This is a request for proposal from the General Services Administration for an elevator modernization project at the Robert F. Kennedy Federal Building in Washington, DC. The project requires design and construction services for modernizing thirty public elevators and two private elevators, including professional architectural, engineering, construction management, inspection, testing, and commissioning services. The site visit date is to be determined, with the solicitation closing on July 17, 2023. Interested firms must register in the System for Award Management and submit representations and certifications through the SAM website. The North American Industry Classification System codes for this work are 236220, with a small business size standard of $45 million in average annual receipts over the past three years.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVATOR STUDY
Revised Final Report
July 5, 2019
ROBERT F. KENNEDY BUILDING
950 PENNSYLVANIA AVENUE, NW
WASHINGTON, DC 20530
Building # DC0023ZZ
REON, Inc | Lerch Bates | ECO-MAR, LLC | TCS ooNE
Robert F. Kennedy Building - DOJ Washington, DC
SCOPE OF WORK
REON team surveyed 32 elevators on November 27, 28, and December 3, 2018. The purpose of the audit and systems analysis is to develop scopes, cost estimates, time schedules, phasing for the interim repair projects, and a plan for the modernization projects. The team also identifies the primary equipment, determines the maintained condition of major components, records operating performance levels, and evaluates the vertical transportation based on applicable industry and code standards.
Our report is arranged in sections as follows:
EXECUTIVE SUMMARY
SECTION I – Equipment Evaluation
Vertical Transportation Systems Profile
Lifecycle Analysis
Codes and Standards Review
Architectural Barriers Act Compliance Survey
Mechanical Systems
Electrical Systems
Fire Protection Systems
SECTION II – Maintained Condition Evaluation
Itemized Deficiencies
Maintenance Contract Review
Performance
SECTION III – Scope, Budget Costs, Priorities
Passenger Elevators
Private Elevators
Freight Elevators
Historical Renovations
Mechanical, Electrical, Plumbing Systems
Fire Protection Systems
Project Costs
SECTION IV – Photographs, Schedule, Key Plan, Mechanical Engineering Calculations
Attachment A: Photographs
Attachment B: Schedule
Attachment C: Key Plan
Attachment D: Mechanical Engineering Calculations
Washington, DC
EXECUTIVE SUMMARY
The original equipment in the Robert F. Kennedy Building was manufactured and installed by Otis
Elevator Company in 1935, with some component systems original as installed. Several modernizations and repairs have occurred over the life of the building. The last major modernization was performed from
1992 to 1994 on all but the two private elevators, with the passenger elevators group receiving new controls and historical signal fixtures. Cabs were also incorporated into the scope. Replacement parts on the drives consist of rebuilt components.
The Robert F. Kennedy Building is located at 950 Pennsylvania Avenue, NW, Washington, DC. It is a government owned building currently occupied entirely by the Department of Justice (DOJ). General
Services Administration (GSA) has given delegation authority to DOJ for the operations and maintenance of the building. The building has nine levels and an area of 1,257,300 gross square. The passenger elevators service eight levels with stops at B, 1-7; two of the service elevators service nine levels with an additional stop at PH; and one service car serves the sub-basement level.
The REON team performed a comprehensive survey of the elevator equipment at the referenced property from the week of November 27 through December 3, 2018.
1. The office building’s vertical transportation is provided by 26 passenger elevators (9 groups) of overhead gearless traction passenger elevators and 1 hydraulic elevator. The passenger elevators serve 8 front openings (B, 1-7), have a capacity of 2,500 pounds or 3,000 pounds, and operate at 600 feet per minute with 2:1 roping. The hydraulic elevator has a capacity of 3,000 pounds and 2 stops and travels at 113 to 129 feet per minute.
2. The office building’s service/staff transportation is provided by four single dedicated service/freight elevators. Two service/freight elevators serve 8 front openings (B, 1-7) one has 9 stops (B, 1-8) and one has 10 stops (BR, B, 1-8). All have a capacity of 5,000 pounds and operate at 300 feet per minute with 2:1 roping.
3. The office building has two single dedicated private elevators. The elevators serve 6 front openings
(B, 1- 5), have a capacity of 1,200 pounds, and operate at 450 feet per minute with 2:1 roping.
Realizing that preventive maintenance is an ongoing process, the survey represents a snapshot on a specific day and time. Overall, the equipment is in good condition with evidence of preventive maintenance being performed on a regular basis. The machine room spaces are clean, and the areas are organized. The deficiencies found can be addressed during regular preventive maintenance component replacement procedures such as replacement of worn hoistway door pick-up rollers and replacement of the tail sheave assembly related to the steel tape leveling system.
Maintenance and test paperwork in the elevator machine room were found to be out of date. Record keeping of maintenance procedures was one or two months behind, and code-required test tags and firemen’s service monthly testing logs were missing from the machine rooms.
Washington, DC
The elevator control equipment for all elevators in the Robert F. Kennedy Building is obsolete by design.
Parts availability of the Armor KONE TMS 900 control systems on typical elevators is an inherent problem, being no longer supported by the manufacturer. The two private elevators have a CENTEK, Inc., control system installed by KONE during the period in which the two companies had partnered. The relationship ended, making these units likely to become obsolete soon. In addition, the CENTEK control system lacks remote monitoring capability. Boards no longer are readily available for the KONE
TMS900. In addition, the elevator control system for the 26 passenger and 4 freight elevators has exceeded its expected life. The HVAC systems in each elevator machine room appear to be from the
1992-1994 modernization period, and several units did not appear to be operational.
The elevator controls should be budgeted for replacement within the next one to two years due to lack of both spare parts and availability of technical support. Current codes require the addition of elevator rope grippers to prevent unintended movement in the up direction and may require overhead mounting due to clearance issues in the machine room during any modernization.
The typical passenger and private elevators have Otis gearless traction machines and are operating as designed. They are original to the building, making some components 83 years old. The service cars have geared traction machines that are 25 years old. Gearless permanent magnet A/C machines and regenerative drives shall be provided for all passenger gearless applications and new geared traction machines with A/C drives on geared applications.
The passenger elevator hall fixtures (hall call buttons, position indicators, and hall lanterns) are of historic style and currently are in poor condition. They are using incandescent bulb technology, which requires more frequent bulb replacement compared to LED lamps. Original hall fixtures are recommended to be refinished and upgraded with LED bulbs and all others to be replaced with new matching fixtures on levels 1-5. This work should be coordinated with the elevator control upgrades that have been replaced to match historical style and shall to be completed with elevator modernization. Due to the unique cast aluminum fixtures associated with the 26 passenger elevators, cars and hall fixtures for all 25 elevators should be purchased at one time/single package under the first phase of the project. Doing so will ensure best pricing and matching fixtures. And if modernization is split into different projects, etc., then everything will match, and there will be no chance of a different vendor manufacturing custom fixtures.
Pit lighting appears to be adequate, but some new fixtures will be required. All pits were dry with little to no evidence of water/moisture intrusion. However, sump installation will be required during the controller change to meet current codes. GFCI electrical outlets also need to be provided in each pit. Cat walks will be required to enable inspection of the pit buffers of each passenger elevator.
Some passenger elevators have what appears to be a new cab replicating the original cabs. These cabs are to be repaired/refinished. A complete cab replacement is required for non-historical cabs. The existing cabs have aluminum and stainless-steel cove ceiling, wall panels and car doors, flat bar stock stainless steel handrails on side and rear walls, tile flooring, and original car operating panels (main only). All cabs are ventilated by a cab fan mounted on top of each elevator cab shell. There are vents in the base of each cab.
The four service/freight elevator cabs are to be repaired/refinished. The existing cabs have fluorescent fixtures mounted flush with the ceiling, steel shell cab, with three rows of oak bumper rails on side and rear walls, checker plate flooring and stainless-steel car operating panels (main and auxiliary). Ventilation of all cabs is achieved by a cab fan mounted on top of each elevator cab shell. There are vents in the cab base/ lower bumper rail.
Private elevators have what appears to be a standard cab with laminate panels. A complete cab replacement is recommended for non-historical cabs. The existing cabs have eggcrate ceilings, plastic laminate faced paneling, flat bar stock stainless steel handrails on side and rear walls, carpet flooring, and bronze car-operating panels. All cabs are ventilated by a cab fan mounted on top of each elevator cab shell.
The elevator machine rooms for typical passenger cars and service cars 10, 24, and 31 are located on the penthouse level. Service elevator 24’s machine room is offset adjacent to the hoistway with a sheave room above the hoistway separated by metal grating. The service elevator machine room for elevator 40 has a dedicated spiral staircase to the machine room. Private elevators number 11 and 23 have a machine room located on the sixth level.
There are 15 elevator machinery rooms (EMRs) in the RFK Building; 9 serving passenger elevators; 1 serving the 2 private elevators; 4 serving the 4 freight elevators and 1 serving the 2-level hydraulic elevator. There are two A/C system types cooling the rooms. The passenger, private, and hydraulic EMRs are cooled by self-contained A/C units, water cooled by an ethylene glycol distribution system with the heat rejection at rooftop mounted dry coolers. The freight elevator EMRs are cooled by through-the-wall packaged terminal air conditioning (PTAC).
The systems were installed in the 1980s and have reached the end of their useful life, typically 25 years.
The systems, when installed, were adequately sized. However, time and controller changes have rendered the systems ineffective. It is recommended that the existing cooling systems be removed and new systems installed.
The report requires that sump pumps be added to the elevator pits that will be tied into the emergency power systems to ensure reliability and reduce risk of flooding.
Emergency power systems will be incorporated into servicing the elevators, the elevator machine room cooling, the sump pumps, and the lighting (as required) to meet the current codes when modernization or other significant work in these areas is undertaken. The electrical scope of work will require new power to major elevator and mechanical equipment. To meet code, the incorporation of new energy-efficient low-maintenance LED lighting into both the elevator machine rooms and the pits and the upgrading of power outlets to GFCI is recommended during modernization.
Several elements of fire protection will be required as part of the elevator modernization, summarized as follows: elevator recall, fire and smoke alarm/detection, and fire suppression. These systems do not exist, so to meet code requirements, they will need to be added at the time of modernization or other significant renovations that touch these areas. These will be required to meet the Elevator & Escalator Safety Code
ASME/ANSI A17.1, IBC, GSA P-100, and NFPA (13, 70, 72, and 101). This building is taller than two stories, which means that the recall will have to be integrated into the fire alarm system. The current system is lacking an integrated recall system and will need to be incorporated. The new sprinkler work will meet the most recent codes at the time of contract award. This work will include demolition of the existing machine room and shaft sprinkler protection system and replacement with new as required by code.
The elevator shafts are masonry and considered to provide fire rating. Reconstruction of the shafts would not be feasible given the historical context of this building. The designer of record for the modernization will need to perform a comprehensive survey to make required corrections at the time of the modernization.
SECTION I - EQUIPMENT EVALUATION
VERTICAL TRANSPORTATION SYSTEMS PROFILE
Building:
ROBERT F. KENNEDY BUILDING
Group 1, Cars 1-4 & 6
Group 2, Cars 37-39
Group 3, Cars 32 – 35
Capacity 2,500 Cars 37 & 38: 2,500
Car 39: 3,000
2,500
Loading
(Passenger/Service/Freight)
Passenger
Rated Speed (feet per minute) 600 600 600
Roping 2 to 1 2 to 1 2 to 1
Floors Served 8 8 8
Floor Identification B, 1-7 B, 1-7 B, 1-7
Machine Type 74D OH Gearless Cars: 37+39: Otis 74D
Car 38: GE GTE20
Otis 74D Gearless
Control Type Armor/KONE Armor/KONE Armor/KONE
Sequence of Operation 5-car group 3-car group 4-car group
Door Configuration 2-speed, side slide 2-speed, side slide 2-speed, side slide
Car Door Operator GAL MOM/MOH GAL MOM/MOH GAL MOM/MOH
Operating/Signal
Fixtures
Incandescent
Incandescent Incandescent
Door Entrance Size 3’-4” w X 6’-11” h 37+39=3’- 4” w x 6’11” h
38= 3’-6w” X 7’-0”h
42" w X 84" h
Car & Cwt Buffers Oil Oil Oil
Car Safeties Hollister-Whitney Hollister-Whitney Hollister-Whitney
Overspeed Governor KONE KONE KONE
Power Supply 208V 3 PH 208 V 3 PH 208 V 3 PH
O.E.M. Otis Otis Otis
Date of Installation 1935
#37 + 39: 1935
#38 installed in 1993
Modernization Contractor KONE KONE KONE
Date of Modernization
1993 1993
Present Service Company Quality Quality Quality
3- or 5-Year Full Load Test No tag in M.R. No tag in machine room No tag on machine Annual Safety
Inspection
11/27/17 11/11/17 11/11/17
Group 4, Car 28 &30 Group 5, Car 25 & 27
Group 6, Car 19
Capacity 2,500 2,500 3,000
Rated Speed (feet per minute) 600 600 125
Roping 2 to 1 2 to 1 N/A
Floors Served 8 8 2
Floor Identification B, 1-7 B, 1-7 1, 2
Machine Type Otis 74D
Otis 74D
Hydraulic
Control Type Armor/KONE Armor/KONE MCE
Sequence of Operation 2-car group 2-car group Selective Collective
Door Configuration 2-speed, side slide 2-speed, side slide 2-speed, side slide
Car Door Operator GAL MOM/MOH GAL MOM/MOH GAL MOM/MOH
Operating/Signal
Fixtures
Incandescent Incandescent Incandescent
Door Entrance Size 42" w X 84" h 42" w X 84" h 42" w X 84" h
Car & Cwt Buffers Oil Oil Spring
Car Safeties Hollister-Whitney Hollister-Whitney N/A
Overspeed Governor KONE KONE N/A
Power Supply 208 V 3 PH 208 V 3 PH 208 V 3 PH
O.E. M. Otis Otis CEMCO/MCE
Date of Installation 1935 1935 1999 conversion to hydraulic
Modernization Contractor KONE KONE N/A
Date of Modernization 1993 1993 1999
Present Service Company Quality Quality Quality
3- or 5-Year Full Load Test No tag in machine room
No tag in machine room
No tag in machine room
Annual Safety
11/11/17 11/11/17 11/11/17
Group 7, Cars 7 – 9
Group 8, Cars 12 & 14
Group 9, Cars 15 & 17
Capacity (lbs.) 2,500 2,500 3,000
Rated Speed (feet per minute) 600 600 600
Roping 2 to 1 2 to 1 2 to 1
Floors Served 8 8 7
Floor Identification B, 1-7 B, 1-7 B, 1-5 and 7
Machine Type Cars 7 & 9: Otis 74D
Car 8: Imperial
Otis 74D Otis 74D
Control Type Armor/KONE Armor/KONE Armor/KONE
Sequence of Operation 3-car group 2-car group 2-car group
Door Configuration 2-speed, side slide 2-speed, side slide 2-speed, side slide
Car Door Operator GAL MOM/MOH GAL MOM/MOH GAL MOM/MOH
Operating/Signal
Fixtures
Incandescent Incandescent Incandescent
Door Entrance Size 42" w X 84" h 3’-6” w X 7’-0” h 3’-4” w X 7’-0” h
Car & Cwt Buffers Oil Oil Oil
Car Safeties Hollister-Whitney
Overspeed Governor KONE KONE KONE
Power Supply 208 V 3 PH 208 V 3 PH 208 V 3 PH
O.E. M. Otis Otis Otis
Date of Installation 1935 1935 1935
Modernization Contractor KONE KONE KONE
Date of Modernization 1993 1993 1993
Present Service Company Quality Quality Quality
3- or 5-Year Full Load Test No tag in machine room
No tag in machine room
No tag in machine room Annual Safety
11/11/17 11/27/17 11/28/17
Group 10, Cars 20 & 22
Private Elevator 11 Private Elevator 23
Capacity 2,500 1,200 1,200
Loading
(Passenger/Service/Freight)
Passenger Passenger Passenger
Rated Speed (feet per minute) 600 500 500
Roping 2 to 1 2:1 2:1
Floors Served 8 6 6
Floor Identification B, 1-7 B, 1-5 B, 1-5
Machine Type Otis 74D
38 – GE-GTE20
Otis 70 Otis 70
Control Type Armor/KONE Cetek Cetek
Sequence of Operation 2-car group Secured selective collective
Secured selective collective
Door Configuration 2-speed, side slide Swing & 2-speed, car door
Swing & 2 speed, car door
Car Door Operator GAL MOM/MOH GAL – MOVFR GAL – MOVFR
Operating/Signal
Fixtures
Incandescent Incandescent Incandescent
Door Entrance Size 3’-4” w x 6’-11” h 29” w X 84” h 29” w X 84” h
Car & Cwt Buffers Oil Oil Oil
Car Safeties
Overspeed Governor KONE Holister
Whitney
Holister
Whitney
Power Supply 208 V 3 PH 208 Volt 208 Volt
O.E. M. Otis Otis Otis
Date of Installation 1935 1935 1935
Modernization Contractor KONE Montgomery Montgomery
Date of Modernization 1993 2007 – Controls and fixtures
2007 – Controls and fixtures
Present Service Company Quality Quality Quality
3- or 5-Year Full Load Test No tag in machine room
No tag in machine room
No tag in machine room
Annual Safety
11/28/17 11/30/17 11/30/17
Freight
Elevator 10
Freight
Elevator 24
Freight
Elevator 31
Freight
Elevator 40 Capacity 5,000 lbs. 5,000 lbs. 5,000 lbs. 5,000 lbs.
Loading
(Passenger/Service/Freight)
C-1 (service/ freight) C-1 (service/ freight) C-1 (service/ freight)
C-1 (service/ freight) Rated Speed (feet per minute) 300 300 300 300
Roping 1:1 1:1
1:1 1:1
Floors Served 8 9 8 10
Floor Identification B, 1 – 7 B, 1 – 8 B, 1 - 7 BR, B, 1 – 8
Machine Type: Hollister-Whitney
Type 63
ADJ Holister
Whitney
Hollister-Whitney
Type 63
Holister Whitney
Type 63
Control Type: Armor/KONE Armor/KONE Armor/KONE Armor/KONE
Sequence of Operation Selective
Collective
Selective
Collective
Selective
Collective
Selective
Collective
Door Configuration Single-speed, center opening
2-speed, center opening
2-speed, center opening
2-speed, center opening
Car Door Operator GAL MOM/MOH GAL MOM/MOH GAL MOM/MOH GAL MOM/MOH
Operating/Signal
Fixtures
Incandescent Incandescent Incandescent Incandescent
Door Entrance Size 48" w X 84" h 60" w X 84" h 72" w X 84" h 4’-3” w X 7’0” h
Car & Cwt Buffers Oil Oil Oil Oil
Car Safeties Hollister-Whitney Hollister-Whitney Hollister-Whitney Hollister-Whitney
Overspeed Governor Hollister-Whitney Hollister-Whitney Hollister-Whitney Hollister-Whitney
Power Supply 208 Volt 208 Volt 208 Volt 208 Volt
O.E. M. Hollister-Whitney Hollister-Whitney Hollister-Whitney Hollister-Whitney
Date of Installation 1935 1935 1935 1935
Modernization Contractor Montgomery Quality Quality Montgomery
Date of Modernization 1993 – New car sling platform/cab fixture
1993 – New car sling platform/cab fixture
1994 – New car sling platform/cab fixture
1993 – New car sling platform/cab fixture Present Service Company Quality Quality Quality Quality
3- or 5-Year Full Load Test No tag in machine room
No tag in machine room
No tag in machine room
No tag in machine room Annual Safety
08/2016 08/25/2016 11/2017 11/30/2017
LIFECYCLE ANALYSIS – TRACTION SYSTEMS
Elevator I.D. Passenger Date: 11/28/18
Component/System
Projected
Design
Life
(Years)
Present
Age
(Years)
Remaining
Useful
Life
(Years)
Condition
Comments
Recommended Action
MACHINE ROOM
1. Gearless Hoisting
Machinery, Sheaves
& Bearing
Indefinite 83 1
Good
Replace during mod
2. Drive Motor(s) Indefinite 83 1 Good Replace during mod
3. Power Drives 30-50 25 0 OBSOLETE Replace during mod
4. Signal Controls
(Selectors) 20-25 25 0 OBSOLETE Replace during mod
5. Motion Controls 20-25 25 0 OSBOLETE Replace during mod
HOISTWAY AND PIT
1. Wire Ropes (Hoist, Comp. & Governor)
20-25 25
Good – Ropes require cleaning/lube
2. Guide Rails 75+ 83 26+ Good Clean, Align, Tighten
3. Mechanical Safety
Equipment &
Counterweight
75+ 83
26+
Fair Test & Rebuild as required
4. Hoistway Door
Equipment 25-30 25 1 Fair Replace during mod
CAR EQUIPMENT
1. Car Door
Equipment ttt
2.
20-25 25 0 Fair Replace during mod
2. Cab Enclosure 20-30 25 17 Fair Replace during mod
3. Car Frame 75+ 83 26+ Good No Action Required
4. Car Safety 75+ 25/83 26+ Good Replace during mod
OPERATING/SIGNAL EQUIPMENT
1. Fixtures 20-25 25 0 OBSOLETE Replace during mod
Elevator I.D. Service Cars 10, 24, 31 and 40 Date: 11/28/18
Design
Life
(Years)
Present
Age
(Years)
Remaining
Useful
Life
(Years)
1. Geared Hoisting
Machinery, Sheaves
& Bearing
35-40
2. Drive Motor(s) 35-40 25 2 Good Replace during mod
3. Power Drives 30-50 25 0 OBSOLETE Replace during mod
4. Signal Controls
(Selectors) 20-25 25 0 OBSOLETE Replace during mod
5. Motion Controls 20-25 25 0 OSBOLETE Replace during mod
HOISTWAY AND PIT
20-25 25 0 Poor Replace
2. Guide Rails 75+ 83 25+ Good
3. Mechanical Safety
75+ 25/83
25+ Good Cwt Frame Original
Car slings from Mod
4. Hoistway Door
Equipment 25-30 25 0 Poor Replace
CAR EQUIPMENT
1. Car Door
Equipment 20-25 25 0 Poor Replace
2. Cab Enclosure 20-30 25 0 Poor Replace
3. Car Frame 75+ 25 25+ Good Clean & tighten all bolts
4. Car Safety 75+ 25/83 25+ Good Clean & tighten all bolts
1. Fixtures 20-25 25 0 OBSOLETE Replace during mod
Elevator I.D.: Private Cars 11 & 23 Date: 12/28/18
Design
Life
(Years)
Present
Age
(Years)
Remaining
Useful
Life
(Years)
1. Gearless Hoisting
Machinery, Sheaves
& Bearing
Indefinite
83 1
2. Drive Motor(s) Indefinite 83 1 Good Replace during mod
3. Power Drives 30-50 11 9+ OBSOLETE Replace during mod
4. Signal Controls
(Selectors) 20-25 11 9+ OBSOLETE Replace during mod
5. Motion Controls 20-25 11 9+ OBSOLETE Replace during mod
HOISTWAY AND PIT
20-25 11 12+ Good Replace during mod
2. Guide Rails 75+ 83 30+ Good Clean, align, tighten
3. Mechanical Safety
75+ 83 9+ OBSOLETE Replace during mod
4. Hoistway Door
Equipment 25-30 11 9+ Good Replace during mod
CAR EQUIPMENT
1. Car Door
Equipment 20-25 11 9+ Good No action required
2. Cab Enclosure 20-30 11 9+ Good No action required
3. Car Frame 75+ 83 30+ Good No action required
4. Car Safety 75+ 11 30+ Good (recently rebuilt)
No action required
1. Fixtures 20-25 11 9+ Good Replace during mod
CODES AND STANDARDS REVIEW – ELEVATORS ONLY
All passenger and service elevators in the Robert F. Kennedy Building were upgraded between 1992-94.
The private elevators were last upgraded in 2007. The present components are a mixture of old (machine, car, counterweight, pit equipment, fixtures), and new (SCR drives and door operator). The systems do not meet the latest code regulations in the following areas:
1. Firefighters’ elevator provisions should be addressed where possible.
2. Emergency power selection panels contain elevators that do not exist and should be replaced.
For purposes of this evaluation, IBC 2018, which references Elevator A17.1-2016, was used as the basis of comparison.
IBC 2018 – Chapter 30
1. Section 3001.2 – Emergency elevator communication system for deaf, hard of hearing, and speech impaired.
2. Section 3003.1.4 – Venting – machine room HVAC must be connected to standby power.
Annual Safety Inspection (Cat 1): All tests are performed at inspection speed with no load inside the elevator. Manually activate the safeties, governor, emergency final limits, over speed switch, door locks, gate switches, car door restrictors, stop switches and buffer switches. Activate Fireman’s Service Phase I
& II. Test emergency lighting / alarm / communications. Test the door protection devices and closing force. Unintended movement device is also verified.
3-Year Test (Cat 3 for hydraulic elevators): This type of testing is required only if the unit has a pressure vessel (hydraulic valve) as a means of propulsion. The pressure vessel must be charged at maximum pressure for 15 minutes without changes to pressure. A visual inspection inside of the vessel is also performed.
5-Year Full-Load (Cat 5): Same scope of work as the Cat 1 no-load test, and also while elevator is operating at contract speed. Conduct a full-load (elevator capacity) safety drop test, 125% capacity elevator brake test, and a full load buffer test. Manually test the governor activation speeds and governor pull through.
What the 5-year test involves and what is expected at the end of the test: The elevator is loaded to maximum designed capacity and with the elevator traveling in the down direction; the speed governor is activated to put the elevator on emergency stop. The distance of slide on the main elevator rails is then measured for tolerance as well as the level of the elevator itself after the emergency brakes (safety) are applied and the car has come to a complete stop. After this is completed, the elevator is further tested in the down direction (under full load, contract speed) and strikes the elevator pit buffer. The elevator then is lifted, and the buffers (oil type) must return to original position within 90 seconds. Additional weight is added (25% of capacity) to the cab. The elevator is tested again in the down direction and must stop within normal leveling tolerances between the car and hoistway entrance sills. All tests have specific tolerances set by ANSI A17.1 in relation to the elevator design: type, speed and capacity.
Accessibility: The RFK Building was built in 1935. At that time, the federal buildings were not required to meet accessibility standards. Renovations after 1984 were required to meet the Uniform Federal
Accessibility Standards or (UFAS) which was superseded by the Architectural Barriers Act (ABA)
Accessibility Standards (ABAAS) in 2006. Features that are compliant with the UFAS may remain as is unless those features are being altered, then they must be upgraded to current ABAAS requirements unless it is “technically infeasible” to do so (ABAAS F106.1). If a feature did not meet the original UFAS requirements, then it must be upgraded to current ABAAS requirements. For clarity, the Americans with
Disabilities Act and ADAAG do not apply to federally owned facilities. This building is a federally owned facility, not a leased facility. While the standards are similar, the survey is based on compliance with
ABAAS.
THE ARCHITECTURAL BARRIERS ACT (ABAAS) SURVEY OF EXISTING ELEVATOR SYSTEMS
ELEVATOR(S) IDENTIFICATION: DATE: 12/21/18
ALL PASSENGER & SERVICE ELEVATORS
S = SATISFACTORY, U = UNSATISFACTORY, R = READILY ACHIEVABLE, NA = NOT APPLICABLE
SEC. ITEM TECHNICAL REQUIREMENTS S U EXISTING CONDITION/ NOTES R
4.10.1 General A. Elevators shall comply with ASME/ANSI
A17.1-1990, Safety Code for Elevators and
Escalators.
B. Freight elevators shall not be considered as meeting the requirements of this section unless the only elevators provided are used as combination passenger and freight elevators for the public and employees.
X
4.10.2 Automatic
Operations A. Elevator operation shall be automatic.
B. Each car shall have a self-leveling feature that will automatically bring the car to floor landing within a tolerance of ½" under rated loading and zero loading conditions.
C. This self-leveling feature shall be automatic and independent of the operating device and shall correct for undertravel and overtravel.
4.10.3 Hall Call
Buttons A. Shall be centered at 42" above floor.
B. Shall have visual signals to indicate when call is registered and answered.
C. Minimum size 3/4" in the smallest dimension.
D. "UP" button shall be above "DOWN" button.
E. Buttons shall be raised or flush.
F. Objects mounted beneath buttons shall not project more than 4" from the wall.
Within given reach ranges, where buttons were not 42”
4.10.4 Hall
Lanterns
A. A visible and audible signal shall be provided at each hoistway entrance to indicate which car is answering a call.
B. Audible signals shall sound once for "up", twice for "down", or shall have verbal annunciators that say "up" or "down".
C. Visible signals shall have the following features:
1. Fixtures shall be mounted with centerlines at least 72" above the lobby floor.
2. Visual elements shall be at least 2 ½" in the smallest dimension.
3. Signals shall be visible from the vicinity of the hall call button.
D. In-car lanterns, conforming to the above requirements, shall be acceptable.
Existing historical lanterns shall be refurbished during modernization to show direction for full compliance.
4.10.5 Characters A. All elevator hoistway entrances shall have raised and Braille floor designations provided on both jambs.
B. Characters shall be centered 60" above finish floor.
C. Characters shall be 2" high, raised 1/32", upper case, sans serif or simple serif type, and shall be accompanied by Grade 2
Braille.
A few cars have Braille plates missing at basement floors.
4.30.4 On
Hoistway
Entrances
4.10.6 Door A. Elevator doors shall open and close
automatically.
B. Door shall have a reopening device that will stop and reopen a car door if an object or person obstructs the door.
1. The device shall be capable of completing these operations without requiring contact for an obstruction passing through the opening at heights of 5" and 29" above finish floor.
4.16(3)(i) Protective and Reopening Device
2. Door reopening device shall remain effective for at least 20 seconds. After such interval, doors may close in accordance with ASME/ANSI A17.1-
1990.Rule 112.4 and Rule 112.5 closing force provisions.
4.10.7 Door and A. The minimum acceptable time from
notification that a car is answering a call until doors begin to close shall be calculated as follows:
• T = D/(1.5 ft/s) or T=D/(445 mm/s)
• T = time in seconds
• D = distance (in ft or mm) from point
60" directly in front of farthest call button to centerline of hoistway door.
• The minimum acceptable notification time shall be 5 seconds.
Signal Timing for X Hall Calls
4.10.8 Door Delay
for Car
Calls
A. The minimum time for elevator doors to remain fully open in response to a call shall be 3 seconds.
4.10.9 Floor Plan of
Elevator Cars
Shall provide for wheelchair users to enter the car, maneuver within reach of controls and exit the car.
A. Door shall provide 36" clear minimum.
B. Cab Depth: 51" minimum, with 54" minimum from rear of cab to inside face of door.
C. Cab Width: side opening door - 68" minimum; Center opening door - 80" minimum.
D. Clearance between car platform sill and edge of hoistway landing shall be 1 1/4" maximum.
E. Alterations/Existing Condition: Where existing plan configuration or technical infeasibility prevent use of specified cab sizes, dimensions may be reduced as required. However, in no case shall the inside car dimensions be less than 48" by
48".
4.16(3)(ii)
F. Equivalent facilitation may be provided with a cab of different size when usability can be demonstrated and when all other items required to be accessible comply with this section.
SEC. ITEM TECHNICAL REQUIREMENTS S U
EXISTING CONDITION/
NOTES
R
4.10.10 Floor
Surfaces
A. Shall be firm, stable and slip-resistant
B. If carpet is used, it shall have the following features:
1. Shall be securely attached;
2. A firm cushion pad or backing (or none);
3. A level loop, textured loop, level cut pile or level cut/uncut pile texture;
4. Maximum pile thickness: ½”
5. Exposed edges fastened to floor surfaces with carpet edge trim.
4.10.11 Illumination
Levels
A. Illumination level at controls, platform and threshold and landing shall be minimum 5 foot-candles.
Existing historical fixtures should be updated with LED during modernization.
4.10.12 (1) Car
Controls:
Buttons
A. Size 3/4" minimum in least dimension.
B. Buttons shall be raised or flush.
4.10.12 (2)
SEC.
4.10.12 (4)
4.10.13
Car
Controls:
Control
Indicator s
C. All control buttons shall be designated by
Braille and by raised standard alphabet characters for letters, Arabic symbols for numerals, or standard symbols are required in ASME/ANSI 17.1-1990.
D. Characters shall be 5/8" to 2" high, raised
1/32", upper case, sans serif or simple serif type, and shall be accompanied by Grade 2
Braille.
E. All raised designations shall be immediately left of the button to which they apply.
F. Floor buttons shall be provided with visual signals which light when each call is registered and extinguish when each call is answered.
4.10.12 (3) Car
Controls:
Height
G. All floor buttons shall be maximum 54" above floor where side approach is provided, 48" maximum where forward approach is required.
H. Emergency controls (including alarm and stop) shall be grouped at bottom of panel, with centerlines 35" minimum above floor.
Mechanical, Electrical, Plumbing and Fire Protection Systems
Mechanical Equipment Survey
The team performed a survey of the existing elevator machine rooms with some limited documents provided. In summary, there are 15 elevator machine rooms (EMRs) in the RFK Building; 9 serving passenger elevators; 1 serving the 2 private elevators; 4 serving the 4 freight elevators and 1 serving the 2-level hydraulic elevator. Throughout the building, there are two A/C system types cooling the rooms. The passenger, private, and hydraulic EMRs are cooled by self-contained A/C units, water-cooled by an ethylene glycol distribution system with the heat rejection at rooftop mounted dry coolers. The freight elevator EMRs are cooled through the wall packaged terminal air conditioning (PTAC). The PTACs are not part of the BAS. BAS systems were not surveyed in this report, but all new systems would be required to be integrated into the BAS at the time of modernization. The conditions of these systems vary from EMR to
EMR, but generally they are out of date and should be modernized with the elevators. The systems were installed during the 1980s and have reached the end of their useful life, typically 25 years. The systems, when installed, were adequately sized. However, time and controller changes have rendered the systems ineffective. The pages that follow are the survey notes and load calculations for each of the systems.
Building: RFK
EMR No.: Group 1
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
42.8 mbh
Unknown
Same as Designed
Total Cooling = 11.1 Tons @ 75F db/50% rh entering air
Sensible Cooling = 10.5 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
Roof Area: 2000 sf
Exterior Wall Area: 1360 sf
Elevator Machinery Room (EMR) Mechanical Field Investgation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 5 @ 25 hp Floor Area: 2000 sf
Other Internal Loads: Lights & Controllers & Transformers
1. Required
2. Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
N/A
Local thermostst control
Visual
EMR No.: Group 2
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 775 sf
Exterior Wall Area: 896 sf
Elevator Machinery Room (EMR) Mechanical Field Investgation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 3 @ 25 hp Floor Area: 775sf
Other Internal Loads: Lights & Controllers & Transformers
18 mbh
Unknown
Same as Designed
Total Cooling = 5.9 Tons @ 75F db/50% rh entering air
Sensible Cooling = 5.7 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
N/A
EMR No.: Group 3
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
29.6 mbh
Unknown
Same as Designed
Total Cooling = 8.3 Tons @ 75F db/50% rh entering air
Sensible Cooling = 8 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
Roof Area: 1250 sf
Exterior Wall Area: 1160 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 4 @ 25 hp Floor Area: 1250 sf
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
N/A
Local thermostst control
EMR No.: Group 4
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
23.3 mbh
Unknown
Same as Designed
Total Cooling = 4.8 Tons @ 75F db/50% rh entering air
Sensible Cooling = 4.5 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
Roof Area: 850 sf
Exterior Wall Area: 1360 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 25 hp Floor Area: 850 sf
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
N/A
Local thermostst control
EMR No.: Group 5
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 800 sf
Exterior Wall Area: 1000 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 25 hp Floor Area: 800 sf
Other Internal Loads: Lights & Controllers & Transformers
21.1 mbh
Unknown
Same as Designed
Total Cooling = 4.8 Tons @ 75F db/50% rh entering air
Sensible Cooling = 4.5 tons @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
EMR No.: Group 6
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: sf
Exterior Wall Area: 0 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 1 @ 15 hp Floor Area: 300 sf
Other Internal Loads: Lights & Controllers & Transformers
3.3 mbh
Unknown
Same as Designed
Total Cooling = 1.1 Tons @ 75F db/50% rh entering air
Sensible Cooling = 1 ton @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
Comments Hydraulic Passenger Elevator - 2 level.
EMR No.: Group 7
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 600 sf
Exterior Wall Area: 880 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 3 @ 25 hp Floor Area: 600 sf
Other Internal Loads: Lights & Controllers & Transformers
19 mbh
Unknown
Same as Designed
Total Cooling = 6.1 Tons @ 75F db/50% rh entering air
Sensible Cooling = 5.9 tons @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
EMR No.: Group 8
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 1000 sf
Exterior Wall Area: 600 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 25 hp Floor Area: 1000 sf
Other Internal Loads: Lights & Controllers & Transformers
17.5 mbh
Unknown
Same as Designed
Total Cooling = 4.5 Tons @ 75F db/50% rh entering air
Sensible Cooling = 4.2 tons @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
EMR No.: Group 9
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 748 sf
Exterior Wall Area: 896 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 25 hp Floor Area: 748 sf
Other Internal Loads: Lights & Controllers & Transformers
19.9 mbh
Unknown
Same as Designed
Total Cooling = 4.7 Tons @ 75F db/50% rh entering air
Sensible Cooling = 4.5 tons @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
EMR No.: Group 10
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
Roof Area: 800 sf
Exterior Wall Area: 760 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self=contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 25 hp Floor Area: 800 sf
Other Internal Loads: Lights & Controllers & Transformers
16.8 mbh
Unknown
Same as Designed
Total Cooling = 4.4 Tons @ 75F db/50% rh entering air
Sensible Cooling = 4.1 tons @ same entering air condition
Unknown
Same as Designed
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Local thermostst control
Visual
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
EMR No.: Freight Elevator - Typical of 4.
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
13.1 mbh
Unknown
Same as Designed
Total Cooling = 2.3 Tons @ 75F db/50% rh entering air
Sensible Cooling = 2.1 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
Roof Area: 500 sf
Exterior Wall Area: 720 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Thru-the - Wall Package Terminal A/C (PTAC)
Installed in 1980's - poor condition
Elevator MHP 1 @ 25 hp Floor Area: 500 sf
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The
PTAC IS not on standby power . Thus the system does not comply
N/A
N/A
N/A
Local unit control
EMR No.: Private Elevators
1. Description
2. Condition of Equipment
1. Required
2. Designed
3. Actual
1. Required
2. Designed
3. Actual
17.5 mbh
Unknown
Same as Designed
Total Cooling = 3 Tons @ 75F db/50% rh entering air
Sensible Cooling = 2.7 tons @ same entering air condition
Unknown
Same as Designed
Cooling Capacity
Roof Area: 900 sf
Exterior Wall Area: 720 sf
Elevator Machinery Room (EMR) Mechanical Field Investigation Report
HVAC System
Heating Capacity
Self-contained A/C unit cooled by a central ethylene glycol system wth heat rejection at dry coolers
Installed in 1980's - poor condition
Elevator MHP 2 @ 10 hp Floor Area: 900 sf
3. Actual
1. Type
2. Test Description
3. Results of Test
Observed Descrepancies
Not observed
Ventilation Capacity
Temperature Control
The HVAC system is in poor condition and has reached the end of its useful life. The EMR HVAC system is required to comply with the 2015 IBC which requires that the entire system be placed on standby power. The central gylcol system distribition and heat rejection and self contained unit are not on standby power . Thus the system does not comply
N/A
N/A
N/A
Local thermostst control
Electrical Systems Survey
Elevator Group 1
• This group consists of elevators 1-4 and 6, for a total of 5 controllers in this machine room.
• The elevator equipment is on emergency power.
• The power panels and HVAC are not currently on emergency power.
• The panels appear to be in good condition, but are reaching their life expectancy.
• Lighting in the EMR appeared to be adequate but could be updated to the more efficient LED fixtures.
• Currently, the cooling for the EMR is accomplished with a package terminal air conditioner that is cut through the wall and wood framed with a 208-volt receptacle and a factory GFCI cord cap.
• The original HVAC is non-functioning and the electrical is disconnected and removed.
• Electrical receptacles are not GFCI.
• The lighting in the pit appears to be adequate but could be updated to the more efficient LED fixtures.
Elevator Group 2
• This group consists of elevators 37, 38, and elevator 39, for a total of 3 controllers in this machine room.
• The elevator equipment is on emergency power.
• The power panels and HVAC are not currently on emergency power.
• The panels appear to be in good condition but are reaching their life expectancy.
• Lighting in the EMR appeared to be adequate but could be updated to the more efficient LED fixtures.
• Currently, the cooling for the EMR is accomplished with a package terminal air conditioner that is cut through the wall and wood framed with a 208-volt receptacle and a factory GFCI cord cap.
• The original HVAC is non-functioning, the electrical disconnect is off, and the unit is open with numerous panels open.
• Electrical receptacles are not GFCI.
• The pit lighting appears to be adequate but could be updated to the more efficient LED fixtures.
Elevator Group 3
• This group consists of elevators 32, 33, 34, and elevator 35 for a total of 4 controllers in this machine room. Elevator 32 is locked and tagged off.
• The elevator equipment is on emergency power.
• The power panels and HVAC currently are not on emergency power.
• The panels appear to be in good condition but are reaching their life expectancy.
• Lighting in the EMR appeared to be adequate but could be updated to the more efficient LED fixtures.
• Currently, the cooling for the EMR is accomplished with a package terminal air conditioner that is cut through the wall and wood framed with a 208-volt receptacle and a factory GFCI cord cap.
• The original HVAC is non-functioning and the electrical disconnect is off.
Elevator Group 4
• This group consists of elevators 28 and 30 for a total of 2 controllers in this machine room.
• The elevator equipment is on emergency power.
• The power panels and…