The file is a Price Schedule Attachment (RFP_25_8399_DPS_Attachment_B_Price_Schedule_Rev._2.xlsx) for the Orlando Utilities Commission (OUC) in Florida, specifically for Emergency Response Safety Assessment Support Services. The solicitation seeks qualified suppliers to provide emergency response services during hurricanes, tornadoes, and other major disasters for 2025 and 2026. The procurement involves deploying safety assessment teams to perform field evaluations focusing on identifying safety hazards such as downed lines, structural risks, and energized equipment. The pre-response conference is scheduled for June 25, 2025, at 11:30 AM EST via Microsoft Teams, with proposal submissions due by July 22, 2025, at 3:30 PM EST (extended from the original 2:00 PM deadline). The contract period extends through May 31, 2027, with the ability to issue purchase orders based on event severity.
The pricing structure includes detailed rate schedules for labor classifications like Electrical Engineers, Electrical Technicians, and Drivers, with provisions for standard, overtime, and double-time rates. The evaluation scenario involves a seven-day post-hurricane response in Orlando, requiring five or more crews working daily from 7:00 AM to 7:00 PM, with assessors documenting structural damages and safety hazards. While no specific budget range is disclosed, the contract is designed to support rapid deployment of emergency response crews and potentially qualify for FEMA reimbursement. The solicitation does not specify set-aside designations or require bid bonds, focusing instead on suppliers' technical capabilities, experience, and ability to integrate with OUC's damage assessment and restoration systems.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Assessment Scenario
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| Safety Inspection Team Price Scenario |
| Safety Assessment Team - 7 Day Storm - Operational Period: 7 am - 7 pm |
| Description: The following scenario will be used to evaluate pricing among proposers to determine the lowest price for ranking purposes. Proposers will be ranked based on the total price, with the lowest price receiving the highest ranking (e.g., Rank 1), and subsequent rankings assigned in ascending order of price. Please complete this form based on the following scenario: |
Scenario: Post-Hurricane Response
Florida has declared a state of emergency due to Hurricane Milton. After the hurricane passes, the City of Orlando experiences widespread impacts. OUC deploys Safety Assessors to perform field evaluations focused on identifying safety hazards such as downed lines, structural risks, and energized equipment. Although damage observations may be documented during these assessments to support OUC's internal restoration planning, only safety-related activities are eligible for FEMA reimbursement. All assessments must be conducted under the designated Safety Assessment scope.
For this scenario, please assume the following details:
1. The assessment will take place over a seven-day period (Monday through Sunday).
2. Five (5) or more crews will be deployed each day.
3. Work will begin at 7:00 AM and end at 7:00 PM each day.
4. Assessors will need to document and report on structural damages, safety hazards, and infrastructure integrity.
5. Crews will be required to use [any specific equipment, tools, or vehicles] as part of the assessment process.
6. Assessors must have [any required certifications, e.g., OSHA certification, structural safety qualifications].
| Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday | Total Hours | Daily Cost | |
| Straight Time (ST) Hours: | 0 | $ - 0 | |||||||
| Overtime Time (OT) Hours: | 0 | $ - 0 | |||||||
| Double Time (DT) Hours: | 0 | $ - 0 | |||||||
| Total Labor Cost for a Week: | $ - 0 |
| Safety Team | # of Employees | Straight Time | Overtime | Double Time |
| Electrical Engineer | $ - 0 | $ - 0 | ||
| Electrical Technician | $ - 0 | $ - 0 | ||
| Driver | $ - 0 | $ - 0 | ||
| Hourly Rate per hour: | $ - 0 | $ - 0 | $ - 0 |
| Equipment Type | # of Equipment | Hourly Rate | Hours/day | # of days | Total |
| Truck | $ - 0 | ||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| Total Equipment Cost for a Week: | $ - 0 |
Total Labor and Equipment Cost per week: $ - 0
2025 Price Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2025 Safety Assessment Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
2026 Price Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2026 Safety Assessment Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
File details come from the government source that posted it. Updated .