RFP_25_8399_DPS_Attachment_B_Price_Schedule_Final.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- PR8399
- Issued by
- Orange County, Orlando City, Florida
About this file
This is an Excel-based Price Schedule (RFP_25_8399_DPS_Attachment_B_Price_Schedule_Final.xlsx) for the Orlando Utilities Commission (OUC) involving emergency response safety and damage assessment support services in Florida. The request for proposals seeks qualified suppliers to provide comprehensive safety and damage assessment services during natural disasters like hurricanes, specifically for post-storm infrastructure evaluation. The contract covers a two-year period (2025-2026) with pre-negotiated pricing, allowing OUC to quickly issue purchase orders for emergency response scenarios. The pricing scenario details a seven-day assessment period with three crews deployed daily from 7 AM to 7 PM, focusing on documenting structural damages, safety hazards, and infrastructure integrity following a hypothetical hurricane event in Orlando.
The pricing schedule includes detailed rate structures for different labor classifications such as Electrical Engineers, Electrical Technicians, and Drivers, with provisions for standard time, overtime, and double-time rates. The contract aims to establish suppliers capable of rapid deployment, accurate documentation, and integration with OUC's damage assessment systems. A key objective is to meet federal procurement standards to support potential FEMA reimbursement eligibility. The pricing template allows suppliers to submit hourly rates for labor and equipment, with options for rates with and without fuel, ensuring flexibility in cost calculation and transparent pricing for emergency response services.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Safety Assessor Scenario
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| Safety Inspection Team Price Scenario |
| Safety Inspection Team - 7 Day Storm - Operational Period: 7 am - 7 pm |
| Description: The following scenario will be used to evaluate pricing among proposers to determine the lowest price for ranking purposes. Proposers will be ranked based on the total price, with the lowest price receiving the highest ranking (e.g., Rank 1), and subsequent rankings assigned in ascending order of price. Please complete this form based on the following scenario: |
Scenario: Post-Hurricane Response
Florida has declared a state of emergency due to Hurricane Milton. After the hurricane passes, the City of Orlando has suffered significant damage. OUC requires safety assessors to evaluate and assess the damages in the affected areas. This assessment is crucial for OUC to effectively prioritize and manage the remediation efforts.
For this scenario, please assume the following details:
1. The assessment will take place over a seven-day period (Monday through Sunday).
2. Three (3) crews will be deployed each day.
3. Work will begin at 7:00 AM and end at 7:00 PM each day.
4. Assessors will need to document and report on structural damages, safety hazards, and infrastructure integrity.
5. Crews will be required to use [any specific equipment, tools, or vehicles] as part of the assessment process.
6. Assessors must have [any required certifications, e.g., OSHA certification, structural safety qualifications].
| Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday | Total Hours | Daily Cost | |
| Straight Time (ST) Hours: | 0 | $ - 0 | |||||||
| Overtime Time (OT) Hours: | 0 | $ - 0 | |||||||
| Double Time (DT) Hours: | 0 | $ - 0 | |||||||
| Total Labor Cost for a Week: | $ - 0 |
| Safety Team | # of Employees | Straight Time | Overtime | Double Time |
| Electrical Engineer | $ - 0 | $ - 0 | ||
| Electrical Technician | $ - 0 | $ - 0 | ||
| Driver | $ - 0 | $ - 0 | ||
| Hourly Rate per hour: | $ - 0 | $ - 0 | $ - 0 |
| Equipment Type | # of Equipment | Hourly Rate | Hours/day | # of days | Total |
| Truck | $ - 0 | ||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| Total Equipment Cost for a Week: | $ - 0 |
Total Labor and Equipment Cost per week: $ - 0
Damage Assessor Scenario
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| Damage Inspection Team Price Scenario |
| Damage Inspection Team - 7 Day Storm - Operational Period: 7 am - 7 pm |
| Description: The following scenario will be used to evaluate pricing among proposers to determine the lowest price for ranking purposes. Proposers will be ranked based on the total price, with the lowest price receiving the highest ranking (e.g., Rank 1), and subsequent rankings assigned in ascending order of price. Please complete this form based on the following scenario: |
Scenario: Post-Hurricane Response
Florida has declared a state of emergency due to Hurricane Milton. After the hurricane passes, the City of Orlando has suffered significant damage. OUC requires damage assessors to inspect and document the extent of damages in the affected areas. This assessment is critical for OUC to prioritize and manage the necessary remediation efforts.
For this scenario, please assume the following:
1. The assessment will take place over a seven-day period (Monday through Sunday).
2. Three (3) crews will be deployed each day.
3. Work hours will be from 7:00 AM to 7:00 PM daily.
4. Damage assessors must document and report on structural damages, safety hazards, and infrastructure conditions.
5. Crews will be required to use [any specific equipment, tools, or vehicles] as part of the assessment process.
6. Assessors must hold [any required certifications, e.g., structural inspection credentials, damage assessment training].
| Monday | Tuesday | Wednesday | Thursday | Friday | Saturday | Sunday | Total Hours | Daily Cost | |
| Straight Time (ST) Hours: | 0 | $ - 0 | |||||||
| Overtime Time (OT) Hours: | 0 | $ - 0 | |||||||
| Double Time (DT) Hours: | 0 | $ - 0 | |||||||
| Total Labor Cost for a Week: | $ - 0 |
| Safety Team | # of Employees | Straight Time | Overtime | Double Time |
| Electrical Engineer | $ - 0 | $ - 0 | ||
| Electrical Technician | $ - 0 | $ - 0 | ||
| Driver | $ - 0 | $ - 0 | ||
| Hourly Rate per hour: | $ - 0 | $ - 0 | $ - 0 |
| Equipment Type | # of Equipment | Hourly Rate | Hours/day | # of days | Total |
| Truck | $ - 0 | ||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| Total Equipment Cost for a Week: | $ - 0 |
Total Labor and Equipment Cost per week: $ - 0
2025 Safety Inspection Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2025 Safety Inspection Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
2026 Safety Inspection Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2026 Safety Inspection Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
2025 Damage Assessor Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2025 Damage Assessor Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
2026 Damage Assessor Schedule
| Attachment B |
| RFP 25 8399 DPS Emergency Response Safety Assessment Support Services |
| 2026 Damage Assessor Price Schedule |
| Note: Submit all pricing using this spreadsheet template only. |
| Labor Classification | Standard Time | Overtime Rate | Double Time Rate |
| Electrical Engineer | |||
| Electrical Technician | |||
| Driver |
Equipment Type Hourly Rate with fuel, if applicable ($/hour) Hourly Rate without fuel, if applicable ($/hour) Notes
File details come from the government source that posted it. Updated .