A0003 Solicitation 47PM0123R0022 Bid Sheet.xlsx
XLSX spreadsheet 103 KB Posted
- Solicitation number
- 47PM0123R0022
About this file
This solicitation package requests proposals for an elevator modernization project at the Robert F. Kennedy Federal Building in Washington, DC. The General Services Administration seeks a firm-fixed-price design-build contract to design and construct thirty public elevators, two private elevators, and associated work. Required services include professional engineering, construction management, inspection, testing, and commissioning. The site visit date is to be determined. Proposals are due by July 17, 2023. The selected contractor will modernize elevators serving eight to nine levels of the 1.257 million square foot building, which is occupied by the Department of Justice. The North American Industry Classification System codes for this work are 236220, with a small business size standard of $45 million in average annual receipts.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Page
| ENTER COMPANY NAME HERE | ||
| PREPARED BY: | DATE: | |
| PROPOSAL SUMMARY |
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
DIVISION DESCRIPTION MATERIAL LABOR EQUIPMENT TOTAL
| Division 02 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 | Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 04 | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 | Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06 | Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08 | Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09 | Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10 | Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 14 | Conveying Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21 | Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22 | Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23 | Heating, Ventilation and Air Conditioning | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 25 | Integrated Automation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27 | Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 28 | Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 31 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 32 | Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 1 | General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| Subtotal | $ - 0 | ||
| Overhead | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Profit | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Bonds | 0.00% | $ - 0 | |
| Subtotal | $ - 0 | ||
| Gross Receipts Tax | 0.0000% | $ - 0 |
TOTAL $ - 0
CSI Division (base contract)
ENTER COMPANY NAME HERE
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| DESIGN | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Design for thirty (30) Elevators | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Group 1 (Elevs # 1-4, 6) | 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 2 (Elevs # 37-39) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 3 (Elevs # 32-35) | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 4 (Elevs # 28, 30) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 5 (Elevs # 25, 27) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 6 (Elevs # 19 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 7 (Elevs # 7-9) | 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 8 (Elevs # 12,14) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 9 (Elevs # 15,17) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Group 10 (Elevs # 20,22) | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Freight Elevs #10,24,31,40 | 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0 $ - 0
CSI Division (Option 1)
ENTER COMPANY NAME HERE
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| BASE BID PHASE 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Group 1 Elevators 1 - 4 Replace | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Passengert Elevator 6 Replace | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Group 2 Elevators 37- 39 Replace | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Demolition/ Equipment Removal | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Temporary Hoistway Safety Partitions, Install/Demo | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Rail Brackets & Machine Beams, adustments | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Guide Rails, Clean & Adjust | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Car Slings & platform, refurbish | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Car Safety Devices, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Door Operator & Hrdwe., new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hoistway Equipment, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Signal fixtures, indicators, COP, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator controller with wiring harness, cabling | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Hoist Motor-refurbish, new hoist ropes | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevtor Cab, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Control Wiring - TOC-Panel | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Adjust and Balance, Counterweighs, Floor Levelers | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Door Thresholds, entrance plates-retain & refurnbish | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hall call stations, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hall laterns, TOC fixtures, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Spring buffers, new | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Braille plates | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead Deflector Sheaves | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| EMR Security locks + alarm monitoring box | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Wall patching, painting, firesafing | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| EMR HVAC Equipment, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sump pump and drain in Elevator Pit | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sump pump elect. emerg. power connection | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Emerg, Gen Power, ATS/ Selector Switch | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Main Elevator Shunt-Trip Circuit Bkr @ Elev Swbd | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Hoistway electrical power & lighting | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator MCB Panel, 100-A. 2P 3W. 120/240V.36-ckt | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire Alarm Devices, EMR+Hoistway | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sprinkler Syustem Heads + Piping, EMR+Hoistway | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Recall System, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire & Life Safety Device Integration, Testing | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Inspection, Testing, & Acceptance | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Monitoring System w/ BMS Integration | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Final Demonstration & Training on New Equipment | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Elevator Phasing Premium - Added Storage Fees | 8 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| As-Built Drawings | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CSI Division (Option 2)
ENTER COMPANY NAME HERE
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| BASE BID PHASE 1 - Base Award Complete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Passenger Elevators 1 - 4 (N/A) | 0 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passengert Elevator 6 (N/A) | 0 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevators 37- 39 (N/A) | 0 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Design Fee for all elevators (N/A) | 0 | Allowance | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| OPTION PHASE 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Hydraulic elevator 19 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 25 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 27 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 28 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 30 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 32 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger Elevator 33 - 35 | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Freight elevator 31 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Elevator Demolition/ Equipment Removal | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Temporary Hoistway Safety Partitions, Install/Demo | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Rail Brackets & Machine Beams, adustments | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Guide Rails, Clean & Adjust | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Slings & platform, refurbish | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Safety Devices, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Operator & Hrdwe., new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hoistway Equipment, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Signal fixtures, indicators, COP, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator controller with wiring harness, cabling | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Hoist Motor-refurbish, new hoist ropes | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevtor Cab, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Control Wiring - TOC-Panel | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Adjust and Balance, Counterweighs, Floor Levelers | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Thresholds, entrance plates-retain & refurnbish | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall call stations, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall laterns, TOC fixtures, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Spring buffers, new | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Braille plates | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Overhead Deflector Sheaves | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR Security locks + alarm monitoring box | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Wall patching, painting, firesafing | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR HVAC Equipment, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sump pump and drain in Elevator Pit | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sump pump elect. emerg. power connection | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Emerg, Gen Power, ATS/ Selector Switch | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Main Elevator Shunt-Trip Circuit Bkr @ Elev Swbd | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hoistway electrical power & lighting | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator MCB Panel, 100-A. 2P 3W. 120/240V.36-ckt | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fire Alarm Devices, EMR+Hoistway | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sprinkler Syustem Heads + Piping, EMR+Hoistway | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Recall System, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fire & Life Safety Device Integration, Testing | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Inspection, Testing, & Acceptance | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Monitoring System w/ BMS Integration | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Final Demonstration & Training on New Equipment | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Phasing Premium - Added Storage Fees | 10 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| As-Built Drawings | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CSI Division (Option 3)
ENTER COMPANY NAME HERE
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| BASE BID PHASE 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Passenger elevators 7 - 9 | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 12 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 14 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 15 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 17 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 20 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Passenger elevator 22 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Freight elevator 10 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Freight elevator 24 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Freight elevator 40 | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Elevator Demolition/ Equipment Removal | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Temporary Hoistway Safety Partitions, Install/Demo | 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Rail Brackets & Machine Beams, adustments | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Guide Rails, Clean & Adjust | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Slings & platform, refurbish | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Safety Devices, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Operator & Hrdwe., new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hoistway Equipment, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Signal fixtures, indicators, COP, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator controller with wiring harness, cabling | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Hoist Motor-refurbish, new hoist ropes | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevtor Cab, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Control Wiring - TOC-Panel | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Adjust and Balance, Counterweighs, Floor Levelers | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Thresholds, entrance plates-retain & refurnbish | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall call stations, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall laterns, TOC fixtures, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Spring buffers, new | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Braille plates | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Overhead Deflector Sheaves | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR Security locks + alarm monitoring box | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Wall patching, painting, firesafing | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR HVAC Equipment, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sump pump and drain in Elevator Pit | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sump pump elect. emerg. power connection | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Emerg, Gen Power, ATS/ Selector Switch | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Main Elevator Shunt-Trip Circuit Bkr @ Elev Swbd | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hoistway electrical power & lighting | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator MCB Panel, 100-A. 2P 3W. 120/240V.36-ckt | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fire Alarm Devices, EMR+Hoistway | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sprinkler Syustem Heads + Piping, EMR+Hoistway | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Recall System, new | 3 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Fire & Life Safety Device Integration, Testing | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Inspection, Testing, & Acceptance | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Monitoring System w/ BMS Integration | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Final Demonstration & Training on New Equipment | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Phasing Premium - Added Storage Fees | 12 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| As-Built Drawings | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CSI Division (Option 4)
ENTER COMPANY NAME HERE
| Project Number and Name: | DOJ RFK Elevators |
| Building Number and Name: | DC0023ZZ DOJ RFK Federal Building |
| RFP Number: |
| QTY | UNIT | LABOR | MATERIAL | EQUIPMENT | TOTAL | |||||
| WORK ITEM DESCRIPTION | MANHOURS | RATE | TOTAL | UNIT PRICE | TOTAL | UNIT PRICE | TOTAL | |||
| Enter Relevant Tasks Below | ||||||||||
| BASE BID PHASE 1A OPTION 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Private passenger elevator 11 - Replace | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Private passenger elevator 23 - Replace | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Elevator Demolition/ Equipment Removal | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Rail Brackets & Machine Beams, adustments | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Guide Rails, Clean & Adjust | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Slings & platform, refurbish | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Car Safety Devices, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Operator & Hrdwe., new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hoistway Equipment, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Signal fixtures, indicators, COP, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator controller with wiring harness, cabling | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevator Hoist Motor-refurbish, new hoist ropes | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Elevtor Cab, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Security Access Control Panel - Cardkey | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Adjust and Balance, Counterweighs, Floor Levelers | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Door Thresholds, entrance plates-retain & refurnbish | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall call stations, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Hall laterns, TOC fixtures, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Spring buffers, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Braille plates | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Overhead Deflector Sheaves | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR Security locks + alarm monitoring box | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Wall patching | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| EMR HVAC Equipment, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Sump pump and drain in Elevator Pit | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Sump pump elect. emerg. power connection | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator Emerg, Gen Power, ATS/ Selector Switch | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Main Elevator Shunt-Trip Circuit Breaker @ Elev Swbd | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Hoistway electrical power & lighting | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator MCB Panel, 100-A. 2P 3W. 120/240V.36-ckt | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Fire Alarm Devices, EMR+Hoistway | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Sprinkler Syustem Heads + Piping, EMR+Hoistway | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator Recall System, new | 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Fire & Life Safety Device Integration, Testing | 2 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator Inspection, Testing, & Acceptance | 2 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator Monitoring System w/ BMS Integration | 2 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Final Demonstration & Training on New Equipment | 2 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Elevator Phasing Premium - Added Storage Fees | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| As-Built Drawings | 1 | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
$ - 0 $ - 0 $ - 0