090204M-03.pdf

PDF 26 KB Posted

Attached to
TINKER AFB MAC BOA WWYK250031 - Repair B62528 (Round 2)
Solicitation number
FA813726R0001
Issued by

About this file

This mechanical construction drawing (Sheet M03) details repair and upgrade work for a Heavy Metal Basin Facility (Facility B62528) at Tinker Air Force Base, Oklahoma. The technical specifications include six key installation requirements: (1) new sodium hydroxide (NaOH) tanks matching existing type and size, (2) new Schedule 80 CPVC chemical piping, (3) reinstallation of pumps, valves, and controls on a new support stand, (4) reinstallation of an air compressor on a new support stand, (5) installation of a new 50-gallon, 480-volt three-phase electric water heater, and (6) new CPVC Schedule 80 bulk tank fill lines with stainless steel exterior wall piping. The project was designed by the 72 ABW Civil Engineer Directorate and issued on 21 December 2009, with specific attention to piping support, connectivity, and installation details.

View the file

Other files

File Type Posted
Solicitation - FA813726R0001.pdf PDF
Repair B62528 round 2 RFI CO Signed Nov 2025.pdf PDF
Site Visit Sign in Oct 21.jpeg JPEG file
Solicitation FA813726R0001.pdf PDF
090204M-03 (002).jpg JPG image
090204E-01.pdf PDF
090204M-02.pdf PDF
090204E-02.pdf PDF
Att11_250031 - Design Narrative.pdf PDF
911035W.pdf PDF
090204E-03.pdf PDF
0311G-01.pdf PDF
860261.pdf PDF
0311M-02.pdf PDF
0311E-01.pdf PDF
090204M-01.pdf PDF
0311M-05.pdf PDF
090204C-02.pdf PDF
0311M-01.pdf PDF
250031 Drawing.jpg JPG image
2020 TAFB Mechanical Standard.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
Wage Determination OK20250049.pdf PDF
RFI Response B62528 CO Signed.pdf PDF
090204G-01.pdf PDF
0311M-03.pdf PDF
0311M-04.pdf PDF
62528.pdf PDF
090204C-01.pdf PDF
62528A-FP01-Model.pdf PDF
090204E-04.pdf PDF
090204C-03.pdf PDF
2020 TAFB Facility Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
Att13_250031- drawings - 25MAR2025.pdf PDF
Att10_250031 - SOW MACB DB.pdf PDF
Att12_250031 - Submittal Register_v4.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

T I N

K E

R

A

I R

F

O R

C E

B

A S

E

O

K L

A H

O M

A

P R

O J E

T

N

F O

R M

A T

I O

N

Q P r o j e c t D

E S

I G

N s

S u p p o r t

D r a w i n g s

D E

S I G

N

F

I L

E

L

O C

A T

I O

N

R E

V I S

I O

N S

M A

R K

D E

S I G

N

G

R O

U P

D R

A W

N

B

Y

C H

E C

K E

D

B

Y

D E

S I G

N E

D

B

Y

D A

T E

D E

S C

R I P

T I O

N

2 3 4

E

D

C

B

A

M A

N A

G E

M E

F O

R M

A T

I O

N

1 2

E

D

C

B

A

I S

S U

E

D

A T

E

SHEET

SHEET NUMBER

S H

E E

T

T

I T

L E

D M

A G

D

C

R U

Z

M

A

L E

Z

H

E N

S O

N

D

W W

Y K

A

R E

P A

R

H

A

V Y

M

T

A L

B

A S

I N

F A

C I L I T

Y

I W

P

B

M03

M E

C H

A N

I C

A L

C O

N S

T R

U C

T I O

N

N

KEYED NOTES

A PROVIDE AND INSTALL NEW NAOH TANKS.

MATCH EXISTING TANKS FOR TYPE AND

SIZE

B INSTALL NEW CHEMICAL PIPING AS SHOWN.

ALL PIPING SHALL BE SCHEDULE 80 CPVC.

C REINSTALL PUMPS, VALVES, AND

CONTROLS AT NEW SUPPORT STAND TO

MATCH EXISTING CONNECTIVITY.

D REINSTALL AIR COMPRESSOR AT NEW

SUPPORT STAND TO MATCH EXISTING

CONNECTIVITY

E INSTALL NEW 50 GALLON LOW BOY

ELECTRIC WATER HEATER. WATER

HEATER SHALL BE 480 VOLT THREE PHASE

DUAL ELEMENT.

F INSTALL COLD WATER PIPING TO WATER

HEATER AS SHOWN. INSTALL HOT WATER

PIPING FROM WATER HEATER DISCHARGE

DOWN TO 18" A.F.F. WHERE IT SHALL

TERMINATE WITH A VACUUM BREAKER

PROTECTED HOSE BIB. INSTALL ISOLATION

VALVE NEAR HOT WATER DISCHARGE. USE

SCHEDULE 80 CPVC PIPING. SECURE PIPING

WITH EXTRA SUPPORTS TO ENSURE PIPE

STABILITY AND PREVENT GARDEN

HOSE FROM DAMAGING PIPE.

G INSTALL NEW CPVC SCHEDULE 80 BULK

TANK FILL LINES WITH EXTRA SUPPORTS.

USE STAINLESS STEEL PIPING AT EXTERIOR

WALL AND SUPPORT PIPE TO BUILDING

STRUCTURE.

AS-BUILTS

HW

E

A A

B C

B

D

B

B

B

B

F

G

G

G

G

NEW PUMP STAND

COMPRESSOR

STAND

File details come from the government source that posted it. Updated .