RFI Response B62528 CO Signed.pdf

PDF 195 KB Posted

Attached to
TINKER AFB MAC BOA WWYK250031 - Repair B62528 (Round 2)
Solicitation number
FA813726R0001
Issued by

About this file

This document is a Pre-Bid Request for Information (RFI) log for project WWYK250031-Repair B62528, dated 5/1/2025. The RFI addresses multiple technical clarifications for a facility repair project, including questions about overhead door operation, steel structure corrosion repair, utility line relocation, tank removal, chemical feed line protection, piping replacement, and control system integration. Key government responses include: confirming the overhead door will be manually operated, estimating 5,000 SF of steel members requiring corrosion repair, noting electrical overhead lines will be completed in Mid-Nov 2025, acknowledging building demolition may be needed to remove a 4,000-gallon tank, specifying freeze protection requirements for exterior lines only, and clarifying that direct digital controls will include gas monitoring system and exhaust fan integration. The RFI provides detailed technical guidance to potential bidders to ensure precise understanding of project specifications.

View the file

Other files

File Type Posted
Solicitation - FA813726R0001.pdf PDF
Repair B62528 round 2 RFI CO Signed Nov 2025.pdf PDF
Site Visit Sign in Oct 21.jpeg JPEG file
Solicitation FA813726R0001.pdf PDF
090204G-01.pdf PDF
0311M-03.pdf PDF
0311M-04.pdf PDF
62528.pdf PDF
090204C-01.pdf PDF
62528A-FP01-Model.pdf PDF
090204E-04.pdf PDF
090204C-03.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
Att13_250031- drawings - 25MAR2025.pdf PDF
Att10_250031 - SOW MACB DB.pdf PDF
Att12_250031 - Submittal Register_v4.xlsx XLSX spreadsheet
090204M-03 (002).jpg JPG image
090204E-01.pdf PDF
090204M-02.pdf PDF
090204E-02.pdf PDF
Att11_250031 - Design Narrative.pdf PDF
911035W.pdf PDF
090204E-03.pdf PDF
0311G-01.pdf PDF
860261.pdf PDF
0311M-02.pdf PDF
0311E-01.pdf PDF
090204M-01.pdf PDF
0311M-05.pdf PDF
090204C-02.pdf PDF
0311M-01.pdf PDF
090204M-03.pdf PDF
250031 Drawing.jpg JPG image
2020 TAFB Mechanical Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
Wage Determination OK20250049.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: RFI No. QUESTION GOVERNMENT RESPONSE

5/1/2025

SOW Para. 4.2.5 states to install a manually operated insulated coiling overhead door. Para. 4.10.4 states to provide power to the new overhead door. Is the overhead door supposed to be a manual door or motor operated?

The Over head door shall be manually operated: Para 4.10.4 shall be deleted from SOW.

5/1/2025

SOW Para. 4.4.1 states to repair all significant rust or corrosion on the steel structure including main frame members, columns, beams, purlins, girts, metal panels, fasteners, or miscellaneous steel items. With this being a competitively bid process there is no way to quantify the corrosion repair prior to award. Can approximate quantities be provided in order for an adequate review of proposals? Will any additional corrosion repair be treated as an Unforeseen Site Condition?

Rough estimate is 5,000 SF of steel members. The DOR will determine the exact quantity. Suggest providing a unit price for this item. Anything beyond this would be unforseen.

5/1/2025

SOW Para. 4.9.3 refers to OG&E relocating overhead distribution lines to underground and removing two (2) utility poles. This will affect the schedule and work related to the structural repairs in SOW Para. 4.4.3 and 4.4.4. Will this be completed prior to award?

Pending no unforseen site conditions: Electrical overhead electrical lines is scheduled to be completed in Mid-Nov 2025.

5/1/2025

How does the government intend the existing 4,000 gallon tank to be physically removed from the building and the new tank brought into the building, considering space limitations (concrete containment walls/overhead door dimensions)?

The government understands that some amount of building demolition will be required to remove the tank

5/1/2025

The design narrative calls for providing freeze protection to chemical feed lines. Please confirm this includes all chemical feed piping within the building and advise the required pipe insulation material type and thickness?

The interior of the building is going to be conditioned, so only the exterior lines require freeze protection.

5/1/2025

Are the 3/4" pvc lines that are labeled GL826 & NAOH that exit the NW corner of the building to underground to be replaced? If so, to what point are they to be replaced?

This piping is existing to remain. Only the fill and containment piping piping are to be replaced.

5/1/2025

Are the 3/4" pvc lines that are labeled GL826 & NAOH that exit the NW corner of the building to receive freeze protection?

Are they to receive freeze protection within the building only, or is the underground portion of this piping to also receive freeze protection?

This piping is outside the scope of this project and does not require freeze protection.

5/1/2025

The design narrative states that the direct digital controls will be tied into the base wide Honeywell DDC system. Please confirm this is referring to the gas monitoring system only.

The direct digital controls shall include the gas monitoring system and the associated exhaust fan with start/stop & status.

5/1/2025

Does heat trace or any other electrical components installed within the building need to be explosion proof? If so, to what classification?

The environment is not explosive; no hazardous classfication(s), necessary.