition, concrete, coatings, lightning protection, and earthwork. Key submittals include the Contractor Quality Control Plan, Accident Prevention Plan, Concrete Mix Designs, Record Drawings, and Grounding System Test Plan. The required submittal classifications, approval authorities, and schedule information are provided. The related federal contract opportunity is for a Multiple Award Construction Contract (MACC) for general construction requirements at several Air Force locations in Georgia and Florida, with an estimated total IDIQ value not to exceed $150,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), Moody AFB, newest first.
File Type Posted
RFP Atch 5d(iii)- WD FL20240207 Building 06 Dec 24 Highlands FL.pdf PDF
RFP Atch 5c(ii)- WD FL20240131 Heavy 12 Jul 24 Polk FL.pdf PDF
RFP Atch 3b(iiii) - Bldg 1108 Utility Map.pdf PDF
RFP Atch 3a(iiii) Bldg 1107 Utility Map.pdf PDF
RFP Atch 3d(i) Bldg 1121 Ancillary Explosives Facility LPS Specs.pdf PDF
RFP Atch 3b(i) Bldg 1108 Missile Assembly Shop LPS Specs 28 Nov 24.pdf PDF
RFP Atch 11 Question and Answer Form.docx DOCX document
RFP Atch 8 - Past Performance Information PPI.docx DOCX document
RFP Atch 5d(ii) - WD FL20240093 Heavy 05 Jan 24 Highlands FL.pdf PDF
RFP Atch 5c(i) WD FL20240267 Highway 13 Sep 24 Polk FL.pdf PDF
RFP Atch 5b(iii) WD GA20240166 Building 18 Oct 24 Colquitt GA.pdf PDF
RFP Atch 5a(iii) WD GA20240316 Building 15 Nov 24 Lanier and Lowndes GA.pdf PDF
RFP Atch 5a(i) WD GA20240066 Highway 20 Sep 24 Lanier and Lowndes GA.pdf PDF
RFP Atch 3c(i) Bldg 1109 Conventional Munitions Shop LPS Specs 28 Nov 24.pdf PDF
RFP Atch 3a(i) Bldg 1107 Rocket Test Cell Shop LPS Specs 28 Nov 24.pdf PDF
Solicitation Amendment FA483024R00070004 SF 30.pdf PDF
Solicitation Amendment 0003 FA483024R0007 SF 30.pdf PDF
RFP Atch 12 Pre-Proposal Conference Site Visit Invitation Amended 0002.pdf PDF
RFP Atch 7 Past Performance Questionnaire (PPQ) Amended 0002.docx DOCX document
MACC Pre-Proposal Conference Briefing Slides.pptx PPTX presentation
RFP Atch 10 Subcontractor Consent Letter Amended 0002.docx DOCX document
Solicitation Amendment 0002 FA483024R0007 0002 SF 30.pdf PDF
RFP Atch 12 Amended Pre-Proposal Conference Site Visit Invitation.pdf PDF
RFP Atch 3 Seed Project SOW QSEU 23-0118 Repair Lighting Protection System (LPS).pdf PDF
Solicitation Amendment 0001 FA483024R00070001 SF 30.pdf PDF
RFP Atch 9 - Client Authorization Letter.docx DOCX document
RFP Atch 5a(i) WD FL20240066 Highway 20 Sep 24 (Lowndes GA).pdf PDF
RFP Atch 5e(ii) - WD FL20240093 Heavy 05 Jan 24 (Highlands FL).pdf PDF
RFP Atch 3a(i) - Bldg 1107 Rocket Test Cell Shop LPS Specs.pdf PDF
RFP Atch 3d(iii) - Bldg 1121 Submittal Register.pdf PDF
RFP Atch 1c- Moody AFB A-E Design Guide.pdf PDF
Solicitation - FA483024R0007.pdf PDF
RFP Atch 12 Pre-Proposal Conference Site Visit Invitation.pdf PDF
RFP Atch 6 Site Visit Pre-Registration_Form.pdf PDF
RFP Atch 5d(iii)- WD FL20240223 Building 12 Jul 24 (Polk FL).pdf PDF
RFP Atch 5c(ii) - WD GA20240060 Heavy 26 Jul 24 (Colquitt GA).pdf PDF
RFP Atch 4 - Seed Project WBS and Price Worksheet.xlsx XLSX spreadsheet
RFP Atch 3b(i) - Bldg 1108 Missile Assembly Shop LPS Specs.pdf PDF
RFP Atch 3d(ii) - Bldg 1121 LPS Drawings.pdf PDF
RFP Atch 3b(iii) - Bldg 1108 Submittal Register.pdf PDF
RFP Atch 2a Special Contract Requirements.pdf PDF
RFP Atch 2 - General MACC Statement of Work (SOW) (3 Jul 24).pdf PDF
RFP Atch 1b - Moody Installation Guide Specs (Vol 2).pdf PDF
RFP Atch 11 - Question and Answer Form.docx DOCX document
RFP Atch 8 - Past Performance Information (PPI).docx DOCX document
RFP Atch 7 - Past Performance Questionnaire (PPQ).docx DOCX document
RFP Atch 5c(iii) WD FL20240166 Building 20 Sep 24 (Colquitt GA).pdf PDF
RFP Atch 5e(i) WD FL20240251 Highway 13 Sep 24 (Highland FL).pdf PDF
RFP Atch 5d(i) WD FL20240267 Highway 13 Sep 24 (Polk FL).pdf PDF
RFP Atch 5b(i) WD FL20240066 Highway 20 Sep 24 (Lanier GA).pdf PDF
Show all 50

Multiple Award Construction Contract (MACC), Moody AFB has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES

QSEU 23-0118

RPR, Lightning Protection System Multi FAC BUILDING 1107

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals 1.3.1.1List of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals 1.4View Location Map 1.5Progress and Completion

Pictures SD-04 Samples

1.3 GColor Boards

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7.1 GAPP - Construction

1.16 GDive Operations Plan

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.3LHE Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

RFP FA4830240007

Attachment 3a(iii)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

01 35 26 SD-07 Certificates 1.6.1.4Crane Operators/Riggers

1.7.3.2 GStandard Lift Plan

1.7.3.3 GCritical Lift Plan

1.7.3.4 GNaval Architecture Analysis

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

1.14.1 GRadiography Operation Planning

Work Sheet

1.14.1 GPortable Gauge Operations

Planning Worksheet 01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports 3.9.2Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.3.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports Backflow Preventer Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

01 50 00 1.4.1Backflow Tester 1.4Backflow Preventers

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan SD-11 Closeout Submittals

1.10Final Construction Waste Diversion Report

01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions 1.5.1Instructions

SD-10 Operation and Maintenance Data

3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

1.5.1As-Built Record of Equipment and Materials 01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

01 78 23 3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

SD-11 Closeout Submittals Landfill Receipts for Demolished Materials

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications 1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

3.3.7Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data 2.4.5Joint Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

03 30 00 2.4.4Joint Filler 2.1Formwork Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder 2.4.1Concrete Curing Materials 2.6Reinforcement 2.3.4Admixtures 2.6.5Reinforcing Fibers 1.8.1Local/Regional Materials 1.6.3.2Pumping Concrete 1.6.3.3Finishing Plan 2.4.2Nonshrink Grout

SD-04 Samples 1.6.5.1Slab Finish Sample 1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.2Aggregates

1.6.4.3 GFiber-Reinforced Concrete

3.12.2.3 GCompressive Strength Tests

3.12.2.5Unit Weight of Structural

Concrete 3.12.2.6Chloride Ion Concentration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

03 30 00 3.12.2.4Air Content 3.12.2.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.9Welder Qualifications 1.6.3.4VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.5Safety Data Sheets 1.8.2Forest Stewardship Council

(FSC) Certification 1.6.7.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.4.5Joint Sealants 2.4.1Curing Compound

05 50 13 SD-02 Shop Drawings

2.4 GBollards/Pipe Guards

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-08 Manufacturer’s Instructions Application Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

09 90 00 2.1Mixing 1.8.1Manufacturer's Safety Data

Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings

26 05 26.00 40 SD-03 Product Data

2.1.1 GGround Rods

GGround Wires

2.1.2 GConnectors and Fasteners

GTest Wells

2.1.3 GConductive Corrosion Inhibiting

Compounds

SD-06 Test Reports

3.2.1 GGround Resistance Tests

SD-07 Certificates

1.3.3 GGround Resistance Test

Equipment SD-11 Closeout Submittals

3.3Record Drawings 26 41 00 SD-02 Shop Drawings

GOverall Lightning Protection System

GEach Major Component SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

26 41 00 1.4.3 GLightning Protection and Grounding System Test Plan

3.4.2 GGrounding Systems Testing

SD-07 Certificates

1.4.2 GComponent UL Listed and

Labeled

1.4.4 GLightning Protection System

Inspection Certificate

31 00 00 SD-01 Preconstruction Submittals

3.2 GShoring

1.6.3 GDewatering Work Plan

SD-03 Product Data

3.6 GUtilization of Excavated Materials

1.6.1.2Rock Excavation

SD-06 Test Reports 3.10Testing 2.1Borrow Site Testing

SD-07 Certificates 3.10Testing

31 23 00.00 20 SD-01 Preconstruction Submittals 1.7.1Dewatering work plan

SD-06 Test Reports

1.6 GBorrow Site Testing

3.8.2.1Fill and backfill 3.8.2.2Density tests

33 71 01 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES

RPR, Lightning Protection System Multi FAC BUILDING 1107

33 71 01 2.4 GConductors

2.2.1 GWood Poles

2.5 GGuy Strand

2.7 GAnchors

SD-07 Certificates

2.2.1 GWood Poles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

File details come from the government source that posted it. Updated .