This mechanical construction drawing (Sheet M03) details repair and upgrade work for a Heavy Metal Basin Facility (Facility B62528) at Tinker Air Force Base, Oklahoma. The technical specifications include six key installation requirements: (1) new sodium hydroxide (NaOH) tanks matching existing type and size, (2) new Schedule 80 CPVC chemical piping, (3) reinstallation of pumps, valves, and controls on a new support stand, (4) reinstallation of an air compressor on a new support stand, (5) installation of a new 50-gallon, 480-volt three-phase electric water heater, and (6) new CPVC Schedule 80 bulk tank fill lines with stainless steel exterior wall piping. The project was designed by the 72 ABW Civil Engineer Directorate and issued on 21 December 2009, with specific attention to piping support, connectivity, and installation details.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I R
F
O R
C E
B
A S
E
O
K L
A H
O M
A
P R
O J E
T
N
F O
R M
A T
I O
N
Q P r o j e c t D
E S
I G
N s
S u p p o r t
D r a w i n g s
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
R E
V I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D M
A G
D
C
R U
Z
M
A
L E
Z
H
E N
S O
N
D
W W
Y K
A
R E
P A
R
H
A
V Y
M
T
A L
B
A S
I N
F A
C I L I T
Y
I W
P
B
M03
M E
C H
A N
I C
A L
C O
N S
T R
U C
T I O
N
N
KEYED NOTES
A PROVIDE AND INSTALL NEW NAOH TANKS.
MATCH EXISTING TANKS FOR TYPE AND
SIZE
B INSTALL NEW CHEMICAL PIPING AS SHOWN.
ALL PIPING SHALL BE SCHEDULE 80 CPVC.
C REINSTALL PUMPS, VALVES, AND
CONTROLS AT NEW SUPPORT STAND TO
MATCH EXISTING CONNECTIVITY.
D REINSTALL AIR COMPRESSOR AT NEW
SUPPORT STAND TO MATCH EXISTING
CONNECTIVITY
E INSTALL NEW 50 GALLON LOW BOY
ELECTRIC WATER HEATER. WATER
HEATER SHALL BE 480 VOLT THREE PHASE
DUAL ELEMENT.
F INSTALL COLD WATER PIPING TO WATER
HEATER AS SHOWN. INSTALL HOT WATER
PIPING FROM WATER HEATER DISCHARGE
DOWN TO 18" A.F.F. WHERE IT SHALL
TERMINATE WITH A VACUUM BREAKER
PROTECTED HOSE BIB. INSTALL ISOLATION
VALVE NEAR HOT WATER DISCHARGE. USE
SCHEDULE 80 CPVC PIPING. SECURE PIPING
WITH EXTRA SUPPORTS TO ENSURE PIPE
STABILITY AND PREVENT GARDEN
HOSE FROM DAMAGING PIPE.
G INSTALL NEW CPVC SCHEDULE 80 BULK
TANK FILL LINES WITH EXTRA SUPPORTS.
USE STAINLESS STEEL PIPING AT EXTERIOR
WALL AND SUPPORT PIPE TO BUILDING
STRUCTURE.
AS-BUILTS
HW
E
A A
B C
B
D
B
B
B
B
F
G
G
G
G
NEW PUMP STAND
COMPRESSOR
STAND